Detailed Design Report

Size: px
Start display at page:

Download "Detailed Design Report"

Transcription

1 Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility

2 CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration RF Units Accelerator Units RF Distribution and Synchronisation Waveguide System Temperature Stabilisation... 9

3 CHAPTER 4.6. ACCELERATION 2(10) 4.6. Acceleration The MAX IV linear accelerator will be constructed in a very modular way. 17 stations are foreseen, each with a high power RF unit and a number of linear accelerator structures. In addition, an 18th high power RF unit will provide RF power to the electron sources and the first Linac section. All 18 RF units are to be constructed in an identical way. Figure 4.6.1: Block diagram showing the major components of the MAX IV linac RF system RF Units The MAX IV linear accelerator will be divided into 18 RF stations. Each station consists of an S-band klystron with modulator and electronics for control and interlock. The klystron generates pulsed RF power from high voltage power delivered by the modulator. The modulator converts AC line power into high voltage pulse power. Its main components are a high voltage power supply, a high voltage pulse unit and a pulse transformer. An interlock system protects the RF unit and the linac in case of failure. To achieve the MAX IV energy stability the RF accelerating fields must be stable. Pulse to pulse random variations can not be corrected by feedback and therefore gives the upper limits on the phase and amplitude noise levels of individual components such as klystrons and modulators. The jitter tolerance specifies the pulse-to-pulse variations that are acceptable in the linac phase and amplitude parameters. For the Thales klystron TH2100, as an example, the phase jitter is 4 for 1 % variation of klystron voltage (280 kv).

4 CHAPTER 4.6. ACCELERATION 3(10) Figur.4.6.2: Schematic layout of RF Unit. RF unit Symbol ΔI/I 0 < % ΔE/E 0 < 0.1% Unit mean rf phase rf unit 0 ϕ 0 S-band deg mean rf phase rf unit1 ϕ 1 S-band deg mean rf phase rf unit 2 ϕ x S-band deg mean rf phase rf unit 3-9 ϕ 2 S-band deg mean rf phase rf unit ϕ 3 S-band deg mean rf voltage rf unit 0 V0/V0 % mean rf voltage rf unit 1 V1/V1 % mean rf voltage rf unit 3 Vx/Vx % mean rf voltage rf unit 3-9 V2/V2 % mean rf voltage rf unit V3/V3 % Tabell 4.6.1: The voltage and phase tolerances per rf unit for unit 3-9 and are 8, larger assuming random errors. All tolerances are rms values.

5 CHAPTER 4.6. ACCELERATION 4(10) Solid state switching technology will be used for the klystron high voltage pulse unit to achieve the desired demands on stability and low operational cost. The pulse shape must be as rectangular as possible. The raise and fall time should be as short as possible to maximize the total efficiency. The pulse to pulse stability must be better than ±0.01 %. An output RF power of 35 to 37 MW with a pulse length of 4,5 μs and a repetition rate of 100 Hz is needed. All klystrons can be operated in saturation, with no low level RF amplitude control, and having global phase control. Total klystron power margin is 1-2 RF units to allow for klystron failure and maintenance. A comprehensive interlock system is required for the reliable and safe operation of the RF system. Internal protection interlocks must be provided for each RF unit that fully ensures safe operation of the equipment. External interlock connection(s) as part of the protection chain of the RF unit must be provided for use in the MAX-lab installation. External interlock(s) will operate at the level of switching off completely the pulsed high voltage from the RF unit, and could be used for example, from a remote emergency stop button or from a klystron waveguide arc detector. The control system for the RF unit will include an API for the complete control and status including interlock signals of the equipment and a TANGO ( device server/servers for GNU/Linux or Windows XP. The source code for the TANGO device serves will be included and will have all necessary commands and attributes for the complete remote control of the RF unit. The control interface and protection of each RF unit will be made using the Ethernet protocol having minimum 10ms response time. There will be a local control and display panel showing operational data and the interlock status of a RF unit under all operating conditions. The RF unit shall be designed for compact size, but still keeping a reasonable level of serviceability. One side of the unit will be placed close to a tunnel wall, so all parts needing service must be accessible from the other three sides. Compact RF units with easy access of replaceable units are preferred. An oil tray must be included that fits below the high voltage pulse transformer tank and has a minimum volume 105 % of the tank oil volume so that all oil will be collected in case of a leak Accelerator Units The MAX IV linear accelerator will be constructed in a modular way. The 18 RF stations are foreseen to feed 35 linear structures and two RF guns. See the fig.xx., each consisting of a high power RF unit followed by a SLED unit, Power divider and two Linac sections. The 35 Linac sections will serve as a full energy injector with electron beam energy in excess of 3 GeV. 17 of all 18 Accelerating units are to be constructed in an identical way. The first one will have some differences.

6 CHAPTER 4.6. ACCELERATION 5(10) Figure 4.6.3: Schematic layout of one accelerator unit. The linac sections are 5.2 m long travelling wave S-band structures, operating at GHz. They are constant gradient structures with an on-axis load. Therefore the last six of their 154 cells are coated with an absorbing material and add little to the total accelerating voltage. The fill-time of the structures is 740 ns. The reason to choose 5.3 m long accelerating sections as compared to the well know 3 m structure, is to reduced number of couplers, input windows or valves and a simpler power distribution system. Basic parameters Length 5.2 m Shunt Impedance 51.5 M/m Attenuation db Frequency /-.03 GHz Mode 2 / 3 Typ constant gradient

7 CHAPTER 4.6. ACCELERATION 6(10) SLED system will be used to provide the necessary accelerating gradient. SLED has the advantage that it will not increase the average power consumed by the accelerator. A relatively long output power pulse of 4,5 µs from each klystron is feeding a SLED system that deliver a short high power RF pulse to two linac structures. Each SLED system consists of two cylindrical cavities in the high Q TE 015 mode. The theoretical value of Q 0 for copper cavities is , and values around have been achieved in practice. Basic parameters Operating Frequency ± 0.5 MHz Cavity Resonant Mode TE 015 Measured Unloaded Q ± 5000 Coupling Value (β) 5 Input power (peak) Input power (average) Cooling 40 MW max 36 kw (PRF 200 Hz, 4.5 µs) Water circuit Operating Temperature 40 ± 2 C Input VSWR 1.10:1 with matched load on output port The RF power delivered from the SLED cavities to the linac structures is seen in Fig The RF power is normalised to the klystron power. 8 6 Et (, 0. ) t Figure 4.6.4: RF output power delivered to the linac structures normalised to the klystron power for the parameters above.

8 CHAPTER 4.6. ACCELERATION 7(10) RF Distribution and Synchronisation The beam energy spread is related to RF phase and amplitude variations. Cooling temperature, air condition and modulator high voltage jitter changes the beam energy. The long term beam energy drift and phase drift will be reduced by using accurate cooling and air conditioning control system. Short term jitter will be reduced by putting high demands on the modulators. The injector RF distributions system should be designed for maximal phase stability relative to the bunches in the linac. The average position of the beam near crest of the accelerating voltage must be kept stable to a fraction of an S-band wavelength or about 1 (rms). This is achieved by couple out RF power from the first klystron before the SLED cavities which is distributed along an nitrogen-filled rigid coaxial transmission line mechanically attached to the linac supports at each coupling points. About 300W RF power are coupled out at the positions of each klystron for driving the klystrons. A remote controlled phase shifter is needed at each klystron to adjust the RF phase. When the linac tunnel changes length due to temperature, both the linac and the transmission line changes the same length. At each coupling point there is an expansion joint that absorbs the length changes. This design is based on the fact that the RF wave propagates with almost the same speed (0.25 % difference) in an nitrogen-filled coaxial transmission line as the electron bunches in the linac. When the linac tunnel changes length the RF phase will follow the bunches. Changes in the coaxial line s dielectric constant are the primary cause of phase length variation. Using an approximate equation from SLAC for their 3 km long linac scaled to a 300 m long line the change in phase length relative to the beam is given by: d T θ ( θ ) = 2.5dT ( C) dp ( Torr) ε ε where θt is the total equivalent phase length at S-band in degrees of electrical phase, ε is the relative dielectric constant (teflon supports plus nitrogen gas) T ε is the temperature of the dielectric and p ε is the N 2 gas pressure inside the coaxial line. To achieve the demanded phase stability a temperature stability of <±0,13 C and pressure stability of >±0,5 Torr are needed. In order to minimize losses due to skin depth we want to use a coaxial line with a diameter as large as possible without supporting the TE 11 mode (a higher-order mode will increase loss and VSWR and has a different propagation velocity than the TEM mode). Only the a + b TEM wave can propagate when the wavelengths is longer than λ C = π ( ) where a is 2 the inner and b the outer radius of the line. If we use the EIA 1 5/8 (a=16,87 and b=38,79 mm) standard coaxial rigid line, the cut off wavelength is 0,087 m (3,43 GHz) which is lower than 0,01m (3 GHz), only the TEM mode will propagate. The maximum power that could be distributed along the line is 2,35 MW. With 20 linac units of 12,6 meter length and 545 W coupled out from the line at each klystron position a

9 CHAPTER 4.6. ACCELERATION 8(10) power of 20 kw is needed from the first klystron. Assuming a 10 m long low loss coaxial cables (Aircom plus ) with an attenuation of 2,6 db there will be 300 W available at each klystron. At each klystron input there are remote controlled variable phase shifters and attenuators. 3 GHz VCO oscillator phase locked to laser High power phase shifter Main Drive Line High power phase shifter Akroma 9 sections 9 sections Figure 4: Blockdiagram of the linac RF system showing the main drive line that supplies the klystrons with drive power.

10 CHAPTER 4.6. ACCELERATION 9(10) RF unit Coupling factor [db] RF unit Coupling factor [db] Table 4.1: The coupling factors for the couplers placed along the main drive line is shown in this table. The master oscillator is the heart of the linac which determines its performance. It should be a RF source with long term frequency stability and low phase noise. Femtosecond lasers push the limits of the phase noise spectrum Waveguide System Because of the very high microwave power used in the linac feeding system the waveguides must be placed under vacuum (<10-8 bar). The high power waveguide network must be adjusted to be equal in phase length, or to differ by only integral numbers of wavelengths Temperature Stabilisation As a general design goal energy stability should be achieved by putting high demands on temperature stability on critical RF components and using klystron modulators with high pulse to pulse voltage stability. To meet the different demands on temperature stability the water temperature control in the linac tunnels will consist of two regulation systems, a

11 CHAPTER 4.6. ACCELERATION 10(10) klystron gallery secondary system and a linac station fine cooling system. The RF system including accelerating structures and SLED cavities require a stability of ±0.05 C at a water temperature of C. This stability is achieved using a closed-loop water system at each station that provides constant water temperature to the SLED, accelerating structures, waveguides and loads. The klystron gallery secondary system supplies 25 C temperature regulated water with a stability of ±0.5 C to components in the klystron gallery such as klystron collector, - body, and focusing coils and other RF devices that needs cooling. Also cooling water for the magnet power supplies and beam focusing magnets are supplied from this system. Reservoir Reservoir Reservoir Reservoir Linac RF Linac RF Linac RF Linac RF Pump Pump Pump Pump Heater Heater Heater Heater Temp. Temp. Temp. Temp. Klystron Components, magnets and magnet power supplies in four Temp. Reservoir Max IV linac primary cooling system Figure 1: Block diagram showing one water cooling block consisting of four linac stations. Each acceleration station, consisting of SLED, accelerating structures, waveguides and loads, has its own fine cooling system and the other devices have a common temperature regulation system. To avoid that fast temperature changes on the primary water supply is affecting the fine cooling temperature stability reservoir tanks have to be added in the cooling system, see figure 1.

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V 14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V With its characteristics of power stability independent of the load, very fast response time when pulsed (via external modulated signal), low

More information

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V 18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V With its characteristics of power stability whatever the load, very fast response time when pulsed (via external modulated signal), low ripple,

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

RF Solutions for Science.

RF Solutions for Science. RF Solutions for Science www.thalesgroup.com State-of-the-art RF sources for your scientific needs High-power klystrons HIGH KLYSTRONS WITH RF LONG PULSE above 50 μs Thales has been one of the leading

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING QUESTION BANK

DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING QUESTION BANK DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING QUESTION BANK SUBJECT NAME : MICROWAVE ENGINEERING UNIT I BASIC MICROWAVE COMPONENTS 1. State Faraday s rotation law. 2. State the properties of

More information

Studies on an S-band bunching system with hybrid buncher

Studies on an S-band bunching system with hybrid buncher Submitted to Chinese Physics C Studies on an S-band bunching system with hybrid buncher PEI Shi-Lun( 裴士伦 ) 1) XIAO Ou-Zheng( 肖欧正 ) Institute of High Energy Physics, Chinese Academy of Sciences, Beijing

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh Design and Simulation of High Power RF Modulated Triode Electron Gun A. Poursaleh National Academy of Sciences of Armenia, Institute of Radio Physics & Electronics, Yerevan, Armenia poursaleh83@yahoo.com

More information

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron Available online www.ejaet.com European Journal of Advances in Engineering and Technology, 2014, 1(1): 11-15 Research Article ISSN: 2394-658X Design, Fabrication and Testing of Gun-Collector Test Module

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

Karin Rathsman. Calculations on the RF Source and Distribution

Karin Rathsman. Calculations on the RF Source and Distribution Accelerator Division ESS AD Technical Note ESS/AD/0002 Karin Rathsman Calculations on the RF Source and Distribution 26 March 2010 Calculations on the rf source and distribution system for the ESS elliptical

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005 RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005 Summary Final dimensions for the LCLS RF gun are described. This gun, referred

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

X-Band Klystron Development at

X-Band Klystron Development at X-Band Klystron Development at SLAC Slide 1 The Beginning X-band klystron work began at SLAC in the mid to late 80 s to develop high frequency (4x SLAC s-band), high power RF sources for the linear collider

More information

ILC-LNF TECHNICAL NOTE

ILC-LNF TECHNICAL NOTE IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany

The TESLA RF System. S. Choroba. for the TESLA Collaboration. DESY Notkestr. 85, D Hamburg, Germany The TESLA RF System S. Choroba for the TESLA Collaboration DESY Notkestr. 85, D-22603 Hamburg, Germany Abstract. The TESLA project proposed by the TESLA collaboration in 2001 is a 500 to 800GeV e+/e- linear

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

SLS RF operation report 2003

SLS RF operation report 2003 SLS RF operation report 2003 M. Pedrozzi, Jean-Yves Raguin Paul Scherrer Institute, 5232 Villigen PSI, Switzerland SUMMARY LINAC report SR Superconducting Third Harmonic system report SR 500 MHz system

More information

Linac upgrade plan using a C-band system for SuperKEKB

Linac upgrade plan using a C-band system for SuperKEKB Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,

More information

Investigation of Radio Frequency Breakdown in Fusion Experiments

Investigation of Radio Frequency Breakdown in Fusion Experiments Investigation of Radio Frequency Breakdown in Fusion Experiments T.P. Graves, S.J. Wukitch, I.H. Hutchinson MIT Plasma Science and Fusion Center APS-DPP October 2003 Albuquerque, NM Outline Multipactor

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons

More information

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs Basic rules Basic rules for the design of RF Controls in High Intensity Proton Linacs Particularities of proton linacs wrt electron linacs Non-zero synchronous phase needs reactive beam-loading compensation

More information

2000 W, 2450 MHz Microwave Generator GMP 20K SM 56M230 FST 3 IR

2000 W, 2450 MHz Microwave Generator GMP 20K SM 56M230 FST 3 IR 2000 W, 2450 MHz Microwave Generator GMP 20K SM 56M230 FST 3 IR Power supply It is based upon the latest switch mode power supply technology, offering size reduction (i.e. 19 rack, 3U power supply), good

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET)

INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET) INTERNATIONAL JOURNAL OF ELECTRONICS AND COMMUNICATION ENGINEERING & TECHNOLOGY (IJECET) International Journal of Electronics and Communication Engineering & Technology (IJECET), ISSN 0976 6464(Print)

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Lecture 17 Microwave Tubes: Part I

Lecture 17 Microwave Tubes: Part I Basic Building Blocks of Microwave Engineering Prof. Amitabha Bhattacharya Department of Electronics and Communication Engineering Indian Institute of Technology, Kharagpur Lecture 17 Microwave Tubes:

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* D. Sprehn, E. Jongewaard, A. Haase, A. Jensen, D. Martin, SLAC National Accelerator Laboratory, Menlo Park, CA 94020, U.S.A. A. Burke, SAIC, San

More information

Chapter 4. Rf System Design. 4.1 Introduction Historical Perspective NLC Rf System Overview

Chapter 4. Rf System Design. 4.1 Introduction Historical Perspective NLC Rf System Overview Chapter 4 Rf System Design 4.1 Introduction 4.1.1 Historical Perspective The design of the NLC main linacs is based on the extensive experience gained from the design, construction, and 35 years of operation

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

Development of high power gyrotron and EC technologies for ITER

Development of high power gyrotron and EC technologies for ITER 1 Development of high power gyrotron and EC technologies for ITER K. Sakamoto 1), K.Kajiwara 1), K. Takahashi 1), Y.Oda 1), A. Kasugai 1), N. Kobayashi 1), M.Henderson 2), C.Darbos 2) 1) Japan Atomic Energy

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Vishnu Srivastava Microwave Tubes Division, CSIR-Central Electronics Engineering Research Institute, Pilani-333031, Rajasthan,

More information

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop Accelerator Division ESS AD Technical Note ESS/AD/0020 Karin Rathsman, Håkan Danared and Rihua Zeng Report from RF Power Source Workshop 10 July 2011 Report on the RF Power Source Workshop K. Rathsman,

More information

7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System

7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System 7000 Series Signal Source Analyzer & Dedicated Phase Noise Test System A fully integrated high-performance cross-correlation signal source analyzer with platforms from 5MHz to 7GHz, 26GHz, and 40GHz Key

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

High-power klystrons. The benchmark in scientific research. State-of-the-art RF sources for your accelerator

High-power klystrons.  The benchmark in scientific research. State-of-the-art RF sources for your accelerator > High- klystrons The benchmark in scientific research State-of-the-art RF sources for your accelerator Thales has been one of the leading manufacturers of RF and microwave sources for decades, and is

More information

Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02

Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02 Model 7330 Signal Source Analyzer Dedicated Phase Noise Test System V1.02 A fully integrated high-performance cross-correlation signal source analyzer from 5 MHz to 33+ GHz Key Features Complete broadband

More information

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 C-band RF System R&D reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 Project was funded in 2001 April Material Science

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16]

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16] UNIT-3 Part A 1. What is CFAR loss? [ N/D-16] Constant false alarm rate (CFAR) is a property of threshold or gain control devices that maintain an approximately constant rate of false target detections

More information

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON

TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON TEST RESULTS OF THE 84 GHZ / 200 KW / CW GYROTRON V.I. Belousov, A.A.Bogdashov, G.G.Denisov, V.I.Kurbatov, V.I.Malygin, S.A.Malygin, V.B.Orlov, L.G.Popov, E.A.Solujanova, E.M.Tai, S.V.Usachov Gycom Ltd,

More information

DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT

DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT DESIGN AND TECHNOLOGICAL ASPECTS OF KLYSTRON DEVELOPMENT Dr. L M Joshi Emeritus Scientist CSIR-CEERI, PILANI lmj1953@gmail.com 22 February 2017 IPR 1 Schemetic Diagram 22 February 2017 IPR 2 Basic Principle

More information

Agilent 5345A Universal Counter, 500 MHz

Agilent 5345A Universal Counter, 500 MHz Agilent 5345A Universal Counter, 500 MHz Data Sheet Product Specifications Input Specifications (pulse and CW mode) 5356C Frequency Range 1.5-40 GHz Sensitivity (0-50 deg. C): 0.4-1.5 GHz -- 1.5-12.4 GHz

More information

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC L-Band RF R&D SLAC DOE Review June 15 th, 2005 Chris Adolphsen SLAC International Linear Collider (ILC) RF Unit (TESLA TDR Layout) Gradient = 23.4 MV/m Bunch Spacing = 337 ns Fill Time = 420 µs Train Length

More information

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator 20 Channel Digital Delay Generator Features of the 745T-20C: 20 Independent delay channels - 100 ps resolution - 25 ps rms jitter - 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every

More information

GFT Channel Digital Delay Generator

GFT Channel Digital Delay Generator Features 20 independent delay Channels 100 ps resolution 25 ps rms jitter 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every channel Fours Triggers Three are repetitive from three

More information

TOSHIBA Industrial Magnetron E3328

TOSHIBA Industrial Magnetron E3328 TOSHIBA E3328 is a fixed frequency continuous wave magnetron intended for use in the industrial microwave heating applications. The average output power is 3kW in the frequency range from 2450 to 2470

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

Chris Gilmour Studies into the Design of a Higher Efficiency Ku Band ring-loop Travelling Wave Tube SWS using the CST PIC Software.

Chris Gilmour Studies into the Design of a Higher Efficiency Ku Band ring-loop Travelling Wave Tube SWS using the CST PIC Software. Chris Gilmour Studies into the Design of a Higher Efficiency Ku Band ring-loop Travelling Wave Tube SWS using the CST PIC Software.... the power in microwaves! History TMD have been making ring-loop TWTs

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

SHF Communication Technologies AG,

SHF Communication Technologies AG, SHF Communication Technologies AG, Wilhelm-von-Siemens-Str. 23 D 12277 Berlin Marienfelde Germany Phone ++49 30 / 772 05 10 Fax ++49 30 / 753 10 78 E-Mail: mail@shf.biz Web: http://www.shf.biz Datasheet

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information