Beam Diagnostics for the BNL Energy Recovery Linac Test Facility
|
|
- Annice Ruth Welch
- 6 years ago
- Views:
Transcription
1 Beam Diagnostics for the BNL Energy Recovery Linac Test Facility Peter Cameron, Ilan Ben-Zvi, Michael Blaskiewicz, Michael Brennan, Roger Connolly, William Dawson, Chris Degen, Al DellaPenna, David Gassner, Martin Kesselman, Jorg Kewish, Vladimir Litvinenko, Joseph Mead, Brian Oerter, Tom Russo, Kurt Vetter, and Vitaly Yakimenko Brookhaven National Laboratory, Upton, NY 11973, USA Abstract. An Energy Recovery Linac (ERL) test facility is presently under construction at BNL. The goals of this test facility are first to demonstrate stable intense CW electron beam with parameters typical for the RHIC e-cooling project (and potentially for erhic), second to test novel elements of the ERL (high current CW photo-cathode, superconducting RF cavity with HOM dampers, and feedback systems), and finally to test lattice dependence of stability criteria. Planned diagnostics include position monitors, loss monitors, transverse profile monitors (both optical and wires), scrapers/halo monitors, a high resolution differential current monitor, phase monitors, an energy spread monitor, and a fast transverse monitor (for beam break-up studies and the energy feedback system). We discuss diagnostics challenges that are unique to this project, and present preliminary system specifications. In addition, we include a brief discussion of the timing system. INTRODUCTION The motivation for the development of the Energy Recovery Linac at BNL is to have high-quality, high-current electron beams (with acceptable RF power requirements) for high-energy bunched-beam electron cooling of ions [1], and possibly for an electron-ion collider [2]. By high quality, we mean beams with minimal emittance, and whose profiles are sharper than Gaussian. The ERL approach proposes to accomplish this not by relying upon equilibrium with radiation to establish the emittance (as in the case of storage rings) but rather by preserving the low emittance (typical of a linac) of a carefully designed source during acceleration for a single pass through the interaction region, then recovering the beam energy with a second pass through the acceleration cavities. This method permits significant reduction in beam emittance compared to a storage ring, and also permits high current without requiring unreasonable RF power. Figure 1 shows a possible layout of the test facility (others are under consideration). Expected parameters are shown in Table 1. Work performed under the auspices of the U.S. Department of Energy. 232
2 FIGURE 1. A Possible Layout of the Test Facility. ERL-SPECIFIC REQUIREMENTS The ERL imposes diagnostics requirements [3, 4] beyond those normally present in linacs and storage rings. One such requirement is to measure with high resolution the difference in currents between the accelerated and decelerated beams. In principle this could be accomplished by measuring the power requirement of the SRF cavity, but that presumes that the low- and high-energy beams are accurately anti-phased, and proper calibration of such a measurement is not completely straightforward. A simple and elegant method is to utilize two toroids placed immediately after the line to the beam dump, one in the dump line and one in the accelerated beam line, and to link those toroids with a figure eight winding. The output of one toroid is used to drive a nulling current through the figure eight, and the output of the second toroid is then the differential current measurement. This overcomes the dynamic range problem of measuring a small current difference in the presence of a large current signal. As implied in the above discussion of current monitoring, a second requirement is to have the bunches properly phased through the SRF cavity in both the acceleration and deceleration passes, to minimize momentum spread in the accelerated beam (crucial for electron cooling) and to maximize energy recovery from the decelerated beam. Phasing for the acceleration pass can be accomplished by measuring beam position and/or profile in dispersive regions. Phasing for the deceleration pass will be accomplished by adjusting path length with a small chicane, and can be monitored in a 233
3 variety of ways. In a method similar to that used for the accelerated beam, beam position and/or profile can be measured in the dump beamline. A second possibility is to directly monitor the SRF cavity drive power, a minimum in the required power indicating good phasing. A third method is direct measurement of phase of either or both beams. Our intent is to I/Q demodulate the outputs of all BPMs. This will provide accurate phase measurement with single beams, but would impose excessive demands on time resolution if both beams were monitored by a single pickup. BPM phase measurements will require a means of accurately correcting time delays relative to the SRF. There is the possibility to construct a longitudinal pickup based on the same principle as the SRF cavity, where a null measurement is accomplished by the antiphasing of the two beams. However, it is not yet clear that there is a need for such a pickup, that it would provide any advantage over simply monitoring the SRF cavity drive power. TABLE 1. Machine parameters Parameter [units] high chg low emit injection energy [MeV] 5 5 beam energy [MeV] rms bunch length [ps] ~20 ~20 RF frequency [MHz] revolution freq [MHz] bunching freq [MHz] 9.4/ charges/bunch ~1e1 4e9 1 beam current [ma] ~150/ rms energy spread 10e-3 10e-4 εx, εy [mm-mrad] 30 5 beampipe dia [cm] 5 5 current recovery [%] A third ERL-specific requirement is to have the accelerated and decelerated beams on a common center and in addition to have that common center centered in the SRF cavity, to minimize excitation of higher-order transverse modes and thereby raise the threshold for the beam breakup (BBU) instability. This implies position monitors immediately before and after the SRF cavity. In low duty cycle operation the time separation (~100 ns) of the low and high energy pass through the pickup would impose a not-unreasonable lower limit on position monitor electronics bandwidth, so that independent position measurement and correction of both beams is feasible. Centering of the aligned beams on the SRF cavity might then be accomplished either by reliance on survey data, or as beam current goes up by measuring higher-order mode power in the SRF cavity. However, this measurement could not be accomplished when most crucial, during normal full-current operations. Alignment of 234
4 the two beams relative to each other during normal operations might be accomplished via the TM120 and 210 modes of a rectangular resonant cavity pickup. Such a pickup might be operated in the vicinity of the third harmonic of the SRF cavity frequency to minimize impedance seen by the beam. Positioning such pickups both immediately before and after the SRF cavity would permit proper transverse alignment through the cavity, and the TM111 mode might also provide a high quality longitudinal phase measurement. A method [3] which is similar in principle but not yet demonstrated in practice, would center the two beams relative to each other by looking at a conventional BPM output at the RF fundamental and second harmonic and tuning to minimize the fundamental and maximize the second harmonic. Bunch length measurement for the BNL ERL is perhaps not so critical as in ERLs designed to produce ultra-short bunches. Ultra-short bunches are not a requirement for either e-cooling or erhic. Bunch length can be measured most directly with a streak camera. Less direct measurement can be accomplished by comparing transverse profiles in dispersive and non-dispersive regions, perhaps in combination with variation of the RF phase. Finally, it is crucial to monitor and localize the development of halo in the ERL. Useful information on halo monitoring may be found in the proceedings of a recent workshop [5]. The measurement requirements in the ERL will require careful implementation of the best methods described in that workshop. ARCHITECTURE AND SPECIFICATIONS One responsibility of the Diagnostics Group for the Brookhaven ERL will be to provide an economic, reliable and uniform interface to the RHIC timing and control systems. We intend to utilize well-developed expertise to accomplish this with a straightforward extension of the approach taken in the RHIC BPM system [6], and later refined in SNS Diagnostics [7, 8]. In both cases the interface to timing is encoder logic embedded in a gate array in each data acquisition module. In RHIC the data acquisition is controlled by a DSP in each custom module, where calibration and initial processing occurs before data is transmitted via firewire to VME and the control system. Additional processing and display are accomplished at the application level. In the SNS, data acquisition is controlled by LabVIEW running in Windows, and communication to the control system is via Ethernet. The timing decoder gate array board also provides the interface to the PCI bus, serves as a motherboard for the analog electronics and digitizers, and permits the possibility of fast pre-processing before delivery of data to LabVIEW. The intent is to employ a similar architecture wherever possible for the ERL diagnostics systems, a plan that may also be compatible with future upgrade plans for the RHIC BPM system. A second responsibility of the Diagnostics Group will be the instruments themselves. Design, implementation, and utilization of the instruments is always a collaboration between Diagnostics and Accelerator Physics. In the case of several of the systems (position monitors, loss monitors, wire scanners, scrapers, current monitors, etc.) most of the needed expertise already resides within the Diagnostics Group, and involvement of Accelerator Physics will probably not extend beyond 235
5 specification of system requirements. However, for those systems specific to electron machines (synchrotron light monitors, transition radiation monitors, streak cameras, etc.) and more specifically to the ERL (phase monitor, energy spread monitor, high resolution differential current monitor, etc.), the experience within the Diagnostics Group is somewhat limited, and there will be greater reliance on Accelerator Physics in design, implementation, and operation. As suggested by Table 1, the ERL will operate in either of two modes. In the first (high bunch charge) mode, the 9.4/28.2 MHz bunch frequency is appropriate for electron cooling of 120/360 bunches in RHIC (although other bunching frequencies are under consideration). In the second, every bucket of the MHz RF will be filled for low emittance studies. The additional dynamic range required by these two modes adds only minimal complication or expense. However, some forethought is required as a result of the sparse spectrum with the MHz bunching frequency. This makes it more difficult to work away from the RF frequency, and imposes more stringent demands on RF shielding. Our intent is to provide flexibility where possible (for instance, by using programmable synthesizers to generate local oscillator frequencies) to permit avoiding the RF fundamental when operating with the 9.4/28.2 MHz bunching frequency. Processing at 14.1 MHz looks particularly attractive, as this will permit the same LO frequency for either e-cooling or high current mode, and the resulting 56.4 MHz clock frequency for BPM I/Q demodulation is comfortable for the intended digitizer. A preliminary list of proposed Diagnostics, together with their preliminary Accelerator Physics specifications, is shown in Table 2. In addition to the two modes (high charge/low emittance) mentioned above, these diagnostics must also meet the needs of both low duty-cycle commissioning and high current operations. Refinement of specifications to include this consideration is in progress. CONCLUSION We have discussed ERL-specific diagnostics requirements, presented a proposed data acquisition platform and timing/controls interface, and made a first attempt to define diagnostics devices, quantities, locations, and specifications. More detailed system-by-system designs will be presented in a series of forthcoming tech notes. 236
6 TABLE 2. Diagnostic devices and AP Specifications Device Qty Range Accuracy Resolution Comments Position/Phase BPM (button) 12 1/2 pipe 500µ 1µ (av)/100µ Dual plane rad BBU/Energy Feedback 1 Sample scope Beam Transfer Function 1 Include BTF kicker Energy Spread Dispersive BPMs Phase 8 +/- 180 deg +/- 2 deg 0.2 deg BPMs w/ I/Q Loss BLM (PMT) rem/h 30% 0.5 rem/h 20µsec and 1sec BLM (cable ion % 0.5 rem/h 20µsec and 1sec chamber) rem/h Current Current 12 5% 1% BPM sum signal Differential toroids w/ null Profile Flags 4? 0.2σ 0.1σ Phosphor + TR 3 inj line, 1 dump Wire Scanner - profile 4? Full aperture 0.2σ SEM mode, 1 inj & dump, 2 ring Wire Scanner - halo 3? 10-6 BLM mode Scraper 2? 0.2σ SEM + BLM Synch Light 8? 0.2σ Every bend mag Compton 2? 0.2σ Inj line Streak Camera 1? 0.2σ Dual sweep REFERENCES 1. Ilan Ben-Zvi et al., R&D Towards Cooling of the RHIC Collider, PAC 2003, Portland. 2. M. Farkhondeh and V. Ptitsyn, erhic Zeroth Order Design Report, BNL CAD AP note 142, March (available at 3. G. A. Krafft and J-C Denard, Diagnostics for Recirculating and Energy Recovered Linacs, BIW 2002, Brookhaven. 4. P. Piot et al., Performance of the Electron Beam Diagnostics at Jefferson Lab s High Power Free Electron Laser, PAC 1999, New York. 5. P. Cameron and K. Wittenberg, Halo Diagnostics Summary, Halo 2003, Montauk, and references therein. 6. T. J. Shea and R.L. Witkover, RHIC Instrumentation, BIW 1998, Stanford. 7. W. Dawson et al., BPM System for the SNS Ring and Transfer Lines, BIW 2002, Brookhaven. 8. K. Vetter et al., RF Beam Position Monitor for the SNS Ring, these proceedings. 237
Summary report on synchronization, diagnostics and instrumentation
Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group
More informationExperience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation
Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF
More informationLHC Beam Instrumentation Further Discussion
LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz
More informationProduction of quasi-monochromatic MeV photon in a synchrotron radiation facility
Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,
More informationAn Overview of Beam Diagnostic and Control Systems for AREAL Linac
An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic
More informationTechnology Challenges for SRF Guns as ERL Source in View of BNL Work
Technology Challenges for SRF Guns as ERL Source in View of BNL Work Work being performed and supported by the Collider Accelerator Division of Brookhaven National Labs as well as the Office of Naval Research
More informationNew Filling Pattern for SLS-FEMTO
SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new
More informationCharacterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera
Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced
More informationDesign Studies For The LCLS 120 Hz RF Gun Injector
BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven
More informationLinac 4 Instrumentation K.Hanke CERN
Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase
More informationSTATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*
STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL* D. Kayran #,1,2, Z. Altinbas 1, D. Beavis 1, S. Belomestnykh 1,2, I. Ben-Zvi 1,2, S. Deonarine 1, D.M. Gassner 1, R. C. Gupta 1, H. Hahn 1,L.R. Hammons
More informationDigital BPMs and Orbit Feedback Systems
Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit
More informationSPEAR 3: Operations Update and Impact of Top-Off Injection
SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3
More informationAn Operational Diagnostic Complement for Positrons at CEBAF/JLab
An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with
More informationThe Elettra Storage Ring and Top-Up Operation
The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationDiamond RF Status (RF Activities at Daresbury) Mike Dykes
Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of
More informationNSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE
NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE Joseph Mead#, Anthony Caracappa, Weixing Cheng, Christopher Danneil, Joseph DeLong, Al DellaPenna, Kiman Ha, Bernard Kosciuk, Marshall Maggipinto,
More informationPrecision measurements of beam current, position and phase for an e+e- linear collider
Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning
More informationPhase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.
Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,
More informationPROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors
PROJECT DESCRIPTION Longitudinal phase space monitors for the ILC injectors and bunch compressors Personnel and Institution(s) requesting funding Philippe Piot Northern Illinois University Dept of Physics,
More informationLCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems
LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end
More informationJefferson Lab Experience with Beam Halo, Beam Loss, etc.
Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,
More informationJLab 10kW FEL Driver Beam Diagnostics
JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.
More informationSummary of the 1 st Beam Line Review Meeting Injector ( )
Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of
More informationTESLA FEL-Report
Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,
More informationPEP II Design Outline
PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,
More informationChallenges in Accelerator Beam Instrumentation
Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges
More informationLCLS Injector Technical Review
LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator
More informationThe basic parameters of the pre-injector are listed in the Table below. 100 MeV
3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,
More information4.4 Injector Linear Accelerator
4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE
More informationP. Emma, et al. LCLS Operations Lectures
P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1
More informationFINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR
BNL-94942-2011-CP FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR S. Sletskiy and N. Solyak Presented at the 2011 Particle Accelerator Conference (PAC 11) New York, NY March
More informationTITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:
TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,
More informationCERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS
Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications
More informationDevelopment of BPM Electronics at the JLAB FEL
Development of BPM Electronics at the JLAB FEL D. Sexton, P. Evtushenko, K. Jordan, J. Yan, S. Dutton, W. Moore, R. Evans, J. Coleman Thomas Jefferson National Accelerator Facility, Free Electron Laser
More informationDESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*
DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box
More informationRecent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010
Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position
More informationINTRODUCTION. SLAC-PUB-8414 March 2000
SLAC-PUB-8414 March 2 Beam Diagnostics Based on Time-Domain Bunch-by-Bunch Data * D. Teytelman, J. Fox, H. Hindi, C. Limborg, I. Linscott, S. Prabhakar, J. Sebek, A. Young Stanford Linear Accelerator Center
More informationReport on the LCLS Injector Technical Review
Report on the LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4, 2003 Committee Members Prof. Patrick G. O Shea, Chair, University of Maryland Dr. Eric Colby, Stanford Linear
More informationMULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR
MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR J. Fox æ R. Larsen, S. Prabhakar, D. Teytelman, A. Young, SLAC y A. Drago, M. Serio, INFN Frascati; W. Barry,
More informationPEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman
PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate
More informationThe PEFP 20-MeV Proton Linear Accelerator
Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.
More informationStatus of SOLARIS Arkadiusz Kisiel
Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS
More informationANKA RF System - Upgrade Strategies
ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu
More informationRUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR
RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction
More informationOPERATIONAL EXPERIENCE AT J-PARC
OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization
More informationBeam Loss Detection for MPS at FRIB
Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
More informationBeam Instrumentation for X-ray FELs
Beam Instrumentation for X-ray FELs 05/16/2011 1 1 Outline X-ray FEL overview Diagnostics requirements for X-ray FELs Transverse Diagnostics Longitudinal Diagnostics Summary 2 2 X-ray FEL Overview 100
More informationCOMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX
COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton
More information3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline
3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The
More informationLLRF at SSRF. Yubin Zhao
LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip
More informationAccelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross
Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues
More informationPhotoinjector Laser Operation and Cathode Performance
Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and
More information30 GHz Power Production / Beam Line
30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression
More informationBeam Instrumentation for CTF3 and CLIC
Beam Instrumentation for CTF3 and CLIC Beam loss - Beam halo monitoring developments CLIC diagnostic Common developments with other projects Specific requirements for CLIC Beam Loss and Beam Halo measurement
More informationPEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings
More informationTHE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract
SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)
More informationOperation and Performance of a Longitudinal Feedback System Using Digital Signal Processing*
SLAC-PUB-6675 LBL-36174 November 22, 1994 Operation and Performance of a Longitudinal Feedback System Using Digital Signal Processing* D. Teytelman, J. Fox, H. Hindi, J. Hoeflich, I. Linscott, J. Olsen,
More informationA Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.
A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to
More informationPEP II STATUS AND PLANS *
PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex
More informationAccelerator Systems of the TPS
Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring July 2-22, 2005, Hsinchu, Taiwan Accelerator Systems of the TPS Preinjector, Booster Synchrotron, Transfer Line, and
More informationUpgrading LHC Luminosity
1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per
More informationStatus of CTF3. G.Geschonke CERN, AB
Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4
More informationStatus of Elettra, top-up and other upgrades
Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy
More informationPEP-II STATUS REPORT *
PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II
More informationbeam dump from P2 losses this morning
beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous
More informationLinac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *
Linac-Beam Characterizations at 6 MeV Using Optical Transition Radiation Diagnostics * A. H. Lumpkin, W. J. Berg, B. X. Yang, and M. White Advanced Photon Source, Argonne National Laboratory 97 South Cass
More informationEPJ Web of Conferences 95,
EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4
More informationKARA and FLUTE RF Overview/status
KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research
More informationDevelopment of an Abort Gap Monitor for High-Energy Proton Rings *
Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA
More information1 Digital BPM Systems for Hadron Accelerators
Digital BPM Systems for Hadron Accelerators Proton Synchrotron 26 GeV 200 m diameter 40 ES BPMs Built in 1959 Booster TT70 East hall CB Trajectory measurement: System architecture Inputs Principles of
More informationAdvanced Photon Source - Upgrades and Improvements
Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently
More informationNon-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers
Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy
More informationBrilliance. Electron Beam Position Processor
Brilliance Electron Beam Position Processor Many instruments. Many people. Working together. Stability means knowing your machine has innovative solutions. For users, stability means a machine achieving
More informationTop-Up Experience at SPEAR3
Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator
More informationHigh Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics
High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,
More informationTWO BUNCHES WITH NS-SEPARATION WITH LCLS*
TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac
More informationLibera Hadron: demonstration at SPS (CERN)
Creation date: 07.10.2011 Last modification: 14.10.2010 Libera Hadron: demonstration at SPS (CERN) Borut Baričevič, Matjaž Žnidarčič Introduction Libera Hadron has been demonstrated at CERN. The demonstration
More informationAndrei Seryi, Toshiaki Tauchi. December 15-18, 2008
ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give
More informationIOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY
IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE
More informationCESR BPM System Calibration
CESR BPM System Calibration Joseph Burrell Mechanical Engineering, WSU, Detroit, MI, 48202 (Dated: August 11, 2006) The Cornell Electron Storage Ring(CESR) uses beam position monitors (BPM) to determine
More information2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2
PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND
More informationHIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *
HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying
More informationNews from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste Outline Status Klystrons / IOT Modifications of transmitters New LINAC for BESSY II Status BERLinPro HoBiCaT Extension --
More informationIntroduction: CW SRF linac types, requirements and challenges High power RF system architecture
RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements
More informationANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.
ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association
More informationFast Orbit Feedback at the SLS. Outline
Fast Orbit Feedback at the SLS 2nd Workshop on Beam Orbit Stabilisation (December4-6, 2002, SPring-8) T. Schilcher Outline Noise Sources at SLS Stability / System Requirements Fast Orbit Feedback Implementation
More informationTHE ANTIPROTON DECELERATOR (AD)
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - PS DIVISION CERN/PS 99-50 (HP) THE ANTIPROTON DECELERATOR (AD) S. Maury (on behalf of the AD team) Abstract To continue an important part of the LEAR physics
More information2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)
2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution
More informationStatus of the X-ray FEL control system at SPring-8
Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka
More informationBBU threshold current study for 6 GeV beam in 12 GeV beamline setup
BBU threshold current study for 6 GeV beam in 12 GeV beamline setup Ilkyoung Shin and Byung C. Yunn JLAB-TN-09-004 January 12, 2009 1. Introduction The study of BBU threshold current is done for a 6 GeV
More information9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20
ALBA RF System F. Perez RF System 1/20 ALBA Synchrotron Light Source in Barcelona (Spain) 3 GeV accelerator 30 beamlines (7 on day one) 50-50 Spanish Government Catalan Government First beam for users
More informationPEP II Status and Plans
SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,
More informationUpgrade of CEBAF to 12 GeV
Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission
More informationPICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006
More informationANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.
ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and
More informationCOMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM
COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM A. Olmos, J. Moldes, R. Petrocelli, Z. Martí, D. Yepez, S. Blanch, X. Serra, G. Cuni, S. Rubio, ALBA-CELLS, Barcelona, Spain Abstract The ALBA Fast
More informationEUROFEL-Report-2007-DS EUROPEAN FEL Design Study
EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project
More informationPRESENT STATUS OF J-PARC
PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize
More information