ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

Size: px
Start display at page:

Download "ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID"

Transcription

1 Factory Name Address Factory ID Shirir Chala, Bagherbazar Electrical Safety dates Initial Date 09/07/ /10/2016 Date of 5 th Follow Up Report Received Date 24/08/ /01/2017 Date of 6 th Follow Up Date of 1 st Follow Up 17/08/ /03/2017 Date of 7 th Follow Up Date of 2 nd Follow Up 18/02/ /07/2017 Date of 8 th Follow Up Date of 3 rd Follow Up 19/04/2016 Date of 9 th Follow Up Date of 4 th Follow Up 21/08/2016 Date of 10 th Follow Up Inspected by Palash Kumar Paul te: Other Factory: Time line Comments from ) 1 1.Overhead service cables are not supported. 2.Cables or wiring are drawn outside (brick wall) without support. 1.Overhead service cable must be firmly fixed at both ends and supported on catenary wire. 2.Provide ladder made of non-combustible material 4 weeks preferably steel to support and protect cables. Ensure the cables are firmly fixed with the ladder and free of physical damage. corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected 2 Haphazard cables lay.(typical) Cables must arranged properly by cable tray or ladder. 4 weeks Page 1 of 18

2 Time line Comments from ) 3 Service cables run on walls are not supported. Cables supported on external walls must be laid horizontal/vertical to the wall, supported in cable trays/ladder. 4 weeks corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected 4 Panel doors not connected with earth bond (Typical). Provide earth connection for body and doors of metallic distribution boards using green cables preferably braid so that the metallic door remains at zero potential all the time. 1 week On 18/02/2016: This issue is not corrected yet. New committed time line has given till On 19/04/2016: This issue has not been corrected yet. Time extension is given till 31/05/2016. On 21/08/2016: Corrected. 31/05/2016 Corrected Corrected Page 2 of 18

3 Time line Comments from ) 5 Mismatch the MCCB incoming and outgoing cable. Mismatch the MCCB incoming & out going cable 4 weeks On 18/02/2016: This issue is not corrected yet. New committed time line has given till issue has not been corrected yet. There are several undersized cables. Installation of properly sized circuit breaker or cable will to resolve the issue. Time extension is given till 30/06/2016. On 21/08/2016: t Corrected. On 30/10/2016: Corrected. 30/06/2016 Corrected Corrected 6 Panel base plates and top plates not installed. (Typical) Block all the openings by holed metal sheet so that it can prevent ingress of dirt, debris, lint etc. Provide cable gland for every cable entry and exit hole. 4 weeks Page 3 of 18

4 Time line Comments from ) 7 Cable terminated from COS (top and base) are not supported and protected. Cables must be supported by cable tray or ladder. 4 weeks 8 Neutral wire of the circuits not connected through Change- Over-Switch, along with the phase conductors. All wires in a circuit of 3- phase must be connected and controlled through the Change-Over-Switch. 3 weeks corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected 9 Cable trench without cover. The cable trench must be tightly covered to avoid physical damage to the cables from falling objects. 3 weeks The cover must prevent the trench from falling debris, dust and lint. Use checker plate or concrete slab. Page 4 of 18

5 Time line Comments from ) Neutral bus bar removed from the panel and mounted on the wall outside the panel. 2. wiring drawn by flexible conduit not supported. 1.A three phase distribution panel must have all bus bars installed inside the same panel. If the panel is crowded and does not have space inside, the panel may be replaced with larger panels. 2.Surface and exposed wiring should be encased in rigid PVC/steel pipe throughout its length; run horizontally and vertically never at an angle and support them at regular intervals by using saddle clam. 4 weeks corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected Cable tray passes through wall not sealed 2.Cable passes through permanent wall not protected 1. Remaining gaps must be sealed with fire resistant materials. 2. Cables passing through permanent walls must be protected in steel pipes and remaining holes around the pipe must be sealed. 3 weeks On 18/02/2016: This issue is not corrected yet. New committed time line has given till 25-25/03/2016 Corrected Corrected issue is resolved. 12 Ducts not covered & ducts contain dusts & lint 1.Cable ducts must be cleaned regularly and covered to prevent ingress of dust and lint. 4 weeks corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected Page 5 of 18

6 Time line Comments from ) 13 Distribution panel not easily accessible.(level- 8) Work bench/table near panel boards in production floors must be relocated to provide clear access to the panel at all times. 2 weeks Joints in the down conductor not spliced firmly. 1. Mid-length joints in down conductor of lightning protection must be avoided 4 weeks 15 MCCB mounted on wooden plank/board. 1. Electrical protective device must be removed from wooden board/plank. Electrical devices must be protected and installed in metal casing enclosure made of 20 SWG thickness metal sheets. Re-wire able fuse may be replaced with MCCB. 4 weeks corrected in the 1st and 2nd follow-up visit. It has been found in same state 20/05/2015 Corrected Corrected Page 6 of 18

7 Time line Comments from ) 16 Circuit directory on the panel. 1. Correct Circuit directory should be put/attach inside each panel with one line diagram. 2 weeks 17 Following programs and test results are not conducted and kept: 1.Thermographic scanning report Set up the above program 2. Insulation and keep the test result resistance test of electrical equipment 3.Earth resistance test. 4.Electric safety program. 5 weeks issue is resolved. On 18/02/2016: This issue is not corrected yet because Thermal report and Insulation test are not properly constructed and there is not Electric safety program. New committed time line has given till /03/2016 Corrected Corrected 18 Use a cable tray to ensure adequate support. This Excess HT cables must not be laid on sub routed/supported through station room the equipment' working floor. clearance area. 2 month 30/12/2015 Corrected Corrected Page 7 of 18

8 Time line Comments from ) 19 HT Cable dropping from 11kV OH line is not firmly supported to the pole and not protected at the base if the pole above ground level. HT cable dropping from 11kV pole must be firmly fixed to the pole with supports and clamps and protected by steel/pvc ridged conduit up to minimum of 2 meters above ground level. 2 month 30/12/2015 Corrected Corrected 20 Battery terminals are left open Use insulated rubber cap to cover all the battery terminals 2 month issue is resolved. On 18/02/2016: This issue is not corrected yet. New committed time line has given till /03/2016 Corrected Corrected 21 Oil leakage has been observed from Generator. Stop oil leakage from Generator and keep clean top of Generator. 1 month But oil leakage has been noticed at transformer top. Take immediate action to check and remediate the leakage. Page 8 of 18

9 Time line Comments from ) 22 Multiple cables terminated at Bus bar. Terminate each power cable at single terminal and use proper sized cable lug. 1 month issue is resolved. On 18/02/2016: This issue is not corrected yet. New committed time line has given till /03/2016 Corrected Corrected 23 Phase barrier/separator has not installed. Put purposely made phase separator (rubber type) between two phases; also terminate cables by proper sized cable lugs and cover cable lugs by heat shrink. 1 month issue is resolved. On 18/02/2016: This issue is not corrected yet. New committed time line has given till /03/2016 Corrected Corrected 24 Cables terminated at electrical bus bar without cable lugs Terminate all the power/earth/neutral cable with proper sized cable lug 1 month issue is resolved. On 18/02/2016: This issue is not corrected yet. New committed time line has given till /03/2016 Corrected Corrected Page 9 of 18

10 Time line Comments from ) 25 Resize earth lead cable for LT panel/mdb/db; follow BNBC 2006 Part 8 Earth lead cable chapter 2 section 2.8 for size is sizing your earthing cables inadequate/under (Usually Earth lead cable size should be equal to the half of the respective phase cable). 2 month issue is resolved. On 18/02/2016: This issue is not corrected yet. New committed time line has given till /04/2016 Corrected Corrected 26 Distribution panels put on wooden Base. Wooden base used for electrical panels or apparatus must be removed. All kind of electrical panels should be put on non combustible foundation to avoid fire hazard. 2 month 27 Exhaust fans are used direct from MCB and fan frame is not connected with earth Use Direct On Line (DOL) switch to stop auto start after power failure and connect each individual fan frame with earth 2 month Page 10 of 18

11 Time line Comments from ) 28 Electrical Single Line Diagram (SLD) has inadequate information which has no effectiveness. Prepare SLD more informative thus anyone can understand it. 3 months On 18/02/2016: This issue is not corrected yet. New committed time line has given till On 19/04/2016: This issue has not been resolved yet. Submit the SLD at ACCORD for detail review. Close the issue within stipulated timeline. On 21/08/2016: Corrected. 25/04/2016 Corrected Corrected 29 Lightning Protections System (LPS) is inadequate for the factory & Lightning Protection System (LPS) drawing is unavailable. Redesign/modify LPS for your factory to increase safety; Factory have to submit LPS design to before starting. 3 month On 18/02/2016: This issue is not corrected yet. New committed time line has given till On 19/04/2016: This issue has been found in incomplete state. Close the issue within stipulated timeline. On 21/08/2016: t Corrected. Installation not completed. On 30/10/2016: t Corrected. On 02/01/2017: t Corrected. On 27/03/2017: t Corrected. On 05/07/2017: t Corrected 25/04/2016 Complete In Progress Air terminal missing One way discharge Metal base, poor connection conductor size inadequate Poor connection Dis continued down conductor Page 11 of 18

12 Time line Comments from ) 30 /Inadequate rubber (insulation) mat on the working are of distribution board/panel. Put electrical insulation (rubber mat) on the working area of each electrical installation (Transformer/LT panel/mdb/db/sdb/ other manual operated machineries) 1 month 31 In front of each distribution board should Electrical power have at least 1.07 m distribution room clearance. For stacking is full of combustible materials this combustible clearance shall not be less material. than 10 feet. 1 month 32 Exposed and heated steam source is close to cable channel. Wires close/attached to steam line/heat source must be protected from external heat. In unavoidable case provide proper insulation for the heat source/steam line. rmally power cable should keep 0.9m apart from hot area. 1 month Page 12 of 18

13 Time line Comments from ) 33 HT cable is not supported properly. Use a cable tray to ensure adequate support and fixed cable with proper sized cable clamp. This must not be routed/ supported through the equipment' working clearance area. On 19/04/2015: This issue is resolved. 25/03/2016 Corrected Corrected 34 Ensure wiring systems are selected and erected so that Wiring systems no damage is caused by the are selected and ingress of water. Remove erected so that no the water line from damage is caused transformer room and seal by the ingress of the opening of the water water. reservoir. On 19/04/2015: This issue is considered corrected at this moment but make sure there is no leakage through flange. 25/02/2016 Corrected Corrected 35 MCCB s knob is broken. MCCB should be replaced by good one to avoid electric shocks On 19/04/2015: This issue is resolved. 25/03/2016 Corrected Corrected Page 13 of 18

14 Time line Comments from ) 36 End cover of Cable duct/channels are missing. Clean all the cable channels/ducts; then cover them (you may use checkered/perforated plate at the bottom) and install end cover. After each maintenance, keep record. 19/04/2016: This issue has not been resolved yet. Time extension is given till 31/05/2016. On 21/08/2016: t Corrected. On 30/10/2016: t Corrected. On 02/01/2017: t Corrected. On 27/03/2017: t corrected On 05/07/2017: t Corrected 31/05/2016 complete In Progress 37 Hot spots at terminations inside panel. Thermographic inspection record is unavailable. Arrange periodic inspection & thermal scan at least twice in a year to identify the overloading, loose connection, unbalanced load which may cause the excessive heat-rise and take action accordingly. On 30/10/2016: Corrected. hotspot 21/09/2016 Corrected Corrected found during inspection. 38 Hazardous lights in store room / storage areas are uncovered. hazardous lights in store room / storage areas shall be covered by proper type material; or non-hazardous lights shall be installed in these areas. On 27/03/2017: Corrected 10/02/2017 Corrected Corrected Page 14 of 18

15 Time line Comments from ) 39 Cables in service are joined (splicing) between terminations. Splicing in the power cables shall be avoided; in unavoidable cases splicing must be made following proper guidance. On 27/03/2017: t corrected. Time extension is given till 30/04/2017. On 05/07/2017: Corrected 30/04/2017 complete Corrected 40 Transformer Oil Test (dielectric strength test) report is unavailable Transformer oil test (dielectric strength test for oil) shall be done once in a year. On 27/03/2017: Corrected 10/02/2017 Corrected Corrected 41 Thermography survey must be done at least twice in a Thermography year; and this survey must scanning report is be recorded to perform outdated. maintenance work. On 27/03/2017: Corrected 10/02/2017 Corrected Corrected Page 15 of 18

16 Time line Comments from ) 42 New finding: Transformer room has inadequate ventilation. Adequate ventilation shall be maintained in transformer room. Cross/forced ventilation must be ensured. For exhaust fan, the fan diameter must not be less than 18 inch. On 05/07/2017: t Corrected 15/04/2017 Complete In Progress 43 New finding: Electrical equipment are loosely installed. Electrical equipment shall be rigidly fixed by permanent means. On 05/07/2017: Corrected 15/04/2017 Complete Corrected 44 Instruction for CPR (Cardiopulmonar y Resuscitation) or Electrical shock restoration is not present. CPR instruction shall be hanged near all electrical installations (LT panel, MDB, FDB, DB, SDB) at visible location. On 05/07/2017: t Corrected 15/04/2017 Complete In Progress Page 16 of 18

17 Time line Comments from ) 45 Multiple cables connected/termi nated at the bus bar using single cable lug. Each power cable must be terminated at any point using single cable lug. 2 Months 10/09/ (i) Field information has no/less reflection in existing SLD. (ii) List of circuit or SLD of existing circuits are not updated. (iii) Circuit do not have any identification. (i) Electrical SLD must be updated properly; all the required information must be mentioned there; and it shall be updated when you do substantial amount of changes of your electrical system. 2 Months 10/09/2017 (ii) Updated list of circuit or SLD of respective circuits shall be available for each electrical panel/board. (iii) Provide identification by separate color coding, marking tape, tagging, or other approved means Page 17 of 18

18 Time line Comments from ) 47 (i) MCCBs are not adjusted per load demand. (ii) Indicator lights are mounted without disconnecting device. (iii) Circuit breaker has no capacity information. (i) All the MCCBs must be adjusted per cable current ampacity/load current; if adjustment is not possible, replacement will be the only way. (ii) Indicator lights should be connected by control device such as rated fuse or MCB. (iii) Each Circuit breaker must have its own capacity information. 2 Months 10/09/ (i) Factory does not have earthing layout. (ii) Earth pits are not identifiable. (iii) Earth Pit resistance record doesn't match with field. (i) Prepared a layout of earthing for whole system earthing. (iii) Each earth pit shall be properly identifiable and marked for periodic maintenance. (iii) Adequate number of earth pits must be ensured (if it's lower in numbers) and record must be made accordingly 2 Months 10/09/2017 Page 18 of 18

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A & B OUTERWEAR LTD. Plot # 29-30, CEPZ, Chittagong, Bangladesh. Factory List: 1. Inspected by: Al-Amin Report Generated by: Al-Amin Inspected on March 7 th 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT., Plot no: 72 & 82, DEPZ, Ganakbari, Savar, Dhaka, Bangladesh. Factory List: 1.Experience Clothing Company Ltd. Inspected on March 31, 2014 SUMMARY Experience Clothing

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX 220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX JAMNAGAR 220KV CABLE NETWORK: 2 2. DESIGN 2A. NETWORK: 220 KV NETWORK DESIGN IS DESIGNED WITH 100% REDUNDANCY FROM 220 KV BUS TO LOAD. THIS IS ACHIEVED

More information

Optical Distribution Box 300 Installation Guide. Version : R0.0

Optical Distribution Box 300 Installation Guide. Version : R0.0 Optical Distribution Box 300 Installation Guide Document No. : OD16-546-L-01 Version : R0.0 Date: 21-Mar-2018 IMPORTANT INSTRUCTIONS When using fiber optic equipment, basic precautions should always be

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

TRF STEP-DOWN TRANSFORMER USER MANUAL

TRF STEP-DOWN TRANSFORMER USER MANUAL TRF STEP-DOWN TRANSFORMER USER MANUA www.ventilation-system.com 2013 ! WARNING The present operation manual consisting of the technical details, operating instructions and technical specification applies

More information

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES 1.0 SCOPE TABLE OF CONTENTS 2.0 CABLES SPLICES 2.1 Definitions 2.2 Scope of Specifications and Drawings 2.3 General Requirements 2.4 Routing Cables 2.5 Connectors 2.6 Conductor Connections 2.7 Heat Shrinkable

More information

Fiberglass - Technical Data

Fiberglass - Technical Data - Technical Data Cable Tray Thermal Contraction and Expansion X : Denotes hold-down clamp (anchor) at support. _ : Denotes expansion guide clamp at support. It is important that thermal contraction and

More information

Laying of cables and lines in electrical installations and data networks

Laying of cables and lines in electrical installations and data networks Technical bulletin Laying of cables and lines in electrical installations and data networks Date: 08/2006 This technical bulletin provides you with information on specific technical subjects. It is based

More information

ART2000i Digital Dimming System. Installation guide. Stock number *8200-

ART2000i Digital Dimming System. Installation guide. Stock number *8200- ART2000i Digital Dimming System Installation guide Stock number 8200-0159 *8200- 0159* Useful Avolites phone numbers:- Avolites England Sales and service* (+44) (0) 20 8965 8522 Service out of hours* (+44)

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

ICS Digital Menu. Installation Guide Version 1.1

ICS Digital Menu. Installation Guide Version 1.1 ICS Digital Menu Installation Guide Version 1.1 Installation Overview This document was written to assist technicians and electricians in installing the ICS Digital Menu. A thorough understanding of electrical

More information

IECEx International Conference 2017 Shanghai, China. Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2

IECEx International Conference 2017 Shanghai, China. Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2 IECEx International Conference 2017 Shanghai, China Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2 10. Cable entry systems and blanking elements 10.2 Selection of cable

More information

7 Day Digital Programmer 3 Channel Surface Mount

7 Day Digital Programmer 3 Channel Surface Mount 7 Day Digital Programmer 3 Channel Surface Mount Model: TRT038N Installation & Operating Instructions 1. General Information These instructions should be read carefully and retained for further reference

More information

DOME OPTIC SPLICE CLOSURE

DOME OPTIC SPLICE CLOSURE FIBER OPTIC SPIICE CLOSURE GJS-JKDH1001-120 BOX DIMENSION: W=140mm H=340mm Weight = 1.80 kgs Outer Internal structure Fuse fiber disc Type sealing ring Plastic hoop base Pole Mount Pole Mount 1 1. product

More information

Operating instructions

Operating instructions 108183 2017-05-17 Page 1 0359 Operating instructions TPPL-EX series Hazardous environments luminaires Please read the instructions carefully before starting any works! Content: 1. Safety instructions 2.

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 - GENERAL 1.1 SUMMARY A. Section includes cables and related cable splices, terminations, and accessories for mediumvoltage (2001 to 35,000 V) electrical distribution

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS CERN INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 Edms 335813 TIS IS 48 Edited by: TIS/GS Publication Date: June 2001 Original: English FIRE PREVENTION FOR CABLES, CABLE

More information

SIR-GM1 GM CLASS-2 BUS COMPATIBLE SIRIUS SATELLITE RADIO TUNER

SIR-GM1 GM CLASS-2 BUS COMPATIBLE SIRIUS SATELLITE RADIO TUNER SIR-GM1 GM CLASS-2 BUS COMPATIBLE SIRIUS SATELLITE RADIO TUNER Installation Guide Congratulations on your purchase of the SIR-GM1 the GM Compatible SIRIUS Satellite Radio Tuner! Your SIR-GM1 is designed

More information

Trends and Challenges of HV Cable Systems

Trends and Challenges of HV Cable Systems Trends and Challenges of HV Cable Systems Bruno Arnold Electrical Engineer FH Global Sales Far East, Latin America and India Pfisterer Business Unit PTS Cable Trends and Challenges of HV Cable Systems

More information

VITALink Taped Splice Straight Through Crimp

VITALink Taped Splice Straight Through Crimp A Marmon Wire & Cable Berkshire Hathaway Company VITALink Taped Splice Straight Through Crimp 2 Hour Fire-Rated Splice VITALink MC Cables, UL FHIT 120 Installation Instructions Description The VITALink

More information

Illustrated Feature. Options

Illustrated Feature. Options Applications Enclosed and gasketed fixtures for use where vapors, moisture, dirt or corrosive atmospheres are encountered. For use in hazardous locations defined by the NEC as Class I, Division 2. Groups

More information

Instruction Manual MODEL RSP SANITARY ELECTRONIC PRESSURE TRANSMITTER

Instruction Manual MODEL RSP SANITARY ELECTRONIC PRESSURE TRANSMITTER Instruction Manual Anderson Instrument Co. Inc. 156 Auriesville Road Fultonville, NY 12072 1-800-833-0081 Fax 518-922-8997 www.andinst.com Instrument Model Number Instrument Serial Number MODEL RSP SANITARY

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) DOCUMENT NUMBER: PE-GL-999-507-E002, Rev. 00 ISSUE DATE: 15.05.14 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT NOIDA PREFACEE

More information

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1 Fiber Optic Splice Closure 1. Introduction 1.1 General SAMJIN s SJOF-BS604B protects fiber optic splicing point in various installation conditions such as aerial, manholes, ducts, wall and direct buried

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

LED Driver Linear / area fixed output

LED Driver Linear / area fixed output Driver LC 10W 350mA fixc lp SNC2 ESSENCE series Product description Fixed output built-in LED Driver Constant current LED Driver Output current 350 ma Max. output power 10.2 W Up to 80 % efficiency For

More information

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology Sample Test Project District / Zonal Skill Competitions Skill- Electrical Installation Category: Construction and Building Technology Version 1 Dec 2017 Skill- Electrical Installation 1 Table of Contents

More information

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED INSTALLATION INSTRUCTIONS FOR MODEL 2230LED www.sportablescoreboards.com 1 Table of Contents MODEL 2230LED... 3 8 X 4 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:...

More information

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE Round Messenger (ADSS) A round messenger fiber optic cable is designed for use in aerial installations

More information

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

2179-CD Series Fiber Optic Splice Closure. Installation Instructions 2179-CD Series Fiber Optic Splice Closure Installation Instructions 1.0 Product Introduction The new 3M TM 2179-CD Series Fiber Optic Splice Closure can be used in buried, underground, aerial, and pedestal

More information

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ISS New Audio & Visual installations Design and Physical install guidelines v1.5 ISS New Audio & Visual installations Design and Physical install guidelines v1.5 David Neal 11/05/2018 Contents Background... 3 Installation Standards... 3 Display Screen and Projector positioning... 3

More information

EXPlora. Introduction

EXPlora. Introduction Introduction EXPlora The EXPlora range is most suited to manufacturers of ancillary electrical equipment such as motors, pumps, lighting equipment, process and control gear for use in factories and plant

More information

INSTALLATION INSTRUCTIONS FOR

INSTALLATION INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR MODEL 2240LED www.sportablescoreboards.com 1 Table of Contents 8 X 7 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR

More information

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E. www.wampfler.com Page 1 of 27 Index Page 1 Basics...4 2 Basic understanding of an IPT -system...5 3 General rules regarding metal parts in close proximity...6 3.1 Envelope free of ferromagnetic material...6

More information

Electrical Installation Booklet Shipyard Standards

Electrical Installation Booklet Shipyard Standards Marine Institute of Memorial University of Newfoundland Electrical Installation Booklet Shipyard Standards Marine Engineering Systems Design Department Revision 0 List of Revisions Revision Description

More information

HN Connectors. Automatic Connector. Introduction. Contents. 631/ FAX 631/

HN Connectors. Automatic Connector. Introduction. Contents. 631/ FAX 631/ Connectors Introduction 2004 Automatic Connector. All rights reserved. pdf 1.0 4-13-04 Contents Specifications........................... 2 Straight Cable Plugs...................... 3 Right Angle Cable

More information

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION 7 -- CROSS-CONNECT SYSTEMS DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL www.prolight.co.uk TRANSCENSION 6-CHANNEL PACK (order code: BOTE40) USER MANUAL SAFETY WARNING FOR YOUR OWN SAFETY, PLEASE READ THIS USER MANUAL CAREFULLY BEFORE YOUR INITIAL START-UP! CAUTION! Keep this

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH 40mm ( 6") CEN III AND CEN IV SAFE L0 CALL -800--600 0 (6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS

More information

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual 24-Fiber LANLINXS (Model # 055-8632-5000) 48-Fiber LANLINXS (Model # 055-8832-5000) User Manual 24-Fiber LANLINXS (Model # 055-8632-5000) 48-Fiber LANLINXS (Model # 055-8832-5000) User Manual, Part Number

More information

NAVSEA STANDARD ITEM. 1.1 Title: Shipboard Electrical/Electronic Cable Procedure; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Shipboard Electrical/Electronic Cable Procedure; accomplish NAVSEA STANDARD ITEM FY-9 ITEM NO: 009-73 DATE: 0 OCT 07 CATEGORY: I. SCOPE:. Title: Shipboard Electrical/Electronic Cable Procedure; accomplish. REFERENCES:. Standard Items. MIL-STD-003, Electric Plant

More information

WiFi Controlled Fused Spur Time Switch

WiFi Controlled Fused Spur Time Switch WiFi Controlled Fused Spur Time Switch Model: FSTWiFi WiFi Controlled Fused Spur Model: FSTWiFiTGV WiFi Controlled IP66 Fused Spur Installation & Operating Instructions 1 1. General Information These instructions

More information

Wired Troubleshooting Manual

Wired Troubleshooting Manual Wired Troubleshooting Manual Congratulations on your choice of this product. Its superior sound reproduction will provide enjoyment and entertainment. We appreciate your patronage and take pride in the

More information

Industrial Monitor Update Kit

Industrial Monitor Update Kit Industrial Monitor Update Kit (Bulletin Number 6157) Installation Instructions 2 Table of Contents Table of Contents Industrial Monitor Update Kit... 3 Overview... 3 Part 1 - Initial Preparation... 5 Part

More information

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD 1 INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD NOTE TO INSTALLERS: PLEASE RETURN THIS MANUAL TO THE INDIVIDUAL IN CHARGE OF THE SCOREBOARD UPON COMPLETION OF INSTALLATION. The scoreboard

More information

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003.

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003. PEMRA Cable Television (Operations) Regulations, 2002. Pakistan Electronic Media Regulatory Authority (PEMRA) The Pakistan Electronic Media Regulatory Authority (PEMRA) is pleased to make the Standards

More information

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman

More information

Digital Economy Seven Programmer

Digital Economy Seven Programmer Digital Economy Seven Programmer Model: TRTD7N White Installation & Operating Instructions 1. General Information These instructions should be read carefully and retained for further reference and maintenance.

More information

SPECIFICATION FIBER OPTIC SPLICE CLOSURE. Spec No : VSS-1007-BS403A-04A/SD. VSS-0107-BS403A-04A/SD R & D Center Manufacturing Division

SPECIFICATION FIBER OPTIC SPLICE CLOSURE. Spec No : VSS-1007-BS403A-04A/SD. VSS-0107-BS403A-04A/SD R & D Center Manufacturing Division SPECIFICATION FIBER OPTIC SPLICE CLOSURE Model Spec. No. Distribution Depts. VSOF-BS403A VSS-0107-BS403A-04A/SD R & D Center Manufacturing Division Sales Division Management Division Revision 10. 07 (Rev.4)

More information

3M Distribution Box (DDB)

3M Distribution Box (DDB) 3M Distribution Box (DDB) Merged Copper and Fiber Pole/Post Mount Enclosure Installation Instructions November 2015 78-0015-2736-1-A 2 November 2015 78-0015-2736-1-A Contents 1.0 General 2.0 Enclosure

More information

www.greenelectricalsupply.com MaxLite 6 & 8 Commercial Downlight Retrofit General Safety Information To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts,

More information

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX 2562089B REV. B 110 Printed in U.S.A. MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

More information

Effective earthing of screened cables

Effective earthing of screened cables NOVEMBER 2006 Effective earthing of screened cables All metallic containment items, other extraneous metalwork and the screens of telecommunications cables in an information technology environment must

More information

Cable installation guidelines

Cable installation guidelines The Quality Connection Cable installation guidelines Business Unit Industrial Projects 2 Cable installation guidelines www.leoni-industrial-projects.com GENERAL Installation methods Many different methods

More information

Installation Manual SaVi Note Underwater LED Light

Installation Manual SaVi Note Underwater LED Light Installation Manual SaVi Note Underwater LED Light Model Numbers SAVI-NOTE7, SAVI-NOTE0 Table of Contents Safety Precautions...2 SaVi Note Install Instructions...3- M Instructions...- Warnings READ AND

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS LIGHTGUARD 350-20-WTC SEALED FIBER OPTIC CLOSURE VIEW ONLINE TABLE OF CONTENTS: GENERAL...2 SPECIFICATIONS...2 PACKAGE CONTENTS...3 PACKAGE CONTENTS: ACCESSORIES...3 RECOMMENDED TOOLS...3 ADD-ON COMPONENTS...4

More information

LGX Compatible (LSX) Connector Module) User Manual)

LGX Compatible (LSX) Connector Module) User Manual) LGX Compatible (LSX) Connector Module) User Manual) 15948-A LSX Connector Module (72-Position Module Shown) Content Page 1 DESCRIPTION... 3 2 DIMENSIONS AND SPECIFICATIONS... 5 3 INSTALLATION... 6 3.1

More information

LIGHTING: ENCLOSED AND GASKETED AREA FLUORESCENT. Applications. Illustrated Feature. Certifications and Compliances

LIGHTING: ENCLOSED AND GASKETED AREA FLUORESCENT. Applications. Illustrated Feature. Certifications and Compliances Applications Enclosed and gasketed fixtures for use where vapors, moisture, dirt or corrosive atmospheres are encountered. For use in hazardous locations defined by the NEC as Class I, Division 2. Groups

More information

Sunny Boy 700U SOLARTECHNOLOGY. Installation Guide. Photovoltaic, Grid-Tied String Inverter

Sunny Boy 700U SOLARTECHNOLOGY. Installation Guide. Photovoltaic, Grid-Tied String Inverter Sunny Boy 700U Photovoltaic, Grid-Tied String Inverter SOLARTECHNOLOGY Installation Guide Installation Guide Copyright 2003 SMA America, Inc. All rights reserved. No part of this document may be reproduced,

More information

PCR AUTOMATIC HEAT TREATMENT CONSOLE

PCR AUTOMATIC HEAT TREATMENT CONSOLE Maritime Stress PO Box 2898, 30 Estates Road Dartmouth, NS, B2W 4Y2, Canada Toll Free: 1-877-468-1781 Phone: (902) 468-7873 Fax: (902) 468-2304 Website: E-mail: info@maritimestress.com OPERATION MANUAL

More information

Cellular Signal Booster

Cellular Signal Booster Drive G-M Cellular Signal Booster THE ALUMINUM CASING OF YOUR SIGNAL BOOSTER!! WILL ADJUST TO THE TEMPERATURE OF ITS ENVIRONMENT, BUT IS DESIGNED TO PROTECT THE SIGNAL BOOSTER TECHNOLOGY. FOR EXAMPLE,

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

VLC-3 USER'S MANUAL. Light Program Controller. M rev. 04 K rev. 00 & ( ( 5, 352*5$0 1 : $ 2 ' 6(77,1*6 )81&7,216

VLC-3 USER'S MANUAL. Light Program Controller. M rev. 04 K rev. 00 & ( ( 5, 352*5$0 1 : $ 2 ' 6(77,1*6 )81&7,216 Light Program Controller VLC-3 USER'S MANUAL +50,1 +50,1 1 : $ ' 2 7. 6 8 ' 5, 7 6 6. $ ( 3 352*5$0 0,16(& )81&7,216 6(77,1*6 & 8 5 5 ( 1 7 3 ( 5, 2 ' M 890-00189 rev. 04 K 895-00406 rev. 00 GENERAL...

More information

Non Magnetic Connectors

Non Magnetic Connectors Non Magnetic Connectors Johnson Components builds coaxial connectors using innovative materials and design to provide Mil Spec Performance at a commercial price. Now we offer our Non Magnetic Connectors

More information

Model LTM-1400 User Manual LTM Multiformat 1x4 Assignment Router / DA. (Component, Y/C, Composite, Balanced Audio, RS422) 2001 Laird Telemedia.

Model LTM-1400 User Manual LTM Multiformat 1x4 Assignment Router / DA. (Component, Y/C, Composite, Balanced Audio, RS422) 2001 Laird Telemedia. Model LTM-1400 User Manual LTM-1400 2001 Laird Telemedia. CE GENERAL DESCRIPTION The LTM-1400 is a Multi-format Assignment Router/Distribution Amplifier System for the most complex Multimedia signal management.

More information

TeSys contactors. Model d. Type of contactor LC1- LC1- LC1- LC1- LC1-D115 & D09 D18 D25 D38 D40 D50 D95 LC1-D150 DT20 & DT25 DT32 & DT40

TeSys contactors. Model d. Type of contactor LC1- LC1- LC1- LC1- LC1-D115 & D09 D18 D25 D38 D40 D50 D95 LC1-D150 DT20 & DT25 DT32 & DT40 Characteristics Type of contactor LC- LC- LC- LC- LC-D & D09 D8 D2 D38 D40 D0 D9 LC-D0 DT20 & DT2 DT32 & DT40 Environment Rated insulation voltage (Ui) Conforming to IEC 947-4-, overvoltage category III,

More information

28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR

28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR 28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR INSTRUCTION MANUAL Please read this manual thoroughly before use, and keep it handy for future reference. TABLE OF CONTENTS 1, General information...

More information

This device is a lighting effect for professional use on stages, in discotheques, theatres, etc..

This device is a lighting effect for professional use on stages, in discotheques, theatres, etc.. At first, thank you for purchasing QUADRO 24. For the sake of safety and regular operation of this projector, please read this manual carefully before using and operating it, lest incur any personal injury

More information

The Chan-L-Wire Pro Series Lighting Distribution

The Chan-L-Wire Pro Series Lighting Distribution Lighting Distribution System Offers Maximum Flexibility The Chan-L-Wire Pro Series Lighting Distribution System offers maximum flexibility while saving up to 40% in labor installation costs. The system

More information

10 PDUs 19 PDUs Zero-U PDUs

10 PDUs 19 PDUs Zero-U PDUs 128, av. du Maréchal-de-Lattre-de-Tassigny - 87045 LIMOGES Cedex - France Tel: +33 (0)5 55 06 87 87 Fax: +33 (0)5 55 06 88 88 www.legrand.com 10 PDUs Page 1. GENERL CHRCTERISTICS...1 2. EQUIPMENT ND PERFORMNCE...3

More information

SERIES BNC 50, COAXIAL MINIATURE CONNECTORS

SERIES BNC 50, COAXIAL MINIATURE CONNECTORS SERIES BNC 50, COAXIAL MINIATURE CONNECTORS DESCRIPTION CONTENTS PAGE HUBER+SUHNER BNC is still one of the most popular connector series, featuring a two stud bayonet coupling mechanism, which is particularly

More information

Cellular Signal Booster

Cellular Signal Booster Drive 4G-X Cellular Signal Booster THE ALUMINUM CASING OF YOUR SIGNAL BOOSTER!! WILL ADJUST TO THE TEMPERATURE OF ITS ENVIRONMENT, BUT IS DESIGNED TO PROTECT THE SIGNAL BOOSTER TECHNOLOGY. FOR EXAMPLE,

More information

OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE MANUAL SERIAL NUMBER CUSTOMER: SALES REP.: CONTENTS Mixer Installation / Assembly / Dimension Drawings Safety... 1 Customer Service Contact... 1 Initial Inspection... 2 Installation...2

More information

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements. FIST-GCOG2 I N S T A L L A T I O N I N S T R U C T I O N TC-986-IP Rev A, Mar 2017 www.commscope.com FIST-GCOG2-Dx6 Content 1 Introduction 2 General 2.1 Abbreviations 2.2 Kit contents 2.3 Tools 2.4 Accessories

More information

DSP 18 Sub active subwoofer. user manual

DSP 18 Sub active subwoofer. user manual DSP 18 Sub active subwoofer user manual Musikhaus Thomann Thomann GmbH Hans-Thomann-Straße 1 96138 Burgebrach Germany Telephone: +49 (0) 9546 9223-0 E-mail: info@thomann.de Internet: www.thomann.de 05.11.2018,

More information

Cyclo Series. user manual. MartinArchitectural

Cyclo Series. user manual. MartinArchitectural Cyclo Series user manual MartinArchitectural Measurements are in millimeters 63 Cyclo 02 88 Cyclo 03 1000 81 1190 88 Cyclo 04 98 88 2002 Martin Professional A/S, Denmark. All rights reserved. No part of

More information

Technical Specifications

Technical Specifications INSTALLATION SHEET AND OPERATORS MANUAL General Description: The is a mixer/preamplifier that includes 6 channels that each include a microphone input at screw terminals and an aux input at an RCA jack.

More information

ENGINEER S REPORT. of the SAFETY OF MAW COMMUNICATIONS FIBER OPTIC CABLE INSTALLATION

ENGINEER S REPORT. of the SAFETY OF MAW COMMUNICATIONS FIBER OPTIC CABLE INSTALLATION ENGINEER S REPORT of the SAFETY OF MAW COMMUNICATIONS FIBER OPTIC CABLE INSTALLATION Prepared by: Daryl L. Ebersole, P.E. Jeffrey M. Kobilka, P.E. January 7, 2018 1 SAFETY OF MAW COMMUNICATIONS FIBER OPTIC

More information

VITEK VTM-TLM191 VTM-TLM240

VITEK VTM-TLM191 VTM-TLM240 VTM-TLM191 VTM-TLM240 19 & 24 Professional LED Monitors with HDMI, VGA, and Looping BNC VITEK FEATURES 19 & 24 Wide Screen LED Display Panel HDMI, VGA, and Looping BNC Composite Video Inputs & Stereo Audio

More information

Digital Time Switch. Installation & Operating Instructions

Digital Time Switch. Installation & Operating Instructions Digital Time Switch Model: NTT06 24 Hour General Purpose Digital Timer Model: NTT07 7 Day General Purpose Digital Timer Installation & Operating Instructions 1 1. General Information These instructions

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION ISSUED : OCT. 02, 2006 PAGE : 1 OF 9 REV. : 1 TECHNICAL SPECIFICATION FOR GST 2006-043A LOOSE TUBE DRY CORE CABLE SINGLE JACKET/SINGLE ARMOR (SJSA CABLE) Prepared By : Oh-Heoung Kwon Engineer Optical Technical

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH mm ( 2") CEN-L SAFE L00 CALL -800-999-600 22 (9 6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND

More information

Building + Mounting Learn Rooftop Basics

Building + Mounting Learn Rooftop Basics Building + Mounting Learn Rooftop Basics A Build-It-Ourselves Guide to Wireless Mesh Networks 1 Introduction This module provides helpful tips for installing wireless equipment on rooftops. It should be

More information

Installation Manual for New or Retrofit Installations

Installation Manual for New or Retrofit Installations Installation Manual for New or Retrofit Installations Release Date: 24-August-2015 c Able Applied Technologies LTD. READ THE ENTIRE MANUAL COMPLETELY AND CAREFULLY BEFORE STARTING BEFORE YOU BEGIN ASSEMBLY

More information

K Service Source. Apple High-Res Monochrome Monitor

K Service Source. Apple High-Res Monochrome Monitor K Service Source Apple High-Res Monochrome Monitor K Service Source Specifications Apple High-Resolution Monochrome Monitor Specifications Characteristics - 1 Characteristics Picture Tube 12-in. diagonal

More information

7 Day Digital Time Switch

7 Day Digital Time Switch 7 Day Digital Time Switch Model: NTT08 Installation & Operating Instructions 1 1. General Information These instructions should be read carefully and retained for further reference and maintenance. 2.

More information

19" TiRAX cabinet system. from page 3. 19" NETcell cabinet system from page 31. Open 19" racks from page 43

19 TiRAX cabinet system. from page 3. 19 NETcell cabinet system from page 31. Open 19 racks from page 43 19" TiRAX cabinet system from page 3 19" NETcell cabinet system from page 31 Open 19" racks from page 43 all-mounting/stand-alone distribution systems from page 53 all-mounting enclosure systems from page

More information