1 I-SEM Project Managers Group 21 March

2 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 2

3 Previous Meeting Minutes & Actions I # Action Resolution Status 301 Consider the forum for discussion of Day 2 Issues and add to a future agenda of the PMG 328 Provide additional details on the priority defects classified as participant impacting 329 Investigate and report if it is possible to add an All or nothing functionality in M7 Keep action open until time allows to discuss on PMG agenda. Detailed Defect Report issued and presented at the Market Trial Coordinators Group Meeting 13 April see slides of MTCG Presentation. This will be updated and reissued periodically throughout the Trial. It has been confirmed that it is not possible to have All or nothing functionality in M7 and will not be offered for blocks in IDC. Open Closed Closed 3

4 Previous Meeting Minutes & Actions II # Action Resolution Status 330 Confirm when the registration freeze will end 331 Confirm the rules for starting & resetting the 168 hr clock during scenario Organise PMG conference calls midway between each monthly PMG meeting The data freeze period will end on 16 March This information was previously communicated in the Market Participant Cutover Guide and in the SEMO News section of the SEMO website. V1.0 of the MT 168 Hour Operations Procedure published 12 March Meetings in I-SEM Calendar; first of these between meetings conference calls took place on 7 March Closed Closed Closed 334 Collateral Posted for FTRs what happens if there is a delay to I-SEM Go-Live? Measures being taken to mitigate the risk and consider possible back-out contingency measures in the event that the delay to golive is realised (to be discussed at meeting). Closed 4

5 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 5

6 I-SEM Project Milestones Status Update

7 Current Progress on Milestones 5 milestones have been completed since 21 Feb 18 PMG: TSOs #174c Central Systems Ready to Complete Market Trial RAs #139 Publication of I-SEM Charges/Tariffs ICOs #198 FTR Auction Trial, Training & Participant Test period end #197 FTR Auction EWIC & Moyle service active with JAO #199 FTR Auction EWIC & Moyle live on JAO platform 7

8 Current Progress on Milestones The slides which follow detail: 2 milestones currently reported as being late (red); and 3 milestones currently reported as being at specific risk (amber) In each case, the impacts and mitigating actions are noted All other milestones are currently reported as being on track, noting that all are not without some risk Please refer to the latest I-SEM Status Report for more details, which is published weekly on the SEMO website 8

9 Slipped Milestones Currently Red (1) #9 BM Engine Certification Complete: As discussed at the 21 Feb. PMG, certification of the BM engine has been extended to 8 May, based upon the current plan for fixing defects in the QBOA software. Achieving this date remains dependent on the timing and quality of software releases, however, we now have increased confidence in this date given (a) the advanced stage of the defect fix work and (b) the recent successful loading & running of QBOA cases in the certification tool. 9

10 Slipped Milestones Currently Red (2) #109a Effective date of ROI Generator and Supplier Licences: In response to a request by a Licence Holder to the Minister in DCCAE, an Appeals Panel was established on 10 Nov 17. It has a maximum period of six months to reach its decision. 10

11 At Risk Milestones Currently Amber (1) #87 Market Trial Complete and #250 Go Live: The status of these two dependent Milestones is shown as amber, given the increased levels of risk being carried in the central programme concerning defect fixes; the impact on participants own test plans given the more condensed period of unscripted trialling without material system defects; and other readiness concerns reported by Market Participants via the Market Readiness Assessment, and at the PMG. 11

12 At Risk Milestones Currently Amber (2) #52 FTR Auction Commences: This milestone has been marked at risk as we await the outcome of the I-SEM Steering Group s decision on approval of the FTR Auction Stage Gate. This decision will be communicated to participants in due course. 12

13 Forward Look at Upcoming Milestones The following 6 TSO Level 2 Milestones are due to be completed by the end of April 18: #7l I-SEM Technical Specification 8.0 #234b I-SEM Data Publication Guide - Issue 2.0 #215 MRC Approval #119 Finalisation of SEMOpx Procedures #216 Intraday Regional & Member Test complete #217 Day Ahead MRC, Regional & Member Test complete 13

14 Forward Look at Upcoming Milestones There are no RA Level 2 Milestones due to be completed by the end of April 18: 14

15 Forward Look at Upcoming Milestones The following ICO Level 2 Milestone is due to be completed by the end of April 18: #52 FTR Auctions commence 15

16 Change Requests Approved Approved since the last PMG: JCR_360: Modification to TSO Level 2 Milestone: #119 Finalisation of SEMOpx Operating Procedures JCR_361: Introduce a new TSO Level 2 Milestone: #139 Publication of I-SEM Charges/Tariffs 16

17 Day 2 Requests No Day 2 Requests have been approved since the last PMG, and none are currently in the pipeline for consideration The objective remains only to issue Day 2 Requests were absolutely essential to preserve the I-SEM Project timeline 17

18 Top Risks I (not in any particular order) Risk Mitigating Controls Trend Legislation/Licensing Delays: Risk that necessary legislation or licensing arrangements are not in place in time for Go-Live RAs on-going liaison with Departments Include relevant market readiness metrics against which to track and report progress Neutral Licence Appeal in Progress; Milestone #109a delayed. 18

19 Top Risks II Risk Mitigating Controls Trend BREXIT Impact: Risk that Government revisits I-SEM decision, or National Grid/Ofgem choose not to comply with the European Network Codes or not actively support the Target Model cross border arrangements, resulting in changes to scope, project delays, cost overruns, reduced quality, or potentially undermine I-SEM Ensure key decision makers are well informed about the benefits of market coupling Close liaison between RAs and Depts. Development of alternative models considering the impact of Brexit scenarios Neutral With the inaugural T-1 CM Auction run complete and Market Trial underway, the risk of a Brexit impact to golive is likely trending down. However, the risk of a longer-term impact on the I-SEM arrangements post go-live is likely continuing to trend up. 19

20 Top Risks III Risk Mitigating Controls Trend Central System Testing / Defect Fixing: Risk that completion of Rigorous management processes for tracking Level testing / defect fixing of the vendor deliverables central systems slips, resulting in Strong hands-on those systems not being available management oversight when needed to progress Market Trial. This may result from of vendors, with robust slippages in the delivery and contractual testing of the multitude of systems (e.g. due to vendor nonperformance), arrangements Fill in as many vendor introduction of shortfalls as possible by necessary changes, volume of taking on additional defects or because of the responsibilities/work complexity in bringing together all those systems in the limited time available Plan agreed with ABB for defect fixes required for go-live; two major releases planned for 3 & 22 April. To support delivery to this plan, we have strengthened our vendor on-site presence and will be testing defect fixes on an ongoing basis as they are completed by the vendor. The impact on participants own test plans given the more condensed period of unscripted trialling without material system defects, remains a concern. 20

21 Top Risks IV Risk Mitigating Controls Trend External Dependencies - Regional Coupling & Cross Zonal Arrangements: Risk that NGET, Ofgem, GB NEMOs &/or ICOs will not deliver key elements/decisions required in a timely fashion resulting in Project delays, cost overruns, or reduced quality. Joint Steering Committee (JSC) (TSOs, NEMOs & ICOs) in place. Joint Implementation Group (JIG) (RAs, TSOs, NEMOs & ICOs) in place. Put in place framework agreements between regional partners. Agree cost sharing arrangements. Down SEM-GB Regional Coupling activities continue to progress well. Going live with a single GB NEMO for the Intraday Auctions was agreed at JSC and JIG meetings in early March. 21

22 Top Risks V Risk Mitigating Controls Trend Participant Access to Clearing Member Readiness workstream Down Bank: Risk that the clearing model may cause a barrier to entry for market participants, especially smaller participants. has been established which will be an actioned forum where issues can be discussed between NEMO and ECC. The result may be that smaller ECC implementing a direct clearing participants may not be able to solution for market participants. enter the DA and ID markets, with flow on consequences for Participants have managed this risk market readiness. by aggregating through intermediaries In excess of thirty Members registered and the Direct Clearing solution having been established. At Feb PMG one Participant noted they did not have access to a clearing bank. Risk remains open. 22

23 Top Risks VI Risk Mitigating Controls Trend ABB s nmarket is not available to meet Project Timelines: Risk to progress of Market Trial, given the dependency of a large number of participants on ABB s nmarket Suite, in the event that the vendor s delivery plans slip. For individual participants to determine. Up? To be confirmed by participants. At the Feb meeting, participants noted that this risk is in part being realised, as ABB will not now deliver some of the nmarket functionality after go-live. However, view appeared to be that this would not stop those participants from going live. Current status to be confirmed by nmarket participants at the meeting. 23

24 Top Risks VII Risk Mitigating Controls Trend Participant Readiness: Risk that Market Participants are not ready Regular market readiness assessment reporting. Regular market participant engagement. Up? To be confirmed by participants Participants have previously advised that this risk was trending up, given compressed timelines to finalise system development and processes, a lack of clarity regarding retail tariffs, and uncertainty on whether participants would be able to make changes to their own systems following updates to the I-SEM Technical Specification and I-SEM Data Publication Guide. Whilst the compressed timeline remains a real challenge for all, there has been progress on these issues. Current status to be confirmed by participants at the meeting. 24

25 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 25

26 Readiness Update - Agenda a) Go-Live Stage Gate Update b) ICO Readiness c) Registration d) Technical Documentation e) System Defects f) Participant Readiness g) Regional Coupling h) Cutover 26

27 Readiness (a) Stage Gate Update I-SEM Readiness Stage Gate Update & Go Live Decision Process ISEM Programme Managers Group 21 st March,

28 FTR Auction Stage Gate - Update The FTR Auction Stage Gate was not approved by I- SEM Steering Group. Energy Trading Arrangements Go Live on May 23 is being reported as at Risk reflecting the increased levels of risk being carried by the central programme mostly surrounding defects. Earliest approval will be in line with the SEMC intention to go-live on April

29 Go Live Decision Process Governance Framework Market Trial Report Participant Assurance TSO/SEMO/MDP/ICO Assurance SEMC 26 th April Confirm Intention to Go Live Complete Market Trial & Readiness Activities Indicative Go Live Decision Timeline Formally Confirm Go Live 8 th May ISEM Steering Group will make recommendation Go Live Decision made by SEMC The SEMC will make an announcement approximately [two weeks] prior to Go Live Cutover Preparation D-8 ETA Go- Live Gate Opening

30 Readiness (b) ICO Readiness ICOs will provide an update on their current state of readiness and plans for the first FTR auction, in light of the I-SEM Steering Committee Decision of 16 March, not to approve the FTR Auction State Gate. 30

31 Readiness (c) Registration Balancing Market Highlights Units in Market Trial Units Pending * *End to end testing completed. Current expected date in Market Trial is by Friday 23/03/2018 *SEMO will advise Participants when they access these units in Market Trial What Who Remark Remaining Forecasts and Revised Forecasts - Complete Initial Credit Cover Calculations Reminder to submit signed Authorised Signatories (B19) to SEMO SEMO Participant Ongoing If not already done so 31

32 Registration Credit Cover Transitional What Who Deadline (By)Sub Complete and Submit Interim Transfer Facility Participant 28/03/2018 (In cases of Cash Collateral Accounts ) Submit TSC Part C Deed of Charge (In cases of Letters of Credit ) Submit LoC amendment based on TSC Part C template I-SEM only Participant 28/03/2018 Participant 28/03/2018 What Who Deadline (By) Submit Request to Open Cash Collateral Account as soon as possible Participant ASAP (deposit to be made by 09/05/2018) (In case of Cash Collateral) Submit TSC Part B Deed of Charge Participant On set up of Cash Collateral Account Submit Letter of Credit in line with TSC Part B template Participant ASAP 32

33 Registration - Banking Registration are still in the process of agreeing with the Market Trial team when banking details can be entered in Market Trial. Main changes highlighted in table below: What Who Deadline Transition Banking Details from SEM to I-SEM for existing Participants SEMO TBC* Enter New Participant Banking Details into Balancing Market Interface (BMI) Participants TBC* Confirmation of Banking Details Letters (CBDL) drafted SEMO TBC** Finance review all CBDLs Finance TBC** Issue CBDL to Participants SEMO TBC** Authorised Signatories Sign and Submit CBDL to SEMO Participants 20/04/2018 Check CBDL against Authorised Signatories (B19) and if complete accept Banking Details in BMI *To be agreed with the Market Trial team **To be updated based on sign off of * SEMO 27/04/

34 Registration - SEMOpx What REMIT Reporting Agreement Comment Requirements still being finalised with ACER. When S08 is published a communication will be issued to Participants Exchange Member Agreement Registration Change to dates: SEMO will issue the Exchange Member Agreements by 20/03/2018 Participants are asked to return signed, undated by and post by 16/04/2018 SEMOpx Unit Registration is dependent on Balancing Market registration. There are a number of units pending Balancing Market entry see slide 31. This will be completed in the coming weeks as EPEX require the final Member Referential File by mid April for Type 2 changes and the end of April for Type 3 changes. 34

35 Registration Capacity Market What REMIT Reporting Agreement Comment Following publication of the C20 REMIT Notification, the System Operators received a number of Requests to Report REMIT Data from Participants. The System Operators shall only process and transmit the REMIT Data to the European Agency for the Cooperation of Energy Regulators on behalf of a Participant for the purposes of compliance with REMIT requirements, as per L of the CMC. Performance Security The SOs have requested clarification from ACER regarding compliance. Participants that have not achieved Substantial Completion (90% of Awarded New Capacity) by 10/04/2018 shall post Performance Security at the rate of 30,000/MW. Two options: - Letter of Credit as per Appendix H of CMC - Reserve Account 35

36 Readiness (d) Technical Documentation I-SEM Technical Specification, Release 8.0 (L2-7L) I-SEM Data Publication Guide, Issue 2.0 (L2-234B) Both due to be published 28 Mar 2018 Planned Changes Doc Volume Change ITS ITS DPUG C: Bal Mkt E: Cap Mkt 1. CSB Settlement report schema files (minor edit to relax constraint on order of fields. xs:sequence -> xs:all) 2. CSB Settlement Calendar: update attribute. RUN -> RUN_TYPE 1. Update filename to reflect system-generated file (Part. Auct. Results) 1. Add website report access mechanisms for Type 2, Type 3 2. Add specification for existing ITS Reports REPT_001b (BM-162), REPT_002b (BM-163) 3. Add specification for SEMOpx Intraday Continuous Results reports 36

37 Readiness (e) Schedule of Priority Defects ABB to EirGrid Release Date Planned 03-Apr Status of Priority Defects for Go-Live Planned 22-Apr Release Pending In EirGrid Test Total (Planned / Pending / In Test) Expected Release Date To Mkt Trial 11-Apr 30-Apr - 19-Mar - # Market Participant Facing Defects # Internal Defects Total Defects Release Pending defects are those for which a release date has not yet been agreed between EirGrid and the vendor discussions are ongoing. ABB has fixed and delivered to EirGrid 143 defect fixes between 01-Jan-18 and 13-Mar

38 Readiness (f) Participants Discussion invited at the meeting on current state of Participant Readiness, and any practical measures which the PMG should consider to help mitigate identified risks or issues impacting on the readiness of participants projects. 38

39 Readiness (g) Regional Coupling SEM/GB Regional Testing commenced 4 th December Involves functional and procedural testing that is designed to: 1. satisfy the European governing body (MRC) that SEM-GB region can robustly join the European Day-Ahead coupled market and 2. ensure the robustness of the new SEM-GB Intraday market arrangements Testing involves TSOs, SEMOpx, GB NEMOs and Interconnectors Day Ahead functional and procedural testing complete Intraday functional testing due to complete next week; Intraday procedural testing to commence next week All testing remains on track to complete by end April

40 Readiness (h) Cutover: Participant Guide Cutover Participant Guide (CPG) V1.0 published Feb 16 th Key Activities Identified: Market Trial Scenario 7 Registration Data & Data Freeze Settlement Credit & Clearing Cutover TSC Part A TSC Part B Meter Data Cutover RA approval steps for cutover & go-live Systems cutover arrangements (incl. SEM Systems wind down) Participant cutover activities & timelines Markets cutover timeline for May 22 nd +/- 1 day Internal detailed cutover planning advanced to inform updates to CPG CPG V2.0 published Mar 16 th incorporating updates from feedback received 40

41 Cutover: Participant Guide CPG V2.0 published Friday March 16 th to address feedback received Feedback received summarily seeking the following: Finalisation of key dates (e.g. gate times, RA decisions) Greater Detail on: Participant Activities Systems Cutover & Access to Production Systems Data cutover arrangements Contingency arrangements Registration Clarifications Market Trial Conclusion Arrangements Fundamental arrangements in CPG V2.0 substantially unchanged 41

42 Holiday Holiday Holiday GO-LIVE Cutover: Participant Guide Market Trial Phase Month Week Commencing: March Mar 19-Mar 26-Mar Unscripted Phase April-18 May Apr 09-Apr 16-Apr 23-Apr 30-Apr 07-May 14-May 21-May 28-May 04-Jun June Jun 18-Jun 25-Jun Live June Jun 10-Jun 17-Jun 24-Jun July Jul Market Trial Scenario 7 Key Milestones:Intraday Continuous Market Gate Open Go-Live Key Milestones: Day Ahead Market & Intraday Auctions Gate Open Go-Live Live Operations Key Milestones: Balancing Market Gate Open Go-Live Registration Data Freeze (New Unit Reg. Data) Registration Data Freeze (Changes to Existing Data) SEM Settlement Wind Down Period I-SEM Settlement Taking Place Trading & Settlement Code Part A Validity Trading & Settlement Code Part B Validity * MDPs Input Meter Data into current SEM systems MDPs Input Meter Data into new I-SEM systems SEM Credit Cover Arrangements in Place Credit Cover Transitional Period (between SEM & I-SEM) I-SEM Credit Cover Arrangements in Place Wind Down of Curent SEM Systems Go-Live Decision Confirmed by Regulator *For validity dates of specific sections of TSC Part A, refer to section RA Decision 42

43 Cutover - Data Registration Data & Data Freeze Key Dates: Registration Packs submitted for New Units going Effective 01/05/2018* 01/02/2018 VTOD entered in Market Systems for New Units going Effective in SEM and I-SEM on 12/04/ /05/2018 VTOD entered in Market Systems for changes to data for Existing Units going Effective in SEM 19/04/2018 and I-SEM on 08/05/2018 Last available Effective Date for New Units in SEM and I-SEM pre I-SEM go live 01/05/2018 Last available Effective Date for changes to data for Existing Units in SEM and I-SEM pre I- 08/05/2018 SEM go live Date VTOD must be entered in Market Systems for New Units going Effective in I-SEM on 01/06/ /06/2018 First available Effective Date for New Units in I-SEM post I-SEM go live 19/06/2018 *Allowing for the registration process to take up to 60 working days. Registration Packs received after this date will be processed on a best endeavour basis. 43

44 Cutover Day-Ahead Market DAM Cutover Dates: No. Milestone Trade Date Start Date End Date 1 2 First Day-Ahead Market Gate for I-SEM Day 1 ( D") First Day-Ahead Market Gate for I- SEM Day 1 ("D") 23/05/18 14/05/18 14/05/18 23/05/18 22/05/18 22/05/18 3 Day Ahead Market 23/05/18 22/05/18 22/05/18 Further details added to SEMOpx section of CPG V2.0 in response to queries raised 44

45 Cutover Intraday Auctions Intraday Auctions Cutover Dates: No. Milestone Trade Date Start Date End Date 1 First Intraday Auction Gate for IDA1, IDA2 & IDA3 23/05/18 14/05/18 14/05/18 2 First IDA1 Gate 23/05/18 22/05/18 22/05/18 3 Intraday Auction 23/05/18 22/05/18 22/05/18 4 First IDA2 Gate 23/05/18 23/05/18 23/05/18 5 First IDA3 Gate 23/05/18 23/05/18 23/05/18 Further details added to SEMOpx section of CPG V2.0 in response to queries raised 45

46 Cutover Intraday Continuous Intraday Continuous Market Cutover Dates: No. Milestone Trade Date Start Date End Date 1 First IDC Gate 23/05/18 22/05/18 22/05/18 2 First IDC Gate Closure One hour before delivery rolling gate closures every 30 minutes 23/05/18 22/05/18 22/05/18 3 Intraday Market 23/05/18 22/05/18 22/05/18 4 First IDC Nominations sent to and every 15 minutes thereafter 23/05/18 22/05/18 22/05/18 Further details added to SEMOpx section of CPG V2.0 in response to queries raised 46

47 Cutover Balancing Market Balancing Market Cutover Dates: No. Milestone Start Date End Date 1 First Balancing Market Gate for I-SEM Day 1 ("D") 14/05/18 14/05/18 2 First Balancing Market Gate (22:00) on D 22/05/18 22/05/18 3 Balancing Market 22/05/18 22/05/18 Further details added to Balancing Market section of CPG V2.0 in response to queries raised. 47

48 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 48

49 Overall Status Last few weeks on improving ex-ante Market Performance Focus now on: Release Programme to fix defects Improving Settlement experience Improving Contents of Reports Preparation for Scenario 7 Understanding 168 Hour goal 49

50 Market Trial Scenario Hour Operations Trial Procedure Scenario 7 Unscripted - plan to commence March 19 Areas of focus Ex-ante volumes Imbalance price Quality - Market reports and solutions Uptime of Markets Exit criteria successful 168-hour Operations Trial 50

51 Start 168 Epex & ECC Scenario Holiday Holiday Holiday Holiday Market Trial Scenario Hour Operations Trial Trial Phase Month Week Commencing: Trial Week Number: 1 - Connectivity 2 - DAM (EirGrid provide data) 3 - DAM + BM (EirGrid provide data) 4 - DAM + IDA + IDC + BM (Participant data) 5 - DAM + IDA + IDC + BM + Settlement 6 - DAM + IDA + IDC + BM + Settlement (Exceptional Conditions) 7 - DAM + IDA + IDC + BM + Settlement Mocked Data Day-Ahead Auction - Uncoupled Intra Day Auction 3 - Uncoupled Day-Ahead Auction - Coupled Intra Day Auction 1 - Coupled Intra Day Auction 2 - Coupled Inter Day Continious Trading Day-Ahead Market Establishment Phase Scripted Phase Unscripted Phase Live December-17 January-18 February-18 March-18 April-18 May Dec 11-Dec 18-Dec 25-Dec 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb 12-Feb 19-Feb 26-Feb 05-Mar 12-Mar 19-Mar 26-Mar 02-Apr 09-Apr 16-Apr 23-Apr 30-Apr 07-May 14-May 21-May 28-May EirGrid Resources Live Operations Intraday Market Balancing Market Settlement Reports - content April 11 - Earliest start date (based on current defect plan) 51

52 hour Operation Trial - Sample Metrics I-SEM Market Trial 168-Hour Operation (Sample daily assessment) ID Market Type Details Target Weekly Tolerance ISEM_5 BM Process Complete and publish 4 LTS Runs per day with feasible output - REPT_001b 28 1 N N N N N N N ISEM_6 BM Process Complete and publish 96 RTC Runs per day with feasible output - REPT_002b N N N N N N N ISEM_7 BM Process Complete and publish 288 RTD Runs per day with feasible output - (REPT_003a & REPT_003b) N N N N N N N ISEM_8 Settlement Process Complete and Publish Indicative Settlement (Trading) - REPT043 & REPT044 within 60 minutes 0 N Y Y Y Y Y N ISEM_9 Settlement Process Complete and Publish Indicative Settlement (Capacity) - REPT043 & REPT044 within 60 minutes 0 N Y Y Y Y Y N ISEM_10 Settlement Process Complete and Publish Initial Settlement (Trading) - REPT043 & REPT044 within 60 minutes 0 Y Y Y Y N Y Y ISEM_11 Settlement Process Complete and Publish Initial Settlement (Capacity) - REPT043 & REPT044 within 60 minutes 0 Y Y Y Y N Y Y ISEM_12 Settlement Process Complete and Publish Settlement Document (Fridays only) - REPT045 By 12:00 0 N ISEM_13 Settlement Process Complete and Publish Credit Management Report 1 Once per day 2 N N N N N N N ISEM_14 Settlement Process Complete and Publish Credit Management Report 2 Once per day 0 Y Y Y Y Y Y Y ISEM_15 Settlement Process Complete and Publish Credit Management Report 3 Once per day 2 N N N N N N N ISEM_16 DAM / IDA Availability ETS Type 2 Available for Submissions 95% 0 Y Y Y Y Y Y Y ISEM_17 DAM / IDA Availability ETS Type 3 Available for Submissions 95% 0 Y Y Y Y Y Y Y ISEM_18 BM Availability MPI Type 2 Available for Submissions 95% ISEM_19 BM Availability MPI Type 3 Available for Submissions 95% ISEM_20 BM Process gate Closure on time 100% +/- 15mins ISEM_21 DAM Process Cross Zonal Capacity Sent to SEMOpx 100% +/- 15mins Y Y Y Y N N/A N/A ISEM_22 DAM Process Gate Closure 100% +/- 15mins Y Y Y Y Y N/A N/A ISEM_23 DAM Process Auction Run 100% +/- 15mins Y Y Y Y N N/A N/A ISEM_24 DAM Process Final Results publication within 60 minutes 0 Y Y Y Y Y N/A N/A Based on last week s metrics restart

53 Issues Summary of Key Issues Participants have raised queries regarding the quality of the content of the BM Settlement Statements and Reports Balancing Market System is not sufficiently stable resulting in lack of availability. As a result, there are periods without schedules being developed and imbalance prices being delivered. The issues with QBOA are currently being addressed but until they are resolved, the settlement statements will not be of the required quality. Actions to Address the Issues Release programme presented on March 13 th. Releases currently in test will address defects in Settlement reports _043 and _045 and defects covered by CR15b. Later releases in early April will address a large number of CSB defects. Releases currently in test address up to 6 QBOA defects. Another 7 QBOA defects will be addressed in early April. A large number of Scheduling and Dispatch defects will be addressed in late April. 53

54 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 54

55 Summary of Participant Queries February 2018 Number Received Number Resolved on time* Average Resolution Time (Working Days) % (70%) 3.81 (3.72) * KPI = 20 days query resolution timescale Figures in brackets are last month s numbers for comparison. 55

56 Summary of Participant Queries February 2018 February showed the same number of queries received over the previous month; there is noted a continued increase in queries related to Market Trial activities (21% growth in comparison to January). The majority of queries received in the month of February were related to Market Trial (68%) and Market Rules (7%). 56

57 Queries Processed Recent History by Month Queries processed November December January February 57

58 Agenda 1. Previous Meeting Notes & Actions 2. Project Status & Key Risks 3. Readiness Update 4. Market Trial Update 5. Query Metrics 6. AOB 58

59 Any Other Business Opportunity to bring forward any other business for discussion. 59

60 AOB Contingency Planning We d like to have a discussion at the meeting on understanding the challenges to participants in the event that the SEM Committee at its meeting on 26 April 2018 does not signal its intention to go-live, or at some point thereafter having signalled its intention to go-live, there is a need to stop the 23 May go-live process. 60

61 Close Web: I-SEMproject@sem-o.com Thank you for your attendance. Next Conference Call: 5 Next Meeting: April 2018 DATE TBC 61

Market Trial Co-ordinators Meeting I-SEM Project

Market Trial Co-ordinators Meeting I-SEM Project Market Trial Co-ordinators Meeting I-SEM Project Dublin, 29 August 2018 1 Agenda The Agenda for the session is as follows: Item Presenter Welcome Ex-Ante Market Update Balancing Market Settlement Cutover

More information

Intra-Day Trading Cutover Workshop. Belfast 27 th June 2012 Dublin 28 th June 2012

Intra-Day Trading Cutover Workshop. Belfast 27 th June 2012 Dublin 28 th June 2012 Intra-Day Trading Cutover Workshop Belfast 27 th June 2012 Dublin 28 th June 2012 Welcome & Housekeeping Welcome to this workshop in relation to cutover to Intra-Day Trading (IDT) arrangements in the SEM.

More information

Grid Code Modification Register. March 2018

Grid Code Modification Register. March 2018 Grid Code Modification Register ch Issue: 1.0 Date of Issue: 26 ch Proposal to Grid Code Review Panel Meeting Publish Workgroup Consultation Workgroup Consultation Closing Date Workgroup Report to Grid

More information

Load Frequency Control Structure for Ireland and Northern Ireland

Load Frequency Control Structure for Ireland and Northern Ireland Load Frequency Control Structure for Ireland and Northern Ireland EirGrid TSO & TSO consultation on a proposal for the determination of LFC blocks in accordance with Article 141(2) of the Commission Regulation

More information

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016 RCOA Mandatory Contestability for Phase 1 Customers 16 December 2016 TOPICS 1 2 3 4 RCOA Updates RCOA Timeline General Procedures on Mandatory Migration Requirements RCOA Updates 420 Contestable Customers

More information

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees...

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees... FEEDBACK REPORT STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Feedback report Work stream Technical Topics: P.01 Planning Filename ONL 15-149 P01_Planning_FBRe_v2 Version 2 public release Pages

More information

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green OB30 paper 07 KPI Report (August 2015) KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green 98% amber Service Restoration within

More information

KPI and SLA regime: September 2015 performance summary

KPI and SLA regime: September 2015 performance summary OB31 Paper 07 KPI Report (September) KPI and SLA regime: September 2015 performance summary Ref Jul 15 Aug 15 Sep 15 Target Description KPI A 100% 99.87% 100% 99% green 98% amber Service Restoration within

More information

Name Initials Position

Name Initials Position Minutes Meeting name CUSC Modifications Panel Meeting number 217 Date of meeting 15 December 2017 Location National Grid House Attendees Name Initials Position Trisha McAuley TM Panel Chair Caroline Wright

More information

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary

More information

GC0100/101/102 Code Administrator Consultation Responses. Rob Wilson. Grid Code Panel 8 th Feb 2018

GC0100/101/102 Code Administrator Consultation Responses. Rob Wilson. Grid Code Panel 8 th Feb 2018 GC0100/101/102 Code Administrator Consultation Responses Rob Wilson Grid Code Panel 8 th Feb 2018 GC0100 Respondent Original/ Alternative Support Implementation Summary of Points View of Proposer EDF Energy

More information

Impact on Providers. Page 1 of 11

Impact on Providers. Page 1 of 11 News Flash - March is National Colorectal Cancer Awareness Month! In conjunction with National Colorectal Cancer Awareness Month, the Centers for Medicare & Medicaid Services (CMS) reminds health care

More information

Building Your DLP Strategy & Process. Whitepaper

Building Your DLP Strategy & Process. Whitepaper Building Your DLP Strategy & Process Whitepaper Contents Introduction 3 DLP Planning: Organize Your Project for Success 3 DLP Planning: Clarify User Profiles 4 DLP Implementation: Phases of a Successful

More information

Applying to carry BBC content and services: a partners guide to process

Applying to carry BBC content and services: a partners guide to process Applying to carry BBC content and services: a partners guide to process June 2018 Introduction 1. This document outlines the processes the BBC follows in meeting partner s requests to carry 1 BBC content

More information

Deliverable 2.17 Periodic WP2 Progress Report 3

Deliverable 2.17 Periodic WP2 Progress Report 3 Deliverable 2.17 Periodic WP2 Progress Report 3 1.1 Objectives of WP2 WP2 is the main SKA design activity; it was aimed at producing a costed top-level design for the SKA and a detailed system design for

More information

Preparing for a Transition from an FI/Carrier to a Medicare Administrative Contractor (MAC) Provider Types Affected

Preparing for a Transition from an FI/Carrier to a Medicare Administrative Contractor (MAC) Provider Types Affected News Flash - November is American Diabetes Month ~ The American Diabetes Association has designated American Diabetes Month as a time to communicate the seriousness of diabetes and the importance of proper

More information

Start of DTV Transition 600 MHz repacking

Start of DTV Transition 600 MHz repacking Start of DTV Transition 600 MHz repacking April 21, 2017 Building a prosperous and innovative Canada Brief Recap of Prior Presentations DTV Application Process 600 MHz Repacking (Nov. 21, 2016) Application

More information

OB35 Paper 06 KPI Report

OB35 Paper 06 KPI Report OB35 Paper 06 KPI Report KPI and SLA regime: January 2016 performance summary Ref Nov 15 Dec 15 Jan 16 Target Description KPI A 99.90% 100% 99.87% 99% green 98% amber Service Restoration within 10 working

More information

RECORDED MUSIC FOR THE PURPOSE OF DANCING MUSIC LICENSING CONSULTATION

RECORDED MUSIC FOR THE PURPOSE OF DANCING MUSIC LICENSING CONSULTATION DATE: 13 October 2017 RECORDED MUSIC FOR THE PURPOSE OF DANCING MUSIC LICENSING CONSULTATION OneMusic Australia is a joint venture initiative of APRA AMCOS and PPCA. APRA AMCOS is the trading name of the

More information

800 MHz Band Reconfiguration

800 MHz Band Reconfiguration 800 MHz Band Reconfiguration RPC Meeting February 13, 2009 1 Agenda Reconfiguration Status Update Implementation Planning Session Schedule Monitoring & Management Change Notice Regional Plans Licensing

More information

-Technical Specifications-

-Technical Specifications- Annex I to Contract 108733 NL-Petten: the delivery, installation, warranty and maintenance of one (1) X-ray computed tomography system at the JRC-IET -Technical Specifications- INTRODUCTION In the 7th

More information

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents

More information

These restrictions, also called Network Constraints, are characterized by:

These restrictions, also called Network Constraints, are characterized by: Subject: Congestion management on the Belgian transmission grid Date: 1 September 2016 Contact: Steven Harlem Phone: 0032 2 500 85 89 Mail: steven.harlem@febeg.be Introduction To guarantee the security,

More information

Policy on the syndication of BBC on-demand content

Policy on the syndication of BBC on-demand content Policy on the syndication of BBC on-demand content Syndication of BBC on-demand content Purpose 1. This policy is intended to provide third parties, the BBC Executive (hereafter, the Executive) and licence

More information

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green OB19 Paper 07 KPI Report KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

OUR CONSULTATION PROCESS WITH YOU

OUR CONSULTATION PROCESS WITH YOU OUR CONSULTATION PROCESS WITH YOU OneMusic Australia is consulting with you and would like to hear what you think. If you use music in your dance school, performance school, or are an instructor of either,

More information

700 MHz clearance programme timescale review. Review of progress, risks and readiness

700 MHz clearance programme timescale review. Review of progress, risks and readiness 700 MHz clearance programme timescale review Review of progress, risks and readiness Publication Date: 13 December 2018 About this document When confirming the timescales for the delivery of the 700 MHz

More information

In this submission, Ai Group s comments focus on four key areas relevant to the objectives of this review:

In this submission, Ai Group s comments focus on four key areas relevant to the objectives of this review: 26 March 2015 Mr Joe Sheehan Manager, Services and Regulation Section - Media Branch Department of Communications GPO Box 2154 CANBERRA ACT 2601 Dear Mr Sheehan, DIGITAL TELEVISION REGULATION REVIEW The

More information

2. I wish to Port the following to Tropical Business Solutions Pty Ltd, Trading as Tropical Communications

2. I wish to Port the following to Tropical Business Solutions Pty Ltd, Trading as Tropical Communications PORT AUTHORITY FORM (Customer Authority) 1. Company details Business name: ABN: Title: Last name: Given name(s): Site address and contact details Unit/No.: Lot.: Street: Suburb: State: Postcode: Site Contact

More information

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document July 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table

More information

Market Index Definition Statement Review 2011 ISG Recommendations

Market Index Definition Statement Review 2011 ISG Recommendations 188/10 Market Index Definition Statement Review 2011 ISG Recommendations Meeting Name BSC Panel Meeting Date 13 October 2011 Purpose of paper Summary For Decision We have carried out the annual review

More information

Customer Authority to Port Telephone Number to Yourhub

Customer Authority to Port Telephone Number to Yourhub Customer Authority to Port Telephone Number to Yourhub 1. Customer Details Business Name (if applicable) Title Surname Given Name(s) 2. Address Details Unit Number Street Number Street Name Suburb State

More information

Broadcasting Ordinance (Chapter 562)

Broadcasting Ordinance (Chapter 562) Broadcasting Ordinance (Chapter 562) Notice is hereby given that the Communications Authority ( CA ) has received an application from Phoenix Hong Kong Television Limited ( Phoenix HK ), a company duly

More information

The complete tender documents are available for download on the Danish Agency of Culture and Palaces website under the DTT Udbud (DDT Tender) point.

The complete tender documents are available for download on the Danish Agency of Culture and Palaces website under the DTT Udbud (DDT Tender) point. The Radio and Television Board H.C. Andersens Boulevard 2 DK-1553 Copenhagen V Phone +45 33 95 42 00 rtv@slks.dk www.slks.dk Summary of the Radio and Television Board s tender of countrywide digital terrestrial

More information

14380/17 LK/np 1 DGG 3B

14380/17 LK/np 1 DGG 3B Council of the European Union Brussels, 15 November 2017 (OR. en) Interinstitutional File: 2016/0284(COD) 14380/17 NOTE From: To: Presidency Delegations No. prev. doc.: ST 13050/17 No. Cion doc.: Subject:

More information

Australian Broadcasting Corporation. Australian Communications and Media Authority

Australian Broadcasting Corporation. Australian Communications and Media Authority Australian Broadcasting Corporation submission to Australian Communications and Media Authority Digital Television codes and standards February 2008 ABC Submission in response to the ACMA discussion paper

More information

ENFORCEMENT DECREE OF THE BROADCASTING ACT

ENFORCEMENT DECREE OF THE BROADCASTING ACT ENFORCEMENT DECREE OF THE BROADCASTING ACT Presidential Decree No. 16751, Mar. 13, 2000 Amended by Presidential Decree No. 17137, Feb. 24, 2001 Presidential Decree No. 17156, Mar. 20, 2001 Presidential

More information

Licence for the transmission of digital terrestrial television multiplex service

Licence for the transmission of digital terrestrial television multiplex service 1 Wireless Telegraphy Act 2006 Licence for the transmission of digital terrestrial television multiplex service Date of Issue 6 July 2007 Licensee Company number (if a company) Registered address of Licensee

More information

CREATIVE ENGLAND ishorts+ FUNNY GIRLS GUIDELINES

CREATIVE ENGLAND ishorts+ FUNNY GIRLS GUIDELINES CREATIVE ENGLAND ishorts+ FUNNY GIRLS GUIDELINES These guidelines relate to ishorts+ Funny Girls, our comedy short film initiative to support female directors and writer/directors based in England. Please

More information

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green Paper 06 OB20 KPI Report KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

BAL Real Power Balancing Control Performance Standard Background Document

BAL Real Power Balancing Control Performance Standard Background Document BAL-001-2 Real Power Balancing Control Performance Standard Background Document February 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents

More information

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS 21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS REQUESTS AND REQUESTS FOR DATASETS... 21-1 21.1 Ancillary Studies... 21-4 21.1.1 MTN Review and Approval of Ancillary Studies (Administrative)...

More information

DIGITAL TELEVISION: MAINTENANCE OF ANALOGUE TRANSMISSION IN REMOTE AREAS PAPER E

DIGITAL TELEVISION: MAINTENANCE OF ANALOGUE TRANSMISSION IN REMOTE AREAS PAPER E Office of the Minister of Broadcasting Chair Economic Development Committee DIGITAL TELEVISION: MAINTENANCE OF ANALOGUE TRANSMISSION IN REMOTE AREAS PAPER E Purpose 1. This paper is in response to a Cabinet

More information

BBC Bitesize Primary Music Animation Brief

BBC Bitesize Primary Music Animation Brief Music Animation Brief BBC Learning Contents About this brief... 2 Who is the BBC Bitesize audience?... 2 The commission... 2 Style, tone and the Bitesize brand... 3 Requirements... 4 Outline of delivery...

More information

Announcement by Society ARTISJUS Hungarian Bureau for the Protection of Authors Rights (Cable 18)

Announcement by Society ARTISJUS Hungarian Bureau for the Protection of Authors Rights (Cable 18) Announcement by Society ARTISJUS Hungarian Bureau for the Protection of Authors Rights (Cable 18) on the remunerations payable by organisations simultaneously retransmitting radio and television programmes

More information

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS 21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS REQUESTS AND REQUESTS FOR DATASETS... 1 21.1 Ancillary Studies... 4 21.1.1 MTN Review and Approval of Ancillary Studies (Administrative)...

More information

200$ 186$ 189$ 196$ 198$ Jul.$2012$ Jun.$2012$ Dec.$2012$ Aug.$2012$ Jan.$2013$ Sep.$2012$ Oct.$2012$ Mar.$2013$ Feb.$2013$ Nov.$2012$ Apr.

200$ 186$ 189$ 196$ 198$ Jul.$2012$ Jun.$2012$ Dec.$2012$ Aug.$2012$ Jan.$2013$ Sep.$2012$ Oct.$2012$ Mar.$2013$ Feb.$2013$ Nov.$2012$ Apr. Agenda Welcome, VESA Update - VESA/VTM MyDP Technology Analogix MyDP, edp Test & Measurement Agilent Lunch HBR2 Measurements Tektronix Link Layer Testing Unigraf/SYMH Understanding Multi-Stream VTM & Allion

More information

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4)

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4) INTERIM ADVICE NOTE 109/08 Advice Regarding the Motorway Signal Mark 4 (MS4) Summary This document provides advice on usage of MS4 signal and when they can be used to replace MS3 signals. Instructions

More information

EudraVigilance: are you ready for change?

EudraVigilance: are you ready for change? EudraVigilance: are you ready for change? Pharmacovigilance Platform Nederland 26 September 2017 Anja van Haren 1 Content 1. Introduction 2. MAH obligation for signal detection on EV 3. ADR reports 4.

More information

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013

MISO Market Participant Cutover Briefing #2: Offer Parameter Overview. December 13, 2013 MISO Market Participant Cutover Briefing #2: Offer Parameter Overview December 13, 2013 Market Participant Cutover Briefing #2 Agenda Introduction and Schedule (5 minutes) Focus Topic: Offer Parameter

More information

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4

FACILITIES STUDY MID AMERICAN TRANSMISSION SERVICE REQUESTS. OASIS Revision: 4 TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: MID AMERICAN ENERGY. FACILITIES STUDY EJO # F4PPAR0422 MID AMERICAN TRANSMISSION SERVICE REQUESTS OASIS 1468288 Revision: 4 Rev Issue Date Description

More information

Grid Code Review Panel Meeting

Grid Code Review Panel Meeting Minutes and Actions Arising from Meeting No. 50 Held on 7 th July 2011 at AEP Offices, London Present: David Smith Thomas Derry National Grid Graham Stein Steve Curtis Tom Ireland DS TD GS SC TI Panel

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5)

POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5) POWER OF CHOICE IMPLEMENTATION PROGRAM INDUSTRY TRANSITION AND CUTOVER PLAN (VERSION 1.5) Published: 24 November 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 31 August 2017 First draft

More information

Switchover to Digital Broadcasting

Switchover to Digital Broadcasting Switchover to Digital Broadcasting Enio Haxhimihali INTRO EU countries have progressed in their implementation of digital networks and switch-off of analogue broadcasting. Most of them have now switched

More information

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference Governance 1. The need case to establish a Next Steps Expert Technical Workgroup Supporting Fast Fault Current Injection (FFCI)

More information

Council of the European Union Brussels, 26 June 2017 (OR. en)

Council of the European Union Brussels, 26 June 2017 (OR. en) Conseil UE Council of the European Union Brussels, 26 June 2017 (OR. en) Interinstitutional File: 2016/0284 (COD) 10551/17 LIMITE NOTE From: To: Presidency Delegations No. prev. doc.: ST 6610/17 No. Cion

More information

IMS Brochure. Integrated Management System (IMS) of the ILF Group

IMS Brochure. Integrated Management System (IMS) of the ILF Group Br ochur e IMS Brochure Integrated Management System (IMS) of the ILF Group FOREWORD ILF Consulting Engineers always endeavours to precisely analyse the requests and needs of its customers and to subsequently

More information

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013

MISO Market Participant Cutover Briefing #5: Notable Market Developments. December 19, 2013 MISO Market Participant Cutover Briefing #5: Notable Market Developments December 19, 2013 Market Participant Cutover Briefing #5 Disclaimer The following presentation is for informational purposes only

More information

Game Consoles Self-Regulatory Initiative 4 th Steering Committee Meeting

Game Consoles Self-Regulatory Initiative 4 th Steering Committee Meeting Game Consoles Self-Regulatory Initiative 4 th Steering Committee Meeting 13 July 2017 Brussels Game Consoles VA 1 Agenda 1. Welcome and introductions 10:00 10:10 2. 3 rd Steering Committee meeting (December

More information

Children s Television Standards

Children s Television Standards Children s Television Standards 2009 1 The AUSTRALIAN COMMUNICATIONS AND MEDIA AUTHORITY makes these Standards under subsection 122 (1) of the Broadcasting Services Act 1992. Dated 2009 Member Member Australian

More information

IKONOS Ground Segment Interoperability & Experiences after 6+ Years of Operations

IKONOS Ground Segment Interoperability & Experiences after 6+ Years of Operations IKONOS Ground Segment Interoperability & Experiences after 6+ Years of Operations George Ellis, European Space Imaging GSCB Workshop, ESA/ESRIN Frascati IKONOS Mission status Launch Owned by Operational

More information

South Australian Energy Transformation

South Australian Energy Transformation South Australian Energy Transformation PSCR Supplementary Information Paper ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box 7096, Hutt Street Post Office, Adelaide,

More information

Foundations Upgrade Institutional Readiness

Foundations Upgrade Institutional Readiness Foundations Upgrade Institutional Readiness GeorgiaFIRST Team November 20, 2013 2013 Board of Regents of the University System of Georgia. All Rights Reserved. WebEx Housekeeping Audio and volume adjustment

More information

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum 1. Introduction and summary The above-named organisations welcome the

More information

Australian Broadcasting Corporation. Department of Broadband, Communications and the Digital Economy

Australian Broadcasting Corporation. Department of Broadband, Communications and the Digital Economy Australian Broadcasting Corporation submission to Department of Broadband, Communications and the Digital Economy Response to the Discussion Paper Content and access: The future of program standards and

More information

A journey of many steps. Alma Integration with Libraries Australia

A journey of many steps. Alma Integration with Libraries Australia A journey of many steps Alma Integration with Libraries Australia The practical stuff University of Adelaide 2 The basics All the records you want to send to Libraries Australia must be tagged Publish

More information

Records & Registration SIG September 2018

Records & Registration SIG September 2018 Records & Registration SIG September 2018 Agenda What does it take to build a Workday tenant? Upcoming Functionality Releases Workday Cutover Framework September 27, 2018 2 What does it take to build a

More information

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013 Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013 Agenda Program Overview Recent Developments Preparing for Reconfiguration Phases of Reconfiguration Planning

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

Editorial Policy. 1. Purpose and scope. 2. General submission rules

Editorial Policy. 1. Purpose and scope. 2. General submission rules Editorial Policy 1. Purpose and scope Central European Journal of Engineering (CEJE) is a peer-reviewed, quarterly published journal devoted to the publication of research results in the following areas

More information

A GUIDE TO COMMISSIONED PROGRAMMES

A GUIDE TO COMMISSIONED PROGRAMMES A GUIDE TO COMMISSIONED PROGRAMMES INTRODUCTION TECHNICAL REQUIREMENTS... RTÉ s DELIVERY REQUIREMENTS PROMOTIONS PROGRAMME PUBLICITY SUBTITLING LIBRARY SERVICES POST TRANSMISSION/ARCHIVE COPYRIGHT IBEC

More information

Newspapers. Periodicals, magazines

Newspapers. Periodicals, magazines Special Terms Extraordinary Provisions Newspapers Print run up to 1/8 ¼ ½ 1/1 Double page 25.000 3 040 5 810 8 300 8 740 14 160 50.000 5 260 7 580 10 520 11 070 17 660 100.000 7 420 10 020 15 390 16 160

More information

Meeting of the BBC Board MINUTES. 23 November 2017 Broadcasting House, London

Meeting of the BBC Board MINUTES. 23 November 2017 Broadcasting House, London Meeting of the BBC Board MINUTES 23 November 2017 Broadcasting House, London ITEMS OF BUSINESS 1. Apologies and Conflicts of Interest 2. Minutes from the 17 October Board Meeting 3. Executive Reports 4.

More information

0.1. Outage Management Process Summary

0.1. Outage Management Process Summary 0.1 Outage Management Process Summary Issue: 1.0 Issue Date: August 27, 2014 Table of Contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Glossary... 4 State Transition Model... 8 2. Outage Management Processes...

More information

CENELEC GUIDE 13. IEC - CENELEC Agreement on Common planning of new work and parallel voting. Edition 1,

CENELEC GUIDE 13. IEC - CENELEC Agreement on Common planning of new work and parallel voting. Edition 1, CENELEC GUIDE 13 IEC - CENELEC Agreement on Common planning of new work and parallel voting Edition 1, 2001-01 The first IEC/CENELEC Cooperation Agreement on common planning of new work and parallel voting

More information

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR 2002-2003 These Guidelines are specific to the terms and conditions of the program for the fiscal year of 2002-2003 (which ends on

More information

REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER

REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER 1. Executive Summary The Selkirk transmitter and its 11 relays, serving 52,000 homes in the Scottish Borders (16,800 of which were eligible for the

More information

RULES & REGULATIONS. B- SHORT FILM SECTION Films that run for a maximum of 45 minutes can compete for the following prizes:

RULES & REGULATIONS. B- SHORT FILM SECTION Films that run for a maximum of 45 minutes can compete for the following prizes: RULES & REGULATIONS Madrid City Council organises the 15th edition of the Madrid International Documentary Film Festival, DOCUMENTAMADRID 2018, a festival dedicated to multiple expressions of documentary

More information

Emerging Subsea Networks

Emerging Subsea Networks THE CHALLENGES OF COMPLETING AN OIL & GAS CABLE SYSTEM ORDER Jerry Brown, Rendong Xu, Guilin Sun, Lei Zhang, Changji Hao, Xiong Wang, Hongli Qu, Di Wu, Fu Feng, Yin Jiang (Hengtong Marine Cable Systems)

More information

PSB nations and regions compliance reporting, 2015

PSB nations and regions compliance reporting, 2015 PSB nations and regions compliance reporting, 2015 2 Introduction (I) TV broadcasters must comply with a range of programme and output quotas that set minimum levels of types of programmes that they must

More information

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan Response to Draft Spectrum Consultation Glasgow 2014 Page 1 of 8 1. BACKGROUND 1.1 The BBC welcomes Ofcom s engagement with stakeholders

More information

Australian and New Zealand Energy Performance and Marking Requirements for External Power Supplies

Australian and New Zealand Energy Performance and Marking Requirements for External Power Supplies FACT SHEET October 2008 Australian and New Zealand Energy Performance and Marking Requirements for External Power Supplies Minimum Energy Performance Standards (MEPS) Implementation dates Australia - 1

More information

AMERICAN NATIONAL STANDARD

AMERICAN NATIONAL STANDARD Digital Video Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 197 2018 Recommendations for Spot Check Loudness Measurements NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International

More information

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE REQUEST FOR PROPOSALS AND TERMS OF REFERENCE Request for Proposals (RFP) and Terms of Reference (TOR) for consultancy services to establish technical standards for FM radio broadcasting in The Bahamas

More information

Demand Side Engagement Document

Demand Side Engagement Document Demand Side Engagement Document Document UE PL 2202 Strategy This document details UE s demand side engagement plan as part of the National Distribution Planning & Expansion Framework This page has been

More information

Council of the European Union Brussels, 11 January 2017 (OR. en)

Council of the European Union Brussels, 11 January 2017 (OR. en) Council of the European Union Brussels, 11 January 2017 (OR. en) Interinstitutional File: 2016/0027 (COD) 5078/17 TELECOM 1 AUDIO 2 MI 14 CODEC 15 NOTE From: To: No. Cion doc.: Subject: Presidency Permanent

More information

GUIDELINES FOR APPLICANTS 2016 SUBMISSION DEADLINE

GUIDELINES FOR APPLICANTS 2016 SUBMISSION DEADLINE GUIDELINES FOR APPLICANTS 2016 SUBMISSION DEADLINE 18.00hrs Tuesday 29 th March 2016 1 These guidelines are intended to assist filmmakers in making a submission to ifeatures. They should be read in conjunction

More information

Working with BBC Radio 4 Extra 2017/18

Working with BBC Radio 4 Extra 2017/18 Working with BBC Radio 4 Extra 2017/18 Introduction... 2 Delivery... 2 Audio Delivery... 2 Dira/Highlander... 2 Programme Durations... 3 Proteus... 3 Running Orders... 3 Programme Descriptions... 3 Compliance...

More information

MACQUARIE CONFERENCE Wednesday 2 May, 2018

MACQUARIE CONFERENCE Wednesday 2 May, 2018 MACQUARIE CONFERENCE Wednesday 2 May, 2018 2017 Financial Highlights Global Cinema Screens Introducing Kimbal Riley Vista Group - Growth Movio Will Palmer Questions 2 2 OPERATING SEGMENTS CINEMA MOVIO

More information

TO BE PUBLISHED IN THE GAZETTE OF INDIA EXTRAORDINARY, PART III SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION

TO BE PUBLISHED IN THE GAZETTE OF INDIA EXTRAORDINARY, PART III SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION TO BE PUBLISHED IN THE GAZETTE OF INDIA EXTRAORDINARY, PART III SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION New Delhi, the 14 th May, 2012 F. No. 16-3/2012-B&CS - In exercise of the powers

More information

Committed to connecting the World ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION. JO, GueJo

Committed to connecting the World ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION. JO, GueJo ITU ACTIVITIES IN DIGITAL BROADCASTING TRANSITION JO, GueJo Senior Engineer On Spectrum Management and Broadcasting ITU BDT ITU-ASBU REGIONAL SEMINAR on MULTIMEDIA PRODUCTION and DELIVERY SERVICES 31 October

More information

SERVICE DESCRIPTION VIDENS SD-WAN SERVICE MANAGEMENT

SERVICE DESCRIPTION VIDENS SD-WAN SERVICE MANAGEMENT VERSION 2.1 MARCH 2018 SERVICE DESCRIPTION VIDENS SD-WAN SERVICE MANAGEMENT TABLE OF CONTENTS 1 Videns SD-WAN Service Management overview... 3 2 Customer benefits... 3 3 Service levels... 3 4 Deliverables...

More information

The Zendesk Benchmark. The ROI case for omnichannel support

The Zendesk Benchmark. The ROI case for omnichannel support The Zendesk Benchmark The ROI case for omnichannel support Table of contents 01 02 03 04 05 06 07 Executive summary Key findings Customers now expect an omnichannel approach Live channels aren t just growing

More information

Arrangements for: National Progression Award in. Music Business (SCQF level 6) Group Award Code: G9KN 46. Validation date: November 2009

Arrangements for: National Progression Award in. Music Business (SCQF level 6) Group Award Code: G9KN 46. Validation date: November 2009 Arrangements for: National Progression Award in Music Business (SCQF level 6) Group Award Code: G9KN 46 Validation date: November 2009 Date of original publication: January 2010 Version: 03 (August 2011)

More information

PHYSICAL REVIEW B EDITORIAL POLICIES AND PRACTICES (Revised January 2013)

PHYSICAL REVIEW B EDITORIAL POLICIES AND PRACTICES (Revised January 2013) PHYSICAL REVIEW B EDITORIAL POLICIES AND PRACTICES (Revised January 2013) Physical Review B is published by the American Physical Society, whose Council has the final responsibility for the journal. The

More information

Health Professions Council Education & Training Panel 5 July 2007 NORDOFF ROBBINS MUSIC THERAPY CENTRE - MA MUSIC THERAPY

Health Professions Council Education & Training Panel 5 July 2007 NORDOFF ROBBINS MUSIC THERAPY CENTRE - MA MUSIC THERAPY Health Professions Council Education & Training Panel 5 July 2007 NORDOFF ROBBINS MUSIC THERAPY CENTRE - MA MUSIC THERAPY Executive Summary and Recommendations Introduction The visitors report for the

More information

Frequently Asked Questions

Frequently Asked Questions for community colleges, by community colleges http://vfa.aacc.nche.edu Frequently Asked Questions What is the VFA? The Voluntary Framework of Accountability (VFA) is the first ever national accountability

More information

Attachment 2 Wastewater

Attachment 2 Wastewater Attachment 2 Wastewater 1 Overview 11 Objective The objective of this attachment is to set the minimum controls for planning and implementing flow isolation / flow management (FIFM) to ensure the safety

More information

Collection management policy

Collection management policy Collection management policy Version 1: October 2013 2013 The Law Society. All rights reserved. Monitor and review This policy is scheduled for review by November 2014. This review will be conducted by

More information

Capital Works process for Medium Works contracts

Capital Works process for Medium Works contracts Capital Works process for Medium Works contracts Guidance Notes Contracts valued between $50k-$500k Please note this process only applies to Ministry-led Medium Works projects. These notes provide further

More information