Have they bunched yet? An exploratory study of the impacts of bus bunching on dwell and running times.

Size: px
Start display at page:

Download "Have they bunched yet? An exploratory study of the impacts of bus bunching on dwell and running times."

Transcription

1 Hve they bunched yet? An explortory study of the impcts of bus bunching on dwell nd running times Dvid Verbich School of Urbn Plnning Fculty of Engineering McGill University Suite 00, 1 Sherbrooke St. W. Montrél, Québec, HA 0C Cnd E-mil: dvid.verbich@mil.mcgill.c Ehb Dib Deprtment of Civil Engineering - Trnsporttion Engineering University of Toronto St. George Street, Room: SF001M Toronto, Ontrio, MS 1A Cnd Tel.: Fx: 1-- e-mil: ehb.dib@utoronto.c Ahmed El-Geneidy* School of Urbn Plnning Fculty of Engineering McGill University Suite 00, 1 Sherbrooke St. W. Montrél, Québec, HA 0C Cnd Tel.: 1--1 Fx: 1-- E-mil: hmed.elgeneidy@mcgill.c *Corresponding uthor April 01 Word Count 0, 1 Figures, nd Tbles For cittion plese use: Verbich, D., Dib, E., & El-Geneidy, A. (ccepted). Hve they bunched yet? An explortory study of the impcts of bus bunching on dwell nd running time. Public Trnsport: Plnning nd Opertions. 1

2 ABSTRACT If trnsit gencies wish to retin nd ttrct riders, they need to provide relible nd efficient services. Trnsit gencies tend to run high-frequency bus routes during pek hours, nd in mny cities, different routes cn lso overlp long mjor corridors. In some instnces, consecutive buses cn rrive t shred stop simultneously or one bus my rrive while nother bus is currently servicing the stop. This phenomenon, known s bus bunching, cn dely buses nd pssengers, nd is usully inefficient. In this study, we ttempt to understnd how bus bunching from the sme or different routes cn impct bus opertions, specificlly dwell nd running times. This reserch uses stop-level records obtined from utomtic vehicle loction (AVL) nd utomtic pssenger counter (APC) systems from TriMet, Portlnd, OR. Using liner modeling, we find tht bus bunching increses both dwell nd running times. Specificlly, when different routes bunch or re scheduled to rrive t bus stop within short time frme, or when buses from the sme route rrive with short time frme, dwell times increse by ~ s. Similrly, bus bunching from the sme route or different route prolongs running times by ~0 s. Our findings suggest tht bus schedulers nd opertors should consider dding more time between consecutive buses from different routes t shred stops to minimize the negtive impcts tht we observed from bus bunching. KEYWORDS: Running time, Dwell time, High-frequency, Bunching, Dely, Overlp

3 INTRODUCTION In n effort to ttrct nd retin bus riders, trnsit gencies continuously djust bus schedules nd routes. These djustments im to improve bus running times s well s to increse the trnsit coverge within cities. Customers view both s crucil components of ny trnsit system nd these fetures re importnt to compete with other modes, specificlly privte vehicles. Nevertheless, some bus opertions cn hve unintended consequences. In prticulr, while providing frequent service nd wht some customers deem s highly relible since they cn expect buses to rrive with regulr hedwys, high-frequency bus routes (with hedwys of minutes or less) cn become victims of bus bunching (Dgnzo, 00). Bus bunching hs frequently surfced in public converstions, nd its impct on user s perception frequently domintes the hedlines (Merevick, 01; Provost, 01; Simcoe, 01). Generlly, bus bunching results in consecutive buses rriving t bus stop within short mount of time, typiclly cused by hedwy devitions due to trffic or other rod condition. For trnsit opertors, bunching my result in inefficient cpcity utiliztion, while frustrting customers who my need to wit longer for subsequent buses (TCRP, 01). In ddition to high-frequency services, trnsit gencies lso tend to run severl routes into centrl business districts through shred corridors. In effect, buses strting from different points will converge onto corridor nd shre series of stops. This service pttern, known s service overlp, cn lso result in bus bunching nd increse running time for both routes. Here we ttempt to nswer the following reserch question: how does bus bunching from buses on the sme or different route ffect dwell times nd thus running time? If trnsit plnners hve clerer understnding of the nunces of bunching t bus stops with overlpping service, then pproprite mesures could be tken to mitigte the cuses nd effects of bus bunching. Wht follows is cse study of the impct of bus bunching on bus opertions on corridor with overlpping bus routes in Portlnd, OR. This pper strts with literture review on running nd dwell time models, s well s n overview of bus bunching. Next, we describe the bus route studied in this pper nd our methodology. Third, we present our results nd findings from the models. Finlly, we discuss our findings nd propose potentil policies bsed on our results. LITERATURE REVIEW

4 For customers, quick nd relible bus service is essentil; importntly, trvel time rnks consistently high on stisfction surveys, long with witing time (Dib, Bdmi, & El-Geneidy, 01; Hensher, Stopher, & Bullock, 00; Yoh, Iseki, Smrt, & Tylor, 0). Therefore, from n opertor s perspective, both running nd witing times re importnt fctors to mesure nd mintin within cceptble bounds. For exmple, reserch hs consistently found tht reduced running times cn ttrct nd mintin riders (Boyle, 00; Hollnder, 00). Moreover, riders lso vlue frequent service (Strthmn et l., 1). Nonetheless, compromise between frequent service nd relibility, in terms of service vribility, cn influence customer stisfction since some studies show tht customers prefer consistent bus rrivls over frequent service (Dsklkis & Strthopoulos, 00; Pulley et l., 00). Mny importnt chrcteristics cn influence running time, which is the time tken for bus to run its customer-serving route. Rider ctivities like bordings nd lightings, lift ctivity, time of dy, s well s unforeseen circumstnces due to trffic or wether, impct running time (Abkowitz & Engelstein, 1; Levinson, 1; Strthmn et l., 000). Trnsit gencies ttempt to control severl fctors to optimize running time. Newer work revels tht dditionl strtegies, such s reserved lnes, trnsit signl priority nd bus stop consolidtion cn reduce running times, while smrtcrd fre collection systems nd rticulted buses cn prolong running times (Dib & El-Geneidy, 01; El-Geneidy, Strthmn, Kimpel, & Crout, 00; El-Geneidy & Vijykumr, 0; Suprennt-Legult & El-Geneidy, 0). An importnt contributor to running times is the dwell time, defined typiclly s the length of time bus stops to serve pssengers t stop; both door nd pssenger ctivities re considered in dwell time models (Dueker, Kimpel, Strthmn, & Clls, 00; El-Geneidy & Vijykumr, 0). Dwell time contributes nywhere between 0% to running time (Brr, Beton, Chirmonte, & Orosz, 0; Levinson, 1); understnding the fctors underlying dwell time cn id trnsit gencies to minimize dwells nd speed up bus opertions (Abkowitz & Engelstein, 1; Levine & Torng, 1). Pssenger ctivity nd bus lod (number of pssengers on bord) ply lrge role in determining dwells, nd low-floor buses nd rticulted buses cn reduce dwell times (Dib & El-Geneidy, 01; Dueker et l., 00; El-Geneidy & Vijykumr, 0; Levine & Torng, 1). Fre collection procedures t the first door, lift opertions, stop shelters nd signlized intersections cn prolong dwell times (Dib & El-Geneidy, 01; Dueker et l., 00).

5 Despite extensive work on dwell nd running times, less work hs been conducted on bus bunching nd its impct on opertions. Bunching occurs when buses rrive t stop nerly simultneously, or when bus rrives t stop recently served by preceding bus. Bunching results from disrupted scheduled hedwys between buses, represents wsted cpcity for opertors, nd prolongs wit times for customers becuse of overcrowded led buses (TCRP, 01b). Bus bunching hs previously been reserched in order to better understnd its cuses or its overll impct on service levels. For instnce, the occurrence of bus bunching increses with route length (Feng & Figliozzi, 01). Moreover, using simultions, holding points were found to reduce the levels of bunching on high-frequency circulr bus route (Holroyd & Scrggs, 1). Most reserch on bus bunching hs used mthemticl pproches to generte theoreticl holding techniques to eliminte or reduce bunching (Dgnzo, 00; Dgnzo & Pilchowski, 0; Eberlein, Wilson, & Bernstein, 001; Hickmn, 001), or to model cuses of or to predict bus bunching (Moreir-Mtis, Ferreir, Gm, Mendes-Moreir, & de Sous, 01; Moreir- Mtis, Gm, Mendes-Moreir, & de Sous, 01). Nevertheless, how bus bunching cn impct dwell nd running times is unknown, especilly with regrd to overlpping services. Previous work on shred locl nd express service corridor in Montrel found tht fter implementing rticulted buses for the express service, running time ws incresed for both the express nd locl services (Dib & El-Geneidy, 01). This finding demonstrtes the importnce of elucidting the impcts of overlpping services long shred corridor. Though scheduled bunching between different routes my enble trnsfers, it remins unknown how bunching from the sme or different routes my differentilly ffect running nd dwell times. METHODOLOGY The min gol of this pper is determine how the dwell nd running times of bus service re impcted by the fct tht it shres corridor with other overlpping bus services. We study two situtions: (1) how n rriving bus s dwell nd running times is impcted by bunching with bus from the sme route long specific segment of bus route tht is shred with mny bus services, nd () how n rriving bus s dwell nd running times is impcted by bunching with bus from different route long specific segment of bus route tht is shred with mny bus services. By studying these situtions, we cn provide plnners with pproprite wys to understnd the impcts of bunching within shred corridor.

6 Cse study We used stop-level AVL/APC from TriMet, Portlnd, Oregon for Route 1 long the Brbur Blvd. corridor (Figure 1). We chose this route primrily becuse it experienced no chnges in terms of route structure nd schedule, hs vriety long its route, nd hs overlpping service routes long some segments. Route 1 runs est-west crossing through downtown Portlnd nd overlps with severl routes, including Routes 1,,,,,, nd. The verge hedwy of Route 1 is 1 min, with minimum hedwy of min during pek hours nd mximum of min during off-pek hours. The verge stop spcing of the corridor is bout 0 meters. A totl of signlized intersections re functioning long the nlyzed segment (Figure 1, nlyzed segment) Figure 1. TriMet's Route 1 nd nlyzed segment of SW Brbur Blvd. The AVL/APC rchived dt originte from 1 st of September 01 until th of November 01 for Route 1 s well s for other overlpping routes (listed bove). Given the reltively short time frme inspected, sesonl vritions my be unccounted for. Since ll TriMet buses re equipped with AVL coupled with APC technology, we were ble to ccurtely clculte bus dwell times nd running times, s well s bunching s we describe below. Moreover, detiled trip informtion, like scheduled deprture time, rrivl time nd ctul

7 deprture times, long with pssenger ctivity is vilble for every stop. It should be noted tht ll buses nd signls long the studied corridor re equipped with n opertionl trnsit signl priority (TSP) system tht ws ctive during the dt collection period. Dt preprtion for dwell time model For the dwell time model, over 00,000 records for ll bus stops served by ll the forementioned routes were first exmined. We clened the source dt by removing system recording errors, duplicted records, nd holidy nd weekend trips. Using this AVL/APC dt, we first clculted dwell time, defined s bus deprture minus bus rrivl t individul stops. In previous work investigting bunching, such s for holding strtegies imed t correcting bunching (e.g., (Berrebi, Wtkins, & Lvl, 01; Cts et l., 01; Dgnzo, 00; Hmmerle, Hynes, & McNeil, 00)), bunching ws visulized using time-spce digrms, or defined using hedwy vritions or hedwy differences between consecutive buses (e.g., subtrcting deprture times for consecutive buses (Figliozzi, Feng, & Lfferriere, 01)). To determine bus bunching here, we took similr pproch to previous work using TriMet AVL/APC dt (Figliozzi et l., 01) by investigting hedwys between consecutive buses. We creted dummy vribles imed to cpture bus bunching, so if hedwys between consecutive buses fell within predefined rnge, we defined this hedwy or bus rrngement s bus bunching. This bus bunching hedwy ws clculted s: (rrivl time of bus of interest, i,) (deprture time of previous bus, i-1). Therefore, bus bunching refers to bus rriving when previous bus is still servicing or stnding t the bus stop, or when bus rrives nd the leder bus hs left the stop within predefined temporl rnge. A negtive vlue for this vrible indictes tht leder bus, i-1, is still servicing stop when bus of interest, i, rrives, or in other words, tht the bus of interest, i, rrives before the leder bus, i-1, deprts. A vlue of 0 indictes tht leder bus, i-1, is deprting when bus of interest, i, rrives. Finlly, positive vlue indictes tht leder bus, i-1, hs left the stop when bus of interest, i, rrives; note tht this is the typicl scheme for rrivls nd deprtures. Previous reserch used three-minute hedwys between consecutive bus deprtures s threshold for bus bunching, cknowledging tht this rbitrry threshold my be modified for given reserch question (Figliozzi et l., 01). Here, to determine the hedwy threshold tht could qulify s bus bunching, we defined different rnges of hedwys between consecutive buses s bus bunching (for exmple, bus of interest rriving between 0 0 s of previous bus

8 deprture) nd used the generted dummy vribles in dwell time models; this procedure ws used to vlidte chosen hedwy rnge bsed on the model output nd how vribles in dwell time model should preform given previous work. The time intervls we specified re: bus of interest, i, rriving within 0 0 s nd 0-0 s of previous bus, i-1, still t the stop (negtive vlues for rrivl deprture), bus, i, rriving s previous bus, i-1, hs just deprted (0 s), nd bus, i, rriving within 0 0 s nd 0 0 s of the previous bus, i-l, deprting (positive vlues for rrivl deprture). Plese see Tble 1 for detiled vribles. These time intervls re expressly short in order to cpture the effects of bunching within smll time window; these vlues re more conservtive thn previous study tht used three-minute time window (Figliozzi et l., 01). Moreover, we determined whether this previous leder bus, i-l, ws from the sme or different route s n rriving bus of interest, i. When bus i-1 ws from different route, we lso specified whether deprture of the bus of interest, i, ws scheduled to occur before the deprture of the previous bus, i-1; we clled this scheduled overlp. To determine scheduled overlp, we first determined whether the scheduled deprture time of bus i ws scheduled to occur before the scheduled deprture time of bus i-1. If this sitution occurred, we generted dummy vrible equl to 1. This dummy vrible ws then multiplied by nother dummy vrible tht coded for our definition of bus bunching, tht is, when this rrngement occurred nd the hedwys (bus i rrivl time bus i-1 ctul deprture time) were within our defined rnges. When these two conditions were met, this is wht we clled scheduled overlp. If bus, i, deprted from stop when previous bus, i-1 (from different route), ws present nd this ws unscheduled, we clled this occurrence unscheduled deprture or bunching from different route. In this wy, we cptured how bus bunching/overlp tht occurs from the sme service or different service my impct dwell nd running times. We nlyzed dwell times of Route 1 stops over ~. km (. mi) between SW Brbur nd Cpitol Hwy intersection south west of the downtown nd the intersection t SW Min nd Pcific Hwy in the south west becuse of the vilbility of AVL/APC dt for ll routes tht shre this segment (Routes 1,,,,,, nd ), which mkes it possible to investigte the impct of overlpping services on Route 1 (Figure 1). After clculting dwell times nd hedwys between buses, we removed dt from stops from other routes, leving over 0,000 stop-level records for Route 1. Since bus bunching cn involve two buses t one stop

9 1 1 1 simultneously nd the triling bus my not experience pssenger ctivity, essentilly resulting in dwell times equl to 0, we kept stops with dwell times equl to 0 in our dtset specificlly becuse of our interest in bus bunching. We then removed the 1 st nd th percentiles of dwells, s well s first stops, lyovers, nd stops without dt pertining to physicl chrcteristics of the bus stop, leving 1, records. We lso removed questionble dt entries, for exmple, records with lrge numbers of bordings nd lightings, or lift ctivities, but with dwell times too short to be plusible (two such records). Finlly, we removed stops where bus of interest, bus i, rrived nd previous bus, bus i-1, ws t the stop for more thn 0 s becuse these rre occurrences (0 records) my represent typicl situtions cused by rod incidents or trffic conditions, for instnce; moreover, dummy vribles for this rrngement yielded difficult to interpret coefficients in the dwell time model output. The finl dtset used to model dwell time included 1, records. Descriptions of ll vribles used in the models re shown in Tble 1. Tble 1. Description of vribles used in both models. Vrible nme Description Dwell time (s) Dwell time mesured in seconds between the rrivl nd deprture of bus (dependent vrible) Running time (s) Totl trvel time mesured in seconds long specified segment of Brbur Blvd. (dependent vrible) AM pek Dummy vrible equl to 1 if the dwell (or trip) occurred between.m. PM pek Dummy vrible equl to 1 if the dwell (or trip) occurred between p.m. Evening nd night Dummy vrible equl to 1 if the dwell (or trip) occurred between p.m. nd midnight Overnight Dummy vrible equl to 1 if the dwell (or trip) occurred between midnight nd.m. Ons Totl number of bording pssengers t stop (or trip) Offs Totl number of lighting pssengers t stop (or trip) Direction Dummy vrible equl to one for inbound trips Totl pssenger ctivity Totl number of pssengers bording nd lighting t stop (or trip) Totl pssenger ctivity^ The squre of the totl number of pssengers bording nd lighting t stop (or trip) Lift Totl lift ctivity t stop (or long trip segment) Pssenger lod The totl number of pssengers on bus t stop (or mximum for trip) Pssenger lod^ The squre of the totl number of pssengers on bus t stop (or mximum for trip) Dely t the strt (s) The dely t the strt of trip in seconds (difference between ctul deprture time nd scheduled time t the first stop of route) Stop mde Dummy vrible equl to 1 if n ctul stop ws mde (or sum of ll stops mde for trip for running time) Unscheduled stop Dummy vrible equl to 1 if stop is n unscheduled stop long trip Stop t time point Dummy vrible equl to 1 if bus stop is holding point (or totl

10 Vrible nme Description number of time points for trip for running time) Signlized intersection Dummy vrible equl to 1 if the bus stop is t trffic light tht is equipped with n opertionl trnsit signl priority (TSP) system Shelter Dummy vrible equl to 1 if stop hs bus shelter Dwell time Previous -0-0 sme Dummy vrible equl to 1 if bus, i, rrives t stop between 0 0 s BEFORE the deprture of previous bus, i-1, of the SAME route Previous -0-0 different Dummy vrible equl to 1 if bus, i, rrives t stop between 0 0 scheduled overlp s BEFORE the deprture of previous bus, i-1, of DIFFERENT Previous -0-0 different unscheduled Previous -0 0 sme Previous -0 0 different scheduled overlp Previous -0 0 different unscheduled Previous 0 sme Previous 0 different scheduled overlp Previous 0 different unscheduled Previous 0 0 sme Previous 0 0 different Previous 0 0 sme Previous 0 0 different No bunching (0+) sme No bunching (0+) different route nd this is scheduled overlp Dummy vrible equl to 1 if bus, i, rrives t stop between 0 0 s BEFORE the deprture of previous bus, i-1, of DIFFERENT route nd this is unscheduled deprture (or bunching) Dummy vrible equl to 1 if bus, i, rrives t stop between 0 0 s BEFORE the deprture of previous bus, i-1, of the SAME route Dummy vrible equl to 1 if bus, i, rrives t stop between 0 0 s BEFORE the deprture of previous bus, i-1, of DIFFERENT route nd this is scheduled overlp Dummy vrible equl to 1 if bus rrives, i, t stop between 0 0 s BEFORE the deprture of previous bus, i-1, of DIFFERENT route nd this is unscheduled deprture (or bunching) Dummy vrible equl to 1 if bus, i, rrives t stop t the SAME TIME previous bus, i-1, is deprting nd is from the SAME route Dummy vrible equl to 1 if bus, i, rrives t stop t the SAME TIME previous bus, i-1, is deprting nd is from DIFFERENT route nd this is scheduled overlp Dummy vrible equl to 1 if bus, i, rrives t stop t the SAME TIME previous bus, i-1, is deprting nd is from DIFFERENT route nd this is unscheduled deprture (or bunching) Dummy vrible equl to 1 if bus, i, rrives t stop 0 0 s AFTER previous bus, i-1, hs left nd is from the SAME route Dummy vrible equl to 1 if bus, i, rrives t stop 0 0 s AFTER previous bus, i-1, hs left nd is from DIFFERENT route Dummy vrible equl to 1 if bus rrives, i, t stop 0 0 s AFTER previous bus, i-1, hs left nd is from the SAME route Dummy vrible equl to 1 if bus, i, rrives t stop 0 0 s AFTER previous bus, i-1, hs left nd is from DIFFERENT route Dummy vrible equl to 1 if bus, i, rrives t stop 0 s AFTER previous bus, i-1, hs left (no bunching) from the SAME route (bse condition) Dummy vrible equl to 1 if bus, i, rrives t stop 0 s AFTER previous bus hs, i-1, left (no bunching) from DIFFERENT route Running time First trip Dummy vrible equl to 1 if the trip is the first trip of the dy Sum of previous -0 0 sme Occurrences long trip segment when bus, i, rrives t stop 0 0 s BEFORE the deprture of previous bus, i-1, of the SAME route Sum of previous -0 0 different scheduled overlp Occurrences long trip segment when bus, i, rrives t stop 0 0 s BEFORE the deprture of previous bus, i-1, of DIFFERENT route nd is scheduled overlp Sum of previous 0 0 different Occurrences long trip segment when bus, i, rrives t stop 0 0 Sum of no bunching (0+) different s AFTER the deprture of previous bus, i-1, of DIFFERENT route Occurrences long trip segment when no bunching occurred with bus, i-1, of DIFFERENT route previously servicing the stop

11 In this pper, we im to understnd how bus bunching, tht is, consecutive buses rriving within short (<0 s) time windows t stop by using the dummies we constructed for different temporl spects of bunching, cn impct dwell times. Tble 1 includes list nd detiled descriptions of dummy vribles used to explore bunching, s well s other vribles incorported in the sttisticl nlysis. For exmple, in our dwell time model, one dummy vrible previous 0 0 different is ment to cpture instnces where bus of interest, i, rrives t stop 0 to 0 s fter bus i-1 from different route hs left the stop. According to previous studies, the generl fctors ffecting dwell time include pssenger ctivity in terms of bording nd lighting, lift usge, time of the dy, nd delys t the beginning of trip (Dueker et l., 00). A positive coefficient vlue for vrible indictes tht this vrible will increse dwell time, while negtive vlue signifies tht this vrible will decrese dwell time of the bus of interest (bus i). Dt preprtion for running time model Using the sme dtset s bove, we nlyzed nerly,000 trips of Route 1 long the southwest Brbur Blvd. corridor. Segments nlyzed included westbound nd estbound trips, specified by dummy vrible for downtown-bound (estbound) trips tht strted t SW Brbur nd Cpitol Hwy (westbound) nd hd between stops, nd trips tht strted t SW Min nd Pcific Hwy (estbound/downtown-bound) nd hd between 0 stops. Upon nlyzing these trips, trips with pssenger ctivity below three were removed, nd the 1 st nd th percentiles of running times were lso removed. As bove, trips where bus bunching occurred with previous bus stnding for more thn 0 s fter the rrivl of the bus of interest were discrded. After this clening process, the running time model used, trips. The dependent vrible, running time, ws clculted s rrivl time t the first stop minus deprture time t the lst stop of the studied segment (without including the lyovers). To cpture bunching t the segment-level, we summed instnces of bunching s defined in our dwell time model to clculte the number of occurrences of different types of bus bunching. For exmple, sum of previous 0 0 different dummy cptures the number of times long trip segment tht bus of interest, i, rrives t stop 0 to 0 s fter bus from different route (i-1) hs serviced the sme stop. These dummy vribles will

12 1 1 llow us to understnd how different types of bunching, nmely with bus of the sme or of different route, cn influence running time. RESULTS Descriptive sttistics Tble presents summry sttistics for the vribles in the dwell time model, while Tble presents summry sttistics for the dt used in the running time model. Along the studied corridor, Route 1 hs verge dwell times of. s, with devition round the men of 1. s (Tble ). Moreover, the verge running time for Route 1 long the segment of interest is 1. s (or bout min) with stndrd devition of 1. s (or bout min) (Tble ). Below, we present the results of regression models. Tble. Dwell time model summry sttistics. Vrible nme Men Std. Dev. Minimum Mximum Dwell time (s) AM pek PM pek Evening nd night Overnight Ons Offs Totl pssenger ctivity^ Lift Pssenger lod Pssenger lod^ Dely t the strt (s) Stop mde Unscheduled stop Stop t time point Signlized intersection Shelter Previous -0-0 sme Previous -0-0 different scheduled overlp Previous -0-0 different unscheduled Previous -0 0 sme Previous -0 0 different scheduled overlp Previous -0 0 different unscheduled Previous 0 sme Previous 0 different scheduled overlp Previous 0 different unscheduled Previous 0 0 sme Previous 0 0 different Previous 0 0 sme Previous 0 0 different No bunching (0+) sme No bunching (0+) different N = 1, stop-level observtions 1

13 Tble. Running time model summry sttistics. Vrible nme Men Std. Dev. Minimum Mximum Running time (s) AM pek PM pek Evening nd night Overnight Direction Totl pssenger ctivity..0 Lift Mximum of pssenger lod Mximum of pssenger lod^.. 0 Dely t the strt (s) Totl stops mde.1. 1 First trip Sum of previous -0 0 sme Sum of previous -0 0 different scheduled overlp Sum of previous 0 0 different Sum of no bunching (0+) different N =, trips Dwell time model We developed liner regression model using dwell time in seconds s the dependent vrible. Only vribles tht displyed significnce or re policy relevnt vribles were mintined in the model. The output of this model is reported in Tble, nd contins 1, records nd explins % of the vrition in dwell time. This proportion of explined vrition is consistent with previous models (Dib & El-Geneidy, 01; Dueker et l., 00; El-Geneidy & Vijykumr, 0). Regrding key policy vribles, we find generlly, tht compred to no bus bunching, bus bunching prolongs dwell time. If bus rrives t stop while previous bus hs not deprted for 0 0 s, then the dwell of this rriving bus is incresed by. s if it is bunched with bus from the sme route. If bus rrives t stop nd bus from different route (scheduled stop) hs not deprted for 0 0 s, then 1. s is dded to dwell time of the rriving bus. If unscheduled bunching occurs with bus of different route (bus rrives nd previous bus from different route hs been stnding for 0 0 s), then dwells re lengthened by. s. These findings suggests tht bunching prolongs dwell times, likely due to pssenger trnsfers between different bus routes, s well s mneuvering resulting from closely spced buses. If this time window (bus i rriving while previous bus i-1 is still stnding) is between 0 0 s t scheduled service overlp (different routes), then. s re dded to dwells, while 1

14 . s re dded to dwells if the stop from different route ws unscheduled. If bus i from the sme route rrives nd the previous bus hs been t the stop for 0 0 s nd is from the sme route, then 1. s re dded to the dwell time of bus i. This is likely becuse the preceding bus from the sme route will hve picked up most pssengers. Overll, the presence of stnding bus will prolong dwells of n rriving bus becuse of incresed mneuvering time nd pssenger ctivity relted to the previous bus. In ddition, the impct of bus bunching on dwell times does not depend on whether the previous bus servicing stop is from the sme or different route. In other words, the differences between bunching from different or the sme routes re minor. Tble. Dwell time model. % CI % CI Coefficient t-sttistic Vrible nme Lower bound Upper bound Constnt 0.1*** AM pek -0.*** PM pek 0.*** Evening nd night -0.*** Overnight -1.0*** Ons.*** 1... Offs.***..0.0 Totl pssenger ctivity^ -0.1*** Lift 1.*** Pssenger lod -0.*** Pssenger lod^ 0.00*** Dely t the strt (s) *** Stop mde.*** Unscheduled stop.*** Stop t time point.01***.0..1 Signlized intersection.*** Shelter 1.*** Previous -0-0 sme.*** Previous -0-0 different scheduled overlp 1.*** Previous -0-0 different unscheduled.***.. 1. Previous -0 0 sme 1.** Previous -0 0 different scheduled overlp.** Previous -0 0 different unscheduled.***... Previous 0 sme Previous 0 different scheduled overlp Previous 0 different unscheduled Previous 0 0 sme -1.*** Previous 0 0 different Previous 0 0 sme -1.0*** Previous 0 0 different.***. 1.. No bunching (0+) different 0.0*** N 1, Adjusted R 0. F sttistics (0, 1) 1. F significnce (Prob > F)

15 compred to No bunching (0+) fter stop ws serviced by the SAME route ***Significnt t %; **Significnt t % When bus i rrives t stop fter previous bus i-1 from the sme route hs been deprted for 0 0 s, then 1. s re sved on dwells, nd this svings is lso similr to buses rriving fter bus hs left for 0 0 s nd is from the sme route. These results suggest tht dwells of subsequent buses re shorter becuse the previous bus will hve picked up most pssengers. In contrst, if the rriving bus is from different route tht hs deprted for 0 0 s, then. s re dded to the dwell time compred to bus tht rrives fter 0 s from the sme route. This my be explined by users behvior t stops with overlpping routes, since fter the rrivl nd deprture of bus, riders witing for nother route my leve the proximity of the stop nd thus tke longer to bord the subsequent rriving bus they re witing for. Finlly, dwell time of n rriving bus is minimlly impcted (incresed by 0.0 s) by bus from different route tht hs been deprted for more thn 0 s, compred to the bse sitution of bus rriving more thn 0 s fter deprted bus is from the sme route. This my be explined by drivers behvior; drivers my slow down their deprture t stops with overlpping service to ensure tht they pick up pssengers witing for this trip. The control vribles in the dwell time model behve s lrgely expected bsed on previous literture (Dueker et l., 00; El-Geneidy & Vijykumr, 0; Stewrt & El- Geneidy, 01). Dwells will be shorter in the AM pek, likely becuse of regulr customers fmilirity with bus bording, but PM pek dwells re longer. Evening nd night dwells, s well s overnight dwells, re both shorter thn off-pek dwells. Every pssenger bording nd lighting dds. s nd. s, respectively, while the pssenger ctivity squred-term indictes tht every dditionl pssenger quickens dwells by bout 0.1 s. Lift ctivity increses dwell time, s does mking n unscheduled stop. Buses stopping t signlized intersection stop will increse dwells by nerly s becuse red lights cn prolong bus stnding, while stop mde t stop with shelter will increse dwells by nerly s becuse pssengers tke longer to bord the bus in these res. Running time model Next, we developed bus running time model to understnd how the bus bunching tht we found prolongs dwell times my impct running time. We tested how the frequency of bus bunching occurrences ffected running times; we tested different time intervls nd bus rrngements nd 1

16 dropped from the model those vribles, like occurrences of buses rriving s bus from the sme route is leving (sum of previous 0 sme), tht were not significnt. Moreover, only vribles tht disply significnce or re policy relevnt vribles were mintined in the model. Our model, which nlyzed, trips, explins 0% of the vrition in running time, comprble with similr models (Dib & El-Geneidy, 01; Kimpel, Strthmn, Bertini, & Clls, 00). Interestingly, our model (Tble ) revels tht ech time bus i rrives t stop nd the previous bus i-1 from the sme route hs been stnding for 0 0 s, then the running time of the rriving bus increses by. s. This vlue represents bout % of the segment verge running time (Tble ). If this sitution occurs with bus from different route nd is scheduled overlp (scheduled rrivls occurring within 0 s of ech other), then.1 s re dded to the rriving bus running time. Once bunched, running time will be dded to the following bus since it needs to wit for the preceding bus to deprt from stop or mneuver round it. Ech time bus from different route rrives t stop fter previous bus hs left for 0 0 s, the running time of the bus is. s longer, while. s is dded to running time if bus rrives nd no bunching occurs nd the previous bus ws from different route. These findings suggest tht service overlpping increses running times. As mentioned in the previous section (Dwell time model) this likely results from drivers behvior. It seems tht drivers slow down their deprture t stops with overlpping service to ensure tht they re not missing ny pssengers witing for this trip. Tble. Running time model. Vrible nme Coefficient t-sttistic % CI % CI Lower bound Upper bound Constnt 1.0*** AM pek PM pek.***.. 1. Evening nd night -.*** Overnight -1.*** Direction 1.1*** Totl pssenger ctivity.*** Lift.***. 0.. Mximum of pssenger lod -1.0*** Mximum of pssenger lod^ 0.0*** Hedwy dely t the strt (s) -0.0*** Totl stops mde 1.1*** First trip -.0** Sum of previous -0 0 sme.*** Sum of previous -0 0 different.1**

17 Vrible nme Coefficient t-sttistic % CI Lower bound % CI Upper bound scheduled overlp Sum of previous 0 0 different.** Sum of no bunching (0+) different.***.1.0. N, Adjusted R F sttistics F significnce (Prob > F) ***Significnt t %; **Significnt t % 0.0 (1, 0) The remining vribles show tht running times re longer during the fternoon pek, but substntilly shorter during evening nd overnight trips. Inbound trips re 1.1 s longer thn outbound trips, likely due to pek-hour trffic. Pssenger ctivity dds bout. s, nd lift ctivity dds. s to running time. Delys t the beginning of trip will shorten totl running time, likely becuse drivers ttempt to mke up this dely, which is consistent with previous reserch (Dib & El-Geneidy, 01). Finlly, the first trip of the dy hs short running times, mostly due to fewer stops mde (which dd 1.1 s per stop to running time) nd less pssenger ctivity. 1

18 CONCLUSIONS AND DISCUSSION The min objective of this rticle is to understnd the impct of bus bunching on bus dwell nd running times while ccounting for overlpping bus routes. Using two sttisticl models, we nlyzed rchived dt obtined from TriMet s AVL nd APC systems for corridor in Portlnd, OR served by high-frequency bus routes to determine how bunching impcts bus opertions. The first model is dwell time model nd investigted the impcts of bunching nd overlpping service stops on disggregted dwell times. The second model is running time model, exmining the impcts of bus bunching nd overlpping service stops on the segment route-level of nlysis. We found tht bus bunching increses both dwell nd running times. The mount of time dded by bunching does not depend on whether the previous bus servicing stop is from the sme or different route. Insted, the dded time depends to lrger extent on mount of time between rriving nd deprting buses. In other words, our study reveled tht bunching nd overlpping service from different routes impct bus opertions lmost similrly to bunching by the sme route. Thus, while scheduling ner-simultneous rrivls for different routes could fcilitte route trnsfer, trnsit gencies should overlp bus routes with cution in order to minimize delys on the system. One importnt contribution of this reserch is tht trnsit plnners nd schedulers should dd more time between trips, prticulrly from different routes in order to decrese dwell time nd running time delys tht result from overlpping services t stops. Specificlly, our work indictes tht scheduled overlps or bunched vehicles where different routes rrive nd deprt within 0 s of one nother will prolong both dwells (dding bout s) nd running times (dding bout s). These vlues decrese if the routes rrive nd deprt within 0 s, nd bunching dds only bout seconds to dwell time nd with no significnt impct on running time. Given this finding, to ensure miniml delys, schedulers nd opertors should ensure tht buses from different routes should hve ctul hedwys of more thn 0 seconds. We recognize tht this my not lwys be possible given trnsfer times or pssenger ctivity. However, considering bunching is importnt t the plnning stge in order to decrese service delys during ctul opertions. In ddition, our reserch indictes tht using holding or other control techniques to decrese bunching nd inserting more time between buses is useful (Moreir- Mtis, Mendes-Moreir, de Sous, & Gm, 01). 1

19 Previous work hs studied the generl cuses of bus bunching, nmely hedwy delys t the strt of the route (Hmmerle et l., 00), or focused on corrective ction by implementing holding points long route (Holroyd & Scrggs, 1) or by djusting bus cruising speeds (Dgnzo & Pilchowski, 0). As dwells directly ffect running time feture vlued by customers (Dib & El-Geneidy, 01; Vuchic, 00) our models predict tht both dwells nd running times will be incresed by bunching. As result, bunching cn dversely ffect customer stisfction (Merevick, 01; Provost, 01; Simcoe, 01). Importntly, not ll bunching ffects dwell or running times similrly, nd our novel findings revel some nunces of bunching depending on rrivls nd deprtures. Overll, we found tht impcts of bus bunching on dwell times vries bsed on the rrivls nd deprtures of the buses, so tht the longer bus hs been servicing stop, more time is dded to the dwell time of the subsequent bus. Given the previous finding tht bunching worsens long the length of the route (Feng & Figliozzi, 01) suggests tht these prolonged dwells will increse the running time of buses long the sme route nd therefore overll running time, which we confirmed in the running time model. One potentil strtegy to reduce bunching could be to introduce more holding points t the opertionl stge to void the penlties of bunching on dwell nd running times. Therefore, trnsit gencies will need trde-off between the dded mount of slck time for bus holding nd dely if bunching hppened. Thus, study tht focuses on this trde-off is recommended. Finlly, this study offers trnsit plnners nd policy mkers better understnding of the impcts of bunching long shred corridor on the service dwell time nd trvel time. These findings re not limited to TriMet, s other trnsit gencies, by using similr methodology, cn use our models to understnd how overlpping service nd bunching my influence the system performnce t different loctions nd stop setups. Minimizing bunching while providing relible nd frequent service remins chllenge for trnsit gencies. ACKNOWLEGMENTS We thnk TriMet for providing the dt for this study, nd prticulrly Steve Clls nd Miles Crumley. We thnk Chris Loong for collecting bus stop environment dt. This work ws funded by Nturl Sciences nd Engineering Reserch Council of Cnd (NSERC) Discovery 1

20 Grnt. We lso would like to thnk the three nonymous reviewers for their feedbck on the erlier version of the mnuscript. The ides nd findings presented in this pper represent the uthors views in n cdemic exercise. 0

21 References Abkowitz, M., & Engelstein, I. (1). Fctors ffecting running time on trnsit routes. Trnsporttion Reserch Prt A, 1(), -. Brr, J., Beton, E., Chirmonte, J., & Orosz, T. (0). Select bus service on Bx1 in New York City. Trnsporttion Reserch Record, 1, 0-. Berrebi, S. J., Wtkins, K. E., & Lvl, J. A. (01). A rel-time bus disptching policy to minimize pssenger wit on high frequency route. Trnsporttion Reserch Prt B: Methodologicl, 1(), -. Boyle, D. (00). Fixed-route trnsit ridership forecsting nd service plnning methods. TCRP Synthesis. In TCRP (Ed.), TCRP Synthesis. Wshington, D.C. Cts, O., Lrijni, A., Ólfsdóttir, Á., Burghout, W., Andrésson, I., & Koutsopoulos, H. (01). Bus-holding control strtegies. Trnsporttion Reserch Record,, 0-. Dgnzo, C. F. (00). A hedwy-bsed pproch to eliminte bus bunching: Systemtic nlysis nd comprisons. Trnsporttion Reserch Prt B: Methodologicl, (), 1-1. Dgnzo, C. F., & Pilchowski, J. (0). Reducing bunching with bus-to-bus coopertion. Trnsporttion Reserch Prt B: Methodologicl, (1), -. Dsklkis, N., & Strthopoulos, A. (00). Users' perceptive evlution of bus rrivl time devitions in stochstic networks. Journl of Public Trnsporttion, (), -. Dib, E., Bdmi, M., & El-Geneidy, A. (01). Bus trnsit service relibility nd improvement strtegies: Integrting the perspectives of pssengers nd trnsit gencies in North Americ. Trnsport Reviews, (), -. Dib, E., & El-Geneidy, A. (01). Understnding the impcts of combintion of service improvement strtegies on bus running time nd pssenger s perception. Trnsporttion Reserch Prt A: Policy nd Prctice, (), 1-. Dib, E., & El-Geneidy, A. (01). Vrition in bus trnsit service: Understnding the impcts of vrious improvement strtegies on trnsit service relibility. Public Trnsport: Plnning nd Opertions, (), 0-1. Dib, E., & El-Geneidy, A. (01). Trnsitory optimism: Chnges in pssenger perception following bus service improvement over time. Trnsporttion Reserch Record, 1, -. Dib, E., & El-Geneidy, A. (01). The fr side story: Mesuring the benefits of bus stop loction on trnsit performnce. Trnsporttion Reserch Record,, 1-. Dueker, K. J., Kimpel, T. J., Strthmn, J. G., & Clls, S. (00). Determinnts of bus dwell time. Journl of Public Trnsporttion, (1), 1-0. Eberlein, X., Wilson, N., & Bernstein, D. (001). The holding problem with rel-time informtion vilble. Trnsporttion Science, (1), 1-1. El-Geneidy, A., Strthmn, J. G., Kimpel, T. J., & Crout, D. (00). The effects of bus stop consolidtion on pssenger ctivity nd trnsit opertions. Trnsporttion Reserch Record, 11, -1. El-Geneidy, A., & Vijykumr, N. (0). The effects of rticulted buses on dwell nd running times. Journl of Public Trnsporttion, 1(), -. Feng, W., & Figliozzi, M. (01). Empiricl nlysis of bus bunching chrcteristics bsed on bus AVL/APC dt. Pper presented t the th Annul Meeting of the Trnsporttion Reserch Bord, Wshington, D.C. 1

22 Figliozzi, M., Feng, W., & Lfferriere, G. (01). A study of hedwy mintennce for bus routes: Cuses nd effects of bus bunching in extensive nd congested service res Civil nd Environmentl Engineering Fculty Publictions nd Presenttions (Vol. Pper ). Portlnd, Oregon. Hmmerle, M., Hynes, M., & McNeil, S. (00). Use of utomtic vehicle loction nd pssenger count dt to evlute bus opertions. Trnsporttion Reserch Record, 10, -. Hensher, D., Stopher, P., & Bullock, P. (00). Service qulity developing service qulity index in the provision of commercil bus contrcts. Trnsporttion Reserch Prt A: Policy nd Prctice, (), -1. Hickmn, M. (001). An nlytic stochstic model for the trnsit vehicle holding problem Trnsporttion Science, (), 1-. Hollnder, Y. (00). Direct versus indirect models for the effects of unrelibility. Trnsporttion Reserch Prt A: Policy nd Prctice, 0(), -. Holroyd, E., & Scrggs, D. (1). Witing times for buses in Centrl London. Trffic Engineering nd Control, (), Kimpel, T., Strthmn, J., Bertini, R., & Clls, S. (00). Anlysis of trnsit signl priority using rchived TriMet bus disptch system dt. Trnsporttion Reserch Record, 1, 1-1. Levine, J., & Torng, G. (1). Dwell time effects of low-floor bus design. Journl of Trnsporttion Engineering, (), -1. Levinson, H. (1). Anlyzing trnsit trvel time performnce. Trnsporttion Reserch Record, 1, 1-. Merevick, T. (01). New CTA system might finlly reduce wful bus-bunching issues Thrillist. Retrieved 1 Mrch, 01, from Moreir-Mtis, L., Ferreir, C., Gm, J., Mendes-Moreir, J., & de Sous, J. F. (01). Bus Bunching Detection by Mining Sequences of Hedwy Devitions. In P. Perner (Ed.), Advnces in Dt Mining. Applictions nd Theoreticl Aspects (Vol., pp. -1): Springer Berlin Heidelberg. Moreir-Mtis, L., Gm, J., Mendes-Moreir, J., & de Sous, J. F. (01). An incrementl probbilistic model to predict bus bunching in rel-time. Lecture Notes in Computer Science, 1, -. Moreir-Mtis, L., Mendes-Moreir, J., de Sous, J. F., & Gm, J. (01). Improving mss trnsit opertions by using AVL-bsed systems: A survey. IEEE Trnsctions on Intelligent Trnsporttion Systems, 1(), 1-1. Pulley, N., Blcombe, R., Mckett, R., Titheridge, H., Preston, J. M., Wrdmn, M. R.,... White, P. (00). The demnd for public trnsport: The effects of fres, qulity of service, income nd cr ownership. Trnsport Policy, 1(), -0. Provost, A.-M. (01). Fibilité des utobus de l STM: Nombre de plintes en husse. TVA Retrieved 1 Mrch, 01, from Simcoe, L. (01). TTC turns to tech to tme bus bunching. Metro. Retrieved 1 Mrch, 01, from

23 Stewrt, C., & El-Geneidy, A. (01). All bord t ll doors: Route selection nd running-time svings estimtion for multiscenrio ll-door bus bording. Trnsporttion Reserch Record, 1, -. Strthmn, J., Dueker, K., Kimpel, T., Gerhrt, R., Turner, K., Tylor, P.,... Griffin, D. (000). Service relibility impcts of computer-ided disptching nd utomtic loction technology: A Tri-Met cse study. Trnsporttion Qurterly, (), -. Strthmn, J., Dueker, K., Kimpel, T., Gerhrt, R., Turner, K., Tylor, P.,... Hopper, H. (1). Automted bus disptching, opertions control, nd service relibility bseline nlysis. Trnsporttion Reserch Record, 1, -. Suprennt-Legult, J., & El-Geneidy, A. (0). Introduction of reserved bus lne: Impct on bus running time nd on-time performnce. Trnsporttion Reserch Record, 1, - 1. TCRP. (01). Qulity of Service Concepts Trnsit Cpcity nd Qulity of Service Mnul, rd Edition. Wshington, D.C.: TRB. TCRP. (01b). Qulity of Service Methods Trnsit Cpcity nd Qulity of Service Mnul, rd Edition. Wshington, D.C.: TRB. Vuchic, V. (00). Urbn Trnsit: Opertions, Plnning nd Economics. Indinpolis, IN: John Wiley & Sons. Yoh, A., Iseki, H., Smrt, M., & Tylor, B. D. (0). Hte to wit: Effects of wit time on public trnsit trvelers' perceptions. Trnsporttion Reserch Record, 1, -1.

SeSSION 9. This session is adapted from the work of Dr.Gary O Reilly, UCD. Session 9 Thinking Straight Page 1

SeSSION 9. This session is adapted from the work of Dr.Gary O Reilly, UCD. Session 9 Thinking Straight Page 1 G N I K N I THmily TrHeeT FSTRAIG SeSSION 9 This session is dpted from the work of Dr.Gry O Reilly, UCD Session 9 Thinking Stright Pge 1 Lerning Objectives ful thinking tht To look t how we cn spot unhelp

More information

GRABLINKTM. FullTM. - DualBaseTM. - BaseTM. GRABLINK Full TM. GRABLINK DualBase TM. GRABLINK Base TM

GRABLINKTM. FullTM. - DualBaseTM. - BaseTM. GRABLINK Full TM. GRABLINK DualBase TM. GRABLINK Base TM GRLINKTM FullTM - DulseTM - setm Full-Fetured se, Medium nd Full Cmer Link Frme Grbbers GRLINK Full TM GRLINK Dulse TM GRLINK se TM www.euresys.com info@euresys.com Copyright 011 Euresys s.. elgium. Euresys

More information

CMST 220 PUBLIC SPEAKING

CMST 220 PUBLIC SPEAKING CMST 220 PUBLIC SPEKING RED G. METZGER, INSTRUCTOR OICE: RINIER 213 PHONE: 253-964-6659 fmetzger@pierce.ctc.edu O V E R V I E W PUBLIC SPEKING IS N OPPORTUNITY TO LOOK GOOD IN RONT O PEOPLE. LL YOUR LIE

More information

Standards Overview (updated 7/31/17) English III Louisiana Student Standards by Collection Assessed on. Teach in Collection(s)

Standards Overview (updated 7/31/17) English III Louisiana Student Standards by Collection Assessed on. Teach in Collection(s) Stndrds Overview (updted 7/31/17) 2017-2018 English III Louisin Student Stndrds y Collection Tech in Collection(s) Stndrd Numer Wording of Stndrd 1 2 3 4 5 6 Assessed on E.O.C. Test RL.1 RL.2 RL.3 RL.4

More information

Chapter 1: Introduction

Chapter 1: Introduction Chpter : Introduction Slides to ccompny the textbook, First Edition, by, John Wiley nd Sons Publishers, 7. http://www.ddvhid.com Copyright 7 Instructors of courses requiring Vhid's textbook (published

More information

The Official IDENTITY SYSTEM. A Manual Concerning Graphic Standards and Proper Implementation. As developed and established by the

The Official IDENTITY SYSTEM. A Manual Concerning Graphic Standards and Proper Implementation. As developed and established by the The Officil ISKCON IDENTITY SYSTEM A Mnul Concerning Grphic Stndrds nd Proper Implementtion As developed nd estlished y the COMMUNICATIONS DEPARTMENT of the INTERNATIONAL SOCIETY FOR KRISHNA CONSCIOUSNESS

More information

ECE 274 Digital Logic. Digital Design. Datapath Components Registers. Datapath Components Register with Parallel Load

ECE 274 Digital Logic. Digital Design. Datapath Components Registers. Datapath Components Register with Parallel Load ECE 274 igitl Logic Multifunction Registers igitl esign 4. 4.2 igitl esign Chpter 4: Slides to ccompny the textbook igitl esign, First Edition, by Frnk Vhid, John Wiley nd Sons Publishers, 27. http://www.ddvhid.com

More information

PRACTICE FINAL EXAM T T. Music Theory II (MUT 1112) w. Name: Instructor:

PRACTICE FINAL EXAM T T. Music Theory II (MUT 1112) w. Name: Instructor: Music Theory II (MUT 1112) w Nme: Instructor: PRACTICE FINAL EXAM Prt-writing (45 minutes; 40%) Complete the prtil progression below with pproprite chord symbols. (There my be more thn one correct nswer.)

More information

DRAFT. Vocal Music AOS 2 WB 3. Purcell: Music for a While. Section A: Musical contexts. How is this mood achieved through the following?

DRAFT. Vocal Music AOS 2 WB 3. Purcell: Music for a While. Section A: Musical contexts. How is this mood achieved through the following? Purcell: Music for While Section A: Musicl contexts Like the Bch Brndenurg Concerto No. 5 in Workook 1, this song y Henry Purcell ws composed during the Broque er. To understnd the music it is helpful

More information

Corporate Logo Guidelines

Corporate Logo Guidelines Corporte Logo Guidelines The llpy logo Inspirtion The logo is inspired by llpy s commitment to the world of secure nd complete pyment services. The solid circle surrounding the nme represents bullet proof

More information

Pitch I. I. Lesson 1 : Staff

Pitch I. I. Lesson 1 : Staff Pitch Lesson 1 : Stff n this lesson you will lern bout the five-line stff, pitches nd notes, noteheds, scending nd descending motion, steps nd leps, ledger lines. Music is written on five-line stff: five

More information

LCD Data Projector VPL-S500U/S500E/S500M

LCD Data Projector VPL-S500U/S500E/S500M LCD Dt Projector VPL-S500U/S500E/S500M Sony presents to you... In tody s world it is esy to crete n impctful nd colorful presenttion full of chrts grphics video clips nd nimtions. To deliver these effective

More information

Soft Error Derating Computation in Sequential Circuits

Soft Error Derating Computation in Sequential Circuits Soft Error Derting Computtion in Sequentil Circuits Hossein Asdi Northestern University, ECE Dept. Boston, MA 02115 gsdi@ece.neu.edu Mehdi B. Thoori Northestern University, ECE Dept. Boston, MA 02115 mthoori@ece.neu.edu

More information

lookbook Transportation - Airports

lookbook Transportation - Airports Trnsporttion - Airports Trnsporttion - Airports Introduction By using digitl signge for generl informtion, wyfinding, lerts nd dvertising in key loctions, irports cn elevte their brnd imge nd provide experiences

More information

Answers to Exercise 3.3 (p. 76)

Answers to Exercise 3.3 (p. 76) Answers to Exercise 3.3 (p. 76) First of ll, check to see tht you hve weighted your dtset with the vrible WTCORRCT (see Figure 2.5 on p. 52 for how to do this). Once this hs been done, you then need to

More information

arxiv: v2 [cs.sd] 13 Dec 2016

arxiv: v2 [cs.sd] 13 Dec 2016 Towrds computer-ssisted understnding of dynmics in symphonic music rxiv:1612.02198v2 [cs.sd] 13 Dec 2016 Mrten Grchten 1, Crlos Edurdo Cncino-Chcón 2, Thssilo Gdermier 2 nd Gerhrd Widmer 1,2 1 Deprtment

More information

Application Support. Product Information. Omron STI. Support Engineers are available at our USA headquarters from

Application Support. Product Information. Omron STI. Support Engineers are available at our USA headquarters from Omron STI Appliction Support Thnk you for your interest in Omron STI products. Plese contct Omron STI with your ppliction questions. Support Engineers re vilble t our U hedqurters from 4:00.m. until 5:00

More information

Pro Series White Toner and Neon Range

Pro Series White Toner and Neon Range WHEN YOU REGISTER YOUR PRODUCT Pro Series White Toner nd Neon Rnge Discover New Dimension in Colour printing for grment decortion, signge nd design Pro7411WT White Toner (CMYW) A4 printer Pro8432WT White

More information

Chapter 3: Sequential Logic Design -- Controllers

Chapter 3: Sequential Logic Design -- Controllers Chpter 3: Sequentil Logic Design -- Controllers Slides to ccompny the textbook, First Edition, by, John Wiley nd Sons Publishers, 27. http://www.ddvhid.com Copyright 27 Instructors of courses requiring

More information

CPE 200L LABORATORY 2: DIGITAL LOGIC CIRCUITS BREADBOARD IMPLEMENTATION UNIVERSITY OF NEVADA, LAS VEGAS GOALS:

CPE 200L LABORATORY 2: DIGITAL LOGIC CIRCUITS BREADBOARD IMPLEMENTATION UNIVERSITY OF NEVADA, LAS VEGAS GOALS: CPE 200L LABORATORY 2: DIGITAL LOGIC CIRCUITS BREADBOARD IMPLEMENTATION DEPARTMENT OF ELECTRICAL AND COMPUTER ENGINEERING UNIVERSITY OF NEVADA, LAS VEGAS GOALS: In this l, the sic logic circuits will e

More information

Introduction. APPLICATION NOTE 712 DS80C400 Ethernet Drivers. Jun 06, 2003

Introduction. APPLICATION NOTE 712 DS80C400 Ethernet Drivers. Jun 06, 2003 Mxim > Design Support > Technicl Documents > Appliction Notes > Microcontrollers > APP 712 Keywords: DS80C400, ethernet drivers, ethernet controller, TCP/IP router, source code, MII, MAC, PHY, ethernet

More information

ECE 274 Digital Logic. Digital Design. Sequential Logic Design Controller Design: Laser Timer Example

ECE 274 Digital Logic. Digital Design. Sequential Logic Design Controller Design: Laser Timer Example ECE 274 Digitl Logic Sequentil Logic Design Sequentil Logic Design Process Digitl Design 3.4 3.5 Digitl Design Chpter 3: Sequentil Logic Design -- Controllers Slides to ccompny the tetook Digitl Design,

More information

VISUAL IDENTITY GUIDE

VISUAL IDENTITY GUIDE VISUAL IDENTITY GUIDE contents Bsic Section Visul Identity System Bsic Prt Appliction Section Visul Identity System Appliction Prt 1.1 Logo System Design 1.1.1 Stndrd Color Grphics of The Logo 1.1.2 Stndrd

More information

Reverse Iterative Deepening for Finite-Horizon MDPs with Large Branching Factors

Reverse Iterative Deepening for Finite-Horizon MDPs with Large Branching Factors Reverse Itertive Deepening for Finite-Horizon MDPs with Lrge Brnching Fctors Andrey Kolobov Peng Di Musm Dniel S. Weld {kolobov, dipeng, musm, weld}@cs.wshington.edu Dept. of Computer Science nd Engineering

More information

Empirical Analysis of Bus Bunching Characteristics Based on Bus AVL/APC Data. Wei Feng* PhD. Researcher Portland State University

Empirical Analysis of Bus Bunching Characteristics Based on Bus AVL/APC Data. Wei Feng* PhD. Researcher Portland State University 0 0 0 Empirical Analysis of Bus Bunching Characteristics Based on Bus AVL/APC Data Wei Feng* PhD. Researcher Portland State University wfeng@pdx.edu Miguel Figliozzi Associate Professor Portland State

More information

TAU 2013 Variation Aware Timing Analysis Contest

TAU 2013 Variation Aware Timing Analysis Contest TAU 2013 Vrition Awre Timing Anlysis Contest Debjit Sinh 1, Luís Guerr e Silv 2, Ji Wng 3, Shesh Rghunthn 4, Dileep Netrbile 5, nd Ahmed Shebit 6 1;5 IBM Systems nd Technology Group, 1 Hopewell Junction/

More information

Before Reading. Introduce Everyday Words. Use the following steps to introduce students to Nature Walk.

Before Reading. Introduce Everyday Words. Use the following steps to introduce students to Nature Walk. Nture Wlk Objectives 15 Before Reding Demonstrte understnding of the orgniztion nd bsic fetures of print Recognize nd red grde-pproprite irregulrly spelled words Red on-level text orlly with ccurcy pproprite

More information

Chapter 5. Synchronous Sequential Logic. Outlines

Chapter 5. Synchronous Sequential Logic. Outlines Chpter 5 Synchronous Sequentil Logic Outlines Sequentil Circuits Ltches Flip-Flops Anlysis of Clocke Sequentil Circuits Stte Reuction n Assignment Design Proceure 2 5. Sequentil Circuits Sequentil circuits

More information

Train times. Monday to Sunday. Stoke-on-Trent. Crewe

Train times. Monday to Sunday. Stoke-on-Trent. Crewe Trin times Mony to Suny Services between: Derby Crewe Stoke-on-Trent 5 Vli from 22n July to 7th October 2018 This timetble replces the Est Milns Trins Trin times 5 timetble between the bove tes on this

More information

lookbook Higher Education

lookbook Higher Education Higher Eduction Higher Eduction Introduction Your digitl signge success hinges on creting unique nd integrted cmpus experience for students, fculty, lumni nd visitors. The ever-expnding rnge of solutions

More information

For public transport information phone Bus 415. Easy access on all buses. Middleton Alkrington Middleton Junction Chadderton Oldham

For public transport information phone Bus 415. Easy access on all buses. Middleton Alkrington Middleton Junction Chadderton Oldham From 23 April Minor timetble chnges to Mondy to Sturdy dytime journeys. Dytime journeys on Sundys nd public holidys re now run by Stgecoch Bus Esy ccess on ll buses Alkrington Junction Chdderton Oldhm

More information

Safety Relay Unit G9SB

Safety Relay Unit G9SB Sfety Rely Unit CSM DS_E_6_1 Ultr Slim Sfety Rely Unit Models of width 17.5 mm vilble with 2 or 3 poles. Models of width 22.5 mm with 3 poles lso vilble. Conforms to EN stndrds. (TÜV pprovl) DIN trck mounting

More information

VOCAL MUSIC I * * K-5. Red Oak Community School District Vocal Music Education. Vocal Music Program Standards and Benchmarks

VOCAL MUSIC I * * K-5. Red Oak Community School District Vocal Music Education. Vocal Music Program Standards and Benchmarks INTEGRATIONS: CE=Creer Eduction; CM=Communiction Skills; GE=Glol Eduction; HOTS=Higher Order Thinking Skills; LS=Lerning & Studying; MCGF=Multiculturl/Gender Fir; T=Technology Vocl Music Progrm Stndrds

More information

walking. Rhythm is one P-.bythm is as Rhythm is built into our pitch, possibly even more so. heartbeats, or as fundamental to mu-

walking. Rhythm is one P-.bythm is as Rhythm is built into our pitch, possibly even more so. heartbeats, or as fundamental to mu- Ir melody- is sung without its rhythm, it immeditely loses much of its essence. P-.bythm is s fundmentl to mu- sic s pitch, possibly even more so. Rhythm is built into our bodies s hertbets, or s the motion

More information

Engineer To Engineer Note

Engineer To Engineer Note Engineer To Engineer Note EE-203 Technicl Notes on using Anlog Devices' DSP components nd development tools Contct our technicl support by phone: (800) ANALOG-D or e-mil: dsp.support@nlog.com Or visit

More information

INPUT CAPTURE WITH ST62 16-BIT AUTO-RELOAD TIMER

INPUT CAPTURE WITH ST62 16-BIT AUTO-RELOAD TIMER APPLICATION NOTE INPUT CAPTURE WITH ST62 -BIT AUTO-RELOAD TIMER by -bit Micro Appliction Tem 1 INTRODUCTION This note presents how to use the ST62 -bit Auto-Relod Timer (ARTimer) to mesure durtions or

More information

style type="text/css".wpb_animate_when_almost_visible { opacity: 1; }/style

style type=text/css.wpb_animate_when_almost_visible { opacity: 1; }/style style type="text/css".wpb_nimte_when_lmost_visible { opcity: 1; }/style Jul 11, 5 thousnd dollrs week life 2011 5 thousnd dollrs week life. 5 thousnd dollrs week life The $5000 A Week For Life Winner Selection

More information

1 --FORMAT FOR CITATIONS & DOCUMENTATION-- ( ) YOU MUST CITE A SOURCE EVEN IF YOU PUT INFORMATION INTO YOUR OWN WORDS!

1 --FORMAT FOR CITATIONS & DOCUMENTATION-- ( ) YOU MUST CITE A SOURCE EVEN IF YOU PUT INFORMATION INTO YOUR OWN WORDS! 1 --FORMAT FOR CITATIONS & DOCUMENTATION-- (2014-2015) YOU MUST CITE A SOURCE EVEN IF YOU PUT INFORMATION INTO YOUR OWN WORDS! -----SEE LAST PAGE FOR SUMMARIES AND PARAPHRASES----- Tle of Contents 1. Source

More information

Reproducible music for 3, 4 or 5 octaves handbells or handchimes. by Tammy Waldrop. Contents. Performance Suggestions... 3

Reproducible music for 3, 4 or 5 octaves handbells or handchimes. by Tammy Waldrop. Contents. Performance Suggestions... 3 eproducible Spring ing! eproducible music for, or octves hndbells or hndchimes by Tmmy Wldrop Contents Performnce Suggestions... The Gtheing... Esily memorized, surround sound, to strt off ny event. L+

More information

THE SOLAR NEIGHBORHOOD. XV. DISCOVERY OF NEW HIGH PROPER MOTION STARS WITH 0B4 yr 1 BETWEEN DECLINATIONS 47 AND 00

THE SOLAR NEIGHBORHOOD. XV. DISCOVERY OF NEW HIGH PROPER MOTION STARS WITH 0B4 yr 1 BETWEEN DECLINATIONS 47 AND 00 The Astronomicl Journl, 130:1658 1679, 2005 October # 2005. The Americn Astronomicl Society. All rights reserved. Printed in U.S.A. A THE SOLAR NEIGHBORHOOD. XV. DISCOVERY OF NEW HIGH PROPER MOTION STARS

More information

ARCHITECTURAL CONSIDERATION OF TOPS-DSP FOR VIDEO PROCESSING. Takao Nishitani. Tokyo Metropolitan University

ARCHITECTURAL CONSIDERATION OF TOPS-DSP FOR VIDEO PROCESSING. Takao Nishitani. Tokyo Metropolitan University ARCHITECTURAL CONSIDERATION OF TOPS-DSP FOR VIDEO PROCESSING Tko Nishitni Tokyo Metropolitn University nishitni@eei.metro-u.c.jp ABSTRACT Possible DSP chip rchitecture with Ter-Opertions-Per - Second processing

More information

Virgin Trains East Coast. Timetables, tickets and tips

Virgin Trains East Coast. Timetables, tickets and tips Virgin Trins Est Cost Timetbles, tickets n tips 10 December 2017 19 My 2018 More services, More svings Since My 2017 we ve introuce 24 itionl Stury services cross the route. Awesome. An tht s not ll of

More information

Chapter 2 Social Indicators Research and Health-Related Quality of Life Research

Chapter 2 Social Indicators Research and Health-Related Quality of Life Research Chpter 2 Socil Indictors Reserch nd Helth-Relted Qulity o Lie Reserch Alex C. Michlos Introduction Reserch relted to qulity-o-lie ought to beneit rom eorts o reserchers trined in diverse disciplines, ddressing

More information

Mapping Arbitrary Logic Functions into Synchronous Embedded Memories For Area Reduction on FPGAs

Mapping Arbitrary Logic Functions into Synchronous Embedded Memories For Area Reduction on FPGAs Mpping Aritrry Logic Functions into Synchronous Emedded Memories For Are Reduction on FPGAs Gordon R. Chiu, Deshnnd P. Singh, Vlvn Mnohrrjh, nd Stephen D. Brown Toronto Technology Center, Alter Corportion

More information

Explosion protected add-on thermostat

Explosion protected add-on thermostat Dt Sheet 605051 Pge 1/7 Explosion protected dd-on thermostt ATH-EXx type series Prticulrities 10 A contct rting cn be directly fitted in zone 1, 2, 21 nd 22 optionl -50 C used Control rnges from -20 to

More information

Safety Relay Unit G9SB

Safety Relay Unit G9SB Sfety Rely Unit CSM DS_E_4_1 Ultr Slim Sfety Rely Unit Models of width 17.5 mm vilble with 2 or 3 poles. Models of width 22.5 mm with 3 poles lso vilble. Conforms to EN stndrds. (TÜV pprovl) DIN trck mounting

More information

DIGITAL EFFECTS MODULE OWNER'S MANUAL

DIGITAL EFFECTS MODULE OWNER'S MANUAL DIGITL EFFECTS MODULE OWNER'S MNUL Introduction Thnk you for purchsing the DEP (bbrev For: Digitl Effects Processor) To tke full dvntge of the DEP's functions, nd to enjoy long nd trouble-free use, plese

More information

LOGICAL FOUNDATION OF MUSIC

LOGICAL FOUNDATION OF MUSIC LOGICAL FOUNDATION OF MUSIC philosophicl pproch Im Anfng wr die Tt Goethe, Fust CARMINE EMANUELE CELLA cecily@liero.it www.cryptosound.org NATURE OF MUSICAL KNOWLEDGE Musicl knowledge cn e thought s complex

More information

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 29. Setting Up the Projector 16

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 29. Setting Up the Projector 16 User's Guide Contents 2 Nottions Used in This Guide 6 Introduction to Your Projector 7 Projector Fetures... 8 Quick nd Esy Setup... 8 Esy Wireless Projection... 8 Flexible Connectivity... 9 Connect with

More information

Panel-mounted Thermostats

Panel-mounted Thermostats sles@jumo.co.uk info.us@jumo.net Dt Sheet 602010 Pge 1/7 Pnel-mounted Thermostts ETH Series Specil fetures Version ccording to DIN EN 14597 Pressure Equipment Directive 97/23/EC Brief description Pnel-mounted

More information

Train times. Monday to Sunday

Train times. Monday to Sunday Trin times Mony to Suny Services between: Mtlock Nottinghm Derby Newrk Cstle 3 Vli from 22n July to 7th October 2018 This timetble replces the Est Milns Trins Trin times 3 timetble between the bove tes

More information

months ending June 30th 2001 Innovators in image processing

months ending June 30th 2001 Innovators in image processing 101010011010 110101101 101010011 111101110101101111 1010100 1111011101011011111011101 011111011101011011111011101 110111110111010110111 010 Six 11010 1011101 11011111011101111 11011101 months ending June

More information

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 28. Setting Up the Projector 15

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 28. Setting Up the Projector 15 User's Guide Contents 2 Nottions Used in This Guide 6 Introduction to Your Projector 7 Projector Prts nd Functions... 8 Projector Prts - Front/Side... 8 Projector Prts - Top/Side... 9 Projector Prts -

More information

WE SERIES DIRECTIONAL CONTROL VALVES

WE SERIES DIRECTIONAL CONTROL VALVES WE SERIES DIRECTIONL CONTROL VLVES ISO4401 Size 03 ulletin 80340- DESIGNTION PGE Fetures nd Generl Description 3 Specifictions 4 Operting Limits 5 Tle of Contents Performnce Dt 6 Stndrd Models 7-8 Dimensions

More information

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 30. Setting Up the Projector 17

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 30. Setting Up the Projector 17 User's Guide Contents 2 Nottions Used in This Guide 6 Introduction to Your Projector 7 Projector Fetures... 8 Quick nd Esy Setup... 8 Esy Wireless Projection... 8 Flexible Connectivity... 9 Connect with

More information

LAERSKOOL RANDHART ENGLISH GRADE 5 DEMARCATION FOR EXAM PAPER 2

LAERSKOOL RANDHART ENGLISH GRADE 5 DEMARCATION FOR EXAM PAPER 2 LAERSKOOL RANDHART ENGLISH GRADE 5 DEMARCATION FOR EXAM PAPER 2 Dte: 15 Octoer 2018 Time: 2 hours Totl: 25 mrks SECTION C: ESSAY (15 MARKS) Write n essy out one of the given topics. Your essy should e

More information

Phosphor: Explaining Transitions in the User Interface Using Afterglow Effects

Phosphor: Explaining Transitions in the User Interface Using Afterglow Effects Phosphor: Explining Trnsitions in the User Interfce Using Afterglow Effects Ptrick Budisch, Desney Tn, Mxime Collom, Dn Roins, Ken Hinckley, Mneesh Agrwl, Shengdong Zho, Gonzlo Rmos To cite this version:

More information

TAP 413-1: Deflecting electron beams in a magnetic field

TAP 413-1: Deflecting electron beams in a magnetic field TAP 413-1: Deflecting electron bems in mgnetic field Circulr control Mgnetic fields re often used to steer bems of chrged prticles, in situtions from teleision tube to lrge-scle prticle ccelertor. The

More information

Contents. English. English. Your remote control 2

Contents. English. English. Your remote control 2 English Contents Your remote control 2 Instlltion Preprtion 3 Connect your computer 4 Switch on 5 Select your enu lnguge 5 Serch for nd Store chnnels Automtic instlltion 7 nul instlltion 8 Reshuffle the

More information

Binaural and temporal integration of the loudness of tones and noises

Binaural and temporal integration of the loudness of tones and noises Perception & Psychophysics 1989. 46 (2), 155-166 Binurl nd temporl integrtion of the loudness of tones nd noises DANIEL ALGOM John B. Pierce Foundtion Lbortory, New Hven, Connecticut Yle University, New

More information

22 May to 10 December Pontefract Train Times

22 May to 10 December Pontefract Train Times 22 My to 10 December 2011 Pontefrct Trin Times Pontefrct Line Timetble (lso incluing Derne Vlley Line) West Yorkshire locl ril services between Lees / Wkefiel n Knottingley re operte by Northern on behlf

More information

Notations Used in This Guide

Notations Used in This Guide User's Guide Nottions Used in This Guide Sfety indictions The documenttion nd the projector use grphicl symbols to show how to use the projector sfely. The indictions nd their mening re s follows. Mke

More information

MILWAUKEE ELECTRONICS NEWS

MILWAUKEE ELECTRONICS NEWS MILWAUKEE ELECTRONICS NEWS Q2 2017 Tecte Fcility Adds SMT Line IN THIS ISSUE Len Chngeovers 2 New SC Product Mgr. 2 HDI Chllenges Solved 3 About Milwukee Electronics Milwukee Electronics designs nd mnufctures

More information

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 29. Setting Up the Projector 16

Contents 2. Notations Used in This Guide 6. Introduction to Your Projector 7. Using Basic Projector Features 29. Setting Up the Projector 16 User's Guide Contents 2 Nottions Used in This Guide 6 Introduction to Your Projector 7 Projector Fetures... 8 Quick nd Esy Setup... 8 Esy Wireless Projection... 8 Flexible Connectivity... 9 Connect with

More information

Day care centres (ages 3 to 5) Kindergarten (ages 4 to 5) taken part in a fire drill in her building and started to beep.

Day care centres (ages 3 to 5) Kindergarten (ages 4 to 5) taken part in a fire drill in her building and started to beep. You nd your fmily Here re eight key fire cn tke prt in sfety tips tht you should know Dy cre centres (ges 3 to 5) Kindergrten (ges 4 to 5) flsh Sty wy from hot things tht cn burn! Tell grown-up if you

More information

A New Concept of Providing Telemetry Data in Real Time

A New Concept of Providing Telemetry Data in Real Time The Spce Congress Proceedings 1967 (4th) Spce Congress Proceedings Apr 3rd, 12: AM A New Concept of Providing Telemetry Dt in Rel Time John M. Bllock Pn Americn World Airwys, GMRD, Ptrick Air Force Bse,

More information

Your Summer Holiday Resource Pack: English

Your Summer Holiday Resource Pack: English Messge Activity to Prents: Sheet The summer holidys re here! To help keep your child entertined, we ve put together Summer Holidy Resource Pck. It s een produced to reduce summer holidy lerning loss nd

More information

find out more at eastcoast.co.uk/2for1 eastcoast.co.uk/welcome

find out more at eastcoast.co.uk/2for1 eastcoast.co.uk/welcome 1 estcost.co.uk estcost.co.uk/welcome fin out more t estcost.co.uk/2for1 Welcome to the new Est Cost timetble for My to December 2011 We re excite to unveil some huge evelopments t Est Cost. We ve been

More information

Applications to Transistors

Applications to Transistors CS/EE1012 INTRODUCTION TO COMPUTER ENGINEERING SPRING 2013 LAYERED COMPUTER DESIGN 1. Introduction CS/EE1012 will study complete computer system, from pplictions to hrdwre. The study will e in systemtic,

More information

Big Adventures. Why might you like to have an adventure? What kind of adventures might you enjoy?

Big Adventures. Why might you like to have an adventure? What kind of adventures might you enjoy? UNIT 7Tourism Ledership Sports Big Adventures Lesson One Before you red Why might you like to hve n dventure? Wht kind of dventures might you enjoy? Wht re these people doing? Would you be frid to try?

More information

THE MOSSAT COLLECTION BOOK SIX

THE MOSSAT COLLECTION BOOK SIX TH TH PRACTICALITIS OF LARNIN AN WRITIN A TUN MOSSAT COLLCTION BOOK SIX PRACTICALITIS OF LARNIN AN WRITIN A TUN. Along with other gems BY Jim McCombie 1 TH PRACTICALITIS OF LARNIN AN WRITIN A TUN Thnk

More information

Notations Used in This Guide

Notations Used in This Guide User's Guide Nottions Used in This Guide Sfety indictions The documenttion nd the projector use grphicl symbols to show how to use the projector sfely. Plese understnd nd respect these cution symbols in

More information

Evaluation of the Suitability of Acoustic Characteristics of Electronic Demung to the Original Demung

Evaluation of the Suitability of Acoustic Characteristics of Electronic Demung to the Original Demung Indin Journl of Science nd Technology, Vol 8(S7), 122 126, April 2015 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 DOI: 10.17485/ijst/2015/v8iS7/64718 Evlution of the Suitility of Acoustic Chrcteristics

More information

LCD VIDEO MONITOR PVM-L1700. OPERATION MANUAL [English] 1st Edition (Revised 2)

LCD VIDEO MONITOR PVM-L1700. OPERATION MANUAL [English] 1st Edition (Revised 2) LCD VIDEO MONITOR PVM-L1700 OPERATION MANUAL [English] 1st Edition (Revised 2) efore operting the unit, plese red this mnul thoroughly nd retin it for future reference. Importnt Sfety Instructions Red

More information

CPSC 121: Models of Computation Lab #2: Building Circuits

CPSC 121: Models of Computation Lab #2: Building Circuits CSC 121: Models of Computti L #2: Building Circuits Ojectives In this l, ou will get more eperience with phsicl logic circuits using The Mgic Bo. You will lso get our first eposure to Logisim, tool for

More information

PIRELLI BRANDBOOK 4. IDENTITY DESIGN

PIRELLI BRANDBOOK 4. IDENTITY DESIGN PIRELLI BRANDBOOK 4. IDENTITY DESIGN 4.01 LOGOTYPE 4.01 The PIRELLI logotype The logotype is one of the most importnt elements of PIRELLI s visul identity. The logotype consists of the lettering PIRELLI

More information

Tran Thi Thanh Thao Ticker: STB - Exchange: HSX Recommend: HOLD Target price 2011: VND 15,800 STATISTICS

Tran Thi Thanh Thao   Ticker: STB - Exchange: HSX Recommend: HOLD Target price 2011: VND 15,800 STATISTICS SAI GON THUONG TIN JOINT STOCK COMMERCIAL BANK (STB) Price on 23/09/2011 Industry: Finnce & Bnking Trn Thi Thnh Tho Emil: Tho.TrnThiThnh @tls.vn Ticker: STB - Exchnge: HSX Recommend: HOLD Trget price 2011:

More information

Sequencer devices. Philips Semiconductors Programmable Logic Devices

Sequencer devices. Philips Semiconductors Programmable Logic Devices hilips emiconductors rogrmmle Logic Devices equencer devices INTODUTION Ten yers go, in their serch for strightforwrd solution to complex sequentil prolems, hilips emiconductors originted rogrmmle Logic

More information

What do these sentences describe? Write P for plants, A for animals or B for both next to each sentence below. They ve got roots.

What do these sentences describe? Write P for plants, A for animals or B for both next to each sentence below. They ve got roots. Unit Nture Lerning Link In this unit you will lern words nd phrses to help you tlk out the nturl world. to tell story using pictures. to write letter out dy out in the countryside. to use the Pst Simple

More information

User's Guide. Downloaded from

User's Guide. Downloaded from User's Guide Downloded from www.vndenborre.be Contents 2 Nottions Used in This Guide 6 Connecting to Composite Video Source... 26 Connecting to Externl USB Devices... 27 Introduction to Your Projector

More information

A Proposed Keystream Generator Based on LFSRs. Adel M. Salman Baghdad College for Economics Sciences

A Proposed Keystream Generator Based on LFSRs. Adel M. Salman Baghdad College for Economics Sciences A Proposed Keystrem Genertor Bsed on LFSRs Adel M Slmn Bghdd College for Economics Sciences 1 2 2012 مجلة كلية بغداد للعلوم الاقتصادية الجامعة العدد الرابع و الثلاثون UAbstrct A strem cipher is system

More information

Cooing, Crying, and Babbling: A Link between Music and Prelinguistic Communication

Cooing, Crying, and Babbling: A Link between Music and Prelinguistic Communication Cooing, Crying, nd Bbbling: A Lin between Music nd Prelinguistic Communiction Michel Byrd, Csdy Bowmn, nd Tshi Ymuchi (mybrd@neo.tmu.edu, csdyb@neo.tmu.edu, tshi-ymuchi@tmu.edu) Deprtment of Psychology,

More information

Outline. Circuits & Layout. CMOS VLSI Design

Outline. Circuits & Layout. CMOS VLSI Design CMO VLI esign Circuits & Lyout Outline Brief History CMO Gte esign Pss Trnsistors CMO Ltches & Flip-Flops tndrd Cell Lyouts tick igrms lide 2 Brief History 958: First integrted circuit Flip-flop using

More information

Contents 2. Notations Used in This Guide 7. Introduction to Your Projector 8. Using Basic Projector Features 34. Setting Up the Projector 17

Contents 2. Notations Used in This Guide 7. Introduction to Your Projector 8. Using Basic Projector Features 34. Setting Up the Projector 17 User's Guide Contents 2 Nottions Used in This Guide 7 Introduction to Your Projector 8 Projector Fetures... 9 Long-life Lser Light Source... 9 Quick nd Esy Setup... 9 Esy Wireless Projection... 9 Projecting

More information

Contents. Thank you for the music page 3 Fernando 9 Waterloo 18

Contents. Thank you for the music page 3 Fernando 9 Waterloo 18 Foreword Contents Thnk you for the music pge Fernndo 9 Wterloo 18 The most successful pop ct ever to emerge from Sweden, ABBA ws originlly sonmed prtly in jest (there ws wellknown Swedish fishcnning cony

More information

400 Series Flat Panel Monitor Arm

400 Series Flat Panel Monitor Arm 1 2 INSTALLATION MANUAL 400 Series Flt Pnel Monitor Arm Rotte Mount Double Pivot P/L USA 1-800-888-8458 1 1x A B C D 1x 75-100mm #8-32 1x 3/32" 2 3 1x 2x 1x 1/8" #10-23/8" Sterile #6-32x1/2" 4 3/16" 2x

More information

1. Connect the wall transformer to the mating connector on the Companion. Plug the transformer into a power outlet.

1. Connect the wall transformer to the mating connector on the Companion. Plug the transformer into a power outlet. I/ PUTTIG THE QRP COMPAIO O THE AIR 1. Connect the wll trnsformer to the mting connector on the Compnion. Plug the trnsformer into power outlet. 2. Plug the cord lbeled 12 VDC OUTPUT into the QRP PLUS

More information

Lecture 3: Circuits & Layout

Lecture 3: Circuits & Layout Lecture 3: Circuits & Lyout Slides courtesy of eming Chen Slides sed on the initil set from vid Hrris CMOS VLSI esign Outline CMOS Gte esign Pss Trnsistors CMOS Ltches & Flip-Flops Stndrd Cell Lyouts Stick

More information

EXMOUTH EXETER BARNSTAPLE: THE AVOCET & TARKA LINES

EXMOUTH EXETER BARNSTAPLE: THE AVOCET & TARKA LINES Welcome to our guie to services showing Avocet Line trins between Exeter n, n Trk Line trins between Exeter n rnstple. All services in this timetble re operte by Gret Western Rilwy. Amenments to publishe

More information

Animals. Adventures in Reading: Family Literacy Bags from Reading Rockets

Animals. Adventures in Reading: Family Literacy Bags from Reading Rockets Animls Adventures in Reding: Fmily Litercy Bgs from Reding Rockets Contents: Two books one fiction, one nonfiction Prent informtion sheet Three ctivity sheets Bookmrk Prent survey ADVENTURES IN READING

More information

LCD VIDEO MONITOR PVM-L3200. OPERATION MANUAL [English] 1st Edition (Revised 1)

LCD VIDEO MONITOR PVM-L3200. OPERATION MANUAL [English] 1st Edition (Revised 1) LCD VIDEO MONITOR PVM-L3200 OPERATION MANUAL [English] 1st Edition (Revised 1) efore operting the unit, plese red this mnul thoroughly nd retin it for future reference. Importnt Sfety Instructions Red

More information

Predicted Movie Rankings: Mixture of Multinomials with Features CS229 Project Final Report 12/14/2006

Predicted Movie Rankings: Mixture of Multinomials with Features CS229 Project Final Report 12/14/2006 Predicted ovie Rnkings: ixtre of ltinomils with Fetres CS229 Project Finl Report 2/4/2006 Introdction H Ji Chew Dimitris Economo Rlene Yng hji@stnford.ed dimeco@stnford.ed rlene@stnford.ed The Netflix

More information

expand their agricultural operations. The Friends were delighted to hear how a

expand their agricultural operations. The Friends were delighted to hear how a Oregon tte niversity Librries, Volume 5, Number 3 expnd their griculturl opertions. The Friends were delighted to her how locl entrepreneur used the O Librry to find importnt informtion in support of locl

More information

Preview Only. Editor s Note. Pronunciation Guide

Preview Only. Editor s Note. Pronunciation Guide 2 Editor s Note Antonio Vivldi ws proliic cooser nd violin virtuoso in Venice, Itly during the Broque er. Born in Venice, he worked there much o his lie, mking concert tours throughout Europe. Vivldi is

More information

ViaLite SatComs Fibre Optic Link

ViaLite SatComs Fibre Optic Link ViLite StComs Fibre Optic Link User Mnul LRx-L-HB- 8 CR2874 14/04/11 Pulse Power & Mesurement Ltd, 65 Shrivenhm Hundred Business Prk, Wtchfield, Swindon, Wiltshire SN68TY, UK Tel +44 (0)1793 784389 Fx

More information

Blackheath. Kidbrooke Eltham Falconwood Welling Bexleyheath Barnehurst

Blackheath. Kidbrooke Eltham Falconwood Welling Bexleyheath Barnehurst Trin times 5 19 My to 14 December 2019 Lonon to: Drtfor, Grvesen n The Mewy Towns To Luton Lonon rige Lonon Victori Denmrk Hill Peckhm Rye Nunhe St Pncrs Interntionl Frringon City Thmeslink Lonon lckfrirs

More information

The Big Wide World. spices. harbour

The Big Wide World. spices. harbour The ig Wide World VOAULARY 1 efore You Red A Lbel the pictures. Use the words below. hrbour medicl supplies spices street vendor cruise ship b spices cruise ship c medicl supplies d hrbour e street vendor

More information

Standard Databases for Recognition of Handwritten Digits, Numerical Strings, Legal Amounts, Letters and Dates in Farsi Language

Standard Databases for Recognition of Handwritten Digits, Numerical Strings, Legal Amounts, Letters and Dates in Farsi Language Stndrd Dtbses for Recognition of Hndwritten, Numericl Strings, Legl Amounts, Letters nd Dtes in Frsi Lnguge Frshid Solimnpour, Jvd Sdri, Ching Y. Suen To cite this version: Frshid Solimnpour, Jvd Sdri,

More information

Synchronising Word Problem for DFAs

Synchronising Word Problem for DFAs Synchronising Word Prolem for DFAs Automt Theory nd Computility Rghunndn M. A. Deprtment of Computer Science nd Automtion Indin Institute of Science, nglore rghunndn.m@gmil.com August 26, 2011 Tle of Contents

More information

Kelly McDermott h#s tr#veled the U.S., C#n#d# #nd Europe #s performer, te#cher #nd student. She h#s # B#chelor of Music degree in flute perform#nce

Kelly McDermott h#s tr#veled the U.S., C#n#d# #nd Europe #s performer, te#cher #nd student. She h#s # B#chelor of Music degree in flute perform#nce Kelly McDermott h#s tr#veled the U.S., C#n#d# #nd Europe #s performer, te#cher #nd student. She h#s # B#chelor of Music degree in flute perform#nce #nd music ther#py from Michig#n St#te University. She

More information