1 PEP II Status H. - Ulrich (UZi) Wienands PEP-II Run Coordinator SLAGEPAC Meeting November 8,200O Intro; 11/7/O 19:55

2 Run Statistics In CY 2000, PEP delivered 23.6 fb- (86% of 27.3 fb- ) of which BaBar logged 22.1 fb-. Off -resonance running: (logged, incl. in 22.1 fb-l) Including the 1999 run, PEP delivered 2.6 fb fb-. Peak luminosity achieved: 3.1 xl 033 with BaBar logging: 3.02x1 033 Best day: Best week: Best month: 171 pb-l 0.95 fb fb-l Statistics ;11/7/0 19:56

3 25000 PEP-11 Total Delivered Lu

4 Luminosity History Jan 11, Oct. 31,200O Lumi history.cvs; 11/7/O 19:56

5 Typical W-hr delivery period Average length of fill min x10 3 Cwrected Luminosity 10ww3Wcmw3&'5 or &b/s G 1+5 I O+O -0+5 Typical 24hr; 11/7/O 19:57

6 PEP-II Daily Integrated LundmwMy for 20~

7 PEP II Status H. - Ulrich (UZi) Wienands PEP-II Run Coordinator SLAGEPAC Meeting November 8,200O Intro; 11/7/O 19:55

8 Run Statistics In CY 2000, PEP delivered 23.6 fb- (86% of 27.3 fb- ) of which BaBar logged 22.1 fb-. Off -resonance running: (logged, incl. in 22.1 fb-l) Including the 1999 run, PEP delivered 2.6 fb fb-. Peak luminosity achieved: 3.1 xl 033 with BaBar logging: 3.02x1 033 Best day: Best week: Best month: 171 pb-l 0.95 fb fb-l Statistics ;11/7/0 19:56

9 25000 PEP-11 Total Delivered Lu

10 Luminosity History Jan 11, Oct. 31,200O Lumi history.cvs; 11/7/O 19:56

11 Typical W-hr delivery period Average length of fill min x10 3 Cwrected Luminosity 10ww3Wcmw3&'5 or &b/s G 1+5 I O+O -0+5 Typical 24hr; 11/7/O 19:57

12 PEP-II Daily Integrated Lundnas~i~y for 20~

13 PEP-II Weekly Integrated Luminosity for 2000 \ II Q Q Week

14 PEP-II Monthly Luminosity

15 Raisina Luminosity Luminosity equation: => raise beam currents I => lower beam sizes C,... emittances, a* => keep number of bunches b small... until beam-beam limit reached Luminosity;11/7/0 19:57

16 z 0..,A+, Pm & LJ II, 20. hkn Br L6ṛ ma. :, n*, ::+ &#.I. 3. iis > ::. Km..> L?* ZP. 28, **. e.. :x 3. Y L,> 23% Em. :, w /I,I.%.?g: L E r,. k L3.. :b mu. e 16, h. ::,,:, m he.5 1 tl 27. u( * % 1Pb II*. 6. ::. > llxi. R,I), m,i1, cc,. :. 1 2: I %

17 LER Beam BIOWUD LER beam size vs beam current i 1::: 9 * w v i /\ ly 0.59 r* ; I s 1 * I 1 1 I ; 13 * I; 1 I I BEAh CURRENT, A Cflb& ~-i.$ /,i\,+ & 'il/,bl LER blowup.cvs;11/7/0 19:58 1

18

19

20 .. _- I,

21 Backgrounds Managed jointly by BaBar and PEP Protect detector while allowing operational efficiency and machine to be developed Weekly review of beam-abort thresholds SVTRAD doing most of the protection 3 levels of beam abort thresholds & timescales: Fast (ms), protect SVT from p-stop shorts: Chronic : integrated over a few set Timer (5min), protect from lossy injection: 50 mr (Thresholds in effect for most of the run) EMC is limiting injection if too lossy DCH currents have been an issue Collimation works, esp. in LER HER bunches with short lifetimes troublesome Backgrounds; 11/7/O 19:58

22 Accumu SVTRAD : ated Dose and Budget 2000/l 1 /Ol T.Meyer zi PO : I Inner MID ----outer-iviic plane (HERX ;plan.e.(lerj _ ( Radiation Dose Budget e- i Day of Run 2000

23 ~~ ~_~~~~_~_--_-- -Radiation Protection using most sensiiive PIN diodes (in IR horiz. plane) I I I I I / I I I I I All Daily Trips o Dailv Tritx during Stable Beams J 1 BABM 2 60 Tb \.& E= b Day of Year 2000 T. Meyer

24 Issues encountered HER vacuum leaks High-power sr. dump, IR 2b: guard vacuum Flange leak at IR 2b frangible link: guard vacuum Limit HER beam to 650 ma. Rf HV power supplies HV capacitors not rated for high temperatures Two supplies back at vendor for repairs Use test-stand supply to have at least 4 HER rf stations Beam-related heating Bellows: add forced-air cooling Long. feedback components: add heat sinks Vertex chamber: still being investigated, limits 1LER Issues;ll/7/0 19:59

25 .

26 -- PEP-II Downtime Improvements LER rf station 4-3 for beam currents up to 2.8 A LER arc anti-photoelectron solenoids LER longitudinal feedback thermal upgrade handle the higher beam currents HER upstream IR-2 low-pressure chamber known source of backgrounds reduce pressure by = factor of 10 HER high power sr. dump. HER beam separators reduce injection losses. Plans;11/7/0 20:00

27 i

28

29 The 2001 Run Turn-on Feb. 1, expect one month to recover full operational luminosity Luminosity goal 5x1 033 peak 35 fb-l delivered Run to end Aug. 31,200l 1 c bz* Further upgrades are being pursued Luminosity of 1O34 by the end of 2003 looks feasible Run 2001; 11/7/O 20:02

30 PEP-II Luminosity Upgrade Timeline I J. Seeman for the PEP- II Staff 1 O/9/00 item Upgrade Luminosity Target Activity Hardware Probable Max t&r MaxHER increase luminosity start date ready date luminosity Current Current factor xe33fcm2ls date (A) (A) 1 Starting luminosity 1.oo 2.64 Ott-00 Ott-00 act Near tern? projecfs: 2 Lower betay* (12.5 mm to 9 mm) Ott-00 Jul-00 Mar Raise beam-beam tune shifts to Ott-00 Sep-00 Mar Raise the number of bunches to Ott-00 Ott-00 May-O Third LER RF station (bunches=l024) I Ott-99 Feb-01 Aug Medium term projects: 6 Raise beam-beam tune shifts to Feb-01 Feb-01 Jul Sixth HER Station (bunches=1 125),-I Ott-00 Nov-02 Dee Fourth LER RF Station (bunches=l658) Ott-00 Nov-02 Dee Long term projects: 9 Lower beta y to 5 mm (new IR?) Ott-02 Ott-04 Feb IO Raise beam-beam tune shifts to Ott-02 act-04 Apr Seventh HER RF station Ott-02 Ost-04 Jun Reduce HER bunch length from 9 to 6 mm Ott-02 Ott-04 Jul Fifth LER RF station Ott-02 Ott-04 Ott Improve LER longitudinal feedback Ott-02 Ott-04 Dee Page 1

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

PEP-II Status and Outlook

PEP-II Status and Outlook PEP-II Status and Outlook H.-U. Wienands, M.E. Biagini, F.-J. Decker, M.H. Donald, S. Ecklund, A. Fisher, R.L. Holtzapple, R.H. Iverson, P. Krejcik, A.V. Kulikov, T. Meyer, J. Nelson, A. Novokhatski, I.

More information

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook:

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

PEP-II Operation and Machine Development. U. Wienands PEP-II Run Coordinator for the PEP-II Team

PEP-II Operation and Machine Development. U. Wienands PEP-II Run Coordinator for the PEP-II Team PEP-II Operation and Machine Development U. Wienands PEP-II Run Coordinator for the PEP-II Team Outline of Talk PEP Run 4 Plan & Progress Parameters, Run statistics Machine Development How we run the machine

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ SLAC-PUB-11706 LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ U. Wienands y, SLAC, Stanford, CA, USA Abstract Electron-positron colliders have been operating in a topup-and-coast fashion with a cycle

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

LEP Status and Performance in 2000

LEP Status and Performance in 2000 LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 29 GEV R. W. Aßmann, CERN, Geneva, Switzerland Abstract The Large Electron-Positron Collider (LEP) at CERN completed its operation in

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007 ISOLDE ISOLDE scientific scientific coordinator s s report report ISOLDE ISOLDE Collaboration Collaboration Committee, Committee, 15 15 February February 2007 2007 L.M. Fraile, CERN PH/IS Impact of technical

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Beam instrumentation at the 1-MW proton J-PARC RCS

Beam instrumentation at the 1-MW proton J-PARC RCS Beam instrumentation at the 1-MW proton J-PARC RCS HB2014 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity, High-Brightness and High Power Hadron Beams East Lansing, MI Nov.12, 2014 Kazami Yamamoto

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer The machine parameters and the luminosity goals of the ILC were discussed at the 1 st ILC Workshop. In particular, Nick Walker noted that the TESLA machine parameters had been chosen to achieve a high

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

PEP-II STATUS REPORT *

PEP-II STATUS REPORT * PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar The Scintillating Fibre Tracker for the LHCb Upgrade DESY Joint Instrumentation Seminar Presented by Blake D. Leverington University of Heidelberg, DE on behalf of the LHCb SciFi Tracker group 1/45 Outline

More information

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15 RF Power Klystrons & 20 Year Look R. Nelson 7/15/15 RF Power klystrons 8 x 13 kw klystrons Page 2 Why A klystron? Best (only) choice at the time - 1988 Easy to use: Input (drive), output (to CM), power

More information

AN302 Anconda 3BR 3BA

AN302 Anconda 3BR 3BA AN302 Anconda 3BR 3BA Summary 3 BR 3 Bath Condo - sleeps up to 8 Description AN302 Anconda 3BR 3BA -- Short Walk to Super B Chairlift -- Shared Heated Garage -- Outdoor Hot Tub and Laundry -- Gas Fireplace

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Monthly Progress Report Stanford Synchrotron Radiation Laboratory Monthly Progress Report Stanford Synchrotron Radiation Laboratory April 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 5 B. Design and Fabrication Reports 1.1 Magnets &

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD.

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD. Attached are 2 graphs of monthly average frequency error on the Eastern Interconnection back to 1994. The error is the deviation

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS G. Trento Accelerator Systems Division Argonne National Laboratory Work supported by the U.S. Department

More information

12GeV CEBAF Commissioning

12GeV CEBAF Commissioning 12GeV CEBAF Commissioning Operations Dept. Accelerator Division JLAB Outline 1 Process Integrated Process Overview Accelerator Readiness Review Process Internal Reviews/Process Process Recap 2 Beam Commissioning

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

Review of Diamond SR RF Operation and Upgrades

Review of Diamond SR RF Operation and Upgrades Review of Diamond SR RF Operation and Upgrades Morten Jensen on behalf of Diamond Storage Ring RF Group Agenda Stats X-ray and LN2 pressure results Cavity Failure Conditioning in the RFTF Cavity Simulations

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

PLCC Series EMC 3030 Single color

PLCC Series EMC 3030 Single color PLCC Series PLCC Series EMC 3030 Single color Datasheet Warning Light Stage Light Decorative Light Introduction : EMC 3030 Single Color Series is a surface-mount LED which uses standard package dimension

More information

The LCD general specification provides outgoing inspection provision and its expected quality level based on outgoing inspection of LCD.

The LCD general specification provides outgoing inspection provision and its expected quality level based on outgoing inspection of LCD. Page 1 of 6 1. PURPOSE Issued By : Wilson Chan Audited By : Management : The LCD general specification provides outgoing inspection provision and its expected quality level based on outgoing inspection

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification

More information

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM S. Redaelli on behalf of the LHC beam commissioning team CERN, Geneva, Switzerland Abstract Following various injection tests, the full LHC beam commissioning

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

ALA Webinar August 21, 2013

ALA Webinar August 21, 2013 BUSINESS INTELLIGENCE THROUGH FINANCIAL REPORTING ALA Webinar August 21, 2013 Barry Jackson, CLM, CPA President JC4LM LLC www.jc4lm.com BUSINESS INTELLIGENCE THROUGH FINANCIAL REPORTING Dashboard Graphics

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1 WBS Dictionary/Basis of Estimate Documentation US CMS Endcap Muon Regional CSC Trigger System WBS 3.1.1-1- 1. INTRODUCTION 1.1 The CMS Muon Trigger System The CMS trigger and data acquisition system is

More information

Undulator Protection for FLASH and for the European XFEL

Undulator Protection for FLASH and for the European XFEL Undulator Protection for FLASH and for the European FLASH sacrificial undulator: beam loss simulations FLASH BLM system plans FLASH sacrificial undulator FLASH Collimators BC2 scraper gun collimator (Ø

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

Detector Operations. Run 3 End & Run 4 Progress System Status. IFR Barrel Upgrade. MDI, SVT, DCH & DCH electronics upgrade, DIRC, EMC, IFR-RPC, Trig

Detector Operations. Run 3 End & Run 4 Progress System Status. IFR Barrel Upgrade. MDI, SVT, DCH & DCH electronics upgrade, DIRC, EMC, IFR-RPC, Trig Detector Operations Run 3 End & Run 4 Progress System Status MDI, SVT, DCH & DCH electronics upgrade, DIRC, EMC, IFR-RPC, Trig IFR Barrel Upgrade LST detector progress & milestones Electronics Review &

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

Beam systems without failures what can be done?

Beam systems without failures what can be done? Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven

More information

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes. Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

PEP-II IR-2 Alignment

PEP-II IR-2 Alignment SLAC-PUB-10328 January 2004 PEP-II IR-2 Alignment A. Seryi, S. Ecklund, C. Le Cocq, R. Pushor, R. Ruland, Z. Wolf SLAC, Stanford, CA 94025, USA This paper describes the first results and preliminary analysis

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

Future Circular Collider Study

Future Circular Collider Study Status and Progress M. Benedikt, F. Zimmermann gratefully acknowledging input from FCC coordination group global design study team and all other contributors LHC SPS PS FCC http://cern.ch/fcc Work supported

More information

SLAC R&D Program for a Polarized RF Gun

SLAC R&D Program for a Polarized RF Gun ILC @ SLAC R&D Program for a Polarized RF Gun SLAC-PUB-11657 January 2006 (A) J. E. CLENDENIN, A. BRACHMANN, D. H. DOWELL, E. L. GARWIN, K. IOAKEIMIDI, R. E. KIRBY, T. MARUYAMA, R. A. MILLER, C. Y. PRESCOTT,

More information

CBETA Quarterly Report 7

CBETA Quarterly Report 7 Submission date: 15 September 2018 CBETA Quarterly Report 7 Project Director (BNL): Steve Peggs Peggs@bnl.gov Project Manager (BNL): Rob Michnoff Michnoff@bnl.gov Project Manager (Cornell): Karl Smolenski

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

RF Power Upgrade at Jefferson Lab

RF Power Upgrade at Jefferson Lab RF Power Upgrade at Jefferson Lab Rick Nelson*, Andrew Kimber *nelson@jlab.org * Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE- AC05-06OR23177. The U.S. Government

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

Progress in Scale-up of 2G HTS Wire at SuperPower Part I

Progress in Scale-up of 2G HTS Wire at SuperPower Part I superior performance. powerful technology. Progress in Scale-up of 2G HTS Wire at SuperPower Part I V. Selvamanickam & Y. Xie Y. Chen, X. Xiong, M. Martchevski, Y. Qiao, A. Rar, B. Gogia, R. Schmidt, A.

More information

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Introduction: The Ohio State University high energy physics group consisting of Profs. Gan, Honscheid, Kagan, and

More information

Senior Math Studies Lesson Planning Date Lesson Events

Senior Math Studies Lesson Planning Date Lesson Events Senior Math Studies Lesson Planning 2014-2015 Date Lesson Events Aug 25 Style of Class: Student-led work teams (SLWTs) Facilitated (as opposed to taught) by the teacher Considering MS topics what areas

More information

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford

More information

Mechanical aspects, FEA validation and geometry optimization

Mechanical aspects, FEA validation and geometry optimization RF Fingers for the new ESRF-EBS EBS storage ring The ESRF-EBS storage ring features new vacuum chamber profiles with reduced aperture. RF fingers are a key component to ensure good vacuum conditions and

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

RF upgrade program in LHC injectors and LHC machine

RF upgrade program in LHC injectors and LHC machine RF upgrade program in LHC injectors and LHC machine E r k J e n s e n, o n b e h a l f o f B E - RF Many thanks to M. E. Angoletta, O. Brunner, R. Calaga, E. Ciapala, H. Damerau, W. Höfle, E. Montesinos,

More information

MultiSpec Tutorial: Visualizing Growing Degree Day (GDD) Images. In this tutorial, the MultiSpec image processing software will be used to:

MultiSpec Tutorial: Visualizing Growing Degree Day (GDD) Images. In this tutorial, the MultiSpec image processing software will be used to: MultiSpec Tutorial: Background: This tutorial illustrates how MultiSpec can me used for handling and analysis of general geospatial images. The image data used in this example is not multispectral data

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR

MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR J. Fox æ R. Larsen, S. Prabhakar, D. Teytelman, A. Young, SLAC y A. Drago, M. Serio, INFN Frascati; W. Barry,

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information