1 ADDENDUM 02 DATE: 13 June 2017 CLIENT NAME: PNC Bank ISSUED BY: Christine Barber PROJECT NAME: Meadville Branch - Wealth Management Office ISSUED TO: Ryan Campbell, CBC Ryan Doyle, Perry Const. Mike Cole, Hudson Const. David Wendel, A. Johnson & Sons Co. BDP PROJECT NUMBER: COPY TO: Joe Dick, PNC Joyce Sutcliff, PNC Hung Le, PNC Rick Beer, PNC Carol Tenon, PNC Vernon Trumpe, PNC Rick Ortmeyer, BDP Jason Wieczorek, BDP CLIENT S NUMBER: N/A This Addendum shall modify, supplement, and amend the Bidding Documents for PNC Bank Meadville Branch - Wealth Management Office, Bid Set, dated June 8, 2017, as prepared by. Unless affected by this Addendum, the requirements of the original Bidding Documents, including all previous Addenda, shall govern. This Addendum is comprised of 4 items, and the following 2 attachments: Attachment 1: 2: Spec Section Premise Distribution System Drawing E FIRST FLOOR PLAN - POWER & SYSTEMS ITEM 1 ITEM 2 SPECIFICATION SECTION (REVISED PER OWNER REQUEST) A. Revised specification section as indicated to change data cabling from Cat 6A to Cat 5e. DRAWING E-300 (REVISED PER OWNER REQUEST) A. Deleted data cable run from conference room table to wall mounted TV monitor in Conference 107. B. Added one (1) RG6 cable to wall mounted TV monitor in Lobby 104.

2 Addendum 02 PNC Bank Meadville Wealth Management Office Renovation June 13, 2017 ITEM 3 C. Numbered Note 5 has been revised to read as follows: CAT 5e DATA CABLES TO CONFERENCE TABLE, REFER TO POWER & SYSTEMS DRAWINGS FOR NUMBER OF CABLES, COORDINATE CONNECTIONS WITH FURNITURE MANUFACTURER. D. Numbered Note 6 has been revised to read as follows: ONE (1) HDMI CABLE TO MEDIA BOX MOUNTED BEHIND CONFERENCE ROOM DISPLAY MONITOR. E. Numbered Note 7 has been revised to read as follows: RG6 COAX CABLE, COORDINATE EXACT ROUTING/TERMINATION POINT WITH RICK BEER OF PNC PRIOR TO ROUGH-IN. PNC APPROVED LOW VOLTAGE VENDORS LIST A. Newco Electric Company B. AEC Group C. Marsula Electric Inc D. Vendor contact information below: ITEM 4 ELECTRICAL DRAWINGS A. Question: On Drawing E-300 Numbered Note #5, states to reference power & systems drawings from quantity of 6A cables. Cannot locate quantity. B. Answer: All data cables shall be type Cat 5e, refer to Addendum #1 issued 06/09/2017. Adjacent to the data symbols on drawing E-300 in the following format X(D), where X shall be replaced by the number of cables per data outlet as indicated on 1/E-300. Also, refer to the TELE/DATA legend on drawing E-001. C. Question: Who is supplying the ASCO contactor as per E-700-8? D. Answer: The ASCO contactor indicated in detail 8/E-700 shall be provided by the Electrical Contractor. Page 2 of 3

3 Addendum 02 PNC Bank Meadville Wealth Management Office Renovation June 13, 2017 E. Question: Is there a new conduit & wire from Panel LP1 to Panel LP1A as per E-700-4? F. Answer: Panelboard LP1A is a new panelboard furnished and installed by the Electrical Contractor as part of this project. The 4#1 + 1#8 EGC shall be provided as part of this project and shall be routed from existing to remain panelboard LP1 to new panelboard LP1A in a new 2 ½ conduit as indicated in detail 7/E-700. The 60A/3P circuit breaker within existing panelboard LP1 at breaker positions 17,19,21 shall be removed and replace with a 100A/3P circuit breaker of type and rating to match the existing panelboard. END OF ADDENDUM Page 3 of 3

4 SECTION PREMISE DISTRIBUTION SYSTEM PART 1 - GENERAL 1.1 PURPOSE A. The intent of this document is to provide a standard specification that will be used for all Customer facilities requiring cabling installation. This document provides the minimum performance criteria for the components and sub-systems comprising a complete cable system that shall accommodate the requirements in excess of ten years. B. Product specifications, general design considerations, and installation guidelines are provided in this written document. If the bid documents are in conflict, the written specification shall take precedence. The successful vendor shall meet or exceed all requirements for the cable system described in this document. 1.2 SCOPE A. This section defines the cabling system and subsystem components to include cable, termination hardware, supporting hardware, miscellaneous equipment, and a complete telecommunications system that the contractor shall provide for. The contractor shall provide all equipment, hardware, etc. to provide a complete and operable system even if such systems are not mentioned in this specification. The contractor shall provide all equipment, hardware, etc. to provide a complete and operable system even if such systems are not mentioned in this specification. 1.3 SYSTEM REQUIREMENTS A. General: Coordinate the features of materials and equipment so they form an integrated system. Match components and interconnections for optimum future performance. B. Expansion Capability: Unless otherwise indicated, quantity of spare conductor pairs in cables, positions in patch panels, cross connects, terminal strips, and space in backbone cable trays and wireways shall be adequate to accommodate a 20 percent future increase in active workstations. C. The wiring for the data distribution system shall be Hubbell Premise Wiring, Berk-Tek LANMARK 10G2 CAT 6A 5e copper plenum cabling and the Berk-Tek GIGAlite Multi-mode plenum Fiber, terminated on SC connectors. FLEXTRAY (GSMetals) for telecommunication cable management system is the PNC standard for horizontal cable management. All cabling installations will follow Hubbell Premise Wiring and/or EIA/TIA TSB67 (Link Configuration Testing) & 607 Commercial Building Cabling Standards, using 568B pin configuration for Data, and Voice (USOC pin configuration for Analog Voice connections). PREMISE DISTRIBUTION SYSTEM of 11

5 1.4 APPLICABLE DOCUMENTS A. The cabling system described in this is derived in part from the recommendations made in industry standard documents. The list of documents below is incorporated by reference: 1. National Fire Protection Agency (NFPA) - 70, National Electrical Code (NEC) This Technical Specification and Associated Drawings. 3. ANSI/EIA/TIA-568-B.1 Commercial Building Telecommunications Cabling Standard August Including any additional Parts or addendums. 4. ANSI/EIA/TIA-569 Commercial Building Standard for Telecommunications Pathways and Spaces September ANSI/EIA/TIA-606 Administration Standard for the Telecommunications Infrastructure of Commercial Buildings - February, ANSI/TIA/EIA-607 Commercial Building Grounding and Bonding Requirements for Telecommunications - August, ANSI/TIA/EIA-758 Customer-Owned Outside Plant Telecommunications April Building Industries Consulting Services, International (BICSI) Telecommunications Distribution Methods Manual (TDMM) 11 th Edition. B. If a conflict exists between applicable documents, then the order in the list above shall dictate the order of precedence in resolving conflicts. This order of precedence shall be maintained unless a lesser order document has been adopted as code by a local, state or federal entity, and is therefore enforceable as law by a local, state, or federal inspection agency. C. If this document and any of the documents listed above are in conflict, then the more stringent requirement shall apply. All documents listed are believed to be the most current releases of the documents, the vendor is responsible to determine and adhere to the most recent release when developing the proposal for installation. 1.5 SUBMITTALS A. General: Submit each item in this Article: B. The Contractor shall submit with the bid form, proof of manufacturer's training certification. Training certification certificates shall be submitted for each employee which will be performing the data distribution system installation. In addition, the Contractor shall submit with the bid form, proof of manufacturer's training certification for each of the Alternate Bid manufacturers. C. Product Data for each component specified, including detailed manufacturer's specifications. Include data on features, ratings, and performance. Include dimensioned plan and elevation views of components. Show access and working-space requirements. Verify compliance with TIA/EIA 568-A-5. D. Samples of outlet connectors, jacks, jack assemblies, and faceplates for color selection and evaluation of technical features when requested by the Architect or Owner. PREMISE DISTRIBUTION SYSTEM of 11

6 E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Provide evidence of applicable registration or certification. F. Written field test and observation reports indicating and interpreting test results relative to compliance with performance requirements of the installed systems. Submit test results in accordance with testing specified under "Field Quality Control" which is specified within this Section. G. The Data Technicians shall be fully trained, qualified, and certified by the manufacturer on the installation and testing of the equipment to be installed. Evidence that the Technicians are a current certified installer of the manufacturer must be provided in writing prior to work commencing on the structured cabling project. H. The Contractor shall have experience in installing cabling systems as evidenced with a listing of at least 3 projects involving Category 6A 5e cabling which have been completed by the Contractor in the last 2 years. Names, addresses, and phone numbers of referenced projects shall be included. I. Maintenance data for products to include in the operation and maintenance manual specified. J. Final schedule of cables as specified herein. K. Evidence of listing of products specified to be listed in the "Quality Assurance" Article. L. Provide a diskette copy of final comprehensive schedules for the Project in the software and format selected by Owner. 1.6 QUALITY ASSURANCE A. Contractor Qualifications: The Contractor shall employ, on a full-time basis, a registered communications distribution designer (RCDD), certified by the Building Industry Consulting Service International (BICSI). B. Manufacturer Qualifications: Engage firms experienced in manufacturing components listed and labeled under TIA/EIA-568-A and who comply with these Specifications. C. Comply with NFPA 70, 2008 NEC. D. Listing and Labeling: Provide products specified in this Section that are listed and labeled. 1. The Terms "Listed" and "Labeled": As defined in the National Electrical Code, Article 100. E. Acceptable systems shall be covered by a two part certification program/warranty provided by the Contractor and the premise device manufacturer. Details are as follows: 1. Installation Warranty. The contractor shall warrant the cabling system against defects in workmanship for a period of one year from the date of system acceptance by the customer. The warranty shall cover all labor and materials necessary to correct a failed portion of the system and to demonstrate performance within the original installation specifications after repairs are accomplished. This warranty shall be provided at no additional cost to the Owner. PREMISE DISTRIBUTION SYSTEM of 11

7 2. Cabling System Warranty. The Contractor shall facilitate a 25 Year Performance Warranty between Manufacturer and the Owner. The performance warranty shall warrant properly installed 350 MHz horizontal copper cabling system. Copper links shall be warranted against the link performance minimum expected results defined in the TIA/EIA 568A-5. This Performance Warranty must be extended directly from the Premise Device Manufacturer to the Owner. This is to ensure that in the event that the Contractor should go out of business or change Premise Device Manufacturers that the Owner is covered for all product and labor to install such product for the 25 years duration. F. Work Coordination: Coordinate Work of this Section with Owner's local area network (LAN) equipment suppliers. Coordinate the service entrance arrangement with the local exchange carrier. 1. Meet jointly with representatives of the above organizations and Owner's representatives to exchange information and agree on details of equipment arrangements and installation interfaces. 2. Record agreements reached in meetings and distribute record to other participants. 3. Adjust the arrangements and locations of distribution frames, patch panels, and cross connects in equipment rooms and wiring closets to accommodate and optimize the arrangement and space requirements of the LAN equipment. 1.7 EXTRA MATERIALS A. Furnish extra materials described below that match products installed, are packaged with protective covering for storage, and are identified with labels clearly describing contents. 1. Cable: 300 feet of each size and type used for Project. Furnish on reels. 2. Jack Assemblies: 1 of each type for each 25 installed, but not less than 1. PART 2 - PRODUCTS 2.1 WIRING PATHWAY AND EQUIPMENT MOUNTING ELEMENTS A. Cable Trays: Comply with Section B. Raceways, Boxes, and Cabinets: Comply with Section C. Backboards: 3/4-inch (19-mm) interior grade, painted, fire-resistant-treated plywood. 2.2 TWISTED PAIR CABLES, CONNECTORS, AND TERMINAL EQUIPMENT A. Listed as Complying with Category 6A 5e of TIA/EIA-568-A-5 4-Pair 100 Ohm Cat 6A 5e Cabling.Provide evidence of listing for all products specified in this Article. Provide plenum rated Category 6A 5e cable. B. Conductors: Solid copper. PREMISE DISTRIBUTION SYSTEM of 11

8 C. Unshielded Twisted Pair (UTP) Cable: Comply with TIA/EIA-568-A-5 TSB 36. Multipair, No. 23 AWG, color-coded, thermoplastic-insulated conductors in a polyvinyl chloride (PVC) jacket. 1. UTP cable shall have a CMP jacket, a PVC internal individual jacket and be marked at regular intervals with the manufacturer's name, part number, Category rating, sequential footage, and UL listing. 2. UTP cable shall be constructed of four pairs of 23 AWG solid copper conductors twisted together at different lay lengths to limit cross-talk between pairs. 3. Individual pairs shall be color coded in accordance with ANSI TIA/EIA-568-A-5 requirements. 4. Cat 6A 5e, 4-pair, UTP shall have maximum nominal O.D. of.25 inches. 5. Cable shall be constructed in accordance with the applicable requirements of ANSI/ICEA S- AD Cable shall be able to withstand a minimum bend of 1.0 inch without damage or distortion to the copper conductors or degradation of cable performance. 7. Cable shall be able to withstand a maximum pulling tension of 25 lbf without distortion of the copper conductors or degradation of cable performance. 8. All UTP cable shall meet the minimum electrical requirements detailed in ANSI/TIA/EIA- 568-A-5 for Category 6A 5e cable.these parameters include but are not limited to: attenuation, NEXT, DC resistance, and characteristic impedance. 9. Horizontal cable shall be CAT 6A 5e 350 MHZ extended frequency cable for plenum applications. a. Provide Blue jacket plenum rated cables. D. UTP Cable Connecting Hardware: Comply with EIA/TIA-568-A-5, 4-Pair 100 Ohm Cat 6A 5e. Insulation displacement connector (IDC) 110 type, using modules designed for use with punchdown caps or tools. 1. IDC Terminal Block Modules: Integral with connector bodies, including plugs and jacks. 2. IDC Connecting Hardware: Consistent throughout Project. E. Cat 6A 5e Patch Panels: Shall be wired to T568B and shall be port panels. Comply with EIA/TIA-568-A Ohm Cat 6A 5e Cabling. Offering 45db NEXT and 42dB Power-Sum NEXT performance to ensure enhanced system performance. Connectors of the IDC type at each jack provide permanent termination of conductor pair groups of installed cables. 1. Number of Jacks per Field: 1 for each 4-pair UTP cable indicated, or 1 for each 4-pair conductor group of indicated cables, plus spares and spare positions adequate to satisfy specified expansion criteria. 2. Mounting: Backboard or rack as indicated. 3. Patch panels shall have 110 style connections for the copper cable termination. 4. Patch panels shall use printed circuit board technology to provide Cat 6A 5e terminations. 5. Faceplate shall be constructed in such a manner and strength that no deformation occurs during punch down. 6. Cat 6A 5e availability, wired T568B. 7. Port stenciling as well as icons for EIA/TIA 606 identification. 8. Provide one (1) Cat 6A 5e - 25 pair cable terminated on the 25 port patch panel using pine 4 & 5 and labeled analog extenders. Provide 12, RJ (silver) cords for cross connecting the voice lines. PREMISE DISTRIBUTION SYSTEM of 11

9 F. Jacks and Jack Assemblies for UTP Cable: Modular, Cat 6A 5e, color-coded, 8 position, 8 wire receptacle units with integral 110 IDC-type terminals. Color of jacks shall be Blue, Green, and White as directed by Owner. 1. Jacks must be universal A&B wiring Terminations must be angled/staggered 3. Jacks must have a layered PC Board 4. Jacks must be manufactured by an automated machine. 5. Contact pins must be made of beryllium copper. 6. "One Punch" termination tool must be used. G. UTP Patch Cords: 4-pair, Cat 6A 5e cables in lengths as required, terminated with an RJ-45 Cat 6A 5e plug at each end. UL listed cable assembly. UTP cables shall be Blue Augmented Cat 6A 5e for horizontal cable to work surface outlet jack from data rack, provide 10-0, Black Cat 6A 5e patch cable for work surface user end of link and (1) 7'-0", Yellow Cat 6A 5e patch cable for the rack end of the link. UTP cables shall be Green Cat 6A 5e for horizontal cables to Wireless Access Points (WAP) from data rack, provide (1) 3-0 and (1) 7-0, Green Cat 6A 5e patch cable for the rack end of the link. UTP cables shall be White Cat 6A 5e for horizontal cables to TV Monitor outlet jacks from data rack, provide 7-0, White Cat 6A 5e patch cable patch cable for the rack end of the link. H. Install Black Patch Cords for PC s and Phones. Install black patch cords from PC to Phone Connections and use Cisco provided patch cords to connect phones to work area outlets. For major network components the following patch cord colors will be used: 1. Black for T1 connection. Coordinate connection with PNC IT Department. 2. Orange for ISDN connection. Coordinate connection with PNC IT Department. 3. Yellow for Ethernet connection. 4. Red for crossover cables (as needed for switch to switch connections). 5. Light blue or black for console/rollover cable as needed. I. Workstation Outlets: Dual or Quad Jack in a single gang faceplate as indicated on the plans. 1. Faceplate: Icon-able 110 Faceplate with 2 Label Window. (Polymer) 2. Mounting: Flush, except as otherwise indicated. 3. Icons: Label colored icons for different classifications. 4. Duplex Faceplate shall be used. 5. Quad Faceplate shall be used. 6. Blank Insert for unused ports. 2.3 COPPER PROTECTION PANELS AND MODULES Any copper communications cables entering the building shall be first terminated to a protection module. Ground protection panels or modules as recommended by the manufacturer and as specified in the 2008 NEC. A. Protector panel shall be wall mounted with 710 connector input and 110 block output. PREMISE DISTRIBUTION SYSTEM of 11

10 B. Exceed UL 497 requirements. C. Protection modules shall be Asymmetrical protectors. D. External failsafe mechanism that permanently grounds the module under sustained high current conditions. E. Every copper telephone pair entering the building shall be protected in a protector panel. F. Coaxial cable, used for CATV, entering the building shall be protected. 2.4 IDENTIFICATION PRODUCTS A. Cable Labels: Self-adhesive vinyl or vinyl-cloth wraparound tape markers, machine printed with alphanumeric cable designations. Locate within 4" of each IDC. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine pathway elements to receive cable. Check raceways, cable trays, and other elements for compliance with space allocations, installation tolerances, hazards to cable installation, and other conditions affecting installation. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Wiring Method: Install wiring in raceway and cable tray except within consoles, desks, and counters. Conceal raceway and wiring except in unfinished spaces. B. Install components as indicated, according to manufacturers' written instructions. Use techniques, practices, and methods that are consistent with the Cat 6A 5e rating of the components and that assure Cat 6A 5e performance of completed signal paths, end-to-end. C. Install cable without damaging conductors or jacket. D. Do not bend cable in handling or installation to smaller radii than minimums recommended by manufacturers. E. Pull cables without exceeding cable manufacturer's recommended pulling tensions. 1. Pull cables simultaneously where more than one is being installed in the same raceway. 2. Use pulling compound or lubricant where necessary. Use compounds that will not damage conductor or insulation. 3. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage media or raceway. PREMISE DISTRIBUTION SYSTEM of 11

11 F. Install cable parallel and perpendicular to surfaces or exposed structural members, and follow surface contours where possible. G. Secure and support cable at intervals not exceeding 20 inches and not more than 6 inches from cabinets, boxes, fittings, outlets, racks, frames, and terminals. H. Wiring within Telecommunications Closets and Enclosures: Provide adequate length of conductors. Train the conductors to terminal points with 12" excess cable. Use lacing bars to restrain cables, to prevent straining connections, and to prevent bending cables to radii smaller than allowed. I. Separation of Wires: Comply with EIA/TIA-569 rules for separation of unshielded copper data system cables from potential EMI sources, including electrical power lines and equipment. J. Make terminations only at indicated outlets, terminals, and patch panels. K. No splicing of cables between terminations is permissible. L. The maximum horizontal distance to the farthest workstation shall be limited to 290 ft., as specified in the ANSI/EIA/TIA 568A standard document. Cable shall be provided on reels or boxes (reel in a box) to help eliminate kinks and twists. M. Provide cross-connects as required to connect the building horizontal cables to the telephone service cables. N. Cables shall be bundled with Velcro wraps and supported per manufacturer s recommendations. O. Install cables in E.M.T. above hard ceilings. Bush ends of E.M.T. 3.5 IDENTIFICATION A. Identify system components. Hand lettered labeling is not acceptable. Identification labeling shall be machine generated. B. The Contractor shall develop and submit for approval a labeling system for this cable installation. At a minimum, the labeling system shall clearly identify all components of the system: racks, cables, panels, and outlets. The labeling system shall designate the cables origin and destination and a unique identifier for the cable within the system. Label 2D locations first and then all 1D locations at the end/higher location numbers so that the Owner will have spare locations available at the end of the B patch panel for demarc circuit extensions. Racks and patch panels shall be labeled to identify the location within the cable system infrastructure. All labeling information shall be recorded on the as-built drawings and all test documents shall reflect the appropriate labeling scheme. C. System: Use a unique 3-syllable alphanumeric designation for each cable, and label the cable and the jacks, connectors, and terminals to which it connects with the same designation. Use logical and systematic designations related to the architectural arrangement of the facility. PREMISE DISTRIBUTION SYSTEM of 11

12 1. First syllable is to identify and locate the wiring closet or equipment room where the cable originates. 2. Second syllable is to identify and locate the cross-connect or patch panel field in which the cable terminates. 3. Third syllable is to designate the type of media (copper or fiber) and the position occupied by the cable pairs or fibers in the field. D. Workstation: Label cables within outlet boxes. F. Within Connector Fields, in Wiring Closets and Equipment Rooms: Label each connector and each discrete unit of cable-terminating and connecting hardware. Where similar jacks and plugs are used for both voice and data service, use a different color for jacks and plugs of each service. G. Cables, Generally: Label each cable within 4 inches of each termination and tap, where it is accessible in a cabinet or junction or outlet box, and elsewhere as indicated. H. Exposed Cables and Cables in Cable Trays and Wire Troughs: Label each cable at terminations and at intervals not exceeding 100 feet. I. Cable Schedule: Post at a prominent location in each telecommunications closet and equipment room. A floor plan listing incoming and outgoing cables and their designations, origins, and destinations. Protect with a rigid frame and clear plastic cover. Provide a diskette copy of final comprehensive schedules for the Project in the software and format selected by Owner. 3.6 FIRESTOP SYSTEMS A. All penetrations through fire rated building structures (walls and floors) shall be sealed with an appropriate firestop system. This requirement applies to through penetrations (complete penetration) and membrane penetrations (through one side of a hollow fire rated structure). Any penetrating items i.e., riser slots and sleeves, cables, conduit, cable tray, and raceways, etc. shall be properly firestopped. B. Firestop systems shall be UL Classified to ASTM E814 (UL 1479) and shall be approved by the Architect. C. All firestop systems shall be installed in accordance with the manufacturer's recommendations and shall be completely installed and available for inspection by the local inspection authorities prior to cable system acceptance. 3.7 FIELD QUALITY CONTROL A. Testing: Upon installation of cable and connectors, demonstrate product capability and compliance with requirements. Test each signal path for end-to-end performance. Remove temporary connections when tests have been satisfactorily completed. 1. Copper Cable Procedures: Inspect for physical damage and test each conductor signal path for continuity and shorts for 100% of pairs. Use time-domain reflectometer with strip chart recording capability and anomaly resolution to within 12 inches in runs up to 1000 feet in PREMISE DISTRIBUTION SYSTEM of 11

13 length. Test for faulty connectors, splices, and terminations. Link performance for UTP cables must meet minimum criteria of TIA/EIA-568-A-5 Additional Transmission Performance Specifications for 4-Pair 100 Ohm Cat 6A 5e Cabling. 2. Each cable shall be tested for continuity on all pairs and/or conductors. Twisted-pair data cables shall be tested for the all of the above requirements, plus tests that indicate installed cable performance. These data cables shall be bi-directional tested using a Level 3 cable analyzer. a. Each pair of each installed cable shall be tested using a "green light" test set that shows opens, shorts, polarity and pair-reversals. The test shall be recorded as pass/fail as indicated by the test set in accordance with the manufacturers recommended procedures, and referenced to the appropriate cable identification number and circuit or pair number. Any faults in the wiring shall be corrected and the cable re-tested prior to final acceptance. b. Each installed cable shall be tested for installed length using a TDR type device. The cables shall be tested from patch panel to workstation outlet. The cable length shall conform to the maximum distances set forth in the TIA/EIA-568-A-5 Standard. Cable lengths shall be recorded, referencing the cable identification number and circuit or pair number. For multipair cables, the longest pair length shall be recorded as the length for the cable. c. High speed unshielded twisted pair (UTP) data cable shall be performance verified using an automated test set. This test set shall be capable of testing for the continuity and length parameters defined above, and provide results for the following tests: 1) Near End Cross-Talk (NEXT) 2) Propagation Delay 3) Delay Skew 4) ELFEXT 5) PS ELFEXT 6) Attenuation 7) Attention to Cross-Talk Ration (ACR) 8) Return Loss 9) Length d. Test results shall be automatically evaluated by the equipment, using the most up-todate criteria from the TIA/EIA Standard TIA/EIA-568-A-5 Additional Transmission Performance Specifications for 4-Pair 100 Ohm Cat 6A 5e Cabling. The result shown as pass/fail. Test results shall be printed directly from the test unit or from a download file using an application from the test equipment manufacturer. The printed test results shall include all tests performed, the expected test result and the actual test result achieved. In addition provide an electronic copy, in a format as selected by the Owner. e. All category 6A 5e test must be completed with the Agilent Technology Wire Scope 350 copper test equipment. 3. Where concatenated links are installed to complete a circuit between devices, the Contractor shall test each link from end to end to ensure the performance of the system. After the link performance test has been successfully completed, each link shall be concatenated and tested. The test method shall be the same used for the test described above. The evaluation criteria PREMISE DISTRIBUTION SYSTEM of 11

14 shall be established between the Architect and the Contractor prior to the start of the test. In addition provide an electronic copy of the results, in a format as selected by the Owner. B. Correct non-compliant links, where possible, and retest to demonstrate compliance; otherwise, remove and replace entire links and retest. 3.8 CLEANING A. On completion of system installation, including outlet fittings and devices, inspect exposed finish. Remove burrs, dirt, and construction debris and repair damaged finish, including chips, scratches, and abrasions. 3.9 DEMONSTRATION A. Train Owner's maintenance personnel on procedures and schedules related to startup and shutdown, troubleshooting, servicing, and preventive maintenance. Train designated personnel in cable plant management operations, including changing signal pathways for different workstations, rerouting signals in failed cables, and extending wiring and establishing new workstation outlets. B. Conduct a minimum of one 4-hour day of training. Include both classroom training and hands-on experience. C. Training Aid: Use operation and maintenance manual material as an instructional aid. Provide copies of this material for use in the instruction. D. Schedule training with Owner with at least 7 days' advanced notice. Training to be scheduled at a time and location as selected by the Owner. END OF SECTION PREMISE DISTRIBUTION SYSTEM of 11

15 P LOW ROOF NUMBERED NOTES: 1 CONFERENCE TABLE PEDESTAL, COORDINATE EXACT LOCATION WITH FURNITURE MANUFACTURE. 2 1" CONDUIT BRANCH CIRCUIT SLEEVE STUBBED 6" ABOVE FINISHED FLOOR WITHIN CONFERENCE TABLE PEDESTAL, COORDINATE EXACT LOCATION WITH FURNITURE MANUFACTURE PRIOR TO ROUGH-IN. 3 2" CONDUIT LOW VOLTAGE CABLE SLEEVE STUBBED 6" ABOVE FINISHED FLOOR WITHIN CONFERENCE TABLE PEDESTAL, COORDINATE EXACT LOCATION WITH FURNITURE MANUFACTURE PRIOR TO ROUGH-IN. N M BASEMENT - XR LP1 LP1A 10 LP1A - 13 LP1A - 8 EF-1 M LP1A - 5,7,9 RTU A DOUBLE DUPLEX RECEPTACLE MOUNTED IN THOMAS & BETTS OUTLET BOX, MODEL NO.: 2G4D 1/2 3/4 AND COVER PLATE, THOMAS & BETTS MODEL NO.: 452-NEC. MOUNT OUTLET BOX SHALL TO INSIDE OF PEDESTAL. COORDINATE MOUNTING WITH FURNITURE MANUFACTURE PRIOR TO ROUGH-IN. 5 CAT 5e DATA CABLES TO CONFERENCE TABLE, REFER TO POWER & SYSTEMS DRAWINGS FOR NUMBER OF CABLES, COORDINATE CONNECTIONS WITH FURNITURE MANUFACTURER ONE (1) HDMI CABLE TO MEDIA BOX MOUNTED BEHIND CONFERENCE ROOM DISPLAY MONITOR. 1 STAIR - HIGH ROOF 7 RG6 COAX CABLE, COORDINATE EXACT ROUTING/TERMINATION POINT WITH RICK BEER OF PNC PRIOR TO ROUGH-IN. 8 PROVIDE 20A/1P CIRCUIT BREAKER OF TYPE AND AISC RATING TO MATCHING PANELBOARD. L 3 PARTIAL BASEMENT PLAN - ELECTRICAL E-300 1/8" = 1'-0" 2 PARTIAL ROOF PLAN - POWER E-300 1/8" = 1'-0" 9 REMOVE EXISTING 20A/1P CIRCUIT BREAKERS AT POSITIONS INDICATED, PROVIDE 50A/3P CIRCUIT BREAKER OF TYPE AND AISC RATING TO MATCH PANELBOARD. 10 ELECTRIC HEATER CONTACTOR, REFER TO DETAIL 8/E ROUTE BRANCH CIRCUIT WIRING VIA ELECTRIC HEATER CONROL CONTACTOR, REFER TO DETAIL 7/E-700. K 12 ELECTRIC BASEBOARD HEATER, FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. HALLWAY 100 LP1-38 RG6 +36" A.F.F. H +36" A.F.F. H 1(D) H +36" A.F.F. H H 1(D) +38" A.F.F. +36" A.F.F. J CLOSET 101 XR PANTRY 102 LP1A - 1 G H G +23" A.F.F. XR +36" A.F.F. 8 LP1-40 LP1A - 3 LOBBY LP1-8 FB1 FB1 OPEN OFFICE 105 FB1 LP LP LP OFFICE " A.F.F. 11 LP1A EBH-1 H LP1A - 2 XR OFFICE 111 OFFICE " A.F.F. CONFERENCE LP1A EBH-2 G LP1A " A.F.F. XR HAND LP1A DRYER, LP V STAIR - XR EWH-1 11 LP1A " A.F.F. G TOILET 103 WATER HEATER, 1.5kW, 120V OFFICE " A.F.F. +66" A.F.F. 8 8 LP1-32 LP " A.F.F. +66" A.F.F. OFFICE 109 LP LP1-41 STORAGE SEAL LP M F STORAGE - Bostwick Design Partnership Cleveland, OH I Erie, PA I Pittsburgh, PA I Miami, FL E D FIRST FLOOR - POWER & SYSTEMS E-300 1/4" = 1'-0" 1555 Coraopolis Heights Road, Suite 4200 Moon Township, PA P: CJL Project # PNC BANK C LOW ROOF ISSUED/ REVISED FOR DATE BID SET 06/08/2017 ADDENDUM #2 06/13/2017 AREA OF WORK B DRIVE THRU HIGH ROOF 6/13/ :42:53 AM A KEY PLAN Project North True North FIRST FLOOR PLAN - POWER & SYSTEMS SHEET NO. E

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors including patch panels. 3. Cabling identification

More information

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017 Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM-2017-2 Date: 05/26/2017 Additional specification information for data communication to cameras and between Library

More information

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,

More information

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1. PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25170 TESTING, IDENTIFICATION AND ADMINISTRATION 1. This section includes the minimum requirements for the testing, certification administration and identification

More information

DESIGN!!GUIDELINES!!!!!

DESIGN!!GUIDELINES!!!!! DESIGNGUIDELINES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 1. Testing General 1.1. For acceptance, 100% of the media

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 15 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

ADDENDUM NO. 2 This addendum consists of 8 pages. Kenai Peninsula Borough Purchasing & Contracting

ADDENDUM NO. 2 This addendum consists of 8 pages. Kenai Peninsula Borough Purchasing & Contracting KENAI PENINSULA BOROUGH Purchasing and Contracting 144 North Binkley Street Soldotna, Alaska 99669-7520 Toll-free within the Borough: 1-800-478-4441, Ext. 2260 PHONE: (907) 714-2260 FAX: (907) 714-2373

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 ITB 15-0012 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION

More information

STRUCTURED CABLE SYSTEM (SCS)

STRUCTURED CABLE SYSTEM (SCS) PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 27 15 00 COMMUNICATIONS HORIZONTAL CABLING PART 1 GENERAL 1.1 RELATED DOCUMENTS AND SECTIONS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective

More information

Telecommunication Infrastructure Project September 20, 2002

Telecommunication Infrastructure Project September 20, 2002 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing Publications and Standards B. Category rated UTP systems shall be provided and tested in accordance with the performance level established in Specification

More information

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards. 27 08 00 Certification and Commissioning of Communication Systems (Revision date: 7/3/12) 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents. They are

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 1.0 INTRODUCTION Customer to define background and introduction to the project based on

More information

SECTION TESTING OF COPPER CABLES

SECTION TESTING OF COPPER CABLES SECTION 27 08 13 TESTING OF COPPER CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:

More information

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008 Information & Communications Technology Group Standards June 2008 Appendix F UTP cabling Version 1.1 Appendix F UTP cabling 1. Introduction This Section details the required standards for Unshielded Twisted

More information

PREMIUM 5e F/UTP PRODUCTS

PREMIUM 5e F/UTP PRODUCTS Siemon s end-to-end cabling system is guaranteed to provide transmission performance margins in excess of industry standards for category 5e parameters, while featuring excellent EMI resistance. has been

More information

CABLING STANDARDS FOR

CABLING STANDARDS FOR RFB for Wiring in the Outagamie County Courtrooms Attachment B September 1, 2016 CABLING STANDARDS FOR GENERAL The purpose of this document is to provide guidelines for all structured cable installations

More information

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS VOFP Cabling RFP 1 Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For The Village of Franklin Park 2014 VOFP Cabling RFP 2 TABLE OF CONTENTS I. PROJECT DESCRIPTION

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 08 20 COPPER TESTING PART 1 - GENERAL 1.1 SUMMARY A. Test measurements shall be taken for all balanced-twisted pair cabling, including horizontal and backbone copper cables and wall-to-rack

More information

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project 1.1.0 GENERAL The purpose of this specification is to establish a requirement for the installation of a voice, video and data cable network. The cable (copper), wire, hardware, equipment racks, jumpers,

More information

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall obtain authorization from

More information

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION 7 -- CROSS-CONNECT SYSTEMS DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.

More information

SECTION CONTROL, COMMUNICATION AND SIGNAL WIRING

SECTION CONTROL, COMMUNICATION AND SIGNAL WIRING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 27 10 00 CONTROL, COMMUNICATION AND SIGNAL WIRING SPEC WRITER NOTES: 1. Edit this specification section between // //, to fit project, or delete if not applicable.

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components PART 1 - GENERAL 1.1 SECTION INCLUDES A. Broadband radio frequency active and passive components B. Broadband optical active and passive components C. Coaxial cable and connectors D. Support and termination

More information

A. All communications equipment rooms shall be installed in a neat and workmanlike manner.

A. All communications equipment rooms shall be installed in a neat and workmanlike manner. SECTION 27 11 00 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Description: Pair Color Code Chart: Pair Color Chart 1 Brown White Brown 2 Orange White Orange 3 Green White Green 4 Blue White Blue.

Description: Pair Color Code Chart: Pair Color Chart 1 Brown White Brown 2 Orange White Orange 3 Green White Green 4 Blue White Blue. Description: OZLINX CAT5e cable has a guaranteed performance; exceeds the Category 5e performance requirements and provides positive PSACR up to 155MHz for bandwidth requirement in the future. Product

More information

UNM IT/Telecommunications Guide Specification Labeling 11/07/

UNM IT/Telecommunications Guide Specification Labeling 11/07/ Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing

More information

A. The requirements of Section govern the work specified in this section.

A. The requirements of Section govern the work specified in this section. SECTION 27 05 10 - COMMUNITY ANTENNA TELEVISION CABLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The requirements of Section 27 01 00 govern the work specified in this section. B. Refer to the following

More information

STRUCTURED CABLING SYSTEMS (SCS)

STRUCTURED CABLING SYSTEMS (SCS) STRUCTURED CABLING SYSTEMS (SCS) ModSecur - Structured Cabling Systems (SCS) A Structured Cabling System (SCS) is the backbone of any building, campus or site communication infrastructure. The sharp growth

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Request for Proposal (RFP) Data Network for OCMS 017 Inquiries and requests regarding this RFP should be directed to: Michael Hale Technology Director Oconee County Schools PO Box 16 5-A School Street

More information

Technical Specifications Florida Gulf Coast University

Technical Specifications Florida Gulf Coast University Technical Specifications Florida Gulf Coast University 9/19/2018 Page 1 of 21 Approved Vendors (alphabetical order) Aztek (CIP) Certified Installer Plus Mr. Scott Coyne 4730 Enterprise Avenue Suite #308

More information

Multi-Media Installation Guide

Multi-Media Installation Guide Multi-Media Installation Guide Coaxial Page 2 Data Plug Page 7 Data Jack Page 10 Telephone Page 13 Splicing Page 15 Cable Types Cable Types Two basic types of cable are used in multimedia installations.

More information

What really changes with Category 6

What really changes with Category 6 1 What really changes with Category 6 Category 6, the standard recently completed by TIA/EIA, represents an important accomplishment for the telecommunications industry. Find out which are the actual differences

More information

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14 Table of contents About Nexans 3 About Berk-Tek 4 Hyper Plus 5e Cat 5e UTP 5 HyperPlus 5e Plenum 6 Hyper Plus 5e Riser 10 HyperPlus 5e Patch 14 HyperPlus 5e OSP 18 22 7/10/07 - http://www.berktek.com Page

More information

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices Berk-Tek recommends installing a well-designed structured cabling channel per the TIA standards. This includes up to 100

More information

CATEGORY 6A CABLING SOLUTIONS

CATEGORY 6A CABLING SOLUTIONS 10 Gigabit Ethernet is nowadays viable solution for destinations with very high data traffic concentration like data center, server farms, MAN s and backbones. Premium Line Category 6A Cabling Solutions

More information

Follow The Leader In Shielded Technology

Follow The Leader In Shielded Technology 1970s Vampire Tap 1990s Shielded Modular Jack 190s 4 Position Data Connector Follow The Leader In Shielded Technology The new AMP-TWIST Jack is our latest shielded product evolution. It can be terminated

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

Connect with the industry s best CAT6 and CAT5e channel solutions!

Connect with the industry s best CAT6 and CAT5e channel solutions! Connect with the industry s best CAT6 and CAT5e channel solutions! Our CAT6 and CAT5e channel solutions far exceed the TIA/EIA specifications performance standards! To ensure consistent and continuing

More information

CATEGORY 6A CABLING SOLUTIONS

CATEGORY 6A CABLING SOLUTIONS 10 Gigabit Ethernet is nowadays viable solution for destinations with very high data traffic concentration like data center, server farms, MAN s and backbones. Need of 10 Gigabit Service Application as

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel 1993 Specifications CSJ 0924-06-223 SPECIAL SPECIFICATION 1160 8:1 Video (De) Mux with Data Channel 1. Description. This Item shall govern for furnishing and installing an 8 channel digital multiplexed

More information

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING Revision 05/01/2017 Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING PART 1 GENERAL 1.1 SECTION INCLUDES A. Voice, Data, and Fiber Cable Product materials B. Voice, Data, and Fiber Cable Execution

More information

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper 3M Volition Network Solutions introduces Category 5e (Cat. 5e) copper cabling system to complement its leading fiber optic structured cabling system. Customers can now enjoy a single source of supply and

More information

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines. PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Support Structures 2. Cable trays and ladder rack 3. Racks (including wire managers) 4. Cables (copper and optical fiber) 5. Jacks and faceplates

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

B. Cross-Connect: A facility enabling the termination of cable elements and their interconnection or cross-connection.

B. Cross-Connect: A facility enabling the termination of cable elements and their interconnection or cross-connection. SECTION 271300 - COMMUNICATIONS BACKBONE CABLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11 Table of contents About Nexans 3 About Berk-Tek 4 LANmark-1000 Cat 6 UTP 5 LANmark-1000 Category 6 Plenum 6 LANmark-1000 Category 6 Riser 11 LANmark-1000 Category 6 Patch 16 21 7/10/07 - http://www.berktek.com

More information

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for:

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for: Bid and Build Structured Cabling Technical Specification for: Horizontal & Backbone Requirements Page 1 of 30 PUBLICATION RECORD Document Version Publication Date Primary Author Description Revision 1.0

More information

SECTION COMMUNICATIONS STRUCTURED CABLING

SECTION COMMUNICATIONS STRUCTURED CABLING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 27 15 00 COMMUNICATIONS STRUCTURED CABLING SPEC WRITER NOTES: 1. Edit this specification section between // //, to fit project, or delete if not applicable. 2.

More information

Primex Wireless, Inc. July, Wells Street Lake Geneva, WI

Primex Wireless, Inc. July, Wells Street Lake Geneva, WI Division 0 0 0 0 Primex Wireless, Inc. July, 00 Wells Street Lake Geneva, WI 00--0 www.primexwireless.com Product Guide Specification Specifier Note: This product specification is written according to

More information

Information Technology Services DESIGN AND INSTALLATION STANDARDS

Information Technology Services DESIGN AND INSTALLATION STANDARDS Requirements and Guidelines for: New Construction, Renovations, Upgrades, and Retrofits. Revised: June 5, 2015 VIU ITS Network Services 2 TABLE OF CONTENTS 0 GENERAL... 5 1 FIBER OPTIC CABLING... 5 1.1

More information

Compact Module. Category 6 FTP Cabling System

Compact Module. Category 6 FTP Cabling System Compact Module Shielded design for improved EMI performance Suitable for Gigabit Ethernet applications and beyond Ultra-slimline design Colour coded for quick and accurate termination Interchangeable with

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

Section Communications Optical Fiber Backbone Cabling

Section Communications Optical Fiber Backbone Cabling Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related

More information

GenSPEED Category 5e Cables 3

GenSPEED Category 5e Cables 3 Datacom GenSPEED Category 5e Cables 3 GenSPEED Category 5e cables are available in a wide variety of performance levels and constructions. With many options to pick from, you can select the GenSPEED Category

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

RCIT Cable Certification Testing Revised 10/2017

RCIT Cable Certification Testing Revised 10/2017 RCIT Testing Revised 10/2017 General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

SECTION FIBER OPTIC STATION CABLES

SECTION FIBER OPTIC STATION CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables NEMA Standards Publication WC 63.1-2005 Performance Standard for Twisted Pair Premise Voice and Data Communications Cables Published by: National Electrical Manufacturers Association 1300 North 17th Street,

More information

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables NEMA Standards Publication Performance Standard for Twisted Pair Premise Voice and Data Communications Cables Published by: National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752

More information

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project Family Health Centers, Inc. Request for Proposal for Family Health Centers East Broadway Data and Communications Cabling Project Date Issued: 06/07/2014 Date Due: 06/16/2014 Page 1 of 22 Table of Contents

More information

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of: a door card

More information

PATCH CORDS, PLUGS & CABLES

PATCH CORDS, PLUGS & CABLES PATCH CORDS, PLUGS & CABLES 3.1 SECTION CONTENTS Modular Cords...3.2 Cable Assemblies...3.3 Plugs & Connectors...3.4 Bundled Cable...3.5 Category 5e & 6 UTP Cable...3.6 Coax Cable...3.7 Fiber Optic Cable...3.8

More information

10G 6A UTP SYSTEM PRODUCTS 10G 6A UTP

10G 6A UTP SYSTEM PRODUCTS 10G 6A UTP 0G A is Siemon s advanced, end-to-end augmented category UTP structured cabling system, designed to meet or exceed all 0GBASE-T performance requirements, including alien crosstalk. Siemon s full channel

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION TELECOMMUNICATIONS SYSTEM INFRASTRUCTURE

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION TELECOMMUNICATIONS SYSTEM INFRASTRUCTURE PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. The intent of this standard is to describe the requirements of the telecommunications system infrastructure. Part of this system is the responsibility

More information

Structured Cabling Introduction & Installation Guide

Structured Cabling Introduction & Installation Guide Structured Cabling Introduction & Installation Guide Structured Cabling Overview General Structure - Cat5e/Cat6 Cabling The structure illustrated has the following key points: Face plates present outlet

More information

HighBand 25. TrueNet Category 6 Solutions

HighBand 25. TrueNet Category 6 Solutions HighBand 25 TrueNet Category 6 Solutions The highest performing cross-connect system in the world. A unique high-density solution with superior cable management. ADC KRONE s HighBand 25 cross connect solution

More information

SPECIAL SPECIFICATION 2344 TMC Support Equipment

SPECIAL SPECIFICATION 2344 TMC Support Equipment 2004 Specifications CSJ 0912-00-488 SPECIAL SPECIFICATION 2344 TMC Support Equipment 1. Description. Furnish Traffic Management Center (TMC) support equipment in the City of Missouri City TMC location

More information

CATEGORY 6 CABLING SOLUTIONS

CATEGORY 6 CABLING SOLUTIONS With over 20 years experience and know-how on communicating products design & developing, Premium Line has built maturity systems both in high tech develop and research center & complete structural quality

More information

Model Extend HDMI audio and video connections up to 300 feet. Add up to 8 additional receivers with a dedicated network switch

Model Extend HDMI audio and video connections up to 300 feet. Add up to 8 additional receivers with a dedicated network switch HDMI Extender over Single CAT 6 Cable with IR Control Model 103002 Extend HDMI audio and video connections up to 300 feet Utilize existing Cat 6 wiring for an easy installation Add up to 8 additional receivers

More information

IT/Telecommunications Technical and Wiring Standards. Phillips Exeter Academy

IT/Telecommunications Technical and Wiring Standards. Phillips Exeter Academy IT/Telecommunications Technical and Wiring Standards FOR Phillips Exeter Academy Exeter, NH No deviations will be permitted from these specifications without the express written consent of Phillips Exeter

More information

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents WESLEYAN U N I V E R S I T Y Facilities 170 Long Lane Middletown, Connecticut 06457 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #3 Date: March 4, 2013 Project: To: CFA A Rehearsal Hall AHU Replacement Annual

More information

IEEE 802.3af Power via MDI Standard Compliant Mid-Span Insertion Solution. Presented by PowerDsine: David Pincu -

IEEE 802.3af Power via MDI Standard Compliant Mid-Span Insertion Solution. Presented by PowerDsine: David Pincu - IEEE 802.3af Power via MDI Standard Compliant Mid-Span Insertion Solution Presented by PowerDsine: David Pincu - davidp@powerdsine.com Objectives! Investigate the Channel /Link options! Identify the requirements

More information

SPECIAL SPECIFICATION 6735 Video Optical Transceiver

SPECIAL SPECIFICATION 6735 Video Optical Transceiver 2004 Specifications CSJ 0924-06-244 SPECIAL SPECIFICATION 6735 Video Optical Transceiver 1. Description. This Item governs the furnishing and installation of Video optical transceiver (VOTR) in field location(s)

More information

Belden IBDN System 10GX 10GX Modules and 10GX Patch Panels

Belden IBDN System 10GX 10GX Modules and 10GX Patch Panels C O M M E R C I A L N E T W O R K I N G C O P P E R 5.6 Belden IBDN System GX GX Modules and GX Patch Panels AX2272 GX Module, Black GX Module The GX Module is a revolutionary punch down UTP connector

More information

City of Winter Springs, FL

City of Winter Springs, FL City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual

More information

CATEGORY 5e CABLING SOLUTIONS

CATEGORY 5e CABLING SOLUTIONS With the high speed data transmission requirement in LAN, 1998 IEEE ratified standard 802.3z defined protocol 1000BASE-T over Category 5e and higher level Ethernet cabling system. After that, with the

More information

SMART CLASSix 48 UTP Patch Panels (with patching switches) -

SMART CLASSix 48 UTP Patch Panels (with patching switches) - Features Front-mounted Patching Switches connect ports internally, dramatically reducing the need for patch cords Compatible to Unshielded Twisted Pairs (UTP) cabling systems High performance panel that

More information

Special Specification 6242 Special Fiber Optic Cable

Special Specification 6242 Special Fiber Optic Cable Special Specification 6242 Special Fiber Optic Cable 1. DESCRIPTION 2. MATERIALS The contractor to install, splice, field terminate, test and document all fiber systems. A. General Requirements. Provide

More information

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide materials, labor, and methods for telecommunications grounding and bonding system in accordance with

More information

SECTION STRUCTURED CABLING

SECTION STRUCTURED CABLING SECTION 27 10 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

SECTION COMMUNICATIONS CABLING. (Sub-Sub-Bid Required, Part of Sub-Bid Section ELECTRICAL)

SECTION COMMUNICATIONS CABLING. (Sub-Sub-Bid Required, Part of Sub-Bid Section ELECTRICAL) SECTION 270000 (Sub-Sub-Bid Required, Part of Sub-Bid Section 260001-ELECTRICAL) PART 1 - GENERAL... 3 1.01 GENERAL REQUIREMENTS... 3 1.02 RELATED DOCUMENTS... 3 1.03 SECTION INCLUDES... 4 1.04 RELATED

More information

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting

More information