1 High Rep Rate Guns: FZD Superconducting RF Photogun J. Teichert, A. Arnold, H. Büttig, D. Janssen, M. Justus, U. Lehnert, P. Michel, K. Moeller, P. Murcek, Ch. Schneider, R. Schurig, G. Staats, F. Staufenbiel, H. Tietze, R. Xiang, P. Kneisel, B. v. d. Horst, A. Matheisen, J. Stephan T. Kamps, J. Rudolph, M. Schenk, G. Klemz, I. Will, V. Volkov FLS 2010 Workshop, SLAC, March, 1-5, 2010

2 INTRODUCTION HISTORY OF SRF GUN R&D proposal & first experiment A. Michalke, PhD Thesis, WUB-DIS 92-5 Univ. Wuppertal, first beam from a SCRF FZD D. Janssen et al., NIM-A, Vol. 507(2003) since 2004: Development of the 3½-Cell SRF Photoinjector for ELBE A. Arnold et al., NIM-A, Vol. 577(2006)440

3 COMMISSIONING FIRST COOL-DOWN first cool-down 1 2 August ,3005G 1,3000G frequency [Hz] 1,2995G f=2.02mhz 1,2990G 1,2985G 1,2980G temperature [K]

4 COMMISSIONING - FIRST ELECTRON BEAM first beam of the 3½ cell SRF gun on November 12 th, 2007 RF: E acc = 5 MV/m f = MHz, 150 Hz bandwidth P diss = 6 W Laser: 263 nm, 100 khz reprate 0.4 W power (4 µj) Cu cathode Cathode: Cu, Q.E Electron beam: 2.0 MV energy 50 na average current,0.5 pc bunch charge

5 INTRODUCTION ELBE Superconducting RF Photoinjector New Injector for the ELBE SC Linac Test Bench for SRF Gun R&D Mode ELBE High Charge final electron energy RF frequency operation mode 9.5 MeV 1.3 GHz CW bunch charge 77 pc 1 nc repetition rate 13 MHz 500 khz laser pulse (FWHM) 4 ps 15 ps transverse rms emittance 1 mm mrad 2.5 mm mrad average current 1 ma 0.5 ma

6 Design for the ELBE CW + high rep rate khz, 13 MHz and higher medium average current 1 2 ma (< 10 ma) high energy (stand alone) - 3½ cells low - high bunch charge 80pC 1 nc low transverse emittance 1 3 mm mrad normal-conducting, lqn 2 -cooled, exchangeable, semi-conductor photo cathode highly compatible with ELBE cryomodule (1.3 GHz cavity, 10 kw coupler, He & N2 support, etc.) ELBE high peak-current operation for FELs with (13 MHz, 80 pc) high current (1 low rep rate (<1 MHz) -> high charge pulsed secondary particle beams: neutrons, positrons with ToF measurements low medium charge (100 pc) for short pulses THz-radiation x-rays by inverse Compton backscattering

7 MAIN COMPONENTS helium port cavity tuners Liquid He Vessel SRF Gun Cryomodule photo cathode alignment LASER e - cathode cooling (77 K) & support system rf power coupler SC Nb 3½ -cell cavity NC Cs 2 Te photo cathode

8 MEASUREMENT & OPERATION PARAMETERS SRF Gun Parameter parameter present cavity new high gradient cavity measured 08 ELBE high charge ELBE high charge final electron energy 2.1 MeV 3 MeV 9.5 MeV peak field 13.5 MV/m 18 MV/m 50 MV/m laser rep. rate khz 13 MHz khz 13 MHz 500 khz laser pulse length (FWHM) 15 ps 4 ps 15 ps 4 ps 15 ps laser spot size 2.7 mm 5.2 mm 5.2 mm 2 mm 5 mm bunch charge 200 pc 77 pc 400 pc 77 pc 1 nc max. aver. Current 1 µa 1 ma 100 µa 1 ma 0.5 ma peak current 13 A 20 A 26 A 20 A 67 A transverse. norm. emittance (rms) 3 1 mm 80 pc 2 mm mrad 7.5 mm mrad 1 mm mrad 2.5 mm mrad

9 3½ CELL CAVITY Treatment and test of the cavity 1E10 achieved peak axis fields of all 4 vertical test benches Tests in the vertical cryostat (1.8 K) at DESY in 2007 Q 0 1E9 all 4 tests limited by field emission V-Test 1 V-Test 2 V-Test 3 V-Test M 20.0M 30.0M 40.0M 50.0M E peak in V/m HPR cleaning very difficult, surface damaged after 4 vertical test at DESY improvement not expected cavity used as it was, assembly continued

10 3½ CELL CAVITY Cavity performance in the gun Helium consumption measurement E E peak acc = 2.7 maximum achievable field only 1/3 of the designed value of E peak =50 MV/m, measured Q 0 is 10 times lower than in all vertical tests, gradient is limited by field emission no Q degradation found since the 1 st measurement in 2007, Improvement by (9th test) high power processing (HPP) results 3 MeV operation After warming-up or cathode exchange the HPP must be repeated

11 3½ CELL CAVITY Energy and energy 5 pc (w/o space charge)

12 3½ CELL CAVITY He pressure effect on cavity frequency 31,5 SRF Gun: ~ 230 Hz / 1mbar ELBE Linac: ~ 35Hz / 1mbar 31,2 RF MEASUREMENTS pressure [mbar] f 0 [Hz] 1, G 1, G 1, G Messwerte f 0 vs. P lineare Regression 30,9 1, G 1, G 30,6 1, G 09:36 10:48 12:00 13:12 14:24 15:36 time [hh:mm] f [Hz] =232,61337 Hz/mBar P [mbar] ,6 30,7 30,8 30,9 31,0 31,1 31,2 31,3 SRF-gun ~230 Hz/mbar ELBE module ~35 Hz/mbar Lorentz force detuning SRF-gun K= 0.69 Hz/(MV/m)² ELBE module K = 0.25 Hz/(MV/m)² (with respect to peak fields)

13 3½ CELL CAVITY New High Gradient Cavity old design new design Improvements higher stiffness of the half-cell back wall microphonics, Lorentz force detuning larger opening in choke and partly in half-cell better HPR cleaning new pick-up antenna design, etc. simpler clean-room assembly

14 3½ CELL CAVITY New High Gradient Cavity Fabricated in collaboration with JLab, thanks to P. Kneisel now: warm JLab next: warm rf FZD cleaning & JLab standard RRR 300 Nb cavity Large grain Nb cavity

15 Cs 2 Te PHOTO CATHODES Photo Cathode Transfer System Photo cathode preparation equipment at FZD bayonet fixing pressure spring cone for positioning & thermal contact Ø10 mm Cs 2 Te

16 Cs 2 Te PHOTO CATHODES Photo Cathode Transfer System Lock Places for 6 cathodes Transport chamber Transfer chamber Cool PC exchange works Change of PC needs ~30 min Docking of transport chamber needs 1 maintenance shift + 1 week backing (during ELBE operation) Cathode transfer rod linear & rotation Use of semiconductor photo cathodes like Cs 2 Te requires a UHV exchange system with <10 9 mbar

17 UV LASER SYSTEM UV CW Laser system delivered by MBI Laser upgrade 2010 ( nm) Two oscillators 13 MHz: Nd:glass oscillator (26 mhz) 3 ps FWHM Gaussian 500, 250, 125 khz: Nd:YLF oscillator (26 mhz) 14 ps FWHM Gaussian one amplifier Nd:YLF multipass amplifier W existing 250 khz laser with Nd:YLF regenerative amplifier two UV converters two-stage frequency converters (LBO, BBO)

18 UV LASER SYSTEM Upgrade of the laser beam line & virtual cathode remote-controlled laser spot size setting (telescope & aperture) Measurement of laser profile, position, and power on the virtual cathode screen

19 BEAM PARAMETER MEASUREMENT - DIAGNOSTICS BEAMLINE diagnostics beamline designed and built by HZB (BESSY) Berlin - Laser input port, Solenoid - Current & Charge (Faraday-cup & ICTs) - Transverse Emittance (slit mask, solenoid scan) - Energy and E (C-bent) - Bunch length (Cherenkov radiator with optical beamline and streak camera, electro-optical sampling

20 ELBE INJECTION Installation of electron beamline to ELBE was finished in winter shutdown 2009/10 First accelerated SRF gun beam at ELBE on Febr. 5, 2010

21 ELBE INJECTION 5 MeV energy increase Compared to thermionic injector 3 MeV from SRF gun, 2 MeV from on-crest injection

22 SUMMARY In 2009 Upgrade of the cathode transfer system: sufficient vacuum, backing during ELBE operation Installation of the beam line to ELBE Commissioning of the Cherenkov station for bunch length measurements Spectrometer for slice emittance measurements delivered Design upgrade and fabrication of two new high gradient cavities Outstanding and planned for 2010 Demonstration of ELBE injection Preparation and Test of the new cavities at JLab Demonstration of high-current operation with 13 MHz laser & PC >1% QE Systematic experimental studies of HOM excitation in the gun Measurements & Optimization to find the bunch charge limit at 3 MeV First ELBE user beam with SRF gun

23 THANK YOU FOR YOUR ATTENTION Thanks to the ELBE crew, the technical staff of BESSY, DESY and MBI, to RI, JLab, and all the others supported and encouraged this project Acknowledgement We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 programme (CARE, contract number RII3-CT ) and the FP7 programme since 2009 (EuCARD, contract number ) as well as the support of the German Federal Ministry of Education and Research grant 05 ES4BR1/8.

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

PHIN. Report on the Development of a Radio-Frequency Photo Electron Source with Superconducting Niobium Cavity (SRF Gun Realization)

PHIN. Report on the Development of a Radio-Frequency Photo Electron Source with Superconducting Niobium Cavity (SRF Gun Realization) PHIN Report on the Development of a Radio-Frequency Photo Electron Source with Superconducting Niobium Cavity (SRF Gun Realization) J. Teichert, A. Arnold, H. Buettig, R. Hempel, D. Janssen, U. Lehnert,

More information

Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work

Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work Technology Challenges for SRF Guns as ERL Sources in View of Rossendorf work, Hartmut Buettig, Pavel Evtushenko, Ulf Lehnert, Peter Michel, Karsten Moeller, Petr Murcek, Christof Schneider, Rico Schurig,

More information

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION J. Teichert #, A. Arnold, P. Murcek, G. Staats, R. Xiang, HZDR, Dresden, Germany P. Lu, H. Vennekate, HZDR & Technische Universität,

More information

STATUS OF THE SUPERCONDUCTING RF PHOTO-INJECTOR DEVELOPMENT*

STATUS OF THE SUPERCONDUCTING RF PHOTO-INJECTOR DEVELOPMENT* STATUS OF THE SUPERCONDUCTING RF PHOTO-INJECTOR DEVELOPMENT* J. Teichert #, A. Arnold, H. Buettig, D. Janssen, M. Justus, U. Lehnert, P. Michel, K. Moeller, P. Murcek, Ch. Schneider, R. Schurig, F. Staufenbiel,

More information

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada SRF-gun Development Overview J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada Acknowledgment Many thanks to: A. Arnold, J. Hao, E. Kako, T. Konomi, D. Kostin, J. Lorkiewicz, A. Neumann, J. Teichert

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

Photoinjector Laser Operation and Cathode Performance

Photoinjector Laser Operation and Cathode Performance Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and

More information

SRF GUN DEVELOPMENT OVERVIEW

SRF GUN DEVELOPMENT OVERVIEW SRF GUN DEVELOPMENT OVERVIEW J. Sekutowicz, DESY, Hamburg, Germany Abstract The most demanding component of a continuous wave (cw) operating electron injector delivering low emittance electron bunches

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Technology Challenges for SRF Guns as ERL Source in View of BNL Work

Technology Challenges for SRF Guns as ERL Source in View of BNL Work Technology Challenges for SRF Guns as ERL Source in View of BNL Work Work being performed and supported by the Collider Accelerator Division of Brookhaven National Labs as well as the Office of Naval Research

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

Screen investigations for low energetic electron beams at PITZ

Screen investigations for low energetic electron beams at PITZ 1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary

More information

First Results and Future of the Photo Injector Test Facility at DESY Zeuthen PITZ. introduction first measurements future schedule

First Results and Future of the Photo Injector Test Facility at DESY Zeuthen PITZ. introduction first measurements future schedule First Results and Future of the Photo Injector Test Facility at DESY Zeuthen PITZ introduction first measurements future schedule Frank Stephan for the PITZ Collaboration, TTF Meeting Saclay, April 3 rd

More information

Results of recent photocathode studies at FLASH. S. Lederer, S. Schreiber DESY. L. Monaco, D. Sertore, P. Michelato INFN Milano LASA

Results of recent photocathode studies at FLASH. S. Lederer, S. Schreiber DESY. L. Monaco, D. Sertore, P. Michelato INFN Milano LASA Results of recent photocathode studies at FLASH S. Lederer, S. Schreiber DESY L. Monaco, D. Sertore, P. Michelato INFN Milano LASA FLASH seminar October 21 st, 2008 Outlook Cs 2 Te photocathodes cw QE

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Summary of recent photocathode studies

Summary of recent photocathode studies Summary of recent photocathode studies S. Lederer, S. Schreiber DESY L. Monaco, D. Sertore INFN Milano LASA FLASH seminar November 17 th, 2009 Outlook Cs 2 Te photocathodes Pulsed QE measurements laser

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL* STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL* D. Kayran #,1,2, Z. Altinbas 1, D. Beavis 1, S. Belomestnykh 1,2, I. Ben-Zvi 1,2, S. Deonarine 1, D.M. Gassner 1, R. C. Gupta 1, H. Hahn 1,L.R. Hammons

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Report on the LCLS Injector Technical Review

Report on the LCLS Injector Technical Review Report on the LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4, 2003 Committee Members Prof. Patrick G. O Shea, Chair, University of Maryland Dr. Eric Colby, Stanford Linear

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

SRF PHOTOINJECTOR TESTS AT HOBICAT

SRF PHOTOINJECTOR TESTS AT HOBICAT SRF PHOTOINJECTOR TESTS AT HOBICAT Abstract A. Neumann, W. Anders, R. Barday, A. Jankowiak, T. Kamps, J. Knobloch, O. Kugeler, A. Matveenko, T. Quast, J. Rudolph, S. Schubert, J. Voelker Helmholtz-Zentrum-Berlin,

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste Outline Status Klystrons / IOT Modifications of transmitters New LINAC for BESSY II Status BERLinPro HoBiCaT Extension --

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL Nuclear Instruments and Methods in Physics Research A 475 (2001) 549 553 Performance of a DC GaAs photocathode gun for the Jefferson lab FEL T. Siggins a, *, C. Sinclair a, C. Bohn b, D. Bullard a, D.

More information

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project

More information

High QE Photocathodes lifetime and dark current investigation

High QE Photocathodes lifetime and dark current investigation High QE Photocathodes lifetime and dark current investigation Paolo Michelato INFN Milano - LASA Main Topics High QE photocathode lifetime QE vs. time (measurements on several cathodes, FLASH data) QE

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun A. Sakumi, M. Uesaka, Y. Muroya, T. Ueda Nuclear Professional School, University of Tokyo J. Urakawa, KEK, Japan

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Cathode Studies at FLASH: CW and Pulsed QE measurements

Cathode Studies at FLASH: CW and Pulsed QE measurements Cathode Studies at FLASH: CW and Pulsed QE measurements L. Monaco, D. Sertore, P. Michelato S. Lederer, S. Schreiber Work supported by the European Community (contract number RII3-CT-2004-506008) 1/27

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR

STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR STATUS OF THE EUROPEAN XFEL CONSTRUCTING THE 17.5 GEV SUPERCONDUCTING LINEAR ACCELERATOR Winfried Decking, DESY for the European XFEL Accelerator Consortium Up to 17.5 GeV SC Linac, 27000 pulses per second

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Commissioning program of the 704 MHz SRF gun at BNL

Commissioning program of the 704 MHz SRF gun at BNL BROOKHAVEN SCIENCE ASSOCIATES Commissioning program of the 704 MHz SRF gun at BNL Brookhaven National Laboratory ERL workshop June 7-12 2015 1 Outline Brief Introduction of the BNL R&D ERL and SRF gun

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Drive Laser Operations

Drive Laser Operations Drive-Laser Operations Drive Laser Thales laser Transport system Recent Laser Milestones Safety Technical Where do we stand today? Laser Acceptance Status Laser Commissioning UV on cathode Injector Commissioning

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

Photocathodes FLASH: Quantum Efficiency (QE)

Photocathodes FLASH: Quantum Efficiency (QE) Photocathodes Studies @ FLASH: Quantum Efficiency (QE) L. Monaco, D. Sertore, P. Michelato J. H. Han, S. Schreiber Work supported by the European Community (contract number RII3-CT-4-568) /8 Main Topics

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

ERL 2009 WG1 SUMMARY PAPER: DRIVE LASERS AND RF GUN OPERATION AND CHALLENGES*

ERL 2009 WG1 SUMMARY PAPER: DRIVE LASERS AND RF GUN OPERATION AND CHALLENGES* ERL 2009 WG1 SUMMARY PAPER: DRIVE LASERS AND RF GUN OPERATION AND CHALLENGES* J.W. Lewellen 1, H. Bluem 2, A. Burrill 3, T.L. Grimm 4, T. Kamps 5, R. Legg 6, K. Liu 7, T. Rao 3, J. Smedley 3, J. Teichert

More information

Nick Walker DESY MAC

Nick Walker DESY MAC Nick Walker DESY MAC 4.5.2006 XFEL X-Ray Free-Electron Laser DESY ILC Project Group Accelerator Experimentation Behnke, Elsen, Walker (chair) WP 15, 16 WP 4-7 Accelerator Physics and Design WP 6 High Gradient

More information

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC L-Band RF R&D SLAC DOE Review June 15 th, 2005 Chris Adolphsen SLAC International Linear Collider (ILC) RF Unit (TESLA TDR Layout) Gradient = 23.4 MV/m Bunch Spacing = 337 ns Fill Time = 420 µs Train Length

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

The sc cw-linac project TASCA2012, S. Mickat, LINAC

The sc cw-linac project TASCA2012, S. Mickat, LINAC The sc cw-linac project 14.09.2012 TASCA2012, S. Mickat, LINAC What is the status of the cw LINAC? 1. Motivation 2. HLI-Upgrade 3. cw-linac 4. cw-linac-demonstrator 5. Perspective of a cw-linac @GSI 6.

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Production of accelerators and accelerator components in industry

Production of accelerators and accelerator components in industry Production of accelerators and accelerator components in industry Michael Pekeler RI Research Instruments GmbH Friedrich-Ebert-Str. 1 51429 Bergisch Gladbach 28.04.2009 Foundation of RI Research Instruments

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments P. Adderley, M. Baylac, J. Clark, A. Day, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman PESP

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1 and Status of the ThomX LINAC project Operational experience with the SOLEIL

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB*

AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB* FERMILAB-CONF-17-369-AD AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB* R. Thurman-Keup, A. H. Lumpkin, J. Thangaraj, FNAL, Batavia, IL, 60510, USA Abstract FAST is a facility

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.

More information

Design of the linear accelerator for the MYRRHA project

Design of the linear accelerator for the MYRRHA project MYRRHA Multipurpose hybrid Research Reactor for High-tech Applications Design of the linear accelerator for the MYRRHA project Roberto Salemme ADT - Outline What is MYRRHA? MYRRHA accelerator: requirements

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, KVI Groningen 20 Sep 2011 The Key to CLIC Efficiency NC Linac for 1.5 TeV/beam accelerating gradient: 100 MV/m RF frequency:

More information

Summary report on synchronization, diagnostics and instrumentation

Summary report on synchronization, diagnostics and instrumentation Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

SLAC R&D Program for a Polarized RF Gun

SLAC R&D Program for a Polarized RF Gun ILC @ SLAC R&D Program for a Polarized RF Gun SLAC-PUB-11657 January 2006 (A) J. E. CLENDENIN, A. BRACHMANN, D. H. DOWELL, E. L. GARWIN, K. IOAKEIMIDI, R. E. KIRBY, T. MARUYAMA, R. A. MILLER, C. Y. PRESCOTT,

More information

Operation of CEBAF photoguns at average beam current > 1 ma

Operation of CEBAF photoguns at average beam current > 1 ma Operation of CEBAF photoguns at average beam current > 1 ma M. Poelker, J. Grames, P. Adderley, J. Brittian, J. Clark, J. Hansknecht, M. Stutzman Can we improve charge lifetime by merely increasing the

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode