CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc

Size: px
Start display at page:

Download "CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc"

Transcription

1 CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc The general consensus of the occupants of the CLT is that the following rooms be equiped for Videoconferencing/Distance Learning activities: Public Events Rm. 103, Classroom 105, Multimedia Rm 115, Classroom 108, Seminar Classroom 107, Conference Rm 180 and Lab Classroom 207. The most logical central point for the required equipment 'A/V Production Room' is the A/V Storage room 104. Said equipment will require an area of approximately 7' X 7' square to accommodate 2 equipment racks with 2 operators for the Video, Audio, Intercommunications & Videoconferencing components. PLU Audio Services, Bob Holden, will co-occupy this 7' X 7' space. Room 104 will have a finished wall separating the 7' X 7' storage area Rm 102 from the 7' X 7' A/V Production Room 104. The A/V Production Room will have one door in the South wall, East corner, that opens outward (Southwesterly) into the Lobby for access, and an 8"W X 8"H hatch door (locking) at 2" above floor level on the South wall, West corner, to facilitate temporary cable runs for events in the Lobby area. The A/V Production Room will have adequate clean power, to supply (2) 7 foot tall equipment racks, in the form of 2-20amp circuits on the same phase to separate 4-plex outlets, 2 sets each, mounted on the West wall at 16" above the floor, 1 each on the NW wall and 1 each on the S wall. The A/V Production Room 104 will have adequate ventilation, an open ceiling, Air Conditioning, etc to cool the equipment and operators to 68 degrees F (minimum 2000 BTU's).with a thermostat on the wall. The A/V Production Room 104 will have (20) cabling paths, from each of the Videoconferencing rooms; (2) 3" conduits in the slab from Rm 104 to Rms 103 & 105 (1) each to the 2 Instructors floor pockets; (2) each 2" conduits in the walls from the 6 wall boxes stubbed up to the cable tray above the false ceilings in Rooms 103 & 105 and (1) each 2" conduit in the wall from the 1 wall box stubbed up to the cable tray above the drop ceiling in Room 115; (6) 2" conduits in the slab from Rm 104 to Rms 108, 107 and 180 (1) each to the 3 wall boxes and (1) each to the 3 floor pockets; (4) each 2" conduits in Room 207 from the 3 wall boxes and 1 floor box stubbed down to the cable trays above the first floor false ceiling; All cable paths to A/V Production Room 104 will terminate in (3) 24"H x 12"W x 6"D flush mount boxes in the West wall, Left half, centered at 48" above floor level for Videoconference connector panels. One 24"x 12"x 6" box will have (4) 2" conduits and one 24"x12"x6" box will have (5) 2" conduits exiting the top of the box and stubbed at ceiling level 8' above finished floor and (2) 2" conduit sleeves from box to box. There will also be (2) 24"H x 12" W x 6" D flush mount boxes in the West wall, Right half, centered at 48" above floor level for Audio connector panels one with (6) and one with (4) 2" conduits exiting the top of the box and stubbed at ceiling level 8' above floor level and (2) 2" conduit sleeves from box to box. Each of the (20) cabling paths will provide for a 1-1/2 inch (1.5") diameter bundle of Camera, Video, Tally, Audio, Communications, ISDN, Phone, etc. cables. If conduit is used each 90 degree bend will have a pulling elbow or pull box. Each of the (13) cabling paths to the wallmount boxes will terminate in an 8"H X 8"W X 6"D flush wallmount box in each Videoconferencing room centered at about 16 inches above floor level for connector panels. Rooms 103, 105 and 207 will have three such boxes each. The locations of all such 'Camera Connecton' boxes per PLU-TV Conduit Locations Diagrams. Each of the cabling paths to the Instructors' Console Floor Boxes will terminate in one of two (2) tandem 8"H X 8"W X 6"D flush floor mount box in each Videoconferencing room under the Instructor's console. There will be (1) each additional 2" conduit in the slab from the Instructor floor pocket stubbed up above the drop ceiling for the projector in all classrooms with projectors. PLU will purchase with building funds and supply all Electronic Equipment, Racks, Wall Box and Floor Box Connector Panels, Connectors and associated installations. The Contractor(s) will purchase and supply all Cables, Pulling Lubricant, Velcro Ties, Poly Line Pull String and associated installations.

2 ROOM 103 CLT17620AVControlRoom-RA.doc Page 2 RM 102 A/V PRODUCTION ROOM 104 (6) 2" conduit risers for raceway Audio cables from Rms 103 & 105 (2) 2" sleeves from box to box in both boxes (2) 2" conduits in the slab from Rms 103 & 105 Audio floorboxes (4) 2" conduit risers for raceway Audio cables from Rm 207 (2) 24"H x 12" W x 6" D wall boxes for Audio Wall between Rms 102 & 104 (3) 24"H x 12"W x 6"D wall boxes for Videoconferencing (1) 2" conduit in the slab from Rm 207 Videoconference floor box (3) 2" conduit risers for raceway cables from room 207 Videoconference wall boxes (2) 2" conduit riser for raceway cables from Rm 115 Videoconference wall box (2) 2" sleeves from box to box all 3 boxes (2) 2" conduits in the slab from Rms 103 & 105 Videoconference floorboxes (2) 2" conduit risers for raceway cables from Rm 103 Videoconference wall boxes (2) 2" conduit risers for raceway cables from Rm 105 Videoconference wall boxes EAST ENTRANCE TO ROOM 103 (3) 2" conduits in the slab from Rms 107, 108 & 180 Videoconference floor boxes (3) 2" conduits in the slab from Rms 107, 108 & 180 Videoconference wall boxes

3 ROOM 103 CLT17620AVControlRoom-RA.doc Page 3 Rm 102 A/V PRODUCTION ROOM 104 (1) 20 Amp clean power circuit to (3) 4-plex boxes (all on same phase) (1) 20 Amp clean power circuit to (3) 4-plex boxes (all on same phase)

4 ROOM 103 CLT17620AVControlRoom-RA.doc Page 4 Rm 102 A/V PRODUCTION ROOM B.T.U CAPACITY AIR CONDITIONING OUTLET IN OPEN CEILING WITH WHISPER DUCT FOR LOW NOISE OPERATION AND THERMOSTAT ON THE WALL COOLING TO 68 DEGREES FOR 600 WATTS OF ELECTRONIC EQUIPMENT AND 3 OPERATIONS PERSONS (1) 8"x8" hatch thru wall at 2"above floor with locking hinged door on outside wall (hinge at top)

5 ROOM 103 CLT17620AVControlRoom-RA.doc Page 5 Rm 102 A/V PRODUCTION ROOM 104 EQUIPMENT RACK (on wheels) 24"x 24"x 7' AUDIO OPERATOR EQUIPMENT RACK (on wheels) 24"x 24"x 7' VIDEO OPERATOR

6 ROOM 103 CLT17620AVControlRoom-RA.doc Page 6 Rm 102 A/V PRODUCTION ROOM 104 (2) 4' x 2 tube light fixtures mounted on wall with (2) separate dimmer switches on the wall

7 CLT17620AVControlRoom-RA.doc Page 7 FIRST FLOOR CONDUIT LOCATIONS FLOOR BOX UNDER INSTRUCTOR CONSOLE FLOOR BOX UNDER INSTRUCTOR CONSOLE 115 FLOOR BOX UNDER INSTRUCTOR CONSOLE 104 (3) 2" CONDUITS IN THE SLAB FROM RM 104 TO RMS 103, 105 & 115 FLOOR BOXES (6) 2" CONDUITS IN THE SLAB FROM RM 104 TO RMS 107, 108 & 180 FLOOR & WALL BOXES FLOOR BOXES UNDER INSTRUCTOR CONSOLES 180 WALL BOXES

8 CLT17620AVControlRoom-RA.doc Page 8 FIRST FLOOR CABLE BUNDLES WALL BOXES W/ TWO 3" CONDUT RISERS EACH DISPLAY CASE (7) 1-1/2" CABLE BUNDLES IN THE CABLE RACEWAYS FROM 104 TO 103, 105, & 115 WALL BOXES VIA (2 EA) 3" CONDUIT RISERS IN WALLS

9 CLT17620AVControlRoom-RA.doc Page 9 SECOND FLOOR CONDUIT LOCATIONS 207 WALL BOXES (3) 1-1/2" CABLE BUNDLES FROM 104 TO 207 WALL BOXES VIA (2 EA) 3" CONDUITS IN WALLS TO 1 ST FLOOR CABLE RACEWAYS 104 (1) 2" CONDUIT IN THE SLAB FROM RM 104 TO RM 207, FLOOR BOX UNDER INSTRUCTORS CONSOLE

10 CLT17620AVControlRoom-RA.doc Page 13 8" X 8" WALLPLATES - ROOMS 103 (3), 105 (3), 115 (1), 107 (1), 108 (1), 180 (1), 207 (3) CAM 1 VIDEO CAM 2 VIDEO AUDIO IN LEFT AUDIO IN RIGHT AUDIO OUT LEFT AUDIO OUT RIGHT CAM 1 GNLK CAM 2 GNLK CAM 1 TALLY CAM 2 TALLY PGM PVW CCOM CCOM AT&T

11 8" X 8" WALLPLATES - ROOMS 103 (3), 105 (3), 115 (1), 107 (1), 108 (1), 180 (1), 207 (3) CLT17620AVControlRoom-RA.doc Page 14 NC3FDL-1-B- NC3FDL-1-B NC3MDL-1-B NC3MDL-1-B SWITCHCRAFT 57HA3F SWITCHCRAFT 57HA3F NC5FDL-1-B NC5FDL-1-B AIM BULKHEAD 'F'

12 ( 8 1) 10 3 (3), 10 5 (3), 11 5 (1), 10 7 (1), 10 8" X 8" W A LL P L A T E S - R O O M S CLT17620AVControlRoom-RA.doc Page 15 1" HORIZ CENTERS 1-1/4" VERT CENTERS 1-1/4" HORIZ CENTERS 1-1/4" VERT CENTERS 1/2" HOLES 15/16" HOLES 5/8" HOLES 1-1/4" HORIZ CENTERS 1-1/4" VERT CENTERS 1-1/2"HORIZ CENTER 3/4" VERT CENTER

13 CLT17620AVControlRoom-RA.doc Page 16 8" X 8" FLOOR PLATES - ROOMS 103 (1), 105 (1), 115 (1), 107 (1), 108 (1), 180 (1), 207 (1) OBSERVATION CAMERA LEFT AUDIO IN - 1 RIGHT DOCUMENT CAMERA NETWRK FUTURE ISDN 1 ISDN 2 LEFT AUDIO IN - 2 RIGHT PROGRAM VIDEO FUTURE FUTURE ISDN 3 ISDN 4 FUTURE FUTURE PHONE 1 PHONE 2 PREVIEW VIDEO LEFT AUDIO OUT - 1 RIGHT AT&T LEFT AUDIO OUT - 2 RIGHT CLEARCOM CLEARCOM

14 CLT17620AVControlRoom-RA.doc Page 17 8" X 8" FLOOR PLATES - ROOMS 103 (1), 105 (1), 115 (1), 107 (1), 108 (1), 180 (1), 207 (1) NC3FDL-1-B NC3FDL-1-B 15/16" HOLES 1/2 " HOLES 1-5/16" X 2-5/8" CUTOUTS NC3FDL-1-B NC3FDL-1-B LEVITON W DECORA INSERT LEVITON W DECORA INSERT MOUNTING HOLES ON 3-13/16" CENTERS NC3MDL-1-B NC3MDL-1-B 15/16" HOLES 3/8" HOLE AIM NC3MDL-1-B NC3MDL-1-B NC5FDL-1-B NC5FDL-1-B

15 VIDEOCONFERENCING CABLE BUNDLE DESCRIPTIONS & PULLING INSTRUCTIONS CLT17620AVControlRoom-RA.doc Page 18 All cables shall be pulled simultaneously in a loose bundle; With each bundle pulled in conduit there shall be a pull string Graybar Part # Poly Line; All cables designated Belden shall be Belden and there will be NO substitutes; Each cable bundle pulled in conduit will be lubricated at the beginning and continuously at the rate of one pint minimum (16 fl. Oz) per 100 feet along the full length of the cables with LUBADUK LPLV 301 available from the Mfgr or at WESTERN STATES ELECTRIC Auburn WA (Marge) Each cable bundle will be pulled at no more than the Maximum Pulling Tension of the lowest rated individual cable (BELDEN 1583A DATATWIST 5e CAT5e at maximum pulling tension of 35 Pounds); Each cable bundle will be pulled at no less than the Minimum Bend Radius of the highest rated individual cable (BELDEN 1189A SERIES 6 DUOBOND COAX at minimum bend radius of 3 Inches). See attatched Tech Data Sheets; Each cable bundle shall end in a minimum 6 Foot long loop inside the (3) 24"H x 12" W x 6" D Wall boxes in A/V Production Room 104, and a minimum 3 foot long loop inside the (20) 8" x 8" x 6" Wall Boxes and Floor Boxes in Rooms 103, 105, 115, 107, 108, 180 and 207; All cable bundles not in conduits shall be pulled in the cable raceways and served with Velcro ties every 6 feet. There will be a representative of Pacific Lutheran University Television Services on site as Monitor during ALL cable pulls; Pacific Lutheran University Television Services will terminate all cables at the Wall Boxes and Floor Boxes with the required connectors and solder joints. All the cable bundles from the A/V Production Room 104 to rooms 103, 105, 115, 107, 108, 180 & 207 Wall Boxes shall consist of the following Belden cables. There shall be NO substitutes. All cables will be pulled simultaneously in a loose bundle along with a pull string (see above). Quantity Description PURPOSE 6 EA BELDEN 1505A VIDEO COAX CABLE 4 EA BELDEN 8723 AUDIO CABLE 1 EA BELDEN 1189A CATV RG-6 COAX CABLE All the cable bundles from the A/V Production Room 104 to rooms 103, 105, 115, 107, 108, 180 & 207 Floor Boxes shall consist of the following Belden cables. There shall be NO substitutes. All cables will be pulled simultaneously in a loose bundle along with a pull string (see above). Quantity Description PURPOSE 4 EA BELDEN 1505A VIDEO COAX CABLE 5 EA BELDEN 8723 AUDIO CABLE 1 EA BELDEN 1189A CATV RG-6 COAX CABLE 3 EA BELDEN 1583A DATATWIST CAT5e CABLE

PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT)

PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT) Page 1 08-21-01 PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT) The following is a list of equipment needed to cable and provide

More information

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and

More information

Tele-Conferencing Rooms

Tele-Conferencing Rooms Center for Learning and Technology, Video/Audio Systems Page 1 SECTION 17660-660 Includes AMEP infrastructure required to support data, voice and video communications over a WAN. See Control rooms Camera

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

Church Layout Medium Advanced

Church Layout Medium Advanced Specifier Product Information Church Layout Medium Advanced System Summary This summary is intended to explain, in general terms, some of the possible uses and reasons for having the recommended equipment

More information

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1. PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Off-center of room to match side screen. Location

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Off-center of room to match side screen. Location AV Basis of Design Illinois Project #: Space Location: Date of Creation: Latest Revision: General Information Space Type: Space Usage: Other Notes: Project Name: Room Types Presentation Room Room Numbers

More information

APPENDIX O RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS E. CATV... 8 F. SECURITY SYSTEM...

APPENDIX O RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS E. CATV... 8 F. SECURITY SYSTEM... RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS A. GENERAL REQUIREMENTS... 2 B. MECHANICAL SYSTEM... 2 C. ACOUSTICAL SYSTEM... 3 D. ELECTRICAL SYSTEM... 6 E. CATV...

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Approx. 2,000 BTU each. Off-center of room to match side screen.

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Approx. 2,000 BTU each. Off-center of room to match side screen. AV Basis of Design Illinois Project #: Space : Date of Creation: Latest Revision: General Information Space : Space Usage: Other Notes: Project Name: Room s Presentation Room Room Numbers 1 System AV Presentation

More information

STRUCTURED CABLE SYSTEM (SCS)

STRUCTURED CABLE SYSTEM (SCS) PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1

More information

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC

More information

HCS - HES Cabling Systems

HCS - HES Cabling Systems HCS - HES Cabling Systems Installation Manual for HCS High-Capacity Fiber-Optic Rack-Mount Cabinets Be sure to read and completely understand this procedure before applying product. Be sure to select the

More information

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum: Lyndhurst Secondary Technology Package Addendum #7 8.29.2017 Bid Date: Wednesday, August 30, 2017 @ 1:00PM Items issued in this addendum: A. Contractor questions and responses B. Clarifications A. Contractor

More information

Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008

Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008 Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008 Instructor s Station - All Technology Enhanced Classrooms (TEC) must include an appropriately placed instructor station. It must

More information

Information Technology Services DESIGN AND INSTALLATION STANDARDS

Information Technology Services DESIGN AND INSTALLATION STANDARDS Requirements and Guidelines for: New Construction, Renovations, Upgrades, and Retrofits. Revised: June 5, 2015 VIU ITS Network Services 2 TABLE OF CONTENTS 0 GENERAL... 5 1 FIBER OPTIC CABLING... 5 1.1

More information

Interview Management System Installation Guide

Interview Management System Installation Guide Technical Support Interview Management System Installation Guide www.casecracker.com support@casecracker.com (720) 442-7072 Technologies 2017 (v.15) 1 Equipment Checklist Box 1 Box 2 Box 3 (Optional) CaseCracker

More information

INSTALLATION AND WIRING OF AUDIO-VISUAL SYSTEMS

INSTALLATION AND WIRING OF AUDIO-VISUAL SYSTEMS APPENDIX A SCHEDULE I INSTALLATION AND WIRING OF AUDIO-VISUAL SYSTEMS 1.0 Video projector mounts & screens 1.1 The majority of rooms require ceiling mounts. Other rooms have projection booths which may

More information

A. The requirements of Section govern the work specified in this section.

A. The requirements of Section govern the work specified in this section. SECTION 27 05 10 - COMMUNITY ANTENNA TELEVISION CABLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The requirements of Section 27 01 00 govern the work specified in this section. B. Refer to the following

More information

City of Winter Springs, FL

City of Winter Springs, FL City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

Small System Packages. Strand Dimming Systems

Small System Packages. Strand Dimming Systems 24 Dimmer Advanced System Model 98506 Four SD 6C dimmer packs Permanent Manual & portable Memory lighting console Rack with locking front door. Twelve 15-32 Zoom spotlights Twelve 6 inch Fresnels Three

More information

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

LGX Compatible (LSX) Connector Module) User Manual)

LGX Compatible (LSX) Connector Module) User Manual) LGX Compatible (LSX) Connector Module) User Manual) 15948-A LSX Connector Module (72-Position Module Shown) Content Page 1 DESCRIPTION... 3 2 DIMENSIONS AND SPECIFICATIONS... 5 3 INSTALLATION... 6 3.1

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

The Uniduct Nonmetallic Latching Raceway

The Uniduct Nonmetallic Latching Raceway Uniduct One-Piece Latching Raceway The Uniduct Nonmetallic Latching Raceway System is a one-piece single channel design, ideally suited to route and protect fiber optic, UTP, and and other low-voltage

More information

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0 x 22 8.5 x 22 (15.24 cm x cm cm x cm) OCTOBER 2004 COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x 55.88 cm 21.59 cm x 55.88 cm) Be sure to read and completely understand this procedure before applying

More information

CRESTRON SITE PACK, LAST REVISION: 25/01/2017

CRESTRON SITE PACK, LAST REVISION: 25/01/2017 CRESTRON SITE PACK, LAST REVISION: 25/01/2017 CABLING INORFMATION IT IS ESSENTIAL THAT THE FOLLOWING INFORMATION IS READ AND UNDERSTOOD TO ENSURE THE SYSTEMS SUPPLIED AND INSTALLED PERFORM TO THE HIGHEST

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective

More information

Small System Packages. Strand Dimming Systems

Small System Packages. Strand Dimming Systems 12 Dimmer System Model 98502 Two SD 6C dimmer packs 12/24 channel lighting console Rack with locking front door Six 23-50 Zoom spotlights Six 6 inch Fresnels Three 15 foot circuit strips Applications:

More information

WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE STUDIOS OF CONCENTRIX MUSIC AND SOUND DESIGN, INC.

WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE STUDIOS OF CONCENTRIX MUSIC AND SOUND DESIGN, INC. WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE SALE PRICE: $775,000 BUILDING SIZE: 4,000 SF YEAR BUILT: 2009 ZONING: I-1 PROPERTY OVERVIEW Expertly designed media production/recording studio located

More information

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ISS New Audio & Visual installations Design and Physical install guidelines v1.5 ISS New Audio & Visual installations Design and Physical install guidelines v1.5 David Neal 11/05/2018 Contents Background... 3 Installation Standards... 3 Display Screen and Projector positioning... 3

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors including patch panels. 3. Cabling identification

More information

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) 32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 32 LCD

More information

DESIGN CRITERIA AND REQUIREMENTS FOR CLASSROOMS

DESIGN CRITERIA AND REQUIREMENTS FOR CLASSROOMS DESIGN CRITERIA AND REQUIREMENTS FOR CLASSROOMS PART 1 - General 1.0 This guideline is intended to guide the Offices of Facilities Planning, Facilities Design and Construction, and/or the Design Professional

More information

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) 42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall) NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 42 LCD

More information

Wired Troubleshooting Manual

Wired Troubleshooting Manual Wired Troubleshooting Manual Congratulations on your choice of this product. Its superior sound reproduction will provide enjoyment and entertainment. We appreciate your patronage and take pride in the

More information

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: The SCC is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best practices as they evolve.

More information

SCIR. Infrared Illuminator Powerful Indoor/Outdoor IR Spotlight SCIR

SCIR. Infrared Illuminator Powerful Indoor/Outdoor IR Spotlight SCIR SCIR Infrared Illuminator Powerful Indoor/Outdoor IR Spotlight The NetMedia SCIR Infrared (IR) Illuminator provides night vision for IR (850nm) sensitive cameras. It enables cameras such as NetMedia s

More information

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683 SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683.01.01 GENERAL A. The Contractor shall furnish the designated quantity of Video Optical Transceiver (VOTR) pairs

More information

Bravo AV s Structured or Whole-House Wiring Approach

Bravo AV s Structured or Whole-House Wiring Approach Custom Audio & Video Systems: Design and Installation Bravo AV s Structured or Whole-House Wiring Approach THE QUALITY OF THE CABLE YOU USE IS CRITICALLY IMPORT TO THE PERFORMANCE OF YOUR SYSTEM Introduction

More information

IP-LINX. Installation Guide

IP-LINX. Installation Guide Installation Guide Installation Guide, 146653-4 Copyright 2017, Telect, Inc. All Rights Reserved Telect and Connecting the Future are registered trademarks of Telect, Inc. 22425 East Appleway Ave. # 11

More information

Section Communications Optical Fiber Backbone Cabling

Section Communications Optical Fiber Backbone Cabling Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related

More information

November 5, 2001 Pacific Lutheran University SECTION Center for Learning and Technology, Video/Audio Systems Page 1

November 5, 2001 Pacific Lutheran University SECTION Center for Learning and Technology, Video/Audio Systems Page 1 Center for Learning and Technology, Video/Audio Systems Page 1-430 Monitors, VCR's and Projection Equipment Includes Playback and Projection and Display equipment See Televisions Monitors Scan Converters

More information

Interview Management System Installation Guide. (303) x500

Interview Management System Installation Guide.   (303) x500 Technical Support Interview Management System Installation Guide www.casecracker.com support@casecracker.com (303) 665-3962 x500 Copyright Cardinal Peak Technologies 2015 (v.10) 1 Equipment Checklist Box

More information

Room Recommendations for the Cisco TelePresence System 3210

Room Recommendations for the Cisco TelePresence System 3210 CHAPTER 2 Room Recommendations for the Cisco TelePresence System 3210 Revised: February 20, 2012, This chapter provides you with general room recommendations for the Cisco TelePresence System 3210 (CTS

More information

Church Layout Small. Specifier Product Information

Church Layout Small. Specifier Product Information Specifier Product Information Church Layout Small System Summary This summary is intended to explain, in general terms, some of the possible uses and reasons for having the recommended equipment shown

More information

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines. PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Support Structures 2. Cable trays and ladder rack 3. Racks (including wire managers) 4. Cables (copper and optical fiber) 5. Jacks and faceplates

More information

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 1.0 INTRODUCTION Customer to define background and introduction to the project based on

More information

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) DOCUMENT NUMBER: PE-GL-999-507-E002, Rev. 00 ISSUE DATE: 15.05.14 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT NOIDA PREFACEE

More information

UNM IT/Telecommunications Guide Specification Labeling 11/07/

UNM IT/Telecommunications Guide Specification Labeling 11/07/ Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing

More information

Service Parts Diagrams. For Model: 10/20/09 Service Parts Diagrams for the Rear Projection SMART Board 3000i-DV Interactive Whiteboard 1

Service Parts Diagrams. For Model: 10/20/09 Service Parts Diagrams for the Rear Projection SMART Board 3000i-DV Interactive Whiteboard 1 Service Parts Diagrams For Model: 000i-DV with the serial NEC MT060 numbers Serial greater numbers than 000 000i-DV-09000 to 0999 0/0/09 Service Parts Diagrams for the Rear Projection SMART Board 000i-DV

More information

CABLING STANDARDS FOR

CABLING STANDARDS FOR RFB for Wiring in the Outagamie County Courtrooms Attachment B September 1, 2016 CABLING STANDARDS FOR GENERAL The purpose of this document is to provide guidelines for all structured cable installations

More information

Simplified A/V Infrastructure Design. Carol E. Oliver, RCDD, ESS Training and Contractor Manager Legrand North America Data Communications Division

Simplified A/V Infrastructure Design. Carol E. Oliver, RCDD, ESS Training and Contractor Manager Legrand North America Data Communications Division Simplified A/V Infrastructure Design Carol E. Oliver, RCDD, ESS Training and Contractor Manager Legrand North America Data Communications Division A/V Yesterday 2 A/V Today Higher resolution Multi format

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project Family Health Centers, Inc. Request for Proposal for Family Health Centers East Broadway Data and Communications Cabling Project Date Issued: 06/07/2014 Date Due: 06/16/2014 Page 1 of 22 Table of Contents

More information

Integrated Systems Proposal

Integrated Systems Proposal Integrated Systems Proposal GALLERIA MALL WEST DRW Construction & Development 511 Progress Parkway Chesterfield, MO 63012 314-525-1147 Prepared by: Elite AV Systems Tom Donovan t.donovan@eliteavsystems.com

More information

The MTS FiON Network. for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations

The MTS FiON Network. for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations The MTS FiON Network for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations Table of Contents We ve Upgraded our Network... 1 MTS Fibre Optics Installation Guidelines... 2 MTS Fibre Optics

More information

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: Solano Community College (SCC) is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best

More information

Installation Evaluation Form

Installation Evaluation Form 265 S. Federal Hwy Unit 163 Deerfield Beach, FL 33441-4146 Phone (954) 425-0199 Fax (954) 827-2408 Toll-Free 1-866-SCAN-SND info@scansound.com www.scansound.com Please have someone at the MRI imaging center

More information

RACKS, ENCLOSURES AND CABLE MANAGEMENT

RACKS, ENCLOSURES AND CABLE MANAGEMENT and RS3 RACK SYSTEM (pages 6.2 6.3) RS RACK SYSTEM (pages 6.4 6.5) EXTENDED DEPTH RS RACK SYSTEM (page 6.5) Vertical Side Rail Capacity Cable Manager Covers Accessories 117mm x 152mm (4.6 in. x 6.0 in.)

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

IP-LINX Fiber :: X-XXXX

IP-LINX Fiber :: X-XXXX Fiber :: 055-797X-XXXX User Manual Telect, Inc. All rights reserved. 146653-A0 Table of Contents Chapter 1: Introduction...3 1.1 Tools Required...3 1.2 Additional Parts...3 1.3 Assemblies...3 Chapter 2:

More information

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the

More information

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays FIST-MB2-S I N S T A L L A T I O N I N S T R U C T I O N FIST Medium Box for Cable Splicing Only Contents 1 Introduction 1.1 Product description 2 General 2.1 Tools 2.2 Kit contents 3 Installation and

More information

University Center AV Integration Construction Documents February 8, 2012

University Center AV Integration Construction Documents February 8, 2012 SECTION 27 41 30 AUDIOVISUAL ARCHITECTURAL SPACES PART 1 GENERAL 1.01 SUMMARY A. This Section defines the Audiovisual System requirements for Audiovisual Systems within Architectural Spaces. 1.02 RELATED

More information

Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010)

Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010) Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010) I. Introduction This document presents the current Northwestern University

More information

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall 42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall NOTE: All of these documents are in PDF format located at www.steltronicusa.com To install the 42 LCD

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

SECTION MASTER TELEVISION ANTENNA SYSTEM (MTAS)

SECTION MASTER TELEVISION ANTENNA SYSTEM (MTAS) PART 1 GENERAL 1.1 SCOPE OF WORK SECTION 27 41 00 MASTER TELEVISION ANTENNA SYSTEM (MTAS) A. The extent of the master television antenna system (MTAS) work is hereby defined to include (but not by way

More information

Camden Technology Center. Smart Classroom Guide A/V Sympodium

Camden Technology Center. Smart Classroom Guide A/V Sympodium Camden Technology Center Smart Classroom Guide A/V Sympodium Camden County College Camden Technology Center Overview There are a variety of learning spaces in the Camden Technology Center: 1) Six PC application

More information

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING COAX CABLE U-WRC-C

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING COAX CABLE U-WRC-C Tel-Quip PH: 713-728-0625; FAX: 713-456-2512 www.telquip.com INSTALLATION INSTRUCTIONS 10-17-2013 WIRED REMOTE CONTROL USING COAX CABLE U-WRC-C Thank you for using the Tel-Quip Wired Remote Control. This

More information

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING TWISTED PAIR AND COAX CABLE U-WRC-U-x

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING TWISTED PAIR AND COAX CABLE U-WRC-U-x Tel-Quip PH: 713-728-0625; FAX: 713-456-2512 800-317-0847 (Toll Free) www.telquipstore.com INSTALLATION INSTRUCTIONS 10-17-2013 WIRED REMOTE CONTROL USING TWISTED PAIR AND COAX CABLE U-WRC-U-x Thank you

More information

Camera Control Unit 55D-BS VOLUME OPEN CABLE MIC OFF GND 2W CAMERA CABLE TALLY. Camera Adapter 55D-CA 9.39" 7.40" 5.2"

Camera Control Unit 55D-BS VOLUME OPEN CABLE MIC OFF GND 2W CAMERA CABLE TALLY. Camera Adapter 55D-CA 9.39 7.40 5.2 The Telemetrics Coax/Fiber Link is an affordable camera control system with increased operating distance. Using frequency multiplexing the following signals are transmitted over a single coaxial cable:

More information

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1

More information

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table FIST-GCO2-F INSTALLATION INSTRUCTION GCO2-FC GCO2-FD Content 1 Introduction 2 General 2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table 3 Installation

More information

ADRIAN PHILLIPS BALLROOM INFORMATION AND SPECS

ADRIAN PHILLIPS BALLROOM INFORMATION AND SPECS 1 ADRIAN PHILLIPS BALLROOM INFORMATION AND SPECS The Adrian Phillips Ballroom is located on the concourse level of Boardwalk Hall and can stretch upwards to 17,800 square feet of functional event space.

More information

Standards & Specifications

Standards & Specifications Standards & Specifications Danforth Campus Prepared on 05/06/2016 Contents Overview of Technology-Infrastructure Practices... 3 Technology: WashU IT Wired Network... 5 Technology: WashU IT Wireless Network

More information

HD A/V MATRIX SWITCHER HDMX-1104

HD A/V MATRIX SWITCHER HDMX-1104 HD A/V MATRIX SWITCHER Outline The Inter-M is a multi-format HD, High-definition, video switcher, an audio mixer, frame synchronizer, and digital effect that supports 1080i/720p and formats. The is a four

More information

The following products are used in these packages:

The following products are used in these packages: Equipment Information The Hardware Leviton means limitless possibilities with light. Our control systems are designed to unlock your vision and creativity, giving you the power to animate your lighting

More information

complete, versatile and cost effective

complete, versatile and cost effective Worship Lighting Solution Package complete, versatile and cost effective Presentation Lighting Package Guide 400-600 Seats 3 Dimming System 3 Lighting Control Console 3 Architectural Control Stations 3

More information

Medium Box for Cable Termination

Medium Box for Cable Termination FIST-MB2-T I N S T A L L A T I O N I N S T R U C T I O N Medium Box for Cable Termination Contents 1 Introduction 1.1 Product description. 2 General 2.1 Tools 2.2 Kit contents 3 Installation and pre assembling

More information

INSTALLATION INSTRUCTIONS MO023A

INSTALLATION INSTRUCTIONS MO023A INSTALLATION INSTRUCTIONS MO023A Nexans N3S ODF system NEXANS N3S ODF SYSTEM Content Product description Patching frame Splice frame Doors Splice module Patch module Protective cover and label panel Guides

More information

SkyVision Hybrid II Digital Integration System powered by

SkyVision Hybrid II Digital Integration System powered by SkyVision Hybrid II Digital Integration System powered by TEC-R-0008 REV5 7/12 Pre-Installation Manual SkyVision Installation Criteria Page 1 Introduction The SKYTRON SkyVision Hybrid II Digital Integration

More information

Site Installation Model MP-8433

Site Installation Model MP-8433 Site Installation Model MP- Rev. //0 SCOREBOARD SITE INSTALLATION INSTRUCTIONS CAUTION: All American Scoreboards (AAS) recommends the sign be installed by a licensed contractor, and must meet all local

More information

SECTION FIBER OPTIC STATION CABLES

SECTION FIBER OPTIC STATION CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP

PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX 75078 NOTICE TO BIDDERS RFP 03-2019-IFP Section I General Information Prosper ISD (PISD) is seeking proposals

More information

Projector Project Installation of Boards and Projectors

Projector Project Installation of Boards and Projectors Installing or Relocating SMART Board and Whiteboards Ultra Short Throw Projector (Non-Interactive) Ultra Short Throw Projector (Interactive) / Whiteboards Guiding Principles Installing or Relocating SMART

More information

Panel-Mounted Thermostat

Panel-Mounted Thermostat Data Sheet 602026 Page 1/7 Panel-Mounted Thermostat EM Series Special features Safety temperature monitor STW (STB) Safety temperature limiter STB Tested according to DIN EN 14597 and PED 2014/68/EU Brief

More information

Stage Manager s Guide

Stage Manager s Guide Stage Manager s Guide The Dimensions in Blue Jazz Ensemble from the U.S. Air Force Band of the West is looking forward to performing at your venue in the near future. In this Stage Manager s guide you

More information

The FiberMark1 offers an ideal solution for

The FiberMark1 offers an ideal solution for Large Capacity Fiber Optic Splice Enclosure The Ideal Solution For Large Capacity Voice, Data, and Video Splicing Requirements. The FiberMark1 offers an ideal solution for larger fiber capacity voice,

More information

Site Installation Model MP-8424

Site Installation Model MP-8424 Site Installation Model MP- Rev. //0 SCOREBOARD SITE INSTALLATION INSTRUCTIONS CAUTION: All American Scoreboards (AAS) recommends the sign be installed by a licensed contractor, and must meet all local

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

19" TiRAX cabinet system. from page 3. 19" NETcell cabinet system from page 31. Open 19" racks from page 43

19 TiRAX cabinet system. from page 3. 19 NETcell cabinet system from page 31. Open 19 racks from page 43 19" TiRAX cabinet system from page 3 19" NETcell cabinet system from page 31 Open 19" racks from page 43 all-mounting/stand-alone distribution systems from page 53 all-mounting enclosure systems from page

More information

Halsey 106. For assistance and additional equipment, contact Halsey Instructional Technology Services Halsey 259, extension 4979

Halsey 106. For assistance and additional equipment, contact Halsey Instructional Technology Services Halsey 259, extension 4979 The Illustrated manual for Halsey 106 Contents The master power switch...1 Screen...3 Turning on the projectors...4 Turning off the projectors...5 Microphones... 6 projectors... 9 Installed Computers...

More information

HighBand 25. TrueNet Category 6 Solutions

HighBand 25. TrueNet Category 6 Solutions HighBand 25 TrueNet Category 6 Solutions The highest performing cross-connect system in the world. A unique high-density solution with superior cable management. ADC KRONE s HighBand 25 cross connect solution

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

Gel-sealed in-line fiber optic closure

Gel-sealed in-line fiber optic closure SCIL-C Gel donut INSTALLATION INSTRUCTION TC-1363-1-IP Rev A, Oct 2017 www.commscope.com Gel-sealed in-line fiber optic closure Contents 1 General 2 Sizing and product kit information 3 Installation conditions

More information