ELECTRICAL SAFETY INSPECTION REPORT.

Size: px
Start display at page:

Download "ELECTRICAL SAFETY INSPECTION REPORT."

Transcription

1 ELECTRICAL SAFETY INSPECTION REPORT., Plot no: 72 & 82, DEPZ, Ganakbari, Savar, Dhaka, Bangladesh. Factory List: 1.Experience Clothing Company Ltd. Inspected on March 31, 2014

2 SUMMARY Experience Clothing Company Ltd., factory is established in a two five storeyed (G+4) building and 1 shed. The building reportedly,constructed in The factory began production in The building was approved for industrial purpose and the factory during survey, reported had about 3100 workers working on regular basis. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for approval. Page 2 of 7

3 FINDINGS AND RECOMMENDATIONS E- 1 Transformer room is congested. Maintain safe working space surrounding the existing power transformer. Barrier is very close the transformer. 6 Months E- 2 Transformer breather not installed. Transformer breather must be installed to prevent moisture ingression. Breather is damaged. E- 3 Cables terminating to transformer bushings are not supported. Cable riser supporting cables must be firmly fixed. Power cable connected to the LV side of transformer. Page 3 of 7

4 E- 4 SWITCH BOARD & PANELS Crowded inside panel (MCCB, MCB, Bus bars and Wires) Panel must not be crowded with devices and apparatus. Each panel must be installed with devices and apparatus to maintain safety clearances inside panel. Wires are crowded inside the common busbar panel. E- 5 SWITCH BOARD & PANELS Multiple cables terminating to MCCB in panel. Multiple cable connecting at a MCCB terminal must be disconnected. Existing multiple circuits may be distributed through bus bars. MCCB inside distribution panel. E- 6 SWITCH BOARD & PANELS Multiple cables connected at a terminal of the bus bar. Multiple cable terminating at a terminal in busbars must be separated. Bus bar inside the distribution board. Page 4 of 7

5 E- 7 SWITCH BOARD & PANELS Insufficient working area in front of panel (Operating area). Adequate working space must be provided in front of every panel for operators (operating platform). Panel installed on raised plinth must have platform constructed for operators. 3 Months MDB installed in the washing area very close to the machine operation area. E- 8 GENERATOR ROOM Cables terminating to generator output terminal box are laid on floor. Cable terminating at Generator output terminal box must be supported on riser and protected. Existing cables laid on floor may be installed in cable trench or on trays. Cables on the floor in generator room. E- 9 CABLE & CABLE SUPPORTS Power cables installed close to steam lines. Existing power cables installed along side the steam line must be covered to protect against external heat from the steam lines. Adequate clearance may be provided from the steam lines. Power cables and steam carrying pipe. 3 Months Page 5 of 7

6 E- 10 CABLE & CABLE SUPPORTS Cables in electrical shafts are not protected. Cables in electrical shaft must be securely clamped to the tray/ladder and must be protected. Power cable goes through one floor to another without protection. E- 11 GENERATOR ROOM Inadequate working space around the generators. Expand the existing generator room to provide safe working space. generator placed very close the wall. 6 Months E- 12 Transformer guarded with wire mesh fencing. Transformer may be separated from panels by constructing barrier walls. Substation transformer guarded with wire mesh fencing. 6 Months Page 6 of 7

7 E- 13 WIRINGS Cables terminating to distribution panels (switchboards) are not protected. Cables, terminating to panel, between floor and base of panel must be protected in rigid conduits with ample strength. Conduit must be securely fixed to the wall with saddle or clamps. Wiring through flexible PVC conduit. E- 14 CABLE & CABLE SUPPORTS Cables from electrical shaft exiting at various floors are not supported. Cables leaving supports (tray/ladder) in electrical shafts must be supported till the cables are terminated at the panel. From the LT panel cables are going to different floor. 3 Months E- 15 CABLE & CABLE SUPPORTS Cables partially supported in tray and raceways (cables are not placed inside tray in few sections). Cables supported in tray must be securely laid in the tray and fixed securely. Cables laid on cables tray below ceiling Page 7 of 7

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A & B OUTERWEAR LTD. Plot # 29-30, CEPZ, Chittagong, Bangladesh. Factory List: 1. Inspected by: Al-Amin Report Generated by: Al-Amin Inspected on March 7 th 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID Factory Name Address Factory ID Shirir Chala, Bagherbazar 11705 Electrical Safety dates Initial Date 09/07/2014 30/10/2016 Date of 5 th Follow Up Report Received Date 24/08/2014 02/01/2017 Date of 6 th

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM COURSE ORIGINATOR Cabling and Conduit K Norgate DATE 23rd August 2013 Amendment 1 5th October 2013 Technical changes - Issued Amendment 2 6th October

More information

Specification. NGTS Issue 1 October 1993

Specification. NGTS Issue 1 October 1993 The Electrical Standards for SHE Transmission s area are non-maintained versions of National Grid Technical Specifications that are applicable to the SHE Transmission System only. These specific versions

More information

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL) DOCUMENT NUMBER: PE-GL-999-507-E002, Rev. 00 ISSUE DATE: 15.05.14 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT NOIDA PREFACEE

More information

IECEx International Conference 2017 Shanghai, China. Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2

IECEx International Conference 2017 Shanghai, China. Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2 IECEx International Conference 2017 Shanghai, China Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2 10. Cable entry systems and blanking elements 10.2 Selection of cable

More information

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX 220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX JAMNAGAR 220KV CABLE NETWORK: 2 2. DESIGN 2A. NETWORK: 220 KV NETWORK DESIGN IS DESIGNED WITH 100% REDUNDANCY FROM 220 KV BUS TO LOAD. THIS IS ACHIEVED

More information

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018 DATE: 04/03/2018 TO: The Contractor FROM: System Protection & Control Projects 20413 SUBJECT: Technical Specifications for Center Park APSTF Project PROJECT OVERVIEW This is a general specification that

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING CONTENTS PAGE 1. GENERAL...Q-2 1.1. Introduction...Q-2 1.2. General Requirements...Q-2 1.3. Alarm Circuits...Q-3 1.4. Disconnecting Live Circuits From Service...Q-3

More information

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by: Cable Management in Solar PV Arrays: A Review of Requirements in the National Electrical Code and how CAB Cable Rings and Saddles Meet These Requirements Prepared for: Cambria County Association for the

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting

More information

User Manual. 360W LED Moving Zoom KEEP THIS MANUAL FOR FUTURE NEEDS. 36pcs10W 4 in 1 RGBW LEDs

User Manual. 360W LED Moving Zoom KEEP THIS MANUAL FOR FUTURE NEEDS. 36pcs10W 4 in 1 RGBW LEDs User Manual 360W LED Moving Zoom 36pcs10W 4 in 1 RGBW LEDs KEEP THIS MANUAL FOR FUTURE NEEDS 1. Dispacking Thank you for choosing our moving head. For your own safety, please read this manual before installing

More information

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E. www.wampfler.com Page 1 of 27 Index Page 1 Basics...4 2 Basic understanding of an IPT -system...5 3 General rules regarding metal parts in close proximity...6 3.1 Envelope free of ferromagnetic material...6

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Laying of cables and lines in electrical installations and data networks

Laying of cables and lines in electrical installations and data networks Technical bulletin Laying of cables and lines in electrical installations and data networks Date: 08/2006 This technical bulletin provides you with information on specific technical subjects. It is based

More information

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report Cover Sheet Document Number EVI-2005-0002 Document Date 7/7/2005 Document Title Customer -other- AEA Technologies Type Inspection Report Prepared by: Date: Reviewed by: Date: Approved by: Date: Evisive,

More information

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS SINAMICS G130 Operating Instructions 03/2013 SINAMICS s dv/dt filter plus Voltage Peak Limiter Safety information 1 General 2 SINAMICS SINAMICS G130 Operating Instructions Mechanical installation 3 Electrical

More information

Power and Control T YPE BY RAVI GANATR November/December IAEI NEWS

Power and Control T YPE BY RAVI GANATR November/December IAEI NEWS Power and Control 26 1999 November/December IAEI NEWS T YPE BY RAVI GANATR This article discusses how the requirements in both the installation code and the product standard are utilized to manufacture

More information

OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE MANUAL SERIAL NUMBER CUSTOMER: SALES REP.: CONTENTS Mixer Installation / Assembly / Dimension Drawings Safety... 1 Customer Service Contact... 1 Initial Inspection... 2 Installation...2

More information

Safety Codes Council Conference Banff C Panel Discussion

Safety Codes Council Conference Banff C Panel Discussion Safety Codes Council Conference Banff 2014 90 C Panel Discussion Tim Driscoll OBIEC Consulting Ltd. George Morlidge Fluor Canada Ltd. Scott Basinger Eaton Canada René Leduc Marex Canada Limited Perspectives

More information

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003.

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003. PEMRA Cable Television (Operations) Regulations, 2002. Pakistan Electronic Media Regulatory Authority (PEMRA) The Pakistan Electronic Media Regulatory Authority (PEMRA) is pleased to make the Standards

More information

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting

More information

Cable installation guidelines

Cable installation guidelines The Quality Connection Cable installation guidelines Business Unit Industrial Projects 2 Cable installation guidelines www.leoni-industrial-projects.com GENERAL Installation methods Many different methods

More information

ATT-TP Common Systems Cable and Wire Installation and Removal Requirements Cable Racks and Raceways

ATT-TP Common Systems Cable and Wire Installation and Removal Requirements Cable Racks and Raceways Common Systems Cable and Wire Installation and Removal Requirements Cable Racks and Raceways This practice provides the benchmark cable installation and removal requirements for AT&T Technical Equipment

More information

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS CERN INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 Edms 335813 TIS IS 48 Edited by: TIS/GS Publication Date: June 2001 Original: English FIRE PREVENTION FOR CABLES, CABLE

More information

Kwangil Electronic Introduction

Kwangil Electronic Introduction www.kicable.com Introduction Dear Valuable customs of Kwang IL Wire & Cable Co, Inc. First of all, I d like to appreciate all the supports and cooperations given to us, and we sincerely hope all of you

More information

Lighting Busway: Case Study Busway Vs Cable

Lighting Busway: Case Study Busway Vs Cable Lighting Busway: Case Study Busway Vs Cable Agenda Customer Profile Customer Expectation Existing Lighting system and Problem Schneider solution Calculation Cable Vs Busway Customer Benefit Key Success

More information

Automatic Test System AT-S + with STAR + Technology Features

Automatic Test System AT-S + with STAR + Technology Features AT-S + with STAR + Technology Features AT-S + offers all the known benefits of our STAR technology, now also for AC safety power sources. It is the perfect symbiosis of CEWA GUARD and STAR technology.

More information

Signalling Cable Equivalent Sizes

Signalling Cable Equivalent Sizes Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

ICS Digital Menu. Installation Guide Version 1.1

ICS Digital Menu. Installation Guide Version 1.1 ICS Digital Menu Installation Guide Version 1.1 Installation Overview This document was written to assist technicians and electricians in installing the ICS Digital Menu. A thorough understanding of electrical

More information

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards 1 Category 2: Meeting the Challenge of a Contractor: Kenny Electric Project Name: Comcast Denver Facility Upgrade No Commercial Breaks Comcast of Denver is the national hub for television and Internet

More information

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved. Tab 10 - The NESC and Underground Applications Restricted Siemens Industry, Inc. 2017 All rights reserved. siemens.com/poweracademy The National Electric Safety Code (NESC) The NESC provides guidelines

More information

RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN

RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN APPLICATION FORM MUST BE FULLY D TO PROCEED WITH THE RPL PROCESS. PLEASE ENSURE THE

More information

SQM40/41 Actuators for air and gas dampers

SQM40/41 Actuators for air and gas dampers SQM40/41 Actuators for air and gas dampers Description SQM40/41 actuators are used for the positioning of flow control valves, butterfly valves, dampers or any application requiring rotary motion. The

More information

Instruction Manual MODEL RSP SANITARY ELECTRONIC PRESSURE TRANSMITTER

Instruction Manual MODEL RSP SANITARY ELECTRONIC PRESSURE TRANSMITTER Instruction Manual Anderson Instrument Co. Inc. 156 Auriesville Road Fultonville, NY 12072 1-800-833-0081 Fax 518-922-8997 www.andinst.com Instrument Model Number Instrument Serial Number MODEL RSP SANITARY

More information

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1 Fiber Optic Splice Closure 1. Introduction 1.1 General SAMJIN s SJOF-BS604B protects fiber optic splicing point in various installation conditions such as aerial, manholes, ducts, wall and direct buried

More information

Preventing Fieldbus Physical Layer Problems

Preventing Fieldbus Physical Layer Problems Preventing Fieldbus Physical Layer Problems 1 Introduction Foundation Fieldbus is highly reliable when correctly installed and maintained. The key is in knowing what must be done to start with and to maintain

More information

ECS INSTALLATION OF SERVICE WAYS AND CABLES (SCHNEIDER ELECTRIC)

ECS INSTALLATION OF SERVICE WAYS AND CABLES (SCHNEIDER ELECTRIC) THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE ENGINEERING CONSTRUCTION STANDARD ECS 02-0037 INSTALLATION OF SERVICE WAYS AND CABLES (SCHNEIDER ELECTRIC) Network(s):

More information

4-PROJECTOR BAR WITH 3 X 9W LEDS AND 1 X 1W FLASH LED USER GUIDE

4-PROJECTOR BAR WITH 3 X 9W LEDS AND 1 X 1W FLASH LED USER GUIDE 4-PROJECTOR BAR WITH 3 X 9W LEDS AND 1 X 1W FLASH LED USER GUIDE 10482 - Version 1 / 04-2016 English LIVESET - LIVESET - 4-Projector bar with 3 x 9W LEDs and 1 x 1W Flash LED 1 - Safety information Important

More information

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

2179-CD Series Fiber Optic Splice Closure. Installation Instructions 2179-CD Series Fiber Optic Splice Closure Installation Instructions 1.0 Product Introduction The new 3M TM 2179-CD Series Fiber Optic Splice Closure can be used in buried, underground, aerial, and pedestal

More information

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX 2562089B REV. B 110 Printed in U.S.A. MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

More information

Electrical Installation Booklet Shipyard Standards

Electrical Installation Booklet Shipyard Standards Marine Institute of Memorial University of Newfoundland Electrical Installation Booklet Shipyard Standards Marine Engineering Systems Design Department Revision 0 List of Revisions Revision Description

More information

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the

More information

My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA.

My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA. My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA. Why Kohler Like any major purchase that I make I do a significant amount of research to ensure that I am getting a good value, high

More information

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time. DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.

More information

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC

More information

Metrotown Station and Exchange Upgrades

Metrotown Station and Exchange Upgrades Metrotown Station and Exchange Upgrades Welcome to the Metrotown Station and Exchange Upgrade Open House Purpose of the Open House: Inform neighbours, businesses and customers about: the conceptual design

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

Operating Instructions Dimmer for V Incandescent Lamps

Operating Instructions Dimmer for V Incandescent Lamps Operating Instructions Incandescent Lamps 1. Safety instructions Attention: Electrical equipment must be installed and fitted only by qualified electricians and in observance of the current accident prevention

More information

Preparing a home for TransACT fibre-to-the-premise (FTTP) services

Preparing a home for TransACT fibre-to-the-premise (FTTP) services Preparing a home for TransACT fibre-to-the-premise (FTTP) services A guide for builders, telecommunications cablers and home owners transact.com.au For more information call TransACT s FTTP Sales Manager,

More information

Errata NFPA 70. Proposed 2014 Edition

Errata NFPA 70. Proposed 2014 Edition Reference: 14-1 (Log #392) CC Action Errata NFPA 70 National Electrical Code (Report on Comments) Proposed 2014 Edition The National Electrical Code Technical Correlating Committee notes the following

More information

POLICY & APPLICATION GUIDE FOR 11kV POLYMERIC CABLES

POLICY & APPLICATION GUIDE FOR 11kV POLYMERIC CABLES 1. SCOPE This document provides information and guidance on the application of polymeric cables on the SPEN 11kV network. Throughout this document, references to 11kV shall by inference also relate to

More information

AGENDA. NEC Code-Making Panel 16. Report on Proposal Meeting. Jan. 9-14, Hilton Head, SC

AGENDA. NEC Code-Making Panel 16. Report on Proposal Meeting. Jan. 9-14, Hilton Head, SC National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NEC Code-Making Panel 16 Report on Proposal Meeting Jan. 9-14,

More information

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99 Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF7-8 6/99 June 999 MF7B Chore-Time Warranty Winch Adjustable Feed Level Tubes for ATF Chore-Time

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology Sample Test Project District / Zonal Skill Competitions Skill- Electrical Installation Category: Construction and Building Technology Version 1 Dec 2017 Skill- Electrical Installation 1 Table of Contents

More information

UNM IT/Telecommunications Guide Specification Labeling 11/07/

UNM IT/Telecommunications Guide Specification Labeling 11/07/ Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing

More information

2178-L/S Series Fiber Optic Splice Case with Gasket

2178-L/S Series Fiber Optic Splice Case with Gasket 2178-L/S Series Fiber Optic Splice Case with Gasket Instructions for: 2178-S Splice Case 2178-LS Splice Case 2178-LL Splice Case 2181-LS Cable Addition Kit May 1997 34-7041-9949-5-A 1 Table of Contents

More information

Lighting Information

Lighting Information Lighting Information PLEASE NOTE THAT THE ENTIRE INVENTORY MAY NOT BE AVAILABLE FOR YOUR PRODUCTION. PLEASE CONFIRM INVENTORY WITH THE TECHNICAL DIRECTOR AT LEAST 30 DAYS PRIOR TO YOUR EVENT. Welcome to

More information

African Development Bank Group

African Development Bank Group African Development Bank Group African Development Bank's Field Office in Abuja, Nigeria LOT 5A: VOL 3 - BILLS OF QUANTITIES: IT WORKS Prepared by Interstate Architects Ltd. In Conjunction with: IAA Associates

More information

Caution. Hanging the Screen:

Caution. Hanging the Screen: Installation Instructions for Laminar and Laminar XL Projection Screens Caution 1. Read Instructions through completely before proceeding; keep them for future reference. Follow these instructions carefully.

More information

Dragonfly Quad. User Manual V1.4. Order code: EQLED101

Dragonfly Quad. User Manual V1.4. Order code: EQLED101 Dragonfly Quad User Manual V1.4 Order code: EQLED101 Safety advice WARNING FOR YOUR OWN SAFETY, PLEASE READ THIS USER MANUAL CAREFULLY BEFORE YOUR INITIAL START-UP! Before your initial start-up, please

More information

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts. RFP: FQ13024/WJG CONTRACT NO. FQ13024 APPENDIX C STANDARD OPERATING PROCEDURES (SOP) SOP #33 REMOVAL AND RESTORATION OF THIRD RAIL POWER FOR WORK BY CONTRACTOR S FORCES MAINLINE, REVENUE SYSTEM PURPOSE

More information

Unlocking of building entrance door shall be possible by pressing the monitor's door-opener button.

Unlocking of building entrance door shall be possible by pressing the monitor's door-opener button. DIGITAL COLOR VIDEO INTERCOM SYSTEM The contractor shall supply, install, test and commission a modern Electronic Digital Color Video Entry Phone System of an approved manufacturer and design to facilitate

More information

ECS COMBINED CUT-OUT AND CT CHAMBER INSTALLATION

ECS COMBINED CUT-OUT AND CT CHAMBER INSTALLATION Document Number: ECS 13-0080 Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 13-0080 COMBINED CUT-OUT AND CT CHAMBER INSTALLATION EPN, LPN, SPN This standard details the procedure for installing

More information

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION L0 CALL -800--600 OPTEVA 88 LOBBY ATM FRONT LOAD WITH 0mm ( 6") CEN III AND CEN IV SAFE CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION. PLEASE SEE PLANNING AND

More information

Building + Mounting Learn Rooftop Basics

Building + Mounting Learn Rooftop Basics Building + Mounting Learn Rooftop Basics A Build-It-Ourselves Guide to Wireless Mesh Networks 1 Introduction This module provides helpful tips for installing wireless equipment on rooftops. It should be

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH 40mm ( 6") CEN III AND CEN IV SAFE L0 CALL -800--600 0 (6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS

More information

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ISS New Audio & Visual installations Design and Physical install guidelines v1.5 ISS New Audio & Visual installations Design and Physical install guidelines v1.5 David Neal 11/05/2018 Contents Background... 3 Installation Standards... 3 Display Screen and Projector positioning... 3

More information

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman

More information

Schedule of Rate for Electrical Items Name of work:- Supplying of electrical items for day to day electrical maintenance work.

Schedule of Rate for Electrical Items Name of work:- Supplying of electrical items for day to day electrical maintenance work. Page 1 of 15 Schedule of Rate for Electrical Items Name of work:- Supplying of electrical items for day to day electrical maintenance work. 1 1.5 sq mm multistrand single core PVC copper conductor cable.

More information

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time The following document contains questions submitted by Prospective Bidders and the

More information

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR Yvan L. Tits ELECTRABEL 8, Boulevard du Régent, B-1000 Brussels (Belgium) Tel: +32 2 518 62 66 - Fax: +32

More information

Vibratory Deck Sieves 15 in. (380 mm)

Vibratory Deck Sieves 15 in. (380 mm) Instruction Sheet P/N 1604433-01 Vibratory Deck Sieves 15 in. (380 mm) Introduction This instruction sheet covers the vibratory deck sieves listed in the following tables. 15-Inch Deck Sieves with 2.5

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH mm ( 2") CEN-L SAFE L00 CALL -800-999-600 22 (9 6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND

More information

EXISTING/DEMOLITION MECHANICAL PLAN DRAWING KEYED NOTES: 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM 88005 (575) 647-1554 FAX (575) 647-1563 rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED

More information

Section Communications Optical Fiber Backbone Cabling

Section Communications Optical Fiber Backbone Cabling Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related

More information

Technical Specifications

Technical Specifications INSTALLATION SHEET AND OPERATORS MANUAL General Description: The is a mixer/preamplifier that includes 6 channels that each include a microphone input at screw terminals and an aux input at an RCA jack.

More information

CLF Manuals CLF Colour Par CLF Colour 12 Par CLF Colour Par 12 Version 1.0 November 2012 Version 1.0 1

CLF Manuals CLF Colour Par CLF Colour 12 Par CLF Colour Par 12 Version 1.0 November 2012 Version 1.0 1 CLF Manuals CLF Colour Par 12 CLF Colour Par 12 Version 1.0 November 2012 1 1.BEFORE YOU BEGIN What is included Ø 1 x Fixture Ø 1 x Power cable with plug Ø 1 x User Manua Unpacking Instructions Immediately

More information

DMX LED light effect with 4 lenses

DMX LED light effect with 4 lenses DMX LED light effect with 4 lenses User manual 1 Safety precautions WARNING: This unit may cause serious injury to the eyes when used incorrectly. It is therefore strongly advised to read this user manual

More information

B2590/65SNZ. Crank-Up. Installation & Operation Instruction Manual NZ Iss 1

B2590/65SNZ. Crank-Up. Installation & Operation Instruction Manual NZ Iss 1 B2590/65SNZ Crank-Up Installation & Operation Instruction Manual 9111410NZ Iss 1 Useful Information Date of Purchase Retailer Installer Serial Number Contents Warranty P3 Safety Precautions P4 Introduction

More information

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED INSTALLATION INSTRUCTIONS FOR MODEL 2230LED www.sportablescoreboards.com 1 Table of Contents MODEL 2230LED... 3 8 X 4 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:...

More information

Draft for Public Comment

Draft for Public Comment Draft for Public Comment Form 36 Version 6.1 DPC: 03/302646 DC Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Date: 27 March 2003 Origin: National

More information

USER MANUAL Table of Contents

USER MANUAL Table of Contents USER MANUA Table of Contents Safety Information. 3 Specifications.. 4 Main Power Connection.. 5 DMX-512 Connection...... 5 DMX Profile... 7 Main Control Menu... 8 Rigging the Fixture.10 Cleaning & Maintenance...10

More information

4 Wiring Brochure Wiring and installation of specific control

4 Wiring Brochure Wiring and installation of specific control - Wiring Brochure tekmarnet 4 User Switch 480 W 480 09/09 1 Information Brochure Choose controls to match application 2 Application Brochure Design your mechanical applications 3 Rough In Wiring Rough-in

More information

City of Winter Springs, FL

City of Winter Springs, FL City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual

More information

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4 TITLE SPECIFICATION FOR DANGER AND DATE: NOVEMBER 2006 PAGE: 1 OF 13 TABLE OF CONTENTS Page FOREWORD... 3 INTRODUCTION... 4 1 SCOPE... 4 2 NORMATIVE S... 4 3 WARNING TAPE... 4 3.1 Material... 4 3.2 Size...

More information

VGAD-12 ORDERCODE

VGAD-12 ORDERCODE VGAD-12 ORDERCODE 101220 Congratulations! You have bought a great, innovative product from DMT. The DMT Media Spinner brings excitement to any venue. Whether you want simple plug-&-play action or a sophisticated

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information