Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC

Size: px
Start display at page:

Download "Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC"

Transcription

1 Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Dena Giovinazzo University of California, Santa Cruz Supervisors: Davide Ceresa and Kostas Kloukinas August 2018

2 Giovinazzo 1 Abstract The Macro Pixel ASIC (MPA) is a readout chip designed for the CMS Outer Tracker upgrades at the High Luminosity LHC (HL-LHC). The MPA s basic functionalities have already been tested and new research has been done on potential optimizations and the MPA s response to different stimuli. This paper will examine the effect of the krummenacher feedback and preamplifier bias on the analog performance of the MPA, analyze the response of the MPA when it detects particles from a radioactive source, verify that the process of bump bonding the MPA wafer does not damage the functionality of the chip, and test the radiation hardness of the chip. Table of Contents Abstract 1 Introduction 2 Tests and Results 3 Krummenacher and PreAmplifier 3 Response from Radioactive Source 8 Wafer Probing 12 Irradiation 14 Conclusion 17 Acknowledgements 18 References 18

3 Giovinazzo 2 Introduction 1 The HL-LHC upgrade will increase the number of collisions by a factor of 10. This will increase the amount of data that must be readout, triggering a new readout ASIC design. The MPA was designed to not only quickly readout events, but also select only interesting events to pass to the back end electronics to limit the already massive amount of data being transmitted. Initial testing on the MPA proved it met initial parameters, but more specific tests were needed to observe its functionality in other scenarios. The MPA has seven DACs that can be set to change its performance. Two of these DACs, the krummenacher feedback bias and preamplifier bias, were thought to have some influence over the analog performance of the MPA. The krummenacher feedback provides compensation for leakage current and changing the amount of compensation was expected to have an effect on the gain of the MPA with respect to the calibration value, due to the krummenacher feedback changing the peak of the signal. It was also expected that increasing the feedback will decrease the noise response. The combination of these responses is the goal of testing the krummenacher feedback. The current allocated to the preamplifier can also be controlled. Power consumption can be significantly decreased by providing less current to the preamplifier, but how this affects the performance of the MPA must be determined. Previous MPA tests used an injected charge to observe the response of the chip. The injected comes from a capacitor, which slightly alters the rest of the system. This capacitor will not be used in the experiment, so the performance of the MPA must be evaluated when the capacitor is disabled and the signals come from actual particles. A radioactive source within the dynamic range of the MPA front-end can provide an absolute characterization. Like all ASICs, MPA chips are produced on a wafer. The chips are tested after every stage of production. This process includes the manufacturing of the active wafer, bump bonding, and dicing. The wafers contain 88 chips that must be individually tested after each step. This is done by a wafer probing machine, which can be programmed to test each chip on the wafer and is used for this experiment to test the functionality of the wafer after being bump bonded. The MPA will be in a high radiation environment during the course of the HL-LHC experiments. It is important that it can function properly during this time without failing due to radiation. Putting the MPA in an X-Ray machine will test its radiation hardness by exposing it to a high dose rate. 1

4 Giovinazzo 3 Tests and Results Krummenacher and PreAmplifier The testing procedure for the krummenacher and preamplifier analysis is as follows: The chip was first calibrated and trimmed. The krummenacher DAC value was set to 0 and stepped by 1 to 31. A row-by-row injection s-curve was done for every krummenacher value with the calibration set to 20. The gain was also found for two different krummenacher DAC values. First, the DAC value was set to 6 and two s-curves were run; one with a calibration of 15 and the other with a calibration of 30. This was repeated with the krummenacher DAC set to 24. The gain was calculated for each individual pixel using the following formula: G = [T hresholdcal = 30 T hreshold cal = 15 ] * T hlsb CalLSB(30 15) [ mv /fc] T hreshold cal = 30 is the threshold value extracted from the s-curve when the calibration is set to 30. T hreshold cal = 15 is the same, but when the calibration is set to 15. ThLSB is the threshold LSB, which is calculated by setting the threshold DAC to 0 and 160, measuring the output, then computing the slope between the two points. The same is done for CalLSB, which finds the calibration DAC s LSB. Additionally, the typical LSB value of the MPA is 100 electrons. The results of this test show that as the krummenacher feedback is increased, the average threshold value of the pixels decreases exponentially, from ~94 LSB to ~87 LSB. The threshold spread also decreases exponentially from 6.9 LSB to 5.4 LSB. The noise decreases somewhat linearly from 2.7 LSB to 2.4 LSB. The current increases a negligible amount from 5.88 ma to 5.92 ma, which can essentially be ignored. The gain decreases by about 9 mv/fc, from just below 78 mv/fc to just above 68 mv/fc.

5 Giovinazzo 4 Figure 1. Graph of the average threshold as the krummenacher DAC changes from 0 to 31. Figure 2. Graph of the average threshold spread as the krummenacher DAC changes from 0 to 31.

6 Giovinazzo 5 Figure 3. Noise variation as the krummenacher DAC was increased from 0 to 31. Figure 4. Graph of the current draw as the krummenacher DAC changes from 0 to 31. Note that the three voltage values are intentionally disregarded.

7 Giovinazzo 6 Figure 5. Gain when the krummenacher DAC = 6 and 24. The same method of testing the krummenacher values was also used to test the preamplifier DAC. The results showed that increasing the preamplifier DAC had a small effect on the noise, decreasing it from 2.56 LSB to 2.49 LSB. Increasing the preamplifier DAC increased the power consumption considerably, as expected. The current draw increased from 50 ma to 65 ma. The average threshold spread seems to be unaffected by any change in the preamplifier DAC, indicating that the threshold is not affected by the preamplifier. And finally, the gain had no tangible effect from the preamplifier, decreasing by less than one mv/fc. Figure 6. Graph of the noise variation as the preamplifier DAC changes from 0 to 31.

8 Giovinazzo 7 Figure 7. Graph of the current draw as the preamplifier DAC changes from 0 to 31. Voltage not pictured. Note that the voltage is intentionally disregarded. Figure 8. Graph of the average threshold spread as the preamplifier DAC changes from 0 to 31.

9 Giovinazzo 8 Figure 9. Gain when the preamplifier DAC is set to 6 and 24. Based on these results, it is clear that the preamplifier DAC can be set to a low value with minimal effects on the performance of the MPA. The krummenacher DAC can be used to tune the threshold value. Noise decreases as the krummenacher value increases, but so does gain, and a balance must be found between the two. Response from Radioactive Source Americium-241 was used to see how the MPA would respond to detecting hits from actual particles. A test set up was configured to enable the readout of the pixels, but disable the injection capacitor which is used to inject a charge similar to a particle. S-curves were run where, at each calibration value, every pixel s shutter was open at the same time for 3-5 minutes. The first test used only Am-241, where we expected to see a threshold value of 220 LSB based on the typical LSB value of 100 electrons. The average threshold of the data turned out to be 200, with a spread of 3.98 LSB. Below is a heat map showing the number of particles counted for every pixel of the MPA. Pixels 1 and 2 have their outputs tied together which is why they show double the count. This is also true for pixels 119 and 120.

10 Giovinazzo 9 Figure 10. Heat map showing the particle count for every pixel. Figure 11. Threshold histogram of the AM-241 radiation test.

11 Giovinazzo 10 To see how the entire MPA responded, we summed up the counter value of every pixel for each threshold to get a sum s-curve plot, as shown below. Figure 12. S-curve of the sum of all pixel counts using Am-241. The blue line is the sum data, and the orange line is the curve fit. The curve fit produces a threshold of 201. Interestingly, the sum data is not flat before curving down. This is likely due to neighboring pixels injecting charge into each other, but this hypothesis requires further exploration. This phenomena means the noise of the system can not be extracted. The MPA was also tested with Am-241 irradiating tin above the sensor. This produced a second radioactive particle, which in turn produced a second s-curve.

12 Giovinazzo 11 Figure 13. S-curve of the sum of all pixel counts using tin and Am-241. The first s-curve is very close to the noise peak, which is why the value is so high at the beginning. This causes some residual noisiness between threshold DAC values 80 and 100, further complicating the extraction of the threshold. Analysis of this data is relient on the understanding of neighboring pixel charge carrying. Further explorations were done on this phenomena using charge injection instead of a radioactive source. The results showed that small amounts of charge carrying are seen when the entire row is injected at once, but just injecting neighboring pixels has no effect. During the wafer probe tests, described below, a row-by-row charge injection was also seen to cause a major increase in the noise of the pixels. From these results it is possible to calculate the absolute calibration of the MPA. By taking the energy peak of Americium and dividing it by the energy needed to produce electron-hole pairs in Si, the number of electrons produced by Americium can be found. Then, the number of electrons is divided by the difference in threshold LSB between the observed threshold and the noise peak, and the electron LSB, or absolute calibration of the chip, can be found. For the test using Am-241 and tin, the Am-241 threshold was found to be 200, and the noisepeak was guessed to be 70. The actual value is not known because the test started the Th DAC at 70. The energy peak of Am-241 is 60 kev and the energy to create electron-hole pairs in Si is 3.6 ev.

13 Giovinazzo 12 E N e = Am 60 [kev Ee = ] 6.7 [ke ] 3.6 [ev ] = 1 e LSB = N e T h Noise = 16.7 [ke ] = 128 [e LSB] The measured LSB of this chip sas 128 electrons, which is 28 electrons higher than expected. This could be caused by mismatch and other non-idealities. The absolute calibration of the chip can then be used to calculate the number of electrons that contribute to noise. From the krummenacher test above, the noise when the DAC = 15 is Taking this value and multiplying by the electron LSB gives 327 electrons produced by noise. Charge carrying creates a resolution limit for the MPA. If the amount of charge carrying can be calculated, then the resolution can be recovered. Currently this value is unknown. Additionally, the absolute calibration of the chip will require another round of tests to find a more accurate value rather than the estimation calculated above due to the unknown value of the noisepeak. Wafer Probing StatsChipPac provided a bump bonded wafer that needed to be tested. The wafer probe machine tests each chip individually for their analog and digital response. First, the chip is powered on and the MPA is enabled. The script checks the current draw to ensure it is powered on. If the chip does not turn on, the test immediately ends and moves on to the next chip. After this, it checks the alignment DAC values which should be close to 15. If they are close to 0 or 31, it indicates that there may be an error. It next performs a shift test which checks that all output lines have proper signal integrity. If the signal integrity is too poor, the signal can not be recovered from the noise floor and all measurements will be lost. Following the shift test is the s-curve measurement which extracts the gain, noise, threshold spread, and calibration and threshold DAC LSBs. After this, the analog and digital components of each pixel are tested individually. It tests that the analog part of each pixel returns the correct value, and then checks the digital memory of each chip when the digital voltage is at 1V and 1.2V. The memory was designed to work at 1.2V, but simulations showed that it should also work at 1V. Consequently, if the memory works at 1V, it is guaranteed to work at 1.2V. After testing the wafer, only one chip could not be powered on at all as it had a short. The alignment and shift tests were passed by all chips. All chips had an analog response, though three showed poor s-curve results. Seventy-one chips had no memory issues at 1.2V, but most had issues at 1V. This is a common occurrence for other wafers so it was an expected result.

14 Giovinazzo 13 Figure 14. Histogram showing the spread of threshold values for all 88 chips. Figure 15. Histogram with the average noise for all 88 chips.

15 Giovinazzo 14 The results of the wafer probe test were very similar to tests that had been run on non-bump bonded wafers. The bump bonding process, therefore, does not affect the performance of the chips. Irradiation The MPA will be in a high radiation environment while it is operating. As such, it is necessary to ensure it can operate in this condition for long periods of time. To accomplish this, the MPA was put into an X-Ray chamber where it was continuously irradiated for several days. Tests were run during this time to check the status of the chip. The tests were similar to the probe station tests, but tested every DAC point rather than just two. It was suspected that irradiation would affect the DACs so it was necessary to see how every point evolved over time. One MPA chip received over 200 MRad of radiation. Below is how the DACs changed with radiation. The 300 MRad point is not actually 300 MRad; it was taken when the test ended and but the chip was still in the X-Ray machine. Similarly, the 400 MRad point was also taken after the test ended, but was in the lab test bench set up. Figure 16. DAC values as a percentage of their original, non-irradiated value over dose amount. Around 150 MRad, the DACs all jumped by 5-10% with the exception of the calibration DAC. The reason for this is currently unknown, and further testing is required. Additionally, the DAC values all immediately decrease once irradiation starts, again with the exception of the

16 Giovinazzo 15 calibration DAC. Another test will need to be run, taking more data points between 0 and 10 MRad to show this jump. Another interesting result is threshold DAC, shown below. Figure 17. Threshold DAC at the beginning of radiation vs. after radiation was completed. The blue lines are the threshold DAC when the MPA was in the X-Ray machine, before irradiation had started. The magenta lines are the threshold DAC when the MPA was moved to the lab test bench after being irradiated. The blue lines show a discontinuity just before 150 MRad, which has never been seen outside of the X-Ray machine. The reason for this discontinuity must be further researched, but it is possible that this is caused by some electrical or magnetic property of the X-Ray machine. The threshold and noise response of s-curve measurements show a similar result to the overall DAC values jumping immediately when radiation starts.

17 Giovinazzo 16 Figure 18. Average threshold for each run as the dose increased. Figure 19. Threshold spread for each run as the dose increased.

18 Giovinazzo 17 Figure 20. Average noise as the dose increased. The 300 MRad and 400 MRad values are the same as described above. Once the MPA has passed MRad, the threshold and noise values level out. The initial irradiation phenomena must be further explored in the future. This irradiation test proved that the MPA can operate successfully even after receiving high amounts of radiation. Some DAC values stayed the same even after irradiation, which was expected. Each aspect of the chip s operation continued to work throughout and after the irradiation. Conclusion The MPA continues to meet expectations as various tests stress the chip. Optimizations with the krummenacher and preamplifier DAC values should be further explored and implemented. Am-241 testing showed that the absolute calibration of MPA chips can vary significantly from the expected value. The first bump bonded wafer showed promising results, and future wafers can likely be safely bump bonded as well. The effects of radiation are present in the chip but not to a damaging extent.

19 Giovinazzo 18 Acknowledgements I would like to thank Phil Rubin and the IRES at CERN program for providing me with this opportunity, and the National Science Foundation for making this opportunity possible. Thanks to Davide Ceresa and Kostas Kloukinas for their guidance and support throughout this project. And a special thanks to my colleagues on floor 6 for making me a master table football player. References [1]. The HL-LHC Project. [2]. MPA-SSA Project.

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors Atlas Pixel Replacement/Upgrade and Measurements on 3D sensors Forskerskole 2007 by E. Bolle erlend.bolle@fys.uio.no Outline Sensors for Atlas pixel b-layer replacement/upgrade UiO activities CERN 3D test

More information

Threshold Tuning of the ATLAS Pixel Detector

Threshold Tuning of the ATLAS Pixel Detector Haverford College Haverford Scholarship Faculty Publications Physics Threshold Tuning of the ATLAS Pixel Detector P. Behara G. Gaycken C. Horn A. Khanov D. Lopez Mateos See next page for additional authors

More information

THE ATLAS Inner Detector [2] is designed for precision

THE ATLAS Inner Detector [2] is designed for precision The ATLAS Pixel Detector Fabian Hügging on behalf of the ATLAS Pixel Collaboration [1] arxiv:physics/412138v1 [physics.ins-det] 21 Dec 4 Abstract The ATLAS Pixel Detector is the innermost layer of the

More information

Beam test of the QMB6 calibration board and HBU0 prototype

Beam test of the QMB6 calibration board and HBU0 prototype Beam test of the QMB6 calibration board and HBU0 prototype J. Cvach 1, J. Kvasnička 1,2, I. Polák 1, J. Zálešák 1 May 23, 2011 Abstract We report about the performance of the HBU0 board and the optical

More information

The hybrid photon detectors for the LHCb-RICH counters

The hybrid photon detectors for the LHCb-RICH counters 7 th International Conference on Advanced Technology and Particle Physics The hybrid photon detectors for the LHCb-RICH counters Maria Girone, CERN and Imperial College on behalf of the LHCb-RICH group

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC S. Callier a, F. Dulucq a, C. de La Taille a, G. Martin-Chassard a, N. Seguin-Moreau a a OMEGA/LAL/IN2P3, LAL Université Paris-Sud, Orsay,France

More information

Performance Measurements of the ATLAS Pixel Front-End

Performance Measurements of the ATLAS Pixel Front-End Performance Measurements of the ATLAS Pixel Front-End John Richardson Lawrence Berkeley National Laboratory 1, Cyclotron Road Berkeley, CA 94596 USA On behalf of the ATLAS Pixel Collaboration. 1 Introduction

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme, P.Netchaeva, P.Oppizzi, L.Rossi, E.Ruscino, F.Vernocchi Lawrence Berkeley National

More information

The ATLAS Pixel Chip FEI in 0.25µm Technology

The ATLAS Pixel Chip FEI in 0.25µm Technology The ATLAS Pixel Chip FEI in 0.25µm Technology Peter Fischer, Universität Bonn (for Ivan Peric) for the ATLAS pixel collaboration The ATLAS Pixel Chip FEI Short Introduction to ATLAS Pixel mechanics, modules

More information

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Pixel Detector R 1 =3.9 cm R 2 =7.6 cm Main Physics Goal Heavy Flavour Physics D 0 K π+ 15 days Pb-Pb data

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

CBC2: X-ray Irradiation Results

CBC2: X-ray Irradiation Results CBC2: X-ray Irradiation Results Davide Braga, Mark Raymond 6 November 214 HL-LHC dose for CBC2 < 3e+5 Gy = 3 Mrad With x2 safety margin expect to be radhard to >6Mrad NB: calculated for 3 fb -1 but with

More information

HAPD and Electronics Updates

HAPD and Electronics Updates S. Nishida KEK 3rd Open Meeting for Belle II Collaboration 1 Contents Frontend Electronics Neutron Irradiation News from Hamamtsu 2 144ch HAPD HAPD (Hybrid Avalanche Photo Detector) photon bi alkali photocathode

More information

Laboratory Evaluation of the ATLAS PIxel Front End

Laboratory Evaluation of the ATLAS PIxel Front End Laboratory Evaluation of the ATLAS PIxel Front End Pixel 2002, Carmel CA, 10th September 2002 John Richardson Lawrence Berkeley National Laboratory Overview The TurboPLL Test System FE-I1: Studies using

More information

Status of readout electronic design in MOST1

Status of readout electronic design in MOST1 Status of readout electronic design in MOST1 Na WANG, Ke WANG, Zhenan LIU, Jia TAO On behalf of the Trigger Group (IHEP) Mini-workshop for CEPC MOST silicon project,23 November,2017,Beijing Outline Introduction

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

The TDCPix ASIC: Tracking for the NA62 GigaTracker. G. Aglieri Rinella, S. Bonacini, J. Kaplon, A. Kluge, M. Morel, L. Perktold, K.

The TDCPix ASIC: Tracking for the NA62 GigaTracker. G. Aglieri Rinella, S. Bonacini, J. Kaplon, A. Kluge, M. Morel, L. Perktold, K. : Tracking for the NA62 GigaTracker CERN E-mail: matthew.noy@cern.ch G. Aglieri Rinella, S. Bonacini, J. Kaplon, A. Kluge, M. Morel, L. Perktold, K. Poltorak CERN The TDCPix is a hybrid pixel detector

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

CSC Data Rates, Formats and Calibration Methods

CSC Data Rates, Formats and Calibration Methods CSC Data Rates, Formats and Calibration Methods D. Acosta University of Florida With most information collected from the The Ohio State University PRS March Milestones 1. Determination of calibration methods

More information

A pixel chip for tracking in ALICE and particle identification in LHCb

A pixel chip for tracking in ALICE and particle identification in LHCb A pixel chip for tracking in ALICE and particle identification in LHCb K.Wyllie 1), M.Burns 1), M.Campbell 1), E.Cantatore 1), V.Cencelli 2) R.Dinapoli 3), F.Formenti 1), T.Grassi 1), E.Heijne 1), P.Jarron

More information

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle, on behalf of the ATLAS Pixel Collaboration Istituto Nazionale di Fisica Nucleare, Sez. di Genova Via Dodecaneso 33, I-646 Genova, ITALY

More information

High ResolutionCross Strip Anodes for Photon Counting detectors

High ResolutionCross Strip Anodes for Photon Counting detectors High ResolutionCross Strip Anodes for Photon Counting detectors Oswald H.W. Siegmund, Anton S. Tremsin, Robert Abiad, J. Hull and John V. Vallerga Space Sciences Laboratory University of California Berkeley,

More information

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area.

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area. BitWise. Instructions for New Features in ToF-AMS DAQ V2.1 Prepared by Joel Kimmel University of Colorado at Boulder & Aerodyne Research Inc. Last Revised 15-Jun-07 BitWise (V2.1 and later) includes features

More information

ALICE Muon Trigger upgrade

ALICE Muon Trigger upgrade ALICE Muon Trigger upgrade Context RPC Detector Status Front-End Electronics Upgrade Readout Electronics Upgrade Conclusions and Perspectives Dr Pascal Dupieux, LPC Clermont, QGPF 2013 1 Context The Muon

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

Spectroscopy on Thick HgI 2 Detectors: A Comparison Between Planar and Pixelated Electrodes

Spectroscopy on Thick HgI 2 Detectors: A Comparison Between Planar and Pixelated Electrodes 1220 IEEE TRANSACTIONS ON NUCLEAR SCIENCE, OL. 50, NO. 4, AUGUST 2003 Spectroscopy on Thick HgI 2 Detectors: A Comparison Between Planar and Pixelated Electrodes James E. Baciak, Student Member, IEEE,

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

The Readout Architecture of the ATLAS Pixel System

The Readout Architecture of the ATLAS Pixel System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle / INFN - Genova E-mail: Roberto.Beccherle@ge.infn.it Copy of This Talk: http://www.ge.infn.it/atlas/electronics/home.html R. Beccherle

More information

KLM: TARGETX. User-Interface for Testing TARGETX Brief Testing Overview Bronson Edralin 04/06/15

KLM: TARGETX. User-Interface for Testing TARGETX Brief Testing Overview Bronson Edralin 04/06/15 KLM: TARGETX User-Interface for Testing TARGETX Brief Testing Overview Bronson Edralin 1 TARGETX Test Team TARGETX Waveform Sampling/Digitizing ASIC Designer Dr. Gary S. Varner Features 1 GSa/s 16 Channels

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

POLITECNICO DI TORINO Repository ISTITUZIONALE

POLITECNICO DI TORINO Repository ISTITUZIONALE POLITECNICO DI TORINO Repository ISTITUZIONALE Results from CHIPIX-FE0, a Small Scale Prototype of a New Generation Pixel Readout ASIC in 65nm CMOS for HL-LHC Original Results from CHIPIX-FE0, a Small

More information

R&D on high performance RPC for the ATLAS Phase-II upgrade

R&D on high performance RPC for the ATLAS Phase-II upgrade R&D on high performance RPC for the ATLAS Phase-II upgrade Yongjie Sun State Key Laboratory of Particle detection and electronics Department of Modern Physics, USTC outline ATLAS Phase-II Muon Spectrometer

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

LAB 1: Plotting a GM Plateau and Introduction to Statistical Distribution. A. Plotting a GM Plateau. This lab will have two sections, A and B.

LAB 1: Plotting a GM Plateau and Introduction to Statistical Distribution. A. Plotting a GM Plateau. This lab will have two sections, A and B. LAB 1: Plotting a GM Plateau and Introduction to Statistical Distribution This lab will have two sections, A and B. Students are supposed to write separate lab reports on section A and B, and submit the

More information

CMS Tracker Synchronization

CMS Tracker Synchronization CMS Tracker Synchronization K. Gill CERN EP/CME B. Trocme, L. Mirabito Institut de Physique Nucleaire de Lyon Outline Timing issues in CMS Tracker Synchronization method Relative synchronization Synchronization

More information

RX40_V1_0 Measurement Report F.Faccio

RX40_V1_0 Measurement Report F.Faccio RX40_V1_0 Measurement Report F.Faccio This document follows the previous report An 80Mbit/s Optical Receiver for the CMS digital optical link, dating back to January 2000 and concerning the first prototype

More information

3-D position sensitive CdZnTe gamma-ray spectrometers

3-D position sensitive CdZnTe gamma-ray spectrometers Nuclear Instruments and Methods in Physics Research A 422 (1999) 173 178 3-D position sensitive CdZnTe gamma-ray spectrometers Z. He *, W.Li, G.F. Knoll, D.K. Wehe, J. Berry, C.M. Stahle Department of

More information

Status of GEM-based Digital Hadron Calorimetry

Status of GEM-based Digital Hadron Calorimetry Status of GEM-based Digital Hadron Calorimetry Snowmass Meeting August 23, 2005 Andy White (for the GEM-DHCAL group: UTA, U.Washington, Tsinghua U., Changwon National University, KAERI- Radiation Detector

More information

Understanding PQR, DMOS, and PSNR Measurements

Understanding PQR, DMOS, and PSNR Measurements Understanding PQR, DMOS, and PSNR Measurements Introduction Compression systems and other video processing devices impact picture quality in various ways. Consumers quality expectations continue to rise

More information

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Lorenzo Cassina - XXIX cycle MiB - Midterm Graduate School Seminar Day Outline Activity on LHCb MaPTM qualification RICH Upgrade

More information

Review Report of The SACLA Detector Meeting

Review Report of The SACLA Detector Meeting Review Report of The SACLA Detector Meeting The 2 nd Committee Meeting @ SPring-8 Date: Nov. 28-29, 2011 Committee Members: Dr. Peter Denes, LBNL, U.S. (Chair of the Committee) Prof. Yasuo Arai, KEK, Japan.

More information

Standard Operating Procedure of nanoir2-s

Standard Operating Procedure of nanoir2-s Standard Operating Procedure of nanoir2-s The Anasys nanoir2 system is the AFM-based nanoscale infrared (IR) spectrometer, which has a patented technique based on photothermal induced resonance (PTIR),

More information

Reading a GEM with a VLSI pixel ASIC used as a direct charge collecting anode. R.Bellazzini - INFN Pisa. Vienna February

Reading a GEM with a VLSI pixel ASIC used as a direct charge collecting anode. R.Bellazzini - INFN Pisa. Vienna February Reading a GEM with a VLSI pixel ASIC used as a direct charge collecting anode Ronaldo Bellazzini INFN Pisa Vienna February 16-21 2004 The GEM amplifier The most interesting feature of the Gas Electron

More information

ATLAS IBL Pixel Module Electrical Tests Description

ATLAS IBL Pixel Module Electrical Tests Description ATLAS IBL Pixel Module Electrical Tests ATLAS Project Document No: Institute Document No. Created: 10/05/2012 Page: 1 of 41 1221585 Modified: 06/01/2013 ATLAS IBL Pixel Module Electrical Tests Description

More information

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD D. LO PRESTI D. BONANNO, F. LONGHITANO, D. BONGIOVANNI, S. REITO INFN- SEZIONE DI CATANIA D. Lo Presti, NUMEN2015 LNS, 1-2 December 2015 1 OVERVIEW

More information

PoS(Vertex 2017)052. The VeloPix ASIC test results. Speaker. Edgar Lemos Cid1, Pablo Vazquez Regueiro on behalf of the LHCb Collaboration

PoS(Vertex 2017)052. The VeloPix ASIC test results. Speaker. Edgar Lemos Cid1, Pablo Vazquez Regueiro on behalf of the LHCb Collaboration 1 1, Pablo Vazquez Regueiro on behalf of the LHCb Collaboration 7 8 9 10 11 12 13 14 15 16 17 18 LHCb is a dedicated experiment searching for new physics by studying CP violation and rare decays of b and

More information

GS1524 HD-LINX II Multi-Rate SDI Adaptive Cable Equalizer

GS1524 HD-LINX II Multi-Rate SDI Adaptive Cable Equalizer GS1524 HD-LINX II Multi-Rate SDI Adaptive Cable Equalizer Key Features SMPTE 292M, SMPTE 344M and SMPTE 259M compliant automatic cable equalization multi-standard operation from 143Mb/s to 1.485Gb/s supports

More information

Perugia 16 June 2009 Flavio Dal Corso INFN-Padova 1

Perugia 16 June 2009 Flavio Dal Corso INFN-Padova 1 Studies of SiPM @ Padova Flavio Dal Corso INFN-Padova Plans & Objectives Characterization of Silicon Photo Multipliers of different manufacturers and geometries: Currents Gain & Efficiency Dark Rate Time

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER

IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER 2005 2009 3-D Position Sensitive CdZnTe Spectrometer Performance Using Third Generation VAS/TAT Readout Electronics Feng Zhang, Zhong He, Senior

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

Mass production testing of the front-end ASICs for the ALICE SDD system

Mass production testing of the front-end ASICs for the ALICE SDD system Mass production testing of the front-end ASICs for the ALICE SDD system L. Toscano a, R.Arteche Diaz b,e, S.Di Liberto b, M.I.Martínez a,d, S.Martoiu a, M.Masera c, G.Mazza a, M.A.Mazzoni b, F.Meddi b,

More information

Tracking Detector R&D at Cornell University and Purdue University

Tracking Detector R&D at Cornell University and Purdue University Tracking Detector R&D at Cornell University and Purdue University We have requested funding for this research from NSF through UCLC. Information available at the web site: * this presentation Cornell University

More information

MIE 402: WORKSHOP ON DATA ACQUISITION AND SIGNAL PROCESSING Spring 2003

MIE 402: WORKSHOP ON DATA ACQUISITION AND SIGNAL PROCESSING Spring 2003 MIE 402: WORKSHOP ON DATA ACQUISITION AND SIGNAL PROCESSING Spring 2003 OBJECTIVE To become familiar with state-of-the-art digital data acquisition hardware and software. To explore common data acquisition

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

SLHC tracker upgrade: challenges and strategies in ATLAS

SLHC tracker upgrade: challenges and strategies in ATLAS SLHC tracker upgrade: challenges and strategies in ATLAS 1 Rutherford Appleton Laboratory, STFC, Harwell Science and Innovation Campus, Didcot, OX11 0QX, UK E-mail: m.m.weber@rl.ac.uk The Large Hadron

More information

Imaging TOP (itop), Cosmic Ray Test Stand & PID Readout Update

Imaging TOP (itop), Cosmic Ray Test Stand & PID Readout Update Imaging TOP (itop), Cosmic Ray Test Stand & PID Readout Update Tom Browder, Herbert Hoedlmoser, Bryce Jacobsen, Jim Kennedy, KurtisNishimura, Marc Rosen, Larry Ruckman, Gary Varner Kurtis Nishimura SuperKEKB

More information

Analog Circuits Prof. Nagendra Krishnapura Department of Electrical Engineering Indian Institute of Technology, Madras. Module - 04 Lecture 12

Analog Circuits Prof. Nagendra Krishnapura Department of Electrical Engineering Indian Institute of Technology, Madras. Module - 04 Lecture 12 Analog Circuits Prof. Nagendra Krishnapura Department of Electrical Engineering Indian Institute of Technology, Madras Module - 04 Lecture 12 So, far we have discussed common source amplifier using an

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

PACS. Dark Current of Ge:Ga detectors from FM-ILT. J. Schreiber 1, U. Klaas 1, H. Dannerbauer 1, M. Nielbock 1, J. Bouwman 1.

PACS. Dark Current of Ge:Ga detectors from FM-ILT. J. Schreiber 1, U. Klaas 1, H. Dannerbauer 1, M. Nielbock 1, J. Bouwman 1. PACS Test Analysis Report FM-ILT Page 1 Dark Current of Ge:Ga detectors from FM-ILT J. Schreiber 1, U. Klaas 1, H. Dannerbauer 1, M. Nielbock 1, J. Bouwman 1 1 Max-Planck-Institut für Astronomie, Königstuhl

More information

HaRDROC performance IN2P3/LAL+IPNL+LLR IN2P3/IPNL LYON. M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY

HaRDROC performance IN2P3/LAL+IPNL+LLR IN2P3/IPNL LYON. M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD, N. SEGUIN-MOREAU IN2P3/LAL ORSAY V. BOUDRY, J.C. BRIENT,

More information

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Design, Realization and Test of a DAQ chain for ALICE ITS Experiment S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Physics Department, Bologna University, Viale Berti Pichat 6/2 40127 Bologna, Italy

More information

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.042-4 (2005) A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC M.Werner

More information

ARDESIA: an X-ray Spectroscopy detection system for synchrotron experiments based on arrays of Silicon Drift Detectors.

ARDESIA: an X-ray Spectroscopy detection system for synchrotron experiments based on arrays of Silicon Drift Detectors. ARDESIA: an X-ray Spectroscopy detection system for synchrotron experiments based on arrays of Silicon Drift Detectors Carlo Fiorini Dipartimento di Elettronica, Informazione e Bioingegneria, Politecnico

More information

Investigation of Digital Signal Processing of High-speed DACs Signals for Settling Time Testing

Investigation of Digital Signal Processing of High-speed DACs Signals for Settling Time Testing Universal Journal of Electrical and Electronic Engineering 4(2): 67-72, 2016 DOI: 10.13189/ujeee.2016.040204 http://www.hrpub.org Investigation of Digital Signal Processing of High-speed DACs Signals for

More information

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Commissioning and Initial Performance of the Belle II itop PID Subdetector Commissioning and Initial Performance of the Belle II itop PID Subdetector Gary Varner University of Hawaii TIPP 2017 Beijing Upgrading PID Performance - PID (π/κ) detectors - Inside current calorimeter

More information

A TARGET-based camera for CTA

A TARGET-based camera for CTA A TARGET-based camera for CTA TeV Array Readout with GSa/s sampling and Event Trigger (TARGET) chip: overview Custom-designed ASIC for CTA, developed in collaboration with Gary Varner (U Hawaii) Implementation:

More information

New Serial Link Simulation Process, 6 Gbps SAS Case Study

New Serial Link Simulation Process, 6 Gbps SAS Case Study ew Serial Link Simulation Process, 6 Gbps SAS Case Study Donald Telian SI Consultant Session 7-TH2 Donald Telian SI Consultant About the Authors Donald Telian is an independent Signal Integrity Consultant.

More information

Sources of Error in Time Interval Measurements

Sources of Error in Time Interval Measurements Sources of Error in Time Interval Measurements Application Note Some timer/counters available today offer resolution of below one nanosecond in their time interval measurements. Of course, high resolution

More information

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards K. Benslama, G. Brooijmans, C.-Y. Chi, D. Dannheim, I. Katsanos, J. Parsons, S. Simion Nevis Labs, Columbia University

More information

Mosaic 1.1 Progress Report April, 2010

Mosaic 1.1 Progress Report April, 2010 1 Milestones Achieved Mosaic 1.1 Progress Report April, 2010 A final design review was held for the electrical component of the project. The test Dewar is complete and e2v devices have been installed for

More information

Report from the Tracking and Vertexing Group:

Report from the Tracking and Vertexing Group: Report from the Tracking and Vertexing Group: October 10, 2016 Sally Seidel, Petra Merkel, Maurice Garcia- Sciveres Structure of parallel session n Silicon Sensor Fabrication on 8 wafers (Ron Lipton) n

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

FE-I4B wafer probing. ATLAS IBL General Meeting February David-Leon Pohl, Malte Backhaus, Marlon Barbero, Jörn Große-Knetter.

FE-I4B wafer probing. ATLAS IBL General Meeting February David-Leon Pohl, Malte Backhaus, Marlon Barbero, Jörn Große-Knetter. FE-I4B wafer probing ATLAS IBL General Meeting February 15-17 2012 1 of 16 FE-I4A wafer probing summary 20 FE-I4A wafers fully probed (80% Bonn, 20% Berkeley) 2 unprobed wafers for diced chips 4 at Aptasic

More information

Prospect and Plan for IRS3B Readout

Prospect and Plan for IRS3B Readout Prospect and Plan for IRS3B Readout 1. Progress on Key Performance Parameters 2. Understanding limitations during LEPS operation 3. Carrier02 Rev. C (with O-E-M improvements) 4. Pre-production tasks/schedule

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

MCP Upgrade: Transmission Line and Pore Importance

MCP Upgrade: Transmission Line and Pore Importance MCP Upgrade: Transmission Line and Pore Importance Tyler Natoli For the PSEC Timing Project Advisor: Henry Frisch June 3, 2009 Abstract In order to take advantage of all of the benefits of Multi-Channel

More information

Performing a Measurement/ Reading the Data

Performing a Measurement/ Reading the Data CHAPTER 5 Performing a Measurement/ Reading the Data With the basic parameters set and the instrument calibrated (as discussed in Chapters 3 and 4), you are ready to take a measurement and examine the

More information

Pole Zero Correction using OBSPY and PSN Data

Pole Zero Correction using OBSPY and PSN Data Pole Zero Correction using OBSPY and PSN Data Obspy provides the possibility of instrument response correction. WinSDR and WinQuake already have capability to embed the required information into the event

More information

IEEE copyright notice

IEEE copyright notice This paper is a preprint (IEEE accepted status). It has been published in IEEE Xplore Proceedings for 2017 13th Conference on Ph.D. Research in Microelectronics and Electronics (PRIME) DOI: 10.1109/PRIME.2017.7974100

More information

Lab 2: A/D, D/A, and Sampling Theorem

Lab 2: A/D, D/A, and Sampling Theorem Lab 2: A/D, D/A, and Sampling Theorem Introduction The purpose of this lab is to explore the principles of analog-to-digital conversion, digital-to-analog conversion, and the sampling theorem. It will

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

Diamonds as Potential Particle Detectors

Diamonds as Potential Particle Detectors University of Colorado, Boulder CU Scholar Undergraduate Honors Theses Honors Program Spring 2016 Diamonds as Potential Particle Detectors Samuel Jahn samuel.jahn@colorado.edu Follow this and additional

More information

Precision testing methods of Event Timer A032-ET

Precision testing methods of Event Timer A032-ET Precision testing methods of Event Timer A032-ET Event Timer A032-ET provides extreme precision. Therefore exact determination of its characteristics in commonly accepted way is impossible or, at least,

More information

Scan. This is a sample of the first 15 pages of the Scan chapter.

Scan. This is a sample of the first 15 pages of the Scan chapter. Scan This is a sample of the first 15 pages of the Scan chapter. Note: The book is NOT Pinted in color. Objectives: This section provides: An overview of Scan An introduction to Test Sequences and Test

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003 L1 Cal Monitoring Monitoring can mean many things Anything related to observation of system s operation Different

More information

Lab 1 Introduction to the Software Development Environment and Signal Sampling

Lab 1 Introduction to the Software Development Environment and Signal Sampling ECEn 487 Digital Signal Processing Laboratory Lab 1 Introduction to the Software Development Environment and Signal Sampling Due Dates This is a three week lab. All TA check off must be completed before

More information