1 Linac 4 Instrumentation K.Hanke CERN

2 CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase the beam brightness for the LHC, provide more beam to ISOLDE, increase the reliability.

3 CERN Linac 4 Overview 95 kev 3 MeV 3 MeV 50 MeV 100 MeV 160 MeV )/,-.!)*%%+, "#$!!"#$ %&'( RF volume source (DESY) 35 kv extrac. +60kV postacc. Radio Frequency Quadrupole (IPHI) 352 MHz 6 m 1 klystron 1 MW Chopper 352 MHz 3.6 m 11 em quad 3 cavities Drift Tube Linac 352 MHz 18.7 m 3 tanks 3 klystrons 4 MW 82 pm quad Cell-Coupled Drift Tube Linac 352 MHz 21 m 21 tanks 7 klystrons 7 MW 21 em quads Pi-mode structure 352 MHz 22 m 12 tanks 6 klystrons ~12 MW 12 em quads total linac 4: 80 m, 18 klystrons ion current: 40 ma (avg. in pulse), 65 ma (bunch) RF duty cycle: 0.1% phase 1 (Linac4) 3-4% phase 2 (SPL) (design: 10%) 4 different structures, (RFQ, DTL, CCDTL, PIMS) re-design w.r.t. TDR after review May 2007

4 Source & LEBT - emittance scanner - spectrometer - fixed Faraday cup - transformer diagnostics box (Faraday cup, SEM)

5 Source & LEBT instrument position energy [MeV] intensity resolution [ma] retractable Faraday cup between solenoids ma fixed Faraday cup before RFQ ma SEM grid between mm solenoids SEM grid after mm spectrometer transformer ma emittance movable mrad

6 Faraday Cup Design for LEBT bias ring, collector and housing made of st. steel vespel insulators for electrical isolation conical collector use of metal seals only flanged high voltage feedthrough flanged signal feedthrough linear pneumatic drive (travel 102mm) flange DN150CF (ø outer 202mm) C.BAL

7 Chopper Line 2 slow wire scanners BSHM 2 transformers

8 Chopper Line instrument position energy [MeV] intensity resolution [ma] slow wire upstream and mm scanners downstream of chopper transformer between first two and last two quads ma beam shape and halo monitor end of chopper line ns 1 mm

9 Chopper Line Transformers

10 Chopper Line Transformers Magnetic Shielding

11 Chopper Line Transformers Microwave Studio Simulation

12 Chopper Line Slow Wire Scanners horizontal and vertical measurement slow movement (not single-shot) wide moving range allows to measure deflected and undeflected beam after chopping

13 Halo Monitor Specifications 2.84 ns ~10 3 ions ~10 8 ions 1st objective: measure residual H - in (not completely) chopped bunches with a sensitivity of ~ 1000 ions, in the vicinity of full bunches (~10 8 ions). detector must be turned on/off within 1 ns, dynamic range 1:10 6 2nd objective: transverse imaging, halo diagnostics beam core: ~10 8 H - /bunch/cm 2 beam halo: ~10 3 H - /bunch/cm 2 active area of detector 4 4 cm dynamic range: 1:10 6

14 Halo Monitor Principle carbon foil e - H - grids phosphor screen fibre optics bundle CCD camera

15 Halo Monitor View Inside carbon foil grids H - e - light guide

16 Halo Monitor Light Guide and Camera grids fibre optics bundle CCD camera

17 Halo Monitor Light Guide and Camera light guide active area 50 mm Ø 50 million fibers magnification 1.8 provides shielding against X-rays and neutrons CCD camera UHV compatible 1300 x 1300 pixels

18 Halo Monitor Overall Set-up

19 Halo Monitor Tests with Laser Beam M.HORI longitudinal measurement: < 2 ns timing resolution achieved transverse imaging: FWHM <5 mm image observed for 4 mm input beam mm-scale resolution achieved beam time approved for test at TANDEM/ALTO facility (Orsay)

20 3 MeV Test Place IPHI diagnostic line 3 MeV test place in the PS South Hall including source, LEBT, RFQ, chopper line and IPHI diagnostic line

21 IPHI Measurement Line A.C.C.T. R.F.Q. Pick up Dipole magnet Quadrupoles magnets Pump Wire scanner D.C.C.T. Steerer B.P.M. CCD cameras B.P.M. B.P.M Beam stopper Pumps intensity measurement: 1 D.C.C.T et 1 A.C.C.T beam position measurement: 6 P.U. energy measurement: 3 P.U. energy spread measurement: 2 slits + 1 F.C. transverse profiles: 1 wire scanner, optical measurements, backscattered protons temperature measurements of the beam pipe Patrick AUSSET - Meeting SPL / IPHI June 7th-8th

22 DTL Overview SEM grid beam current transformer BLM beam loss monitor wire scanner position, intensity and phase pick-up BLM BLM DTL tank1 DTL tank2 DTL tank3

23 DTL Commissioning commissioning phase: moveable bench for different stages of the DTL Faraday Cup, SEM grid, transverse and longitudinal emittance diagnostics, 2 pick-ups (time-of-flight), energy degrader + Faraday cup - for DTL tank-by-tank commissioning - SNS experience with D-Plate

24 Bunch Length Monitor transformation of longitudinal bunch structure into a transverse distribution of secondary electrons consists of a wire in which secondary electrons are created an electric field to accelerate the electrons deflecting plates with a deflecting field synchronous with the accelerator RF an electron detector detector mainly developed by Institute for Nuclear Research (INR) Moscow (A. Feschenko and collaborators) INR is willing to build detectors for us

25 DTL Diagnostics Summary instrument position energy [MeV] intensity [ma] resolution pick-up (phase, position, intensity) after every tank 12/32/ deg 0.1 mm 0.5 ma SEM grid after tank mm transformer after tank ma

26 Phase/Position/Intensity Pick-Ups to be measured: absolute beam position with respect to an external reference. relative beam intensity measured by two consecutive pick-ups. absolute beam intensity after calibration with BCT. absolute beam phase with respect to distributed RF reference. time of flight between two pick-ups. limited longitudinal space: integrated design for quadrupole, steerer and pick-up 250mm are needed for magnet and pick-up in CCDTL and SCL

27 CCDTL Modules 1-4 SEM grid beam current transformer BLM beam loss monitor wire scanner position, intensity and phase pick-up CCDTL module1 BLM CCDTL module2 BLM CCDTL module3 CCDTL module4

28 CCDTL Modules 5-7 SEM grid beam current transformer BLM beam loss monitor wire scanner position, intensity and phase pick-up CCDTL module5 BLM CCDTL module6 BLM CCDTL module7

29 CCDTL Summary instrument position energy [MeV] intensity [ma] resolution pick-up (phase, position, intensity) after every module 57/64/72/79/ 86/94/ deg 0.1 mm 0.5 ma SEM grid after modules 4 and 7 79/ mm wire scanner after every module 57/64/72/79/ 86/94/ mm transformer after module ma

30 PIMS SEM grid beam current transformer BLM beam loss monitor wire scanner position, intensity and phase pick-up BLM cav 1 cav 2 cav 3 cav 4 cav 5 cav 6 BLM cav 7 cav 8 cav 9 cav 10 cav 11 cav 12

31 PIMS Summary instrument position energy [MeV] intensity [ma] resolution pick-up (phase, position, intensity) after every other cavity 110/120/129/ 139/149/ deg 0.1 mm 0.5 ma SEM grid after cavities 6 and / mm wire scanner after cavities 3 and mm transformer end of linac ma

32 Summary o think about commissioning strategy from the beginning commissioning vs operation; what diagnostics is needed in order to commission the linac (e.g. set rf phase), at what stage of the installation, which diagnostics is suitable for which energy - what is needed in day-to-day operation o steerers steerers are essential closeley linked to diagnostics (pick-up number and position) beam dynamics study to minimise beam loss define steerers define diagnostics overall linac lay-out ( free space vs beam dynamics) everything is linked o space constraints integrated design of quadrupoles, steerers and pick-ups o beam loss is an essential issue (longitudinal and transverse halo, steering) dedicated diagnostics; interlocks based on transformers and BLMs ( watchdog ) o high beam power can damage diagnostics non-intercepting diagnostics where possible; different modes of operation, e.g. diagnostics/commissioning beams with reduced macropulse length

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY HIGH-INTENSITY PROTON BEAMS AT CERN AND THE STUDY E. Métral, M. Benedikt, K. Cornelis, R. Garoby, K. Hanke, A. Lombardi, C. Rossi, F. Ruggiero, M. Vretenar, CERN, Geneva, Switzerland Abstract The construction

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

Progress of Beam Instrumentation in J-PARC Linac

Progress of Beam Instrumentation in J-PARC Linac IBIC2012 International Beam Instrumentation Conference Tsukuba, Ibaraki, JAPAN, 1 st to 4 th, Oct. 2011 Progress of Beam Instrumentation in J-PARC Linac Akihiko MIURA with the Beam Monitor Group in J-PARC

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

BEAM DIAGNOSTICS IN THE CNAO INJECTION LINES COMMISSIONING

BEAM DIAGNOSTICS IN THE CNAO INJECTION LINES COMMISSIONING BEAM DIAGNOSTICS IN THE CNAO INJECTION LINES COMMISSIONING A. Parravicini, G. Balbinot, J. Bosser, E. Bressi, M. Caldara, L. Lanzavecchia, M. Pullia, M. Spairani, CNAO Foundation, Pavia, Italy C. Biscari,

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

Beam Instrumentation for CTF3 and CLIC

Beam Instrumentation for CTF3 and CLIC Beam Instrumentation for CTF3 and CLIC Beam loss - Beam halo monitoring developments CLIC diagnostic Common developments with other projects Specific requirements for CLIC Beam Loss and Beam Halo measurement

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages The SPL at CERN 1. Introduction 2. Description - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages 3. Status of the SPL study slhc Roa Garoby for the SPL team 1. Introduction Motivation for

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Eugène Tanke FRIB / MSU ESS Seminar, Lund, 6 March 2013 Outline Project Goal for the Accelerator Path

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

Summary report on synchronization, diagnostics and instrumentation

Summary report on synchronization, diagnostics and instrumentation Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group

More information

Equipment Installation, Planning, Layout, organisation and updates

Equipment Installation, Planning, Layout, organisation and updates Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

APT Accelerator Technology

APT Accelerator Technology APT Accelerator Technology J. David Schneider LER/APT, Los Alamos National Laboratory Los Alamos, New Mexico 87545 U.S. Abstract The proposed accelerator production of tritium (APT) project requires an

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

LIGHT PROTON THERAPY PROJECT

LIGHT PROTON THERAPY PROJECT 17 th of MAY 2018 LIGHT PROTON THERAPY PROJECT Yevgeniy Ivanisenko on behalf of ADAM team FORM-01040-A AVO-ADAM Advanced Oncotherapy (AVO) is a public company ADAM is R&D center of AVO ~ 100 employees

More information

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1 ESS: The Machine Bucharest, 24 April 2014 Håkan Danared Deputy Head Accelerator Division H. Danared Industry & Partner Days Bucharest Page 1 2025 ESS construction complete 2009 Decision: ESS will be built

More information

COMMISSIONING AND FIRST RESULTS OF THE ELECTRON BEAM PROFILER IN THE MAIN INJECTOR AT FERMILAB*

COMMISSIONING AND FIRST RESULTS OF THE ELECTRON BEAM PROFILER IN THE MAIN INJECTOR AT FERMILAB* FERMILAB-CONF-17-68-AD COMMISSIONING AND FIRST RESULTS OF THE ELECTRON BEAM PROFILER IN THE MAIN INJECTOR AT FERMILAB* R. Thurman-Keup, M. Alvarez, J. Fitzgerald, C. Lundberg, P. Prieto, J. Zagel, FNAL,

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

INSTALLATION STATUS OF THE ELECTRON BEAM PROFILER FOR THE FERMILAB MAIN INJECTOR*

INSTALLATION STATUS OF THE ELECTRON BEAM PROFILER FOR THE FERMILAB MAIN INJECTOR* TUPB77 INSTALLATION STATUS OF THE ELECTRON BEAM PROFILER FOR THE FERMILAB MAIN INJECTOR* R. Thurman-Keup #, M. Alvarez, J. Fitzgerald, C. Lundberg, P. Prieto, M. Roberts, J. Zagel, FNAL, Batavia, IL 651,

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

SNS Target Imaging and Related Developments

SNS Target Imaging and Related Developments SNS Target Imaging and Related Developments Tom Shea (ORNL) ESS Seminar Lund, Sweden January 28, 2011 T. J. Shea, T. McManamy, G. Bancke, W. Blokland, A. Brunson, M. Dayton, R. Fiorito, K. C. Goetz, J.

More information

THE OPERATION EXPERIENCE AT KOMAC*

THE OPERATION EXPERIENCE AT KOMAC* THAM2X01 Proceedings of HB2016, Malmö, Sweden THE OPERATION EXPERIENCE AT KOMAC* Yong-Sub Cho, Kye-Ryung Kim, Kui Young Kim, Hyeok-Jung Kwon, Han-Sung Kim, Young-Gi Song Korea Atomic Energy Research Institute,

More information

Challenges in Accelerator Beam Instrumentation

Challenges in Accelerator Beam Instrumentation Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager Outline Facility overview Organization Shift schedule

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA Lübeck, August 20, 2004 Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA SNS is the Forefront Facility for Future High Beam Power Accelerators Highest

More information

Fast beam chopper at SARAF accelerator via RF deflector before RFQ

Fast beam chopper at SARAF accelerator via RF deflector before RFQ Journal of Instrumentation OPEN ACCESS Fast beam chopper at SARAF accelerator via RF deflector before RFQ To cite this article: A Shor et al View the article online for updates and enhancements. Related

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun A. Sakumi, M. Uesaka, Y. Muroya, T. Ueda Nuclear Professional School, University of Tokyo J. Urakawa, KEK, Japan

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

WHAT IS NEW AT CERN?

WHAT IS NEW AT CERN? WHAT IS NEW AT CERN? Dominique Missiaen, Antje Behrens, Patrick Bestmann, Jean-Frédéric Fuchs, Jean- Christophe Gayde, Mark Jones, Hélène Mainaud Durand, Antonio Marin, Dirk Mergelkuhl, Mateusz Sosin,

More information

Photoinjector Laser Operation and Cathode Performance

Photoinjector Laser Operation and Cathode Performance Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and

More information

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * L. Du #, C.T. Du, X.L. Guan, C.X. Tang, R. Tang, X.W. Wang, Q.Z. Xing, S.X. Zheng, Key Laboratory of Particle & Radiation Imaging (Tsinghua University), Ministry

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

Status of CERN Injectors Upgrades

Status of CERN Injectors Upgrades Status of CERN Injectors Upgrades Introduction Status of linac developments Outcome of the HIP working group SPSC recommendations Consequences for Radio-active Ion Beams Final word R. Garoby ISOLDE Upgrade

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION J. Teichert #, A. Arnold, P. Murcek, G. Staats, R. Xiang, HZDR, Dresden, Germany P. Lu, H. Vennekate, HZDR & Technische Universität,

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics * Linac-Beam Characterizations at 6 MeV Using Optical Transition Radiation Diagnostics * A. H. Lumpkin, W. J. Berg, B. X. Yang, and M. White Advanced Photon Source, Argonne National Laboratory 97 South Cass

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

The Spallation Neutron Source Project Geneva December 8, 2006

The Spallation Neutron Source Project Geneva December 8, 2006 The Spallation Neutron Source Project Geneva December 8, 2006 Norbert Holtkamp ITER International Organization 13108 St Paul lez Durance Norbert.Holtkamp@iter.org The Spallation Neutron Source SNS is funded

More information

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Proceedings of IBIC, Tsukuba, Japan MOPB8 BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Gian Luca Orlandi, Masamitsu Aiba, Simona Bettoni, Bolko Beutner, Helge Brands,

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, KVI Groningen 20 Sep 2011 The Key to CLIC Efficiency NC Linac for 1.5 TeV/beam accelerating gradient: 100 MV/m RF frequency:

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses

Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses E. Nebot del Busto (1,2, 3), M. J. Boland (4,5), S. Doebert (1), F. S. Domingues (1), E. Effinger (1), W. Farabolini

More information

G0 Laser Status Parity Controls Injector Diagnostics

G0 Laser Status Parity Controls Injector Diagnostics G0 Laser Status Parity Controls Injector Diagnostics G0 Collaboration Mtg Jefferson Lab August 16, 2002 G0 Collaboration Mtg (August 16, 2002), 1 Installed new AOM homebuilt laser G0 Collaboration Mtg

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

The Beam Test Facility at the SNS

The Beam Test Facility at the SNS The Beam Test Facility at the SNS R.F. Welton, A. Aleksandrov, B.X. Han, Y.W. Kang, M.M. Middendorf, S.N. Murray, M. Piller, T.R. Pennisi, V. Peplov, R. Saethre, M. Santana, C. Stinson, M.P. Stockli and

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

High Rep Rate Guns: FZD Superconducting RF Photogun

High Rep Rate Guns: FZD Superconducting RF Photogun High Rep Rate Guns: FZD Superconducting RF Photogun J. Teichert, A. Arnold, H. Büttig, D. Janssen, M. Justus, U. Lehnert, P. Michel, K. Moeller, P. Murcek, Ch. Schneider, R. Schurig, G. Staats, F. Staufenbiel,

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017 LCLSII-TN-17-3 LCLS-II Injector Tuning Procedures F. Zhou (SLAC) & F. Sannibale (LBNL) /6/17 1. Introduction Figure 1 shows

More information

Linac4 Technical Design Report

Linac4 Technical Design Report EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - AB DEPARTMENT CERN AB 2006 084 ABP/RF Linac4 Technical Design Report L. Arnaudon, P. Baudrenghien, M. Baylac (LPSC), G. Bellodi, Y. Body, J. Borburgh,

More information