2 Contents 1) Grid-Tie Installation Block Diagram ) Installation Steps ) Initial Setup ) Aurora Installer Software Installation ) USB Cable and Cable Driver ) Block Diagram for Initial Setup ) Initial Setup Main Steps ) Configuring the Grid Settings on Aurora Inverter ) Configuring the Alarm Trip Point (for the Turbine Brake/Dump Load) ) Entering the Cash Value for Energy Output Savings ) Complete System Installation ) Connecting Grid-Tie Junction Box to Aurora Inverter ) Grid Connections ) Aurora Communicator Software Installation Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 2
3 1) Grid-Tie Installation Block Diagram 2) Steps to follow: The installation of grid-tie system involves two steps: Initial Setup Complete Systems Installation 2.1) Initial Setup In order to use the Aurora inverter with the WindTronics wind turbine, the inverter has to be configured with correct settings. To do this, the following tools are required: DC power supply or power adapter capable of supplying 48 Volts DC and 0.5 Amps (i.e. part number GS25U48-P1J from Aurora Installer software (on CD that comes with Aurora inverter or downloadable from website) USB2.0 cable (not supplied with the Aurora inverter) typical for many current printers. The driver for this cable must be installed from the CD or downloaded from the website Configuration File, supplied by Windtronics. This is the WindTronics power curve and is not something you will be able to open up and read, but it is exactly what the Aurora requires Laptop computer with Windows XP operating system Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 3
4 2.1.1) Aurora Installer software installation Following is the link to download this software: Figure 1 Click on the link shown by red arrow in order to download the software. Go to next page... Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 4
5 2.1.2) USB2.0 Cable and Cable Driver You will need a USB2.0 cable as shown below to use with Aurora Installer Software. This cable is not supplied with the inverter. Figure 2 The driver of this cable can be found in the software CD supplied with the inverter. Open the contents of the CD supplied with the inverter and do the USB driver installation (search for a USB driver installation folder in the CD). Refer to the manual in the CD if needed ) Block Diagram for Initial Setup: Figure 3 Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 5
6 Once you have all the tools needed to do the Initial Setup, perform the following steps: 2.1.4) Initial Setup Main Steps: 1) First you need to power up the inverter by connecting the inverter to the DC power supply. Set the power supply to output Volts dc and connect the positive terminal of the power supply to the +IN DC INPUT of the Aurora inverter and negative terminal of DC power supply to -IN DC INPUT of Aurora inverter. Refer to the following picture: Aurora Inverter Figure 4 In the picture above, the white wire (with red tape on it), which is the positive terminal of the DC power supply, is connected to +IN and the black wire, which is the negative terminal of the DC power supply, is connected to the -IN terminal of the Aurora inverter. Warning: Before turning ON the power supply, make sure that the +IN is connected to power supply s positive and -IN to negative terminal of power supply. Reversing the polarity will damage the inverter. 2) Turn ON the DC power supply. You will see missing table on the inverter display. Now connect the USB cable supplied with the Aurora inverter to the USB port of your computer and other end to the Aurora inverter. Refer to Figure 2 for the USB cable and Figure 5 for USB port location on the inverter. Go to next page... Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 6
7 Figure 5 - Aurora Inverter USB port (Figure 5) 3) Once the inverter is ON and the USB2.0 cable is connected to your laptop, start the Aurora Installer Software on your computer. You will see following screen (note: it will say This is a debug version ): Select PLM under the Communication Type tab. In the COM port field select the drop down list and you will see only one port as an option. Select that and press OK. After that you will get following screen: Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 7
8 Click on the arrow shown by yellow circle. You will get another screen as shown below: Select Extended option. It will ask you for a password at this point. Enter in the password field and press enter. You will see the screen on the next page: Go to next page. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 8
9 The default tab you see may be the Monitor tab. Click on the Wind Configuration tab and you will see the screen above. As you can see, there are many tabs in this screen. Select Edit under the Mode tab. Click on the File option on the top left corner of this screen, and then select Open. If message appears File not saved ok to continue, select Yes. Browse to the location where the Configuration File (provided by WindTronics) is saved and open it. Go to next page. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 9
10 Once you have opened the WindTronics Configuration File you will see that new values have been loaded in the table. Now select On Line under the Mode tab and hit the Send button on the bottom right hand of the screen. After this, under the Status tab you will see Sending Table. Wait for a while until the table is sent successfully. Warning: Don t change any value on the screen manually. The "Configuration File" will load all the required values. Once the table is sent, you can close the Aurora Installer Software on your computer and then disconnect the USB2.0 cable. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 10
11 2.1.5) Configuring the Grid Setting on Aurora Inverter Close the Aurora Installer Software on your computer. On the Aurora inverter, hit the ESC key (on right side of inverter display). You will see Statistics, hit Up or Down key to scroll through the following menu: Go to Settings and it will ask you for a password. Hit Enter four times to enter 0000 as your password. You will see following screen: After entering the password, you can scroll through the following menu: Note: You may not see all the menu options listed above or you may have additional menu options. Scroll through the menu until you see Set Vgrid. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 11
12 Select Set Vgrid and hit Enter. Scroll through the menu and you will see following Options: In the picture above, the top line specifies the voltage option that can be set and the bottom line shows the value of the voltage that is currently selected. In the picture above, 208V single phase is selected as the Grid Voltage. For the PVI-3.0-OUTD-US-W model number, you will have three options for the grid voltage: 208V single phase (two hot wires), 277V single phase (one hot and one neutral wire) or 240V split phase. Select the one that is available at the installation site ) Configuring the Alarm trip point (for the Turbine Brake/Dump Load): On the Aurora inverter, hit the ESC key (on right side of inverter display). You will see Statistics, hit Up or Down key to scroll through the following menu: Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 12
13 Go to Settings, enter the password 0000 and then scroll through the menu until you see Alarm. Select Alarm and hit Enter. You will see following screen: Select Fault and hit Enter. Hit Esc twice to go back to the home screen. At this point you have successfully configured the Alarm Relay on the Aurora inverter to stop the WindTronics wind turbine in the event of fault ) Entering the Cash value for energy output savings: On the Aurora inverter, hit the ESC key (on right side of inverter display). You will see Statistics, hit Up or Down key to scroll through the following menu: Go to Settings, enter the password 0000 and then scroll through the menu until you see Cash. Select Cash and hit Enter. You will see following screen: You can set any name you want for your country s currency here. For an example you can set USD in the Name field for US dollars. Just hit Up or Down arrow key until you get the desired letter and then hit Enter to select that letter. Your cursor will automatically move to a new position. Then enter the selling rate of the electricity per kilowatt hour (kwh) charged in your area. When done, hit Esc key twice to get to the home screen. At this point Initial Setup is complete. 2.2) Complete System Installation Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 13
14 Requirements for the Complete System Installation are as follows: Initial set up of the Aurora inverter must be performed first. Make sure that you perform the initial setup with the Configuration File supplied by WindTronics. Wind Turbine Grid-Tie Junction Box Aurora Inverter AC Grid (either 208V 3-phase delta or 240V split phase or 277V 3-phase Y) Cables and Disconnects Following is an overview of the complete set up: Note: The wire gauge for power wires should be as follows: #10 for upto 150 feet (use #6 for ground) #8 for upto 200 feet (use #4 for ground) The wire gauge for communication cable should be #20. Follow local electric wire codes for AC wiring. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 14
15 2.2.1) Connecting Grid-Tie Junction Box to Aurora Inverter: The junction box will be pre-wired to the wind turbine. Connect the Turbine DC + terminal in the grid-tie junction box to +IN DC INPUT of the Aurora inverter and connect the Turbine DC - terminal in the grid-tie junction box to -IN DC INPUT of the Aurora inverter. The ground wire from the junction box must NOT be connected to the ground of the Aurora inverter. The turbine must be separately grounded following proper grounding procedures as per the local electrical code. Refer to the following picture: The wire gauge for above wire should be as follows: #10 for upto 150 feet (use #6 for ground) #8 for upto 200 feet (use #4 for ground) Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 15
16 For communication cable, connect the DP and + terminal (on the right-hand side of DP) to the Alarm NC and Alarm C terminal on the Aurora inverter. The wire gauge for these wires should be #20. At this point, the connections between the grid- tie junction box and the Aurora inverter are complete ) Grid Connections Next, grid connections must be completed. There are three possible grid configurations that can be connected to the Aurora inverter as shown: So, if we have 208V 3-phase delta configuration then the two hot wires L1 and L2 must be connected to terminal Grid 1 and Grid 2 of the Aurora inverter respectively. Likewise, above table must be referred for any other configuration. The installation of the Aurora Grid-Tie System is complete at this point. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 16
17 3) Aurora Communicator software installation This software is NOT required for the installation. It is monitoring software that is used to monitor the status of the wind inverter in real time, its power extraction, turbine voltage, grid voltage, faults and alarm etc. Some of the parameters are also displayed on the Aurora inverter display screen. Tools required for this software are following: RS485 to USB converter and its driver CAT5 cable Following is the link to download Aurora Communicator Software: Click on the link shown by red arrow in order to download the software. Select the 32-bit or 64-bit version to match your computer. If you do not know what you have, this can be found under the Start menu>control Panel>System of your computer Continue to next page.. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 17
18 Procedure to setup a USB to RS485 converter: You will need a USB to RS485 converter in order to connect your laptop to the Aurora inverter. The following is a picture of a sample USB to RS485 converter: When you flip this converter over, the other side will have terminals as shown in the picture below: You will need to use just three wires of a standard cat5 cable to connect this converter to the Aurora inverter. The blue wire connects to terminal 1 which is T- or D-. The white wire connects to terminal 2 which is T+ or D+. Finally the green wire connects to terminal 5 which is GND. Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 18
19 After this you must also install the USB to RS485 driver software on your laptop. You can find the driver on the CD supplied with the converter. Connecting USB to RS485 converter to Aurora Inverter On the Aurora inverter, you will see a terminal named RS485. It will have three terminals named +T/R, -T/R and RTN. Connect white wire of your USB to RS485 converter to +T/R terminal, blue wire to -T/R and green wire to RTN. Refer to the following picture: Aurora Inverter At this point, you are done with the tools and software required. You can now start your Aurora Communicator software and connect your laptop to the inverter using the USB to RS485 converter. Refer to the following link for the instructions on how to use the software: Aurora Grid-Tie Installation Instructions Rev4.1 29Apr11 19
20 AGTII Apr11
PQ-Box 100 Quick Start Instructions
PQ-Box 100 Quick Start Instructions These instructions are provided for the purpose on providing a quick start to PQ-Box 100 installation and operation. Please refer to the user handbook for full details.
More informationOWL micro+ WIRELESS ELECTRICITY MONITOR
COS T NOW TARIFF 3A SENDER 30 25 20 15 10 5 0 SETTING UP YOUR OWL Index of pages 2. Setting up date and time 3. Tariff setting 4. To set up a single tariff 5. To set up a two tiered time tariff 6. To set
More informationGetting started with
PART NO. CMA11 3 MADE IN CHINA 1. Measuring CAT II 2. Max. voltage 250V ~ 3. Max. current 71 Amp Getting started with Electricity consumption & Solar PV generation monitoring single phase, for homes fitted
More informationConfiguration Vestas VMP3500
Configuration Vestas VMP3500 1. Table of contents 1. Table of contents... 2 2. Introduction... 3 3. Vestas turbines (RCS)... 4 3.1. VMP 3500 controller... 4 3.2. Communication with the CT3230 current loop
More informationSolis Export Power Manager
Solis Export Power Manager Installation and Operation Manual Ningbo Ginlong Technologies Co., Ltd. No. 57 Jintong Road, Binhai Industrial Park, Xiangshan, Ningbo, Zhejiang, 3572, P.R.China Tel: +86 (0)574
More informationAPPLICATION NOTE # Monitoring DTMF Digits Transmitted by a Phone
APPLICATION NOTE # Product: 930A Communications Test Set 930i Communications Test Set Monitoring DTMF Digits Transmitted by a Phone Introduction This Application Note describes how to configure and connect
More informationGrid Interactive Advanced Features Self-Supply Mode
Grid Interactive Advanced Features Self-Supply Mode CHILICON POWER MICROINVERTERS AND CP-100 CORTEX GATEWAY SYSTEM OVERVIEW Chilicon Power Advanced Inverter functions Power Factor Control: -0.8 to +0.8
More informationREMOTE DISPLAY WIRELESS DECODER MK II
REMOTE DISPLAY WIRELESS DECODER MK II INSTALLATION MANUAL Part No. LED-DEC 1. Contents 1. Contents... 1 2. Equipment List... 2 3. Overview... 2 Introduction... 2 Location Selection **Important **... 2
More informationModbus for SKF IMx and Analyst
User manual Modbus for SKF IMx and SKF @ptitude Analyst Part No. 32342700-EN Revision A WARNING! - Read this manual before using this product. Failure to follow the instructions and safety precautions
More informationFunctional overview. System configuration FAQ
Vdc 206-13-40 100/110/115/12 110/125V D C MDE IN JPN RSM100 (Relay Setting and Monitoring System) The PC interface software RSM100 allows users to access Toshiba GR-series relays from a local or remote
More informationQuick Start. RSHS1000 Series Handheld Digital Oscilloscope
Quick Start RSHS1000 Series Handheld Digital Oscilloscope General Safety Summary Carefully read the following safety precautions to avoid personal injury and prevent damage to the instrument or any products
More informationIRIG-B PTP Clock Converter Output Module Hardware Installation Manual
IRIG-B PTP Clock Converter Output Module Hardware Installation Manual Kyland Technology Co., LTD. Publication Date: May 2012 Version: V1.2 Customer Service Hotline: (+8610) 88796676 FAX: (+8610) 88796678
More informationIntelligent Security and Fire Ltd
User Manual Product ranges covered by this manual Vi-P14 Vi-P14A Document Reference Date Firmware Vi-Q4C1 Viq601a.doc 26/11/2009 From Viq001a21 Videoswitch Telephone 01252-851510 Ocean House, Redfields
More informationUSER MANUAL FOR THE ANALOGIC GAUGE FIRMWARE VERSION 1.0
by USER MANUAL FOR THE ANALOGIC GAUGE FIRMWARE VERSION 1.0 www.aeroforcetech.com Made in the USA! WARNING Vehicle operator should focus primary attention to the road while using the Interceptor. The information
More informationInstallation Guide AT-HDR-EX-70-2PS
4K HDR HDMI Over TX/RX Kit The Atlona is an transmitter/receiver kit for high dynamic range (HDR) formats. The kit is HDCP 2.2 compliant and supports 4K/UHD video @ 60 Hz with 4:4:4 chroma sampling, as
More informationRF Solution for LED Display Screen
RF Solution for LED Display Screen Introduction RF is a kind of wireless telecommunication technology, now standard IEEE802.11B is much popular. Communication speed between server and terminal can reach
More informationForeword: The purpose of this document is to describe how to install and configure Neets 4 relay box
Foreword: The purpose of this document is to describe how to install and configure Neets 4 relay box COPYRIGHT All information contained in this manual is the intellectual property of and copyrighted material
More informationEdgeConnect Module Quick Start Guide ITERIS INNOVATION FOR BETTER MOBILITY
EdgeConnect Module Quick Start Guide ITERIS INNOVATION FOR BETTER MOBILITY 493456301 Rev B April 2009 Table of Contents Installation... 1 Setup... 2 Operation... 4 Live Video... 4 Video Settings... 5 Network
More informationWeschler AMT Software for the Enhanced Version Transformer Advantage
Weschler AMT Software for the Enhanced Version Transformer Advantage The Weschler AMT software is used to configure and monitor a Transformer Advantage from a PC. The AMT software also simplifies extraction
More informationCDP-0, CDP-G, CDP-DUO INSTRUCTION MANUAL (M B)
Dynamic power control -0, -G, -DUO INSTRUCTION MANUAL (M98250001-03-17B) 2 SAFETY PRECAUTIONS Follow the warnings described in this manual with the symbols shown below. DANGER Warns of a risk, which could
More informationPart names (continued) Remote control
Introduction Part names (continued) Remote control (1) STANDBY ( 25) (1) (2) ON ( 25) (3) (3) ID - 1 / 2 / 3 / 4 s ( 18) (4) (4) COMPUTER 1 ( 27) (7) (5) COMPUTER 2 * (8) (6) COMPUTER 3 * (10) (13) (7)
More informationMATE3 Owner s Manual Addendum
Purpose MATE3 Owner s Manual Addendum This document is an addendum to 900-0117-01-00, Revision C of the MATE3 System Display and Controller Owner s Manual. It provides descriptions of changes to the MATE3
More informationTroubleshooting. 1. Symptom: Status indicator (Red LED) on SSR is constant on. 2. Symptom: Output indicator (Yellow LED) on SSR is flashing.
Product Data Electrical Data SST (Transmitter) SSR (Receiver) Supply voltage 18 30 V dc Max. Voltage ripple 15 % (within supply range) Current consumption 100 ma (RMS) 75 ma Digital - 100 ma Max. outputs
More informationElectronic converter for level transmitters MT03L Instructions manual
Electronic converter for level transmitters MT03L Instructions manual R-MI-MT03L Rev.: 1 English version PREFACE Thank you for choosing the MT03L converter from MT03 series of Tecfluid S.A. This instruction
More informationTALOS ITR-T250. TALOS ITR-T250 Driver Setup Guide (V1.0) on the disk sent with the printer. Follow the steps (see the picture):
TALOS ITR-T250 Driver Setup Guide (V1.0) Run the on the disk sent with the printer. Follow the steps (see the picture): Then click Next (see the following picture). 1 Choose I accept the agreement, (see
More informationHigh Power Bundle for the Icom IC-7300
High Power Bundle for the Icom IC-7300 The Icom IC-7300can be connected to the KAT/KPA500 combo using the Key signal available on the rear panel of the rig. You would configure the appropriate TX port
More informationSECU-16. Specifications Power: Input Voltage 9-12V DC or AC Input Current Max 200mA. 8 2-wire inputs, Analog (0 5VDC) or Supervised
SECU-16 Introduction The SECU-16 module allows 8 inputs and 8 low-current relay outputs to be added to an ADICON control system. The inputs may be supervised (switch closure), analog, or 4-20mA. Specifications
More informationHS-509 VIBRATION TRIP MODULE
HS-509 VIBRATION TRIP MODULE 1. Overview The HS-509 is a configurable trip amplifier capable of accepting a 4-20mA signal from a HS-420 sensor and providing two trip action relay outputs along with an
More informationC Module Description
ASI Distribution Amplifier with Signal Inversion C Module Description The is an ASI distribution amplifier with up to 8 outputs in double width or 4 outputs in single width. The input is transformer coupled
More informationGetting started with
Getting started with Electricity consumption monitoring single phase for homes and some smaller light commercial premises OVERVIEW: The OWL Intuition-e electricity monitoring system comprises of three
More informationDIVERSITY DVB-T RECEIVER (DDR)
User s Manual The most important thing we build is trust. DIVERSITY DVB-T RECEIVER (DDR) Cobham Surveillance GMS Products 1916 Palomar Oaks Way Ste 100 Carlsbad, CA 92008 100-M0062X2 T: 760-496-0055 05/15/09
More informationJAMAR TRAX RD Detector Package Power Requirements Installation Setting Up The Unit
JAMAR TRAX RD The TRAX RD is an automatic traffic recorder designed and built by JAMAR Technologies, Inc. Since the unit is a Raw Data unit, it records a time stamp of every sensor hit that occurs during
More informationABB solar inverters. Product manual Aurora Manager LITE
ABB solar inverters Product manual Aurora Manager LITE IMPORTANT SAFETY INSTRUCTIONS Operators must read this manual and follow its instructions strictly, as ABB will not accept responsibility for damage
More informationESPN XDS Satellite Receiver Configuration Information
ESPN XDS Satellite Receiver Configuration Information To access the web-based scheduler for the ESPN XDS receivers, go to the following website: https://myxdsreceiver.espn.com/ Example #1 You will need
More informationBE3-GPR GENERATOR PROTECTIVE RELAY
BE3-GPR GENERATOR PROTECTIVE RELAY Behind-the-Panel Mounting Semi-flush Mounting Basler Electric s BE3-GPR generator protective relay offers multiple protective features in a single package. Its microprocessor-based
More information0.56" 4 Digital Blue LED Panel Meter (rescalable) User s Guide
0.56" 4 Digital Blue LED Panel Meter (rescalable) User s Guide 2004-2009 Sure Electronics Inc. ME-SP037B_Ver1.0 0.56" 4 DIGITAL BLUE LED PANEL METER (RESCALABLE) USER S GUIDE Table of Contents Chapter
More informationDM1624, DM1612, DM812
Installation Guide Hardware and Software DM Series Digital Processors models DM1624, DM1612, DM812 LECTROSONICS, INC. 1 Installation Specific Information Only This guide covers only installation related
More informationUnderstanding VFD. Variable Frequency Drive. nfi. nfi
Understanding VFD Variable Frequency Drive Practical Demonstration of VFD Delta- M Series 1.5 KW I/P: 230V 1/3 Phase O/P: 230 3 Phase VFD Status Screen Motor OFF Command Freq. Parameters Direction Amperes
More informationData Acquisition Using LabVIEW
Experiment-0 Data Acquisition Using LabVIEW Introduction The objectives of this experiment are to become acquainted with using computer-conrolled instrumentation for data acquisition. LabVIEW, a program
More informationUSER'S MANUAL. Getting started with ALEXAN ATMEL AT89C2051/AT89C4051 Training Module - 1
USER'S MANUAL Getting started with ALEXAN ATMEL AT89C05/AT89C405 Training Module - Version.0 Copyright 006 Ace Electronic Technology Inc. All Rights Reserved Alexan 05/405 TM- v..0 Page of 7 About This
More informationOperation Guide Version 1.0, December 2015
Operation Guide Version 1.0, December 2015 Document Revision History Revision Date Description v1.0 January 8, 2016 Initial release of COLR Operation Manual, based on firmware version 1.0.1 CONTENTS Contents...
More informationVorne Industries. 87/719 Analog Input Module User's Manual Industrial Drive Itasca, IL (630) Telefax (630)
Vorne Industries 87/719 Analog Input Module User's Manual 1445 Industrial Drive Itasca, IL 60143-1849 (630) 875-3600 Telefax (630) 875-3609 . 3 Chapter 1 Introduction... 1.1 Accessing Wiring Connections
More informationME EN 363 ELEMENTARY INSTRUMENTATION Lab: Basic Lab Instruments and Data Acquisition
ME EN 363 ELEMENTARY INSTRUMENTATION Lab: Basic Lab Instruments and Data Acquisition INTRODUCTION Many sensors produce continuous voltage signals. In this lab, you will learn about some common methods
More informationDX-10 tm Digital Interface User s Guide
DX-10 tm Digital Interface User s Guide GPIO Communications Revision B Copyright Component Engineering, All Rights Reserved Table of Contents Foreword... 2 Introduction... 3 What s in the Box... 3 What
More informationRemote Control/Cloud DVR Guide. Special Instructions INPUT:
Special Instructions Remote Control/Cloud DVR Guide INPUT: Programming your remote: Turn TV on Press TV Button Press & hold the Setup button until TV button flashes 3 times (1 flash & 2 quick flashes)
More informationDragon. manual version 1.6
Dragon manual version 1.6 Contents DRAGON TOP PANEL... 2 DRAGON STARTUP... 2 DRAGON STARTUP SCREEN... 2 DRAGON INFO SCREEN... 3 DRAGON MAIN SCREEN... 3 TURNING ON A TRANSMITTER... 4 CHANGING MAIN SCREEN
More informationDXI SAC Software: Configuring a CCTV Switcher. Table of Contents
APPLICATION NOTE MicroComm DXI DXI SAC Software: Configuring a CCTV Switcher Table of Contents 1. Intent & Scope... 2 2. Introduction... 2 3. Options and Parameters... 2 3.1 When to switch the CCTV...2
More informationCOPYRIGHT NOVEMBER-1998
Application Notes: Interfacing AG-132 GPS with G-858 Magnetometer 25430-AM Rev.A Operation Manual COPYRIGHT NOVEMBER-1998 GEOMETRICS, INC. 2190 Fortune Drive, San Jose, Ca 95131 USA Phone: (408) 954-0522
More informationPOINTS POSITION INDICATOR PPI4
POINTS POSITION INDICATOR PPI4 Monitors the brief positive operating voltage across points motors when they are switched Lights a corresponding led on a control panel to show the last operation of each
More informationCommissioning Guide. firepickdelta. Commissioning Guide. Written By: Neil Jansen firepickdelta.dozuki.com Page 1 of 22
firepickdelta Commissioning Guide Written By: Neil Jansen 2017 firepickdelta.dozuki.com Page 1 of 22 Step 1 Pre-Requisites Before commissioning, please make sure ALL of the following steps have been completed,
More informationWelch Allyn CardioPerfect Workstation Tango+ Interface Notes
Welch Allyn CardioPerfect Workstation Tango+ Interface Notes To setup Tango+ with the CardioPerfect stress system, simply follow the directions below. 1. Verify Correct RS-232 and ECG Trigger Cables RS-232
More informationConfiguring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display.
Configuring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display. Your Stack ST8961 VS module allows you to synchronize, overlay, and record data available on your Stack
More informationInterface sheet - Korr Cardio Coach Monitor - CPET Ergometer
Interface sheet - Korr Cardio Coach Monitor - CPET Ergometer Service documentation Lode BV Zernikepark 16 NL 9747 AN Groningen The Netherlands t: +31 50 571 28 11 f: +31 50 571 67 46 @: ask@lode.nl www.lode.nl
More informationC Module Description
IQMMX -Input Router & ASI Distribution Amplifier C Module Description The IQMMX is an ASI to 1 switch, distribution amplifier and transport stream switcher with up to 8 outputs in double width form or
More informationOperating Manual RISH OPTIMA VAF
Operating Manual RISH OPTIMA VAF 2-60-006-00-00511_Rev. A - 5/2014 Section DIGITAL MULTIFUNCTION INSTRUMENT Programmable Multi-function Digital Panel Meter Installation & Operating Instructions Contents
More informationUser Manual for ICP DAS WISE Monitoring IoT Kit -Microsoft Azure IoT Starter Kit-
User Manual for ICP DAS WISE Monitoring IoT Kit -Microsoft Azure IoT Starter Kit- [Version 1.0.2] Warning ICP DAS Inc., LTD. assumes no liability for damages consequent to the use of this product. ICP
More informationOperation Guide Version 2.0, December 2016
Operation Guide Version 2.0, December 2016 Document Revision History Revision Date Description v1.0 January 8, 2016 Initial release of COLR Operation Manual, based on firmware version 1.0.1 CONTENTS Contents...
More informationmulti-function meters
multi-function meters eclipse 2 eclipse 7 installation and operating manual 1 GENERAL DESCRIPTION 2 INSTALLATION 3 WIRING INFORMATION 4 2 ECLIPSE 2 METERS 2.1 PROGRAMMING THE METER 5 2.2 INFORMATION 6
More informationGuide For Setting Up Your Fortec Lifetime Ultra Receiver
Guide For Setting Up Your Fortec Lifetime Ultra Receiver Setting up your receiver can be tricky. This document will assist in the process of getting you up and running with minimal effort. Back of the
More informationUSER MANUAL FOR THE ANALOGIC GAUGE FIRMWARE VERSION 1.1
by USER MANUAL FOR THE ANALOGIC GAUGE FIRMWARE VERSION 1.1 www.aeroforcetech.com Made in the USA! WARNING Vehicle operator should focus primary attention to the road while using the Interceptor. The information
More informationSafety Information. Camera System. If you back up while looking only at the monitor, you may cause damage or injury. Always back up slowly.
Table of Contents Introduction...3 Safety Information...4-6 Before Beginning Installation...7 Installation Guide...8 Wiring Camera & Monitor...9-10 Replacement Installation Diagram...11 Clip-On Installation
More informationENGR 1000, Introduction to Engineering Design
ENGR 1000, Introduction to Engineering Design Unit 2: Data Acquisition and Control Technology Lesson 2.4: Programming Digital Ports Hardware: 12 VDC power supply Several lengths of wire NI-USB 6008 Device
More informationPLASMA MONITOR (PT20 UVVis) USER GUIDE
Thin Film Measurement solution Software, sensors, custom development and integration PLASMA MONITOR (PT20 UVVis) USER GUIDE August 2012 Plasma monitor with VFT probe. INTRODUCTION Plasma Monitor includes
More informationSky HD+ / Sky Q Module
Sky HD+ / Sky Q Module Installation and Usage Guide Revision: Date: Author(s): 20171106 Saturday, November 11, 2017 Richard Mullins Page 1 Contents Overview 2 Changelog 2 Installation 3 1. Import the TCM
More informationDVR-431 USB Wireless Receiver User Manual
DVR-431 USB Wireless Receiver User Manual Thank you for using our wireless USB receiver, please read the following content carefully before using, it will help you make better use of this product. Introduction
More informationDigital Terrestrial Alignment & Installation Meter
Digital Terrestrial Alignment & Installation Meter Instruction Booklet Version 3 - February 2005 www.horizonhge.com Thank you for choosing our latest and most innovative terrestrial meter. It has been
More informationSeries Digital Dimmer. User Manual (VER: 2.0) Net.DO LIGHTING CONTROL EQUIPMENT CO.,LTD
DK Series Digital Dimmer User Manual (VER: 2.0) Net.DO LIGHTING CONTROL EQUIPMENT CO.,LTD 1. Function 1.1 Function Welcome to use the DK series dimmer. DK series with a console that generates DMX-512/1990
More informationTriLIN Program Utility TPU_ TriLIN Programming Manual
Program Utility TPU_2.8.2 TriLIN Programming Manual 1. Programming the electronics a. Tool necessary Power supply 12-32 V DC Computer with appropriate USB port and a Windows Operating System (We recommend
More informationFeatures/Specifications
Introduction Thank you for purchasing the DD Audio DSI-1(Digital Signal Integrator). The DSI-1 is a feature rich audio signal processor that will allow you to precisely tune the acoustics of your car audio
More informationSPACESCAN SERIES SS 02
Description 0-10 metre sensing range 12 to 384 channels Available with channel spacing of 5, 10 or 20 mm Active length of 225 mm to 1920 mm Housing length of 300 mm to 1980 mm Plug connection 18-30 V dc
More informationLogic Controls LV3000 VGA Connected Virtual Pole Display
One Blue Hill Plaza, 16 th Floor, PO Box 1546 Pearl River, NY 10965 1-800-PC-AMERICA, 1-800-722-6374 (Voice) 845-920-0800 (Fax) 845-920-0880 Logic Controls LV3000 VGA Connected Virtual Pole Display This
More informationSX Series with TRC6 Remote Control User Guide
SX Series with TRC6 Remote Control User Guide Rev 11May2017 Page 1 of 19 OVERVIEW.... 3 BASIC NAVIGATION.... 4 GENERAL USE.... 5 Setup... 5 Microphone.... 6 Volume.... 6 Site to Site Calls.... 7 Connecting
More informationProcedures to Characterize Maury s Automatic Tuner Using ATS Software Version 5.1 or above
Procedures to Characterize Maury s Automatic Tuner Using ATS Software Version 5.1 or above Things to check before tuner characterization Make sure tuner is power up and USB cable is connected to the computer
More informationCI-218 / CI-303 / CI430
CI-218 / CI-303 / CI430 Network Camera User Manual English AREC Inc. All Rights Reserved 2017. l www.arec.com All information contained in this document is Proprietary Table of Contents 1. Overview 1.1
More informationActivity P32: Variation of Light Intensity (Light Sensor)
Activity P32: Variation of Light Intensity (Light Sensor) Concept DataStudio ScienceWorkshop (Mac) ScienceWorkshop (Win) Illuminance P32 Vary Light.DS P54 Light Bulb Intensity P54_BULB.SWS Equipment Needed
More informationDefining and Labeling Circuits and Electrical Phasing in PLS-CADD
610 N. Whitney Way, Suite 160 Madison, WI 53705 Phone: 608.238.2171 Fax: 608.238.9241 Email:info@powline.com URL: http://www.powline.com Defining and Labeling Circuits and Electrical Phasing in PLS-CADD
More informationMore Skills 14 Watch TV in Windows Media Center
M05_TOWN5764_01_SE_SM5.QXD 11/24/10 1:08 PM Page 1 Chapter 5 Windows 7 More Skills 14 Watch TV in Windows Media Center You can watch and record broadcast TV in Windows Media Center. To watch and record
More informationScan Converter Quick Installation Guide
Scan Converter Quick Installation Guide Software Note: No software is required to use your scan converter. Please complete the hardware installation and system setup before you determine the need to the
More informationRD RACK MOUNT DIMMER OWNERS MANUAL VERSION /09/2011
RD - 122 RACK MOUNT DIMMER OWNERS MANUAL VERSION 1.3 03/09/2011 Page 2 of 14 TABLE OF CONTENTS UNIT DESCRIPTION AND FUNCTIONS 3 POWER REQUIREMENTS 3 INSTALLATION 3 PLACEMENT 3 POWER CONNECTIONS 3 OUTPUT
More informationBooya16 SDR Datasheet
Booya16 SDR Radio Receiver Description The Booya16 SDR radio receiver samples RF signals at 16MHz with 14 bits and streams the sampled signal into PC memory continuously in real time. The Booya software
More informationConfiguration Nordex CC
Configuration Nordex CC Table of contents 1. Introduction... 3 2. Nordex CC Controller... 4 3. Mitsubishi A1SJ71QC24 communication module... 5 4. Mitsubishi A1SJ71UC24-R4-S2 communication module... 6 5.
More informationConfiguring Satellite RFSD-2XA For RF Signal Monitoring
Configuring Satellite RFSD-2XA For RF Signal Monitoring 1. Set your Options a. From Monitoring Menu screen, select Monitor Setup and press Enter. b. From Monitor Setup menu screen, select Options, and
More informationAcoustiSoft RPlusD ver
AcoustiSoft RPlusD ver 1.2.03 Feb 20 2007 Doug Plumb doug@etfacoustic.com http://www.etfacoustic.com/rplusdsite/index.html Software Overview RPlusD is designed to provide all necessary function to both
More informationPixel LED SPI Digital Controller
Pixel LED SPI Digital Controller Part number: The Mini LED Pixel Controller provides a wide array of color changing and chasing effects for both PixelPro and PixelControl products. The 32 different effects
More informationFACTORY AUTOMATION AS-INTERFACE MAINTENANCE AND TROUBLESHOOTING GUIDE
FACTORY AUTOMATION AS-INTERFACE MAINTENANCE AND TROUBLESHOOTING GUIDE Table of Contents AS-Interface Basics... 3 Addressing Modules... 4 Handheld Programmer (Reading Inputs and Settings Outputs)... 5 Gateway
More informationKF200 PORTABLE MANUAL
KF200 PORTABLE MANUAL THIS MANUAL CONTAINS: KF200 OPERATORS MANUAL KF200 GRAIN SOFTWARE MANUAL SPECIAL NOTE BOONE CABLE WORKS & ELECTRONICS, INC. 1773-219TH LANE - P.O. BOX 369 READ THIS ENTIRE BOOKLET
More informationOverview. Shipped in the Venue Vizion Package: Simplified Integration Process. Installation consists of 6 easy steps:
Overview Shipped in the Venue Vizion Package: Four two-channel QMOD Encoder-Modulators Each unit can accept up to 2 inputs, providing up to 8 channels in the system. One ICE-HE-DXL Display Control Center
More informationQUICK START GUIDE FOR DEMONSTRATION CIRCUIT /12/14 BIT 10 TO 65 MSPS DUAL ADC
LTC2286, LTC2287, LTC2288, LTC2290, LTC2291, LTC2292, LTC2293, LTC2294, LTC2295, LTC2296, LTC2297, LTC2298 or LTC2299 DESCRIPTION Demonstration circuit 816 supports a family of s. Each assembly features
More informationUser Manual. Product Link:
User Manual Product Name: "AVR JTAG ICE Emulator" Product Model: PRG-00025 Product Link: https://techshopbd.com/product-categories/avr-98764/3189/avr-jtag-ice-emulatortechshop-bangladesh Note: This AVR
More informationQuick Installation Guide for USB2.0 & FireWire Frame Grabber & Optilia AMCap
Quick Installation Guide for USB2.0 & FireWire Frame Grabber & Optilia AMCap This manual describes how to install the Frame Grabber 1 Installation You have to log on to your computer as Administrator or
More informationPersonal Information Page
Rev. 08.29.07 Personal Information Page Installing Dealer Name Date of Installation Day Month Year Type of System Executive MD500 MD1000.2 MHDTV MD5Slim MSD60 Freedom (not recommended) Serial Number of
More informationSZU OPERATING INSTRUCTIONS SAT NAVI
SZU 21-00 O P ER ATI N G I N S T R U C T I O N S SAT NAVI Operation Instructions SZU 21-00 Safety Notes Turn off the receiver or any used power supply before installing, to avoid short-circuit. Installation
More informationLab 2: A/D, D/A, and Sampling Theorem
Lab 2: A/D, D/A, and Sampling Theorem Introduction The purpose of this lab is to explore the principles of analog-to-digital conversion, digital-to-analog conversion, and the sampling theorem. It will
More informationRADIO FREQUENCY SYSTEMS
RADIO FREQUENCY SYSTEMS Optimizer RT FAQ s Q. What information is require before running the software? The Serial Number of each ACU MUST be recorded with the Model number of the antenna that it is attached
More informationStarFire Instruction Manual Table of Contents
StarFire Instruction Manual Table of Contents Table of Figures... iii Technical Support... 1 Updates to Firmware and Adding Communication Channels... 1 Limited Warranty:... 2 SAFETY WARNING:... 3 Introduction
More informationBirdie-FTR FaulTracker
Birdie-FTR FaulTracker User Guide Version 1.1 July 2003 Laplace Instruments Ltd Page 1 Page 2 Caution read these instructions before using the instrument. Birdie-FTR FaulTracker Patent Application No:
More informationBeginners How to Test DSO138mini
Beginners How to Test DSO138mini You have finished assembling your DSO138mini kit. You may be anxious to see it works. But you might not be familiar with oscilloscope and you could encounter unexpected
More informationFS3. Quick Start Guide. Overview. FS3 Control
FS3 Quick Start Guide Overview The new FS3 combines AJA's industry-proven frame synchronization with high-quality 4K up-conversion technology to seamlessly integrate SD and HD signals into 4K workflows.
More informationCARLO GAVAZZI Automation Components
CARLO GAVAZZI Automation Components UDM 35/40 Digital Panel Meter Programming Guide Index Description 2 Programming Fundamentals 3 Access to Programming Mode/Password Protection 4 Programming 5-18 Inputs