FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

Size: px
Start display at page:

Download "FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure"

Transcription

1 The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman Chemical Co. One of the most common reasons for marriage failure today is the breakdown of basic communications. The same holds true for construction and maintenance workers. Words spoken on the job with a specific intent can often be misconstrued to mean something entirely different a situation that can ultimately be a recipe for disaster. That was definitely the case at a major chemical manufacturing facility when an unqualified electrical helper working for an outside electrical contracting firm was asked to perform a task he didn t fully understand. The job at hand on that fateful day was to remove some temporary mediumvoltage (MV) cabling and rigid conduit that extended from the old MV load break switch (which was being used as a splice box) to a new load break switch and to install a new junction box. The crew performing the installation, who was hired by the manufacturing facility as an electrical contractor, had been working on this job for several weeks, replacing the aging electrical distribution equipment. This involved replacing the old substation located in Building 12B (Photo 1) with a new one in Building 12C (Photo 2 on page 10). The scene. The distribution system was configured so that power flowed from an MV breaker (located in another building) to old load break switch [36-3] (which was basically gutted and used Photo 1. Building 12B (location of old substation). Note stairway at south end of building. for a splice box) in old substation Bldg 12B. Temporary MV cable was installed to power a new load break switch [36-4] in Bldg 12C (green cable), as shown in Fig. 1 on page 10. Company electricians (in-house employees who worked for the chemical plant) placed this circuit under lock and tag (LOTO) the morning of the incident. Contractor employees were removing the temporary cabling and conduit between old load break switch [36-3] and new load break switch [36-4] to install a new junction box below the substations in order to provide a permanent feed for the left half of the new substation in Bldg 12C. Similarly, power flowed from a different MV breaker (also in another building) to the other old load break switch [46-3] (which was also just used as a splice point), and then temporary cable was run to new load break switch [46-4] (red cable). This circuit was energized, and the new double-ended substation in Bldg 12C was configured such that the tie breaker was closed, allowing the entire line-up to be powered by this circuit. The contractor crew acquired a safe work permit and hot work permit from the company s area maintenance coordinator first thing that morning. They also conducted a safety task 8 EC&M December ecm FORENSICS.indd 8 11/12/2014 2:13:32 PM

2 FORENSIC CASEBOOK They also peeled the red tape X off of the back of the new load break switch that had been isolated in the new substation. (This X is used to alert people that this part of the substation is energized. Because this load break switch had been de-energized and placed under LOTO, the X was removed.) Company electricians then removed the back panels of the locked-out new load break switch [36-4], and unbolted the cable terminations after verifying that the circuit parts were de-energized using voltage test equipment. At this point, they told the electrical contractor the circuit had been de-energized/locked out, and left the area. Contractor personnel placed their locks on the lock box for the circuit. Photo 2. Building 12C (location of new substation). Note stairway at north end of building. assessment (STA). In fact, the contractor used the STA as a means of pre-job safety assessment a method that was typically very effective in identifying hazards and either eliminating or mitigating them. However, on this particular morning, the STA did not include any specific information about cutting or removing cables. Instead, it concentrated on installation of the junction box (Photo 3 on page 12). While waiting for the job setup to be completed, a member of the contractor crew (who we will refer to as the contractor electrical helper ) left the building to help move cable reels to another building. Company electricians completed the isolation of the load break switch by racking out and performing LOTO on the MV breaker in another building. The accident. Contractor employees began cutting the conduits and cabling below the de-energized old load break switch [36-3] in Bldg 12B. The contractor lead electrician asked the electrical helper to get his ratchet cable cutters, go to the far load break, and cut the 4/0 cables. (He was being asked to cut the MV terminators off of the cables in the back of the locked-out load break switch [36-4] so that they would pull out of the conduit easily.) The contractor crew, including the lead electrician, began wiping lubricant off of the cables in anticipation of pulling them out of the conduit. Fig. 1. Layout of buildings, showing where the cut was made and where it was supposed to be made. 10 EC&M December ecm FORENSICS.indd 10 11/12/2014 2:14:00 PM

3 FORENSIC CASEBOOK Have you seen the newest E-newsletter in the EC&M family? Photo 3. New junction box located below the buildings. Illumination Insider tracks the research, development, design, installation and operation of all types of lighting and control products. This twice-a-month e-newsletter reaches approximately 75,000* professionals working in the industrial, commercial, retail, residential, institutional, health care, government, and utility market sectors. *Publisher s own data Subscribe Today See all if our EC&M E-newsletters at ecmweb.com The helper promptly went up the south stairway of Bldg 12B and entered the old substation room (Fig. 2 on page 14). He passed by de-energized load break switch [36-3] (which had the wires hanging out and the back taken off), noticed the door leaning up against the back wall, and continued to far load break switch [46-3] in, which was energized. He noticed that this switch was locked and tagged in the off position. He also saw the red tape X on this load break switch (Photo 4 on page 14) but made the incorrect assumption that this device was de-energized. The helper took a battery-powered drill and removed the bolts from the back cover from the energized load break switch and placed the cover to the side. When he began to cut the cable in the back of the load break switch, he heard a loud pop and saw a flash. Realizing something was very wrong, he went to the south stairway to tell the contractor s lead electrician that there might be a problem. A problem it was, indeed. Company operations personnel quickly showed up asking what had happened, considering that a significant portion of the chemical manufacturing facility had lost power when this fault occurred. Despite the disruption and downtime that followed, the miraculous thing was that the helper walked away from the incident without a scratch. Investigation and analysis. One positive result of this near-miss was that the ground fault detection and relaying system on the MV power circuit breaker was tested and proved to work as designed. The protection system detected the phase-to-ground fault, which resulted from the cable cutters slicing through the copper shield on the 13.8kV cable and penetrating the inner conductor. The circuit breaker opened quickly, removing power from the fault and preventing a large arc flash event. The investigation uncovered some rather unsettling facts that ultimately contributed to this safety near-miss. Although he was considered to be a good worker and generally did his 12 EC&M December ILLUMINATION INSIDER_DECIssueHsAd.indd 1 312ecm FORENSICS.indd 12 12/12/2013 2:40:14 PM 11/12/2014 2:14:29 PM

4 best to perform tasks correctly, the helper was not a qualified electrical worker as defined by NFPA 70E ( one who has skills and knowledge relating to the construction and operation of the electrical equipment and installations and has received safety training to recognize and avoid the hazards involved ). During the investigation, the helper s answers to some basic questions about the new substation installation clearly demonstrated he did not fully understand the technical aspects of this job. The electrical contracting firm s employees had worked at the chemical manufacturing site for many years, so they clearly understood both site policies and their own contracting firm s requirements for participating in the LOTO /hand-over of the de-energized circuits, yet they did not do so on this job. The company electricians performed the circuit lock-out, but there was no verification by the contractor employees and virtually no discussion about how the lock-out had been performed. They just took the electrician s word for it that everything had been isolated, locked out, and de-energized. The pre-job safety review performed by the contracting crew the morning of the incident was not executed properly. The STA focused on the big job rather than specific issues and safety hazards of the task at hand, which was to remove the old cables and conduit, install the junction box and new conduit, and then install the new cabling. Clearly, the instructions given by the electrical contractor s lead electrician to the helper were inadequate. Go to the far load break, and cut the 4/0 cables, he was told. During the investigation, it became apparent that the lead electrician intended for the helper to go up the north stairway adjacent to Bldg 12C, enter the new substation room, go to the far load break switch [36-4] in that room (which was de-energized and under LOTO), and cut the terminators off of the shielded cable. The helper, however, went up the south stairway next to Bldg Photo 4. Red taped X on rear of energized load break switch Fig. 2. Layout of buildings, showing intended path (right side) for contractor electrical helper, and actual path (left side). 14 EC&M December ecm FORENSICS.indd 14 11/12/2014 2:14:50 PM

5 12B, entered the old substation room, and went to the far load break switch in that room [46-3] (which was energized) to make the cut (Fig. 2). In essence, the helper did exactly what he was told to do! In retrospect, it was also determined that the lead electrician did not fully understand what tasks he should assign to the helper without direct supervision. The pair had worked together in the same crew for many months, which may have lulled the lead electrician into a sense of complacency concerning the helper s understanding of instructions. There was a lock and tag on the front of load break switch [46-3] left over from the removal of the old substation equipment where the cut was made (Photo 5). In actuality, this load break switch was only being used as a splice box. Thus, the lock and tag were meaningless. However, when the helper saw the lock and tag, it further convinced him that it was okay to remove the back from this load break switch a decision that substantiates the fact that he should not have been considered a qualified electrical worker. At this company site, there were high expectations concerning the wearing of arc-rated clothing whenever an arc flash hazard exists. However, no one had given adequate consideration to the concern of cutting into existing cables especially shielded MV cables that were installed in the field. Because of the difficulty of testing shielded cables to determine whether they are energized or not, the assumption of energized until proven otherwise should always prevail, and adequate arc-rated PPE should be worn until the first cut is made. The taped red X system also proved woefully inadequate as a method to inform workers of energized parts. A better system one that is NFPA 70Ecompliant should have been used. Lessons learned. There were many action items that resulted from the incident investigation, all of which made improvements to the company s electrical safety program: The company group responsible for contractor management was asked to ensure that outside contractors both define and understand the qualifications for Photo 5. Cable cutters embedded in 13.8kV cable. performing electrical work and that those doing so were adequately trained and fully competent. The role of helpers also needed to be clarified. The site s Safe Practices Manual, which contains the electrical safety program, was re-worded to require that all parties working on the job be involved in the absence of voltage check after LOTO is performed. The company contractor management group was asked to stress to all site contractors the proper use of the pre-job safety assessment, which must be detailed enough and specific to the tasks to be performed that day. All those who are involved in the work must participate in this assessment. The company crew responsible for electrical distribution was assigned the task of implementing new minimum PPE requirements for making cuts on cables that have been previously energized. Finally, the company electrical crew responsible for working on distribution equipment developed an NFPA 70Ecompliant hazard identification process to replace the red tape X system. This new process was rolled out to all parties involved, including outside contractors. At the end of this case, all parties involved learned that improper communications is an ongoing issue that is not easily resolved. The miscommunication and incorrect interpretation that started the dangerous chain of events and led to a near-miss in this case is a lesson for all of us. Only by stressing safety above all else and at all times can we hope to keep employees safe. Huddleston is a licensed professional engineer in Tennessee and an electrical safety engineer at Eastman Chemical Co., Kingsport, Tenn. He can be reached at rhud@eastman.com. 16 EC&M December ecm FORENSICS.indd 16 11/12/2014 2:15:10 PM

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-110 Session 2004 CIGRÉ REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA by E. PADILLA * L. CEDEÑO E. PELAYO

More information

HSE Learning from Fatal Coating Plant Accident

HSE Learning from Fatal Coating Plant Accident HSE Learning from Fatal Coating Plant Accident Incident description On Wednesday 4 th October 2006, at about 1700 hours, a five-man cleaning crew was cleaning a concrete mixer unit at the premises of a

More information

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018 DATE: 04/03/2018 TO: The Contractor FROM: System Protection & Control Projects 20413 SUBJECT: Technical Specifications for Center Park APSTF Project PROJECT OVERVIEW This is a general specification that

More information

HEALTH AND SAFETY MANUAL

HEALTH AND SAFETY MANUAL HEALTH AND SAFETY MANUAL Title: Grounding Conductor Program Approved by: Greg Savoy Rev. 4/1/08 1 Purpose/Scope: The purpose of this program is to provide requirements to reduce employee potential for

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

Report on Comments June 2013 NFPA 70

Report on Comments June 2013 NFPA 70 10-1 Log #1392 NEC-P10 Dennis Darling, Stantec Consulting Ltd. 10-5 Delete text to read as follows: Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished

More information

Installation Manual Original Instructions - IW4001

Installation Manual Original Instructions - IW4001 Installation Manual Original Instructions - IW4001 Installation Manual 1 General Operator and Supervisor Information Signal Word Definition Signal Word Panel Table of Contents Operator and Supervisor Information

More information

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards 1 Category 2: Meeting the Challenge of a Contractor: Kenny Electric Project Name: Comcast Denver Facility Upgrade No Commercial Breaks Comcast of Denver is the national hub for television and Internet

More information

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL www.prolight.co.uk TRANSCENSION 6-CHANNEL PACK (order code: BOTE40) USER MANUAL SAFETY WARNING FOR YOUR OWN SAFETY, PLEASE READ THIS USER MANUAL CAREFULLY BEFORE YOUR INITIAL START-UP! CAUTION! Keep this

More information

OneFit Cable test and temporary earthing truck instruction manual

OneFit Cable test and temporary earthing truck instruction manual DISTRIBUTION SOLUTIONS OneFit Cable test and temporary earthing truck instruction manual Index 02 For your safety! 03 Safe practice 04 Introduction OneFit Cable test truck 05 Scope of the instruction manual

More information

2002, Cisco Systems, Inc. All rights reserved.

2002, Cisco Systems, Inc. All rights reserved. 2002, Cisco Systems, Inc. All rights reserved. 1 Panduit Network Infrastructure Essentials Chapter 8 Tools of the Trade Learning Objectives Learn about common tools used in the telecommunications cabling

More information

POTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers

POTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers Question 1: Specification Sections 26 05 00, 1.4, A, 1 and 1.4, K, 4, d require O&M manuals to be in original manufacturer printed stock. Can the Contractor print electronic, manufacturer-produced O&M

More information

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 04-26-96 VIDEO TECHNICIAN, 6145 Summary of Duties: Operates municipal access equipment for City departments, City Council

More information

Methods of Inspection to Determine the Presence of Potential Arc Flash Incidents

Methods of Inspection to Determine the Presence of Potential Arc Flash Incidents Methods of Inspection to Determine the Presence of Potential Arc Flash Incidents Mark Goodman, Author Doug Waetjen, Presenter UE Systems, Inc. 14 Hayes Street Elmsford, NY 10523 Ph: 914-592-1220 Fax: 914-347-2181

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR Yvan L. Tits ELECTRABEL 8, Boulevard du Régent, B-1000 Brussels (Belgium) Tel: +32 2 518 62 66 - Fax: +32

More information

Continuous Currents. When inspectors see a photovoltaic (PV) power system. through Curious Cables. by John Wiles

Continuous Currents. When inspectors see a photovoltaic (PV) power system. through Curious Cables. by John Wiles PV Wiring: Continuous Currents through Curious Cables by John Wiles When inspectors see a photovoltaic (PV) power system for the first time, they will usually be faced with a type of wiring method not

More information

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics Operating Instructions 07/2007 Edition SINAMICS G130/G150 Line harmonics filter sinamics s Safety information 1 General 2 SINAMICS SINAMICS G130/G150 Operating Instructions Mechanical installation 3 Electrical

More information

Product Manual MNX10015 / REV C MODEL SB142, SB242. Dual Output Series Switch Boxes

Product Manual MNX10015 / REV C MODEL SB142, SB242. Dual Output Series Switch Boxes Product Manual MNX10015 / REV C MODEL SB142, SB242 Dual Output Series Switch Boxes Contents Section I Overview Introduction.... 2 Description... 2 Section II Installation Mounting... 3 Electrical Connections...

More information

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS SINAMICS G130 / G150 Line harmonics filter Operating Instructions 05/2010 SINAMICS s Safety information 1 General 2 SINAMICS SINAMICS G130 / G150 Operating Instructions Mechanical installation 3 Electrical

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows Abstract IR viewing windows save lives. Most Thermographers today are thankful to perform their scans without

More information

AMERICAN NATIONAL STANDARD

AMERICAN NATIONAL STANDARD Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 108 2018 Test Method for Dielectric Withstand of Coaxial Cable NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International

More information

COOPER POWER SERIES. 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions. Deadbreak Apparatus Connectors MN650017EN

COOPER POWER SERIES. 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions. Deadbreak Apparatus Connectors MN650017EN Deadbreak Apparatus Connectors MN650017EN Effective January 2016 Supersedes S600-46-2 July 2014 COOPER POWER SERIES 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions DISCLAIMER

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD 1 INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD NOTE TO INSTALLERS: PLEASE RETURN THIS MANUAL TO THE INDIVIDUAL IN CHARGE OF THE SCOREBOARD UPON COMPLETION OF INSTALLATION. The scoreboard

More information

ICS Digital Menu. Installation Guide Version 1.1

ICS Digital Menu. Installation Guide Version 1.1 ICS Digital Menu Installation Guide Version 1.1 Installation Overview This document was written to assist technicians and electricians in installing the ICS Digital Menu. A thorough understanding of electrical

More information

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING CONTENTS PAGE 1. GENERAL...Q-2 1.1. Introduction...Q-2 1.2. General Requirements...Q-2 1.3. Alarm Circuits...Q-3 1.4. Disconnecting Live Circuits From Service...Q-3

More information

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130 Operating Manual (Edition 04/2004) sinamics Line Reactors SINAMICS G130 Contents 1. Safety Information 2 2. General 5 3. Mechanical Installation 6 4. Electrical Installation 8 5. Technical Specifications

More information

SceneStyle2 User Guide

SceneStyle2 User Guide SceneStyle2 User Guide Mode Lighting (UK) Limited. The Maltings, 63 High Street, Ware, Hertfordshire, SG12 9AD, UNITED KINGDOM. Telephone: +44 (0) 1920 462121 Facsimile: +44 (0) 1920 466881 e-mail: website:

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 - GENERAL 1.1 SUMMARY A. Section includes cables and related cable splices, terminations, and accessories for mediumvoltage (2001 to 35,000 V) electrical distribution

More information

TV Lift System Model CL-65 Installation Instructions

TV Lift System Model CL-65 Installation Instructions TV Lift System Model CL-65 Installation Instructions Contact: Support@Nexus21.com Toll Free: (866) 500-5438 Phone: (480) 951-6885 Fax: (480) 951-6879 Revised: 01/17/17 Below is a parts list describing

More information

INSTALLATION INSTRUCTIONS FOR

INSTALLATION INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR MODEL 2240LED www.sportablescoreboards.com 1 Table of Contents 8 X 7 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR

More information

System Troubleshooting for

System Troubleshooting for Brought to You by Presented by Part 2 of 4 A1 Part 2 of 4 Video Problems No Match for the TERMINATOR When electronic security systems fail or malfunction, more often than not it s something small and relatively

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens.

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens. The following technical papers supporting this presentation are available at www.selinc.com: Trip and Restore Distribution Circuits at Transmission Speeds by Jeff Roberts and Karl Zimmerman International

More information

Preventing Fieldbus Physical Layer Problems

Preventing Fieldbus Physical Layer Problems Preventing Fieldbus Physical Layer Problems 1 Introduction Foundation Fieldbus is highly reliable when correctly installed and maintained. The key is in knowing what must be done to start with and to maintain

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS SINAMICS G130 Operating Instructions 03/2013 SINAMICS s dv/dt filter plus Voltage Peak Limiter Safety information 1 General 2 SINAMICS SINAMICS G130 Operating Instructions Mechanical installation 3 Electrical

More information

IEEE-SA SCC-18 Report by Representatives to NFPA NEC CMP-6 January 6-8, 2010 on Actions Taken on Proposals by CMP-6 for NEC 2011 ROC Prepared by

IEEE-SA SCC-18 Report by Representatives to NFPA NEC CMP-6 January 6-8, 2010 on Actions Taken on Proposals by CMP-6 for NEC 2011 ROC Prepared by IEEE-SA SCC-18 Report by Representatives to NFPA NEC CMP-6 January 6-8, 2010 on Actions Taken on Proposals by CMP-6 for NEC 2011 ROC Prepared by Bruce McClung, McSquared Electrical Consulting LLC l.b.mcclung@ieee.org

More information

RoHS. Atma-Sphere Music Preamplifier. model P-2 OWNER'S MANUAL. Please study this document carefully before using equipment

RoHS. Atma-Sphere Music Preamplifier. model P-2 OWNER'S MANUAL. Please study this document carefully before using equipment 1742 Selby Av. St. Paul, MN 55104 651 690 2246 atma sphere.com Atma-Sphere Music Preamplifier model P-2 OWNER'S MANUAL Please study this document carefully before using equipment RoHS CONGRATULATIONS!

More information

Specification. NGTS Issue 1 October 1993

Specification. NGTS Issue 1 October 1993 The Electrical Standards for SHE Transmission s area are non-maintained versions of National Grid Technical Specifications that are applicable to the SHE Transmission System only. These specific versions

More information

/ PAT01 USER MANUAL

/   PAT01 USER MANUAL PONOVO POWER CO., LTD No. 139 Jinghai Third Road, BDA, Beijing, China, 100176 Office TEL. +86 (10) 59089666 E-Mail Website Info@relaytest.com www.relaytest.com / www.ponovo.com.cn PAT01 USER MANUAL VERSION:

More information

High Voltage Cable Splicing Training

High Voltage Cable Splicing Training High Voltage Cable Splicing Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq High Voltage Cables are

More information

Photovoltaic Module Installation Manual (IEC)

Photovoltaic Module Installation Manual (IEC) Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO

More information

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts. RFP: FQ13024/WJG CONTRACT NO. FQ13024 APPENDIX C STANDARD OPERATING PROCEDURES (SOP) SOP #33 REMOVAL AND RESTORATION OF THIRD RAIL POWER FOR WORK BY CONTRACTOR S FORCES MAINLINE, REVENUE SYSTEM PURPOSE

More information

FIBER OPTIC CABLE PULLING

FIBER OPTIC CABLE PULLING C H A P T E R 15 FIBER OPTIC CABLE PULLING THOMAS A. DOOLEY AND JERALD R. ROUNDS (with hints from Northern Lights Cable) Electrical wire installers know how to pull cable. The basic approach to pulling

More information

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle. Please read all of the installation instructions carefully before installing the product. Improper installation will void manufacturer s warranty. The installation instructions do not apply to all types

More information

Programming Guide and User Manual INS # Model # CKM. ControlKeeper M

Programming Guide and User Manual INS # Model # CKM. ControlKeeper M Programming Guide and User Manual Model # CKM INS # Contents Contents Description Contents....2 Safety Instructions....3 Introduction....4 Welcome....4 Terminology used in this guide....5 ControlKeeper

More information

Transfer Switch. OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) Amperes. English Original Instructions (Issue 5)

Transfer Switch. OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) Amperes. English Original Instructions (Issue 5) Operator Manual Transfer Switch 40-1000 Amperes OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) English Original Instructions 10-2015 962-0131 (Issue 5) Table of Contents 1. SAFETY PRECAUTIONS...

More information

Installation Manual SaVi Note Underwater LED Light

Installation Manual SaVi Note Underwater LED Light Installation Manual SaVi Note Underwater LED Light Model Numbers SAVI-NOTE7, SAVI-NOTE0 Table of Contents Safety Precautions...2 SaVi Note Install Instructions...3- M Instructions...- Warnings READ AND

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED INSTALLATION INSTRUCTIONS FOR MODEL 2230LED www.sportablescoreboards.com 1 Table of Contents MODEL 2230LED... 3 8 X 4 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:...

More information

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132 GENERAL INFORMATION Tucker Theatre is a proscenium theatre with two side stages. Auditorium

More information

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES 1.0 SCOPE TABLE OF CONTENTS 2.0 CABLES SPLICES 2.1 Definitions 2.2 Scope of Specifications and Drawings 2.3 General Requirements 2.4 Routing Cables 2.5 Connectors 2.6 Conductor Connections 2.7 Heat Shrinkable

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A & B OUTERWEAR LTD. Plot # 29-30, CEPZ, Chittagong, Bangladesh. Factory List: 1. Inspected by: Al-Amin Report Generated by: Al-Amin Inspected on March 7 th 2015 SUMMARY

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

Photovoltaic Module Installation Manual (IEC)

Photovoltaic Module Installation Manual (IEC) Phono Solar Technology Co., Ltd. Add: No. 1 Xinghuo Rd., Nanjing Hi-tech Zone, Nanjing, China Tel: +86 25 5863 8000 Fax: +86 25 5863 8009 E-mail: support@phonosolar.com Website: www.phonosolar.com PHONO

More information

MICROMASTER Encoder Module

MICROMASTER Encoder Module MICROMASTER Encoder Module Operating Instructions Issue 01/02 User Documentation Foreword Issue 01/02 1 Foreword Qualified Personnel For the purpose of this Instruction Manual and product labels, a Qualified

More information

Tube Rotator. User Guide. Version 1.2

Tube Rotator. User Guide. Version 1.2 Tube Rotator User Guide Version 1.2 Figure 1: Fixed Speed Model Tube holder spindle Tilt adjustment wheel IEC power inlet socket (at rear) Power on/off switch Figure 2: Variable Speed Model Tube holder

More information

Utility Amplifier GA6A Model

Utility Amplifier GA6A Model Utility Amplifier GA6A Model Installation and Use Manual 2004 Bogen Communications, Inc. All rights reserved. Specifications subject to change without notice. 54-5757-03D 1503 NOTICE: Every effort was

More information

TRIPLETT. PairMaster. Lan Cable Test Set. Instruction Manual

TRIPLETT. PairMaster. Lan Cable Test Set. Instruction Manual TRIPLETT PairMaster Lan Cable Test Set Instruction Manual The PairMaster LAN CABLE TEST SET INSTRUCTION MANUAL IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS Before using the PairMaster, read all

More information

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX 2562089B REV. B 110 Printed in U.S.A. MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID Factory Name Address Factory ID Shirir Chala, Bagherbazar 11705 Electrical Safety dates Initial Date 09/07/2014 30/10/2016 Date of 5 th Follow Up Report Received Date 24/08/2014 02/01/2017 Date of 6 th

More information

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology Sample Test Project District / Zonal Skill Competitions Skill- Electrical Installation Category: Construction and Building Technology Version 1 Dec 2017 Skill- Electrical Installation 1 Table of Contents

More information

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION 7 -- CROSS-CONNECT SYSTEMS DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.

More information

Broadcast Operations

Broadcast Operations he Broadcasters Desktop Resource www.thebdr.net edited by Barry Mishkind the Eclectic Engineer Broadcast Operations Personal Safety is Not An Accident By Barry Mishkind [March 2019] This month saw several

More information

VITALink Taped Splice Straight Through Crimp

VITALink Taped Splice Straight Through Crimp A Marmon Wire & Cable Berkshire Hathaway Company VITALink Taped Splice Straight Through Crimp 2 Hour Fire-Rated Splice VITALink MC Cables, UL FHIT 120 Installation Instructions Description The VITALink

More information

S Regulators. Supplement 1. Contents. Control Replacement Assembly Installation Instructions Supplement

S Regulators. Supplement 1. Contents. Control Replacement Assembly Installation Instructions Supplement Regulators Control Replacement Assembly Installation Instructions Supplement Service Information S225-40-1 Supplement 1 Figure 1. CL-6A Control Replacement Assembly. Contents Safety Information... 2 Product

More information

Installation Guide VL-MV10. Model No.

Installation Guide VL-MV10. Model No. Installation Guide Model Name Model No. Main Monitor Station VL-MV0 R Main monitor station is described as "main monitor" in this guide. R In this guide, the suffix of each model number (e.g., the "EX"

More information

Fieldbus Testing with Online Physical Layer Diagnostics

Fieldbus Testing with Online Physical Layer Diagnostics Technical White Paper Fieldbus Testing with Online Physical Layer Diagnostics The significant benefits realized by the latest fully automated fieldbus construction & pre-commissioning hardware, software

More information

Longwood University Department of Communication Studies Communication Studies Facilities and Equipment. Policies & Procedures

Longwood University Department of Communication Studies Communication Studies Facilities and Equipment. Policies & Procedures Longwood University Department of Communication Studies Communication Studies Facilities and Equipment Policies & Procedures Policies & Expectations 2 Purpose The purpose of this document is to provide

More information

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA PC-250 SMD Taped Parts Counter Operator s Manual ISO 9001:2008 Certified V-TEK, Incorporated 751 Summit Avenue Mankato, MN 56001 USA (P) 507-387-2039 (F) 507-387-2257 www.vtekusa.com Dear Customer: All

More information

User Manual CC DC 24 V 5A. Universal Control Unit UC-1-E. General Information SET. Universal Control Unit UC-1 Of Central Lubrication PAUSE CONTACT

User Manual CC DC 24 V 5A. Universal Control Unit UC-1-E. General Information SET. Universal Control Unit UC-1 Of Central Lubrication PAUSE CONTACT Universal Control Unit UC-1-E User Manual General Information Universal Control Unit UC-1 Of Central Lubrication CC DC 24 V 5A / M 15 SL /MK 31 M Z 30 General Information Contents Universal Control Unit

More information

Model 1421 Distribution Amplifier

Model 1421 Distribution Amplifier Model 1421 Distribution Amplifier Installation and Operating Instructions The 1421 Distribution Amplifier provides four independent, wide bandwidth outputs from one video input. The unit is color compatible

More information

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS CERN INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 Edms 335813 TIS IS 48 Edited by: TIS/GS Publication Date: June 2001 Original: English FIRE PREVENTION FOR CABLES, CABLE

More information

Failure Report. elbow near termination on bend. live-front

Failure Report. elbow near termination on bend. live-front Failure Report Circuit owner: Entergy (Gulf States) Segment: 00001301-2 Work Order: Goslin Feeders (PO 10174636) Termination 1: Gosling RD Termination 2: Woodlands DR/Gosling RD Failure type: Cable Termination

More information

AUTOMATIC VIDEO LOSS A/B SWITCH

AUTOMATIC VIDEO LOSS A/B SWITCH CG-X AUTOMATIC VIDEO LOSS A/B SWITCH INSTRUCTION BOOK IB647502 TABLE OF CONTENTS DESCRIPTION 2 MOUNTING INSTRUCTIONS 3 HOW TO CABLE THE CG-X 3 POWER SUPPLY INSTALLATION 3 OPERATION 3 CARE AND MAINTENANCE

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

Tube Roller Shakers. User Guide. Version 1.2

Tube Roller Shakers. User Guide. Version 1.2 Tube Roller Shakers User Guide Version 1.2 Control panel Rollers Side retaining panels Analog models LED display Drip tray (not visible) Digital models Power On/Off and control dial Roller retaining panel

More information

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX 220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX JAMNAGAR 220KV CABLE NETWORK: 2 2. DESIGN 2A. NETWORK: 220 KV NETWORK DESIGN IS DESIGNED WITH 100% REDUNDANCY FROM 220 KV BUS TO LOAD. THIS IS ACHIEVED

More information

www.greenelectricalsupply.com MaxLite 6 & 8 Commercial Downlight Retrofit General Safety Information To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts,

More information

Condition Monitoring Program of HV Cable Systems

Condition Monitoring Program of HV Cable Systems Condition Monitoring Program of HV Cable Systems Mrs. Heena Sharma 1, Mr.M.T.Deshpande 2 and Mr. Rahul Pandey 3 1 M.E(Power System) student, Department of Electrical and Electronics Engineering, SSTC Junwani,Bhilai,CSVTU,

More information

Model 1476-C SuperQuad HR

Model 1476-C SuperQuad HR Model 1476-C SuperQuad HR Installation and Operating Instructions Table of Contents Page Table of Content... 2 System Description... 3 Features... 3 Installation... 4 Internal Setups... 4 Connections...

More information

National Wire and Cable and National Cable Molding Headquarters Los Angeles California

National Wire and Cable and National Cable Molding Headquarters Los Angeles California National Wire and Cable and National Cable Molding Headquarters Los Angeles California CAPABILITIES Medical Business Machines Communications Equipment Computer Equipment Audio Systems General Instrumentation

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CG-1 CAMERA-GUARD INSTRUCTION BOOK IB647501

CG-1 CAMERA-GUARD INSTRUCTION BOOK IB647501 CG-1 CAMERA-GUARD INSTRUCTION BOOK IB647501 TABLE OF CONTENTS DESCRIPTION 2 MOUNTING INSTRUCTIONS 2 HOW TO CABLE THE CG-1 2 POWER SUPPLY INSTALLATION 3 OPERATION 3 CARE AND MAINTENANCE 3 APPLICATIONS (WHERE

More information

Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE 103 2018 Test Method for DC Contact Resistance, Drop cable to F connectors and F 81 Barrels NOTICE The Society of Cable Telecommunications

More information

The Chan-L-Wire Pro Series Lighting Distribution

The Chan-L-Wire Pro Series Lighting Distribution Lighting Distribution System Offers Maximum Flexibility The Chan-L-Wire Pro Series Lighting Distribution System offers maximum flexibility while saving up to 40% in labor installation costs. The system

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement

More information

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel OWNERS MANUAL Revision 1.8 09/01/2002 OWNERS MANUAL Page 2 of 12 AR-1202 UNIT DESCRIPTION The AR-1202 consists of a processor and 12 dimmer channels of 2.4KW each. Each dimmer channel is protected by a

More information

DS1 Cross-Aisle Panel

DS1 Cross-Aisle Panel DS1 Cross-Aisle Panel Model 005-0005-0100 Installation Guide 1.1 Overview 1.1.1 Inspection Compare the contents of the DS1 Cross-Aisle Panel shipping container with the packing list. Call Telect if anything

More information

SyncGen. User s Manual

SyncGen. User s Manual SyncGen User s Manual 1 IMPORTANT SAFETY INSTRUCTION READ FIRST This symbol, whenever it appears, alerts you to the presence of uninsulated dangerous voltage inside the enclosure-voltage that may be sufficient

More information

BROADCAST RECEIVER. Installation Guide (BR-100-MOT, BRP-100-MOT) Document Version 1.0. BR-100-MOT, BRP-100-MOT Installation Guide

BROADCAST RECEIVER. Installation Guide (BR-100-MOT, BRP-100-MOT) Document Version 1.0. BR-100-MOT, BRP-100-MOT Installation Guide BROADCAST RECEIVER (BR-100-MOT, BRP-100-MOT) Installation Guide Document Version 1.0 i BR-100-MOT, BRP-100-MOT Installation Guide INSTALLATION CONSIDERATIONS Installation and maintenance of the Broadcast

More information

Wired Troubleshooting Manual

Wired Troubleshooting Manual Wired Troubleshooting Manual Congratulations on your choice of this product. Its superior sound reproduction will provide enjoyment and entertainment. We appreciate your patronage and take pride in the

More information

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company www.rstechserv.com 1315 Controller OPERATIONS MANUAL Made in the USA Table Of Contents: Page 3 Page 5 Page 6 Page 7 Page

More information

RFIs AND RESPONSES; ANSWERS ARE IN RED.

RFIs AND RESPONSES; ANSWERS ARE IN RED. January 4, 2013 ADDENDUM #3 TITLE OF RFQ: Gateway Audio Visual Bid REFERENCE: 12/13 B-30 Please note the following information regarding 12/13 B-30: 1. The due date is: January 11, 2013 at 1:00 p.m. in

More information

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16) Satellite multiswitch Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16) EMP-CENTAURI is a registered trademark Dear Customer, Thank you for buying the EMP-Centauri

More information