1 KPI and SLA regime: March 2017 performance summary OB49 Paper 06 KPI Report Ref Jan 17 Feb 17 Mar 17 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary DTT user KPI A % 99.68% 99.81% 97.5% green Engineer visits completed as scheduled with viewer 95.0% amber KPI A % 92.71% 97.26% 90% green Engineer visits completed within 3 working days 50% amber KPI A % 92.75% 96.62% 90% green Vulnerable visits completed within 3 working days 70% amber KPI A6 100% 75% 100% Communal engineer visits completed as scheduled with landlord where access and liability is confirmed KPI A7 100% 100% 100% 98% green 94% amber Reactive filters issued within 3 working days [KPI A10] SLA B % 100% 99.98% 100% green 99% amber [SUSPENDED FOR REACTIVE-ONLY TRIAL] Addresses in very high pixels mailed filters Previously un-mailed properties in areas identified as being at risk of interference above agreed thresholds from active masts to be mailed at least once ahead of activation.* Complaints SLA C1 0.31% 0.21% 0.41% <1% green <2% amber SLA C4 Report on total number and categories of complaints SLA C5 Report on vulnerable complaints SLA D1 Measure of the numbers of mailings per report of / SLA D2 case of interference Qualitative and quantitative reports provided. No specific Measure of the number of reported cases that occur targets. outside of mailed area SLA D3 Measure of number of cases of interference per mast remaining between 0.17 and 1.66 (5k to 50k cases of interference for rollout) * Note that the definition of SLA B1 has changed from this month s report onwards. Its previous wording was as follows: Previously un-mailed properties in areas identified as at risk of interference above agreed thresholds from active and forecast masts, to be mailed at least once no more than six weeks ahead of forecast mast activation. Page 1 of 11

2 KPIs March 2017: KPI and SLA performance summary, 10 April 2017 KPI A: Service Restoration within 10 working days where household is a primary DTT user (communal households and households where cable or satellite services are received are excluded). 99% (green); 98% (amber) Result: 100%; green All 554 confirmed 4G cases in March 2017 were resolved within 10 working days Result: 100% KPI A1: Engineer visits completed as scheduled with viewer. 97.5% (green); 95% (amber) Result: 99.81%; green Of the 2,055 engineer visits originally scheduled for March 2017: o A total of 1,930 visits were undertaken and closed on schedule o Four visits were cancelled or rearranged by at800 o A further 121 visits were cancelled by the viewer Total scheduled visits not missed by engineer / total visits scheduled (1, ) / 2,055 Result: 99.81% KPI A2: Engineer visits completed within 3 working days. 90% (green); 50% (amber) Result: 97.26%; green Of the 2,055 scheduled engineer visits detailed above, there were 1,934 visits scheduled where the viewer did not cancel Of these 1,934 visits: o A total of 1,624 visits were completed within three working days o A further 257 were delayed beyond three working days at the viewer s request o Four visit was cancelled or rearranged by at800 o A further 49 visits were completed outside of the three working day target (1, ) / 1,934 Result: 97.26% KPI A4: Vulnerable visits completed within 3 working days: 90% (green); 70% (amber) Result: 96.62%; green Of the 917 scheduled engineer visits to people identified as being eligible for additional support where the viewer did not cancel: o A total of 809 visits were completed within three working days o Seventy-seven visits were delayed beyond the three working day window at the request of viewers o Two visits were cancelled or rearranged by at800 o Twenty-nine visits were delayed beyond the three working day target KPIs Page 2 of 11

3 ( ) / 917 Result: 96.62% March 2017: KPI and SLA performance summary, 10 April 2017 KPI A6: Communal engineer visits completed as scheduled with landlord where access and liability is confirmed. Reporting only Result: 100% The one communal visit scheduled for March were undertaken on time and as scheduled. Result: 100%. KPI A7: Reactive filters issued in 3 working days. 98% (green); 94% (amber) Result: 100%; green All of the 2,103 filter requests made in March were sent within one working day Result: 100% KPI A10 [SUSPENDED]: 100% of identifiable addresses in very high pixels mailed proactive filter Not applicable. KPIs Page 3 of 11

4 SLA B Awareness March 2017: KPI and SLA performance summary, 10 April 2017 SLA B1: Previously un-mailed properties in areas identified as being at risk of interference above agreed thresholds from active masts to be mailed at least once ahead of activation. 99% amber, 100% green Result: 99.98%; amber A total of 51,660 households were identified as being eligible for mailing against the 8 March mast submission. These were mailed during the period March and are detailed under SLA B2 below A mast that activated on 22 March had not been submitted to at800 before its activation. Because the mast was in an infill area, only nine households were identified as not having been mailed previously. The site was locked down on 5 April and will only be reactivated once the households have been mailed 51,660 / (51, ) Result: 99.98% Amber. SLA B2: Report on households mailed and not mailed within forecast pixels (i.e. number of low risk households) The table below details the number of households mailed in March. Mailing Mailing Date Mailed Not mailed* 21 March 29,998 March March 21,662 submission Not mailed 45,398 Total 51,660 45,398 * Not mailed: properties within 2km of a mast used in the model that have not previously received a postcard but where the predicted likelihood of receiving DTT in their pixel has not reduced by more than two percentage points on any multiplex. SLA B3: Report on households reporting interference within unmailed forecast pixels. Where more than 40% of total reports of interference are in these pixels, at800 to address through operational adjustments In March 2017, at800 was contacted by a total of 3,249 households reporting interference that at800 believed could be caused by 4G. Engineers visited 1,708 properties, and filters were sent to a further 1,541. Of the 1,708 viewers to whom at800 sent engineers, 512 were confirmed as being impacted by 4G Of the 3,249 households, 297 (9.1%) were identified in the model but suppressed, either through the risk-based mailing approach or because under the new regime, their degradation was below the threshold required to trigger a mailing. 4G Filter Grand Mailing Status confirmed Not 4G sent Total Mailed 469 1,086 1,339 2,894 SLA B: Awareness Page 4 of 11

5 March 2017: KPI and SLA performance summary, 10 April 2017 Suppressed Not identified Total 512 1,196 1,541 3,249 SLA B4: Raising awareness with properties where the risk of interference due to active masts has increased by more than the agreed threshold from a point 20 weeks after it was previously mailed. Report on reminder mailing numbers to be provided. A total of 181,049 households were forecast to experience increased interference because of masts activated between 13 January and 8 February. These households excluded any properties that had been mailed during the 20 weeks up to 13 January. Of these, 1,834 households fell within the coverage area of the Selkirk TV transmitter, which was being used for a Selkirk retune event throughout March. Those households outside of the Selkirk area were mailed during the period 6 15 March and are detailed in the table below. Those within the Selkirk area will be mailed in April to avoid message confusion A total of 171,467 households were forecast to experience increased interference because of masts activated between 10 February and 8 March. These households excluded any properties that had been mailed during the 20 weeks up to 10 February. These households are scheduled to be mailed between 28 March and 10 April. Those households mailed in March are detailed in the table below. Mailing Mailing Date Number of properties* 6 March 29,999 7 March 30,000 Batch R39 8 March 30,000 reminder 13 March 29, March 29, March 29,218 Batch R40 28 March 30,000 reminder 29 March 30,000 Total 239,215 * Number of properties: these are properties that have previously been contacted by at800 more than 20 weeks prior to the cut-off date where the likelihood of receiving DTT on any single multiplex has reduced by more than two percentage points solely due to recent mast activations (up to six weeks before mailing). SLA B7: Report on above the line communications and research outcomes, including awareness in rollout areas In March, 53 pieces of media coverage communicated information about potential 4G-related TV interference and at800 s support. Forty-seven pieces were generated by proactive PR outreach and four articles were published after journalists contacted our press office. Two further pieces of coverage were generated organically. SLA B: Awareness Page 5 of 11

6 March 2017: KPI and SLA performance summary, 10 April 2017 Information about at800 appeared in 31 online articles, with 19 appearing in print alongside coverage in three radio shows. The organically generated coverage comprised two mentions of 4G-related Freeview interference on BBC Radio Somerset. Show hosts discussing local newspaper articles mentioned an article about the Freeview interference issue that had been published in the Western Gazette (Wincanton edition) following act800 s PR outreach work. Ben Roome was also interviewed on BBC Radio Shetland about Freeview interference caused by 4G and help that at800 is providing. Examples of coverage: Batley News Accredited engineers can visit homes to help resolve the problems, or free filters can be provided. Tavistock Times The company also offers extra support for people who are 75 years of age or older, are registered blind or partially sighted or receive any benefits The Paisley Daily Express Villagers have been warned that new 4G masts could cause some interference with their Freeview TV services. SLA B: Awareness Page 6 of 11

7 SLA C Quality of Service March 2017: KPI and SLA performance summary, 10 April 2017 SLA C1: Percentage of households interacting with at800 that make a complaint. 1% (green); 2% (amber) Result: 0.41%; green at800 interacted with a total of 5,064 households in March 2017 Of these, 21 made a complaint that related to at800 s operational processes Result: 0.41% SLA C4: Report on total number and categories of complaints There were a total of 29 complaints made in March 20 related to at800 s operational processes; nine to its policies. Below is a breakdown of the topics of these complaints. Operations-related Dispute of non-4g diagnosis: 9 Engineer: damage/quality: 3 Mailing and communication: 3 Late or missed engineer appointment: 2 Engineer attitude/behaviour: 1 Appointment availability: 1 Time taken to resolve issue: 1. Policy-related Support of satellite or cable viewers: 4 4G rollout in general: 2 Support for satellite/cable viewers: 2 Support for commercial viewers: 1. SLA C5: Vulnerable viewer complaints Of the 1,441 viewers flagged as being eligible for additional support with whom at800 interacted in March 2017, eight made a complaint about at800 s operational process; none complained about its policies. The complaint reasons are detailed below. Operations-related Dispute of non-4g diagnosis: 4 Engineer: damage/quality: 2 Engineer attitude/behaviour: 1 Time taken to resolve issue: 1. SLA C: Quality of Service Page 7 of 11

8 SLA D Scale March 2017: KPI and SLA performance summary, 10 April 2017 SLA D1: Measure of the numbers of mailings per report of/case of interference The following table shows the number of mailings per engineer visit (4G and non-4g) and reactive filter sent, broken down by mast activated before the end of January It only includes cases tied to masts that were submitted as part of the old mailing regime. Each case is tied to a single mast per the rules specified in Appendix 1. Note that the cases are tied to the month in which the mast was scheduled to be activated (and therefore the masts that drove the mailing volumes); not the month in which the mast was activated. Rollout month Engineer, 4G Engineer, non-4g Reactive filter Initial mailings per 4G per non-4g per reactive filter per visit or filter sent July ,827 9,627 22,734 7,205,414 1, August , , September , , October , November , December ,043 1, January , ,796 1, February , March , April , May , June , July ,465 3, , August ,090 64, September ,282 2, , October ,140 2, , November ,367 1,623 3, , December ,536 1, January , February ,041 95, March , , April ,147 1, , May , June , , July ,198 2, , August , , September , , October , , November , December ,009 1, , January , , February , March , April , May , June , July , August , September , Nothing within 2km ,738 Total 19,500 34,018 74,982 14,246, The following table shows the equivalent information for masts submitted under the new mailing regime, based on the first submission in which they appeared. This table only includes cases where SLA D: Scale Page 8 of 11

9 March 2017: KPI and SLA performance summary, 10 April 2017 the associated mast using the logic specified in Appendix 1 is a mast first submitted under the new mailing regime. Submission date Engineer, 4G Engineer, non-4g Reactive filter Initial mailings per 4G per non-4g per reactive filter per visit or filter sent 27 July , , August , September , October , November , December ,280 1, , January ,285 1,982 1,680 1, February ,354 2,445 1,210 2, March ,660 5,740 2,246 25,830 2,066 Total 2,026 3,938 4,008 1,058, SLA D2: Measure of the number of reported cases that occur outside of mailed area Of the 512 households confirmed as experiencing 4G interference in March 2017: Cases not mailed due to risk profile 40 (7.8%) Cases never identified in modelling 3 (0.6%) Total cases outside mailed area 43 (8.4%) Total cases caught by mailing 512 (91.6%) SLA D: Scale Page 9 of 11

10 March 2017: KPI and SLA performance summary, 10 April 2017 SLA D3: Measure of number of cases of interference per mast remaining between 0.17 and 1.66 (5k to 50k cases of interference for rollout) exceeding or trending towards exceeding the range will be raised to the OB for review/action Note: The above thresholds are based on a range of between 5,000 and 50,000 cases of interference for an estimated number of total 4G at 800 MHz masts for full rollout from all MNOs. SLA D: Scale Page 10 of 11

11 March 2017: KPI and SLA performance summary, 10 April 2017 Appendix 1: Logic for SLA D1: Identifying the nearest mast Identifying an individual mast that is causing interference is an inexact science. Indeed two masts may individually not result in interference for a household, but when both are active at the same time, interference may result. A household that has interacted with at800 a number of times (either requesting multiple filters or receiving many engineer visits) further complicates the identification of a single affecting mast, as masts may have activated between in between their contacts with at800. For the purposes of SLA D1, the logic described below has been used to identify the dates against which households should be measured, and the logic for identifying the mast that is thought most likely to be causing the interference. In-scope households and their effective date The analysis looks separately at households that have received reactive filters and those that have had engineer visits. The few households that have received both count in both analyses. For households to which at800 has sent reactive filters, their analysis is based on the first date on which they made a request for a filter, a request that the triage process indicated warranted the dispatch of a filter. For engineer visits, each household is counted once, but all visits are analysed to inform the record. For any households that had a single visit, the date on which that visit was requested is used as the basis for analysis, and the household is categorised as 4G or not based on the outcome of that visit. For any households that had multiple visits, if one or more visits resulted in a 4G diagnosis, it is categorises as 4G and the date on which the earliest of these visits was requested is used as the basis for analysis. If all visits resulted in a non-4g diagnosis, it is categorised such and the request date of the earliest visit is used as the basis for analysis. Identifying mast most likely to be causing interference For each of the above cases, the following process is undertaken: Determine all masts that were activated on or before the household s effective date (see above), but only include masts that are within a 900-metre radius of the property. From these masts, determine the mast that was activated the soonest before the call came in. This is deemed to be the mast most likely to be the cause of the interference If the above yields no masts, undertake the same process using a 1,500-metre radius If the above yields no masts, undertake the same process using a 2,000-metre radius If the above yield no masts (i.e. there was no active mast within 2,000 metres at the point at which the call came in), the case is not associated with any specific mast and is discounted from the analysis. This logic is used to tag each household with an affecting mast. The rollout month for which this mast was submitted is used as the basis for analysis. Page 11 of 11

KPI and SLA regime: November 2016 performance summary

KPI and SLA regime: November 2016 performance summary KPI and SLA regime: November 2016 performance summary OB46 Paper 06a KPI Report Ref Sep 16 Oct 16 Nov 16 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working

More information

OB35 Paper 06 KPI Report

OB35 Paper 06 KPI Report OB35 Paper 06 KPI Report KPI and SLA regime: January 2016 performance summary Ref Nov 15 Dec 15 Jan 16 Target Description KPI A 99.90% 100% 99.87% 99% green 98% amber Service Restoration within 10 working

More information

KPI and SLA regime: September 2015 performance summary

KPI and SLA regime: September 2015 performance summary OB31 Paper 07 KPI Report (September) KPI and SLA regime: September 2015 performance summary Ref Jul 15 Aug 15 Sep 15 Target Description KPI A 100% 99.87% 100% 99% green 98% amber Service Restoration within

More information

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary

More information

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green OB30 paper 07 KPI Report (August 2015) KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green 98% amber Service Restoration within

More information

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green OB19 Paper 07 KPI Report KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green Paper 06 OB20 KPI Report KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days

More information

OB17 Paper 6 KPI Report

OB17 Paper 6 KPI Report OB17 Paper 6 KPI Report KPI and SLA regime: July 2014 performance summary Reference Outcome Result Target Description KPI A Pass 100% 100% Service Restoration within 10 working days where household is

More information

Digital Switchover Management of Transition Coverage Issues Statement

Digital Switchover Management of Transition Coverage Issues Statement Digital Switchover Management of Transition Coverage Issues Statement Statement Publication date: 16 May 2007 Contents Section Annex Page 1 Summary 1 2 Introduction 2 3 Comments received on the revised

More information

Introduction. Introductory remarks

Introduction. Introductory remarks Communications Consumer Panel and ACOD s response to Ofcom s consultation on the UK preparations for the World Radiocommunication Conference 2015 (WRC-15) Introduction The Communications Consumer Panel

More information

700 MHz clearance programme timescale review. Review of progress, risks and readiness

700 MHz clearance programme timescale review. Review of progress, risks and readiness 700 MHz clearance programme timescale review Review of progress, risks and readiness Publication Date: 13 December 2018 About this document When confirming the timescales for the delivery of the 700 MHz

More information

REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER

REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER REVIEW OF THE SCOTTISH BORDERS DIGITAL TV SWITCHOVER 1. Executive Summary The Selkirk transmitter and its 11 relays, serving 52,000 homes in the Scottish Borders (16,800 of which were eligible for the

More information

The Communications Market: Digital Progress Report

The Communications Market: Digital Progress Report The Communications Market: Digital Progress Report Digital TV, Q2 2007 This is the fifteenth Ofcom Digital Progress Report covering developments in digital television take-up. The data are the latest available

More information

DIGITAL SWITCHOVER & THE BBC S ROLE

DIGITAL SWITCHOVER & THE BBC S ROLE DIGITAL SWITCHOVER & THE BBC S ROLE Dr David Levy Controller, Public Policy BBC OXFORD UNIVERSITY, JULY 2006 1 2 What s special about Digital TV? Changing standards is relatively common Gas, Currencies

More information

Everything you need to know about the switch to digital TV.

Everything you need to know about the switch to digital TV. Important information please keep. For more information and help with your switchover to digital TV, call 0845 454 00 15 * or visit digitaluk.co.uk/selkirk If you already have digital TV, please help any

More information

Broadcast TV Technical Codes. Updates and amendments

Broadcast TV Technical Codes. Updates and amendments Broadcast TV Technical Codes Updates and amendments Statement Publication date: 9 November 2016 1 About this document Ofcom sets technical standards for the digital terrestrial TV platform (also often

More information

North West Media Briefing

North West Media Briefing Digital Television Switchover North West Media Briefing Gemma McNeilis Smith & Smith PR 0161 236 5560 / 07962 532 098 gemma@smithandsmithpr.co.uk October 2009 What is digital TV switchover? Switchover

More information

The Communications Market: Digital Progress Report

The Communications Market: Digital Progress Report The Communications Market: Digital Progress Report Digital TV, 2009 This is Ofcom s twenty-third Digital Progress Report covering developments in multichannel television. The data are the latest available

More information

Springhead Road, Northfleet Kent, DA11 8HN Tel: web:

Springhead Road, Northfleet Kent, DA11 8HN Tel: web: Championing excellence and diversity in broadcasting Founded in 1983 by Jocelyn Hay CBE The Old Rectory Business Centre Springhead Road, Northfleet Kent, DA11 8HN Tel: 01474 338716 email: info@vlv.org.uk

More information

DTG Response to Ofcom Consultation: Licensing Local Television How Ofcom would exercise its new powers and duties being proposed by Government

DTG Response to Ofcom Consultation: Licensing Local Television How Ofcom would exercise its new powers and duties being proposed by Government DTG Response to Ofcom Consultation: Licensing Local Television How Ofcom would exercise its new powers and duties being proposed by Government 16 th March 2012 The Digital TV Group s (DTG) response to

More information

Response to Ofcom Consultation The future use of the 700MHz band. Response from Freesat. 29 August 2014

Response to Ofcom Consultation The future use of the 700MHz band. Response from Freesat. 29 August 2014 Response to Ofcom Consultation The future use of the 700MHz band Response from Freesat 29 August 2014 1 1 About Freesat Freesat is a subscription free satellite and IP TV service offering digital television

More information

Code of Practice on Changes to Existing Transmission and Reception Arrangements

Code of Practice on Changes to Existing Transmission and Reception Arrangements Code of Practice on Changes to Existing Transmission and Reception Arrangements Publication date: 11 March 2016 Code of Practice on Changes to Existing Transmission and Reception Arrangements Contents

More information

Note for Applicants on Coverage of Forth Valley Local Television

Note for Applicants on Coverage of Forth Valley Local Television Note for Applicants on Coverage of Forth Valley Local Television Publication date: May 2014 Contents Section Page 1 Transmitter location 2 2 Assumptions and Caveats 3 3 Indicative Household Coverage 7

More information

All-digital planning and digital switch-over

All-digital planning and digital switch-over All-digital planning and digital switch-over Chris Nokes, Nigel Laflin, Dave Darlington 10th September 2000 1 This presentation gives the results of some of the work that is being done by BBC R&D to investigate

More information

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum 1. Introduction and summary The above-named organisations welcome the

More information

Digital Television Reception Predictors

Digital Television Reception Predictors Digital Television Reception Predictors Teletext Aerial Checker - Summary Version 1.1 8 th October 2007 Introduction The performance of television aerial systems can become worse over time. Weather, corrosion

More information

Interim use of 600 MHz for DTT

Interim use of 600 MHz for DTT Interim use of 600 MHz for DTT Executive summary The BBC, Channel 4 and Arqiva have developed a proposal to make interim use of the 600 MHz band to provide additional Digital Terrestrial Television (DTT)

More information

Methods, Evidence, Action? The Case of Digital Television. Dr Jeremy Klein, Head of Public Sector, Generics Group.

Methods, Evidence, Action? The Case of Digital Television. Dr Jeremy Klein, Head of Public Sector, Generics Group. Methods, Evidence, Action? The Case of Dr Jeremy Klein, Head of Public Sector, Generics Group jeremy.klein@genericsgroup.com EQUAL Conference, 21 January 2004 The Case of 1. Context 2. Methods 3. Evidence

More information

PLANNING STUDIES INTO THE ALL-DIGITAL FUTURE AND DIGITAL SWITCH-OVER SCENARIOS

PLANNING STUDIES INTO THE ALL-DIGITAL FUTURE AND DIGITAL SWITCH-OVER SCENARIOS PLANNING STUDIES INTO THE ALL-DIGITAL FUTURE AND DIGITAL SWITCH-OVER SCENARIOS C.R. Nokes, N.J. Laflin, D.J. Darlington BBC R&D, UK ABSTRACT With digital terrestrial television now launched in the UK,

More information

NOTICE 682 OF 2014 PROMOTION OF DIVERSITY AND COMPETITION ON DIGITAL TERRESTRIAL TELEVISION REGULATIONS

NOTICE 682 OF 2014 PROMOTION OF DIVERSITY AND COMPETITION ON DIGITAL TERRESTRIAL TELEVISION REGULATIONS STAATSKOERANT, 22 AUGUSTUS 2014 No. 37929 3 GENERAL NOTICE NOTICE 682 OF 2014., I C(A-S A Independent Communications Authority of South Africa Pinm ill Farm, 164 Katherine Street, Sandton Private Bag X10002,

More information

6.3 DRIVERS OF CONSUMER ADOPTION

6.3 DRIVERS OF CONSUMER ADOPTION 6.3 DRIVERS OF CONSUMER ADOPTION The main drivers for the take-up of DTT by consumers in South Africa are likely to be: Affordability of STBs and potential subsidies for STBs is the single most important

More information

Coexistence of new services in the 800 MHz band with digital terrestrial television

Coexistence of new services in the 800 MHz band with digital terrestrial television Coexistence of new services in the 800 MHz band with digital terrestrial television Consultation Publication date: 2 June 2011 Closing Date for Responses: 11 August 2011 Coexistence of new services in

More information

Digital Television Update Q4 2004

Digital Television Update Q4 2004 Digital Television Update Q4 2004 This is the fifth of Ofcom s Digital Television Update quarterly reports. As far as possible, data is based upon the latest figures provided by platform operators; however,

More information

Consumer aerial survey. Implementing Ofcom s UHF Strategy

Consumer aerial survey. Implementing Ofcom s UHF Strategy Implementing Ofcom s UHF Strategy Research Publication date: 28 May 2014 Contents Section Page 1 Introduction 1 2 Key findings 3 3 Background 4 4 Survey methodology 9 5 Number of DTT households 12 6 Aerial

More information

GUIDELINES AND APPLICATION FORM TO OBTAIN A DIGITAL TERESTERIAL TELEVISION BROADCASTING LICENSE AS SIGNAL DISTRIBUTOR

GUIDELINES AND APPLICATION FORM TO OBTAIN A DIGITAL TERESTERIAL TELEVISION BROADCASTING LICENSE AS SIGNAL DISTRIBUTOR GUIDELINES AND APPLICATION FORM TO OBTAIN A DIGITAL TERESTERIAL TELEVISION BROADCASTING LICENSE AS SIGNAL DISTRIBUTOR May 2017 94, Kairaba Avenue, P. O. Box 4230 Bakau, The Gambia Tel. (220) 4399601 /

More information

House of Lords Select Committee on Communications Digital switchover of television and radio 20 January Digital UK Submission

House of Lords Select Committee on Communications Digital switchover of television and radio 20 January Digital UK Submission House of Lords Select Committee on Communications Digital switchover of television and radio 20 January 2010 1. Digital Television Switchover on track, on time and under budget a. 16 main transmitter groups,

More information

Background Briefing Digital Switchover March 2009

Background Briefing Digital Switchover March 2009 Background Briefing Digital Switchover March 2009 Purpose 1. David Scott, Chief Executive of Digital UK and Simon Crine, Director of Corporate Affairs, attended the 14 January Panel meeting to brief the

More information

GLASGOW 2014 LIMITED RESPONSE TO OFCOM CONSULTATION DOCUMENT Submitted 15 November 2012

GLASGOW 2014 LIMITED RESPONSE TO OFCOM CONSULTATION DOCUMENT Submitted 15 November 2012 GLASGOW 2014 LIMITED RESPONSE TO OFCOM CONSULTATION DOCUMENT Submitted 15 November 2012 Question 1. Do you agree that the most relevant comparator for a top-down approach is likely to be the London 2012

More information

Australian Broadcasting Corporation Submission Digital Conversion of Self-Help Television Retransmission Sites

Australian Broadcasting Corporation Submission Digital Conversion of Self-Help Television Retransmission Sites Australian Broadcasting Corporation Submission Digital Conversion of Self-Help Television Retransmission Sites (Department of Communications, Information and the Arts) August 2007 Australian Broadcasting

More information

HOW FAIR IS THE GOOGLE BOOK SEARCH SETTLEMENT? Pamela Samuelson Berkeley Law School Feb. 12, 2010 FAIR TO WHOM?

HOW FAIR IS THE GOOGLE BOOK SEARCH SETTLEMENT? Pamela Samuelson Berkeley Law School Feb. 12, 2010 FAIR TO WHOM? HOW FAIR IS THE GOOGLE BOOK SEARCH SETTLEMENT? Pamela Samuelson Berkeley Law School Feb. 12, 2010 FAIR TO WHOM?? before Judge Chin is whether the amended settlement is fair, reasonable, and adequate as

More information

Session 1. Digital Terrestrial Television Broadcasting Implementation in Asia and the Pacific

Session 1. Digital Terrestrial Television Broadcasting Implementation in Asia and the Pacific Session 1 Digital Terrestrial Television Broadcasting Implementation in Asia and the Pacific 2015 Kuala Lumpur, Malaysia Dr AMAL Punchihewa Director ABU Technology Asia-Pacific Broadcasting Union A Vice

More information

Guidelines for ASEAN Digital Switch-Over

Guidelines for ASEAN Digital Switch-Over Guidelines for ASEAN Digital Switch-Over Introduction to the Guidelines The migration from analogue to digital TV broadcasting services is a complex process, involving decisions on the regulator/ government,

More information

The long term future of UHF spectrum

The long term future of UHF spectrum The long term future of UHF spectrum A response by Vodafone to the Ofcom discussion paper Developing a framework for the long term future of UHF spectrum bands IV and V 1 Introduction 15 June 2011 (amended

More information

Invitation to Submit Songs for Eurovision Australia Decides, the selection show for Australia s entry to the Eurovision Song Contest 2019

Invitation to Submit Songs for Eurovision Australia Decides, the selection show for Australia s entry to the Eurovision Song Contest 2019 Invitation to Submit Songs for Eurovision Australia Decides, the selection show for Australia s entry to the Eurovision Song Contest 2019 SBS and production partner, Blink TV, are excited to be holding

More information

Managing the effects of 700 MHz clearance on PMSE and DTT viewers. Summary of progress and call for input

Managing the effects of 700 MHz clearance on PMSE and DTT viewers. Summary of progress and call for input Managing the effects of 700 MHz clearance on PMSE and DTT viewers Summary of progress and call for input Call for Input Publication date: 31 March 2016 Closing Date for Responses: 13 May 2016 About this

More information

db Broadcast reflect on their role in the largest broadcasting engineering project ever undertaken in the UK Digital Switchover

db Broadcast reflect on their role in the largest broadcasting engineering project ever undertaken in the UK Digital Switchover db Broadcast and Digital Switchover db Broadcast reflect on their role in the largest broadcasting engineering project ever undertaken in the UK Digital Switchover The digital switchover programme (DSO)

More information

Government Gazette Staatskoerant

Government Gazette Staatskoerant Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 592 Pretoria, 28 October Oktober 2014 No. 38134 N.B. The Government Printing Works will not be held responsible

More information

Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda

Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda March 2018 Contents 1. Introduction.3 2. Legal Requirements..3 3. Scope & Jurisdiction....5 4. Effective Date..5 5. Achieving

More information

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range)

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range) : Measuring Variability for Skewed Distributions (Interquartile Range) Student Outcomes Students explain why a median is a better description of a typical value for a skewed distribution. Students calculate

More information

UK 700MHz Strategy and Digital Terrestrial Television update. Chris Woolford, Director of International Affairs, Ofcom 3 rd October 2013

UK 700MHz Strategy and Digital Terrestrial Television update. Chris Woolford, Director of International Affairs, Ofcom 3 rd October 2013 UK 700MHz Strategy and Digital Terrestrial Television update Chris Woolford, Director of International Affairs, Ofcom 3 rd October 2013 1 Ofcom decided on its UHF strategy last year Our dual objectives

More information

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan Response to Draft Spectrum Consultation Glasgow 2014 Page 1 of 8 1. BACKGROUND 1.1 The BBC welcomes Ofcom s engagement with stakeholders

More information

Digital Terrestrial HDTV Broadcasting in Europe

Digital Terrestrial HDTV Broadcasting in Europe EBU TECH 3312 The data rate capacity needed (and available) for HDTV Status: Report Geneva February 2006 1 Page intentionally left blank. This document is paginated for recto-verso printing Tech 312 Contents

More information

Measuring Variability for Skewed Distributions

Measuring Variability for Skewed Distributions Measuring Variability for Skewed Distributions Skewed Data and its Measure of Center Consider the following scenario. A television game show, Fact or Fiction, was canceled after nine shows. Many people

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2015-123 PDF version Route reference: 2014-472 Ottawa, 1 April 2015 Craig Timmermans, on behalf of a corporation to be incorporated Little Current and Manitoulin Island, Ontario

More information

e.tv SUBMISSION ON DRAFT SPECTRUM ASSIGNMENT PLAN FOR THE COMBINED LICENSING OF THE 800MHZ AND 2.6GHZ BANDS 29 February 2012

e.tv SUBMISSION ON DRAFT SPECTRUM ASSIGNMENT PLAN FOR THE COMBINED LICENSING OF THE 800MHZ AND 2.6GHZ BANDS 29 February 2012 e.tv SUBMISSION ON DRAFT SPECTRUM ASSIGNMENT PLAN FOR THE COMBINED LICENSING OF THE 800MHZ AND 2.6GHZ BANDS 29 February 2012 1 1 INTRODUCTION 1.1 On 15 December 2011 in Notice 911, ICASA published Government

More information

Television Audience 2010 & 2011

Television Audience 2010 & 2011 Television Audience 2010 & 2011 Overview The 51 st edition of Television Audience continues your collection of TV Audience reports. This report continues to include annual trends of population and television

More information

REVIEW OF THE GRANADA DIGITAL TV SWITCHOVER

REVIEW OF THE GRANADA DIGITAL TV SWITCHOVER REVIEW OF THE GRANADA DIGITAL TV SWITCHOVER 1. Executive Summary The Winter Hill transmitter and its 70 relays, serving 3,041,000 households in the Granada TV Region, successfully switched to digital TV

More information

DECISION. The translation of the decision was made by Språkservice Sverige AB.

DECISION. The translation of the decision was made by Språkservice Sverige AB. DECISION 29 June 2016 Ref. No. 16/01344 The translation of the decision was made by Språkservice Sverige AB. MEDIA SERVICE PROVIDERS (BROADCASTERS) See distribution list SUBJECT Requirements regarding

More information

Managing the effects of 700MHz clearance on PMSE and DTT viewers

Managing the effects of 700MHz clearance on PMSE and DTT viewers Response to Ofcom call for input Managing the effects of 700MHz clearance on PMSE and DTT viewers 13 May 2016 This response is submitted by Digital UK on behalf of its Members the BBC, ITV, Channel 4 and

More information

Planning for TV Spectrum Repacking and the Transition to ATSC 3.0

Planning for TV Spectrum Repacking and the Transition to ATSC 3.0 Planning for TV Spectrum Repacking and the Transition to ATSC 3.0 April 23, 2017 NAB Show 2017 Featuring GatesAir s Joe Seccia Manager, Market & Product Development, TV Transmission Copyright 2017 GatesAir,

More information

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range)

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range) : Measuring Variability for Skewed Distributions (Interquartile Range) Exploratory Challenge 1: Skewed Data and its Measure of Center Consider the following scenario. A television game show, Fact or Fiction,

More information

BROADCAST. The following concepts help ensure the way we distribute revenue to members is equitable.

BROADCAST. The following concepts help ensure the way we distribute revenue to members is equitable. BROADCAST Key concepts The following concepts help ensure the way we distribute revenue to members is equitable. Commercial licensee blanket revenues that cover more than one radio or TV station are divided

More information

Going Digital Strategic plan November 2011

Going Digital Strategic plan November 2011 Going Digital Strategic plan November 20 Introduction 1. New Zealand s move from analogue to digital television is a significant milestone in the development of broadcast technology. Going Digital is a

More information

Independent TV: Content Regulation and the Communications Bill 2002

Independent TV: Content Regulation and the Communications Bill 2002 Franco-British Lawyers Society, 13 th Colloquium, Oxford, 20-21 September 2002 Independent TV: Content Regulation and the Communications Bill 2002 1. The Communications Bill will re-structure the statutory

More information

Digital noise floor monitoring (DNFM)

Digital noise floor monitoring (DNFM) Digital noise floor monitoring (DNFM) Riverside County Project Report Site monitored: March 22, 2010 Table of Contents Revision History... 1 Digital Noise Floor Monitoring Overview... 2 What is Digital

More information

Broadcasting Ordinance (Chapter 562)

Broadcasting Ordinance (Chapter 562) Broadcasting Ordinance (Chapter 562) Notice is hereby given that the Communications Authority ( CA ) has received an application from Phoenix Hong Kong Television Limited ( Phoenix HK ), a company duly

More information

The Communications Market in Scotland. 2 TV and audio-visual content

The Communications Market in Scotland. 2 TV and audio-visual content The Communications Market in 2 2 TV and audio-visual content 49 2.1 TV and audio-visual content 2.1.1 Recent developments in The Scottish Government and Scottish Broadcasting Commission In September 2009,

More information

47 USC 534. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

47 USC 534. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 47 - TELEGRAPHS, TELEPHONES, AND RADIOTELEGRAPHS CHAPTER 5 - WIRE OR RADIO COMMUNICATION SUBCHAPTER V-A - CABLE COMMUNICATIONS Part II - Use of Cable Channels and Cable Ownership Restrictions 534.

More information

AIBD/ITU/ABU Pre Summit Regional Workshop on Enabling & Enhancing the DTT Broadcasting Experiences. 23 May 2016

AIBD/ITU/ABU Pre Summit Regional Workshop on Enabling & Enhancing the DTT Broadcasting Experiences. 23 May 2016 AIBD/ITU/ABU Pre Summit Regional Workshop on Enabling & Enhancing the DTT Broadcasting Experiences 23 May 2016 About Brunei Darussalam Located north western coast of Borneo Bordered by Sarawak (Malaysian

More information

The West Country TV region s digital switchover.

The West Country TV region s digital switchover. Important information please keep. For more information and help call our UK helpline on 0845 454 00 15 * or visit digitaluk.co.uk/westcountry The West Country TV region s digital switchover. If you already

More information

Report on the first digital TV switchover Whitehaven / Copeland, Cumbria

Report on the first digital TV switchover Whitehaven / Copeland, Cumbria Report on the first digital TV switchover Whitehaven / Copeland, Cumbria Published April 2008 Working with: contents 1. Foreword from the Digital UK Chief Executive 1 2. Executive Summary 3 3. About the

More information

Telecommunication Development Sector

Telecommunication Development Sector Telecommunication Development Sector Study Groups ITU-D Study Group 1 Rapporteur Group Meetings Geneva, 4 15 April 2016 Document SG1RGQ/218-E 22 March 2016 English only DELAYED CONTRIBUTION Question 8/1:

More information

Written by İlay Yılmaz and Gönenç Gürkaynak, ELIG, Attorneys-at-Law

Written by İlay Yılmaz and Gönenç Gürkaynak, ELIG, Attorneys-at-Law TURKEY Written by İlay Yılmaz and Gönenç Gürkaynak, ELIG, Attorneys-at-Law Lately, changes to the law on broadcasting, adopted in March 2011, have unsettled the broadcasting sector. This relatively recent

More information

The Meridian TV region switches to digital in The Meridian TV region switches to digital in Providing independent advice.

The Meridian TV region switches to digital in The Meridian TV region switches to digital in Providing independent advice. Cert no. TT-COC-002318 The Meridian TV region switches to digital in 2012 The Meridian TV region switches to digital in 2012 MERLEAF0410 Providing independent advice. Providing independent advice. What

More information

Licence for the transmission of digital terrestrial television multiplex service

Licence for the transmission of digital terrestrial television multiplex service 1 Wireless Telegraphy Act 2006 Licence for the transmission of digital terrestrial television multiplex service Date of Issue 6 July 2007 Licensee Company number (if a company) Registered address of Licensee

More information

Digital UK and Ofcom Switchover Tracker Survey. Switchover Progress Report Q3 2008

Digital UK and Ofcom Switchover Tracker Survey. Switchover Progress Report Q3 2008 Digital UK and Ofcom Switchover Tracker Survey Switchover Progress Report Q3 2008 Publication Date: 9 December 2008 Contents Executive Summary 2 Chapter 1 The Q3 2008 Dashboards: 5 (1) By Regions (2) By

More information

LAZER s Sing with Stone Sour Contest

LAZER s Sing with Stone Sour Contest LAZER 103.3 s Sing with Stone Sour Contest LAZER 103.3 s Sing with Stone Sour Contest is an on air and mobile contest that will occur on September 18 th through October 2 nd in which up to 15 contestants

More information

Initially, you can access the Schedule Xpress Scheduler from any repair order screen.

Initially, you can access the Schedule Xpress Scheduler from any repair order screen. Chapter 4 Schedule Xpress Scheduler Schedule Xpress Scheduler The Schedule Xpress scheduler is a quick scheduler that allows you to schedule appointments from the Repair Order screens. At the time of scheduling,

More information

Maximising the benefits of 700 MHz clearance. Enabling acceleration of 700 MHz clearance and use of the 700 MHz centre gap

Maximising the benefits of 700 MHz clearance. Enabling acceleration of 700 MHz clearance and use of the 700 MHz centre gap Maximising the benefits of 700 MHz clearance Enabling acceleration of 700 MHz clearance and use of the 700 MHz centre gap Statement Publication date: 17 th October 2016 Statement Maximising the benefits

More information

Northern Ireland: setting the scene

Northern Ireland: setting the scene Northern Ireland: setting the scene Key facts about Northern Ireland Figure Nation UK Population 1,779m (mid-2009 estimate); population is estimated to have risen by 5.6%, or 94,000 people, since 2001

More information

Broadcasting Decision CRTC

Broadcasting Decision CRTC Broadcasting Decision CRTC 2018-307 PDF version References: 2017-365, 2017-365-1 and 2017-365-2 Ottawa, 23 August 2018 Vues & Voix Across Canada Public record for this application: 2017-0643-3 Public hearing

More information

A guide for. DTT schedule providers

A guide for. DTT schedule providers A guide for DTT schedule providers Introduction Welcome to Digital UK s guide for schedule providers on digital terrestrial television (DTT). Here you can find details of the steps you ll need to consider

More information

Government Gazette Staatskoerant

Government Gazette Staatskoerant Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 597 Pretoria, 18 March Maart 2015 No. 38583 N.B. The Government Printing Works will not be held responsible for

More information

Analysis of data from the pilot exercise to develop bibliometric indicators for the REF

Analysis of data from the pilot exercise to develop bibliometric indicators for the REF February 2011/03 Issues paper This report is for information This analysis aimed to evaluate what the effect would be of using citation scores in the Research Excellence Framework (REF) for staff with

More information

Published July BFI Neighbourhood Cinema: Equipment Fund Guidelines for Applicants

Published July BFI Neighbourhood Cinema: Equipment Fund Guidelines for Applicants Published July 2014 BFI Neighbourhood Cinema: Equipment Fund Guidelines for Applicants What is the BFI Neighbourhood Cinema: Equipment Fund? We want everyone in the UK to be able to access a cinema experience

More information

SoundExchange compliance Noncommercial webcaster vs. CPB deal

SoundExchange compliance Noncommercial webcaster vs. CPB deal SoundExchange compliance Noncommercial webcaster vs. CPB deal SX compliance under CPB rules 1 can be challenging. Noncommercial Webcaster 2 (NW) is another set of rates and terms that some stations might

More information

ITU-D Regional Development Forum for the Arab Region: Access to spectrum, including broadcasting services trends and technologies

ITU-D Regional Development Forum for the Arab Region: Access to spectrum, including broadcasting services trends and technologies ITU-D Regional Development Forum for the Arab Region: Access to spectrum, including broadcasting services trends and technologies Experiences in the transition process Péter Vári Tunis, 3 June 2009 1 Timeline

More information

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016 RCOA Mandatory Contestability for Phase 1 Customers 16 December 2016 TOPICS 1 2 3 4 RCOA Updates RCOA Timeline General Procedures on Mandatory Migration Requirements RCOA Updates 420 Contestable Customers

More information

The Concept of Digital Transition. Korea s Current Status. Korea s Digital Transition Policy. Public Communications Program

The Concept of Digital Transition. Korea s Current Status. Korea s Digital Transition Policy. Public Communications Program 2011. 5. 26 Ⅰ Ⅱ Ⅲ Ⅳ Ⅴ Ⅵ Ⅶ Ⅷ The Concept of Digital Transition Korea s Current Status Korea s Digital Transition Policy Public Communications Program Securing Rights of Vulnerable Groups Addressing Poor

More information

TEN TRANSFERABLE LESSONS FROM THE UK S DIGITAL TV SWITCHOVER PROGRAMME

TEN TRANSFERABLE LESSONS FROM THE UK S DIGITAL TV SWITCHOVER PROGRAMME TEN TRANSFERABLE LESSONS FROM THE UK S DIGITAL TV SWITCHOVER PROGRAMME Introduction The UK s digital TV switchover programme has been completed in nearly 25% of the country, and remains on track to finish

More information

Ofcom Local TV Transmission mode testing

Ofcom Local TV Transmission mode testing Ofcom Local TV Transmission mode testing Date of Issue: 23 rd February 2012 DTG Testing Ltd 5 th Floor, 89 Albert Embankment London, SE1 7TP Email: testing@dtg.org.uk Tel: +44(0) 207 840 6500 2012 DTG

More information

Annex J: Outline for Bhutan DTV Road Map

Annex J: Outline for Bhutan DTV Road Map Annex J: Outline for Bhutan DTV Road Map A Guide for the Working Committee This is an outline of a possible form of a final report of the Working Committee, which could then easily be converted to the

More information

Sidney Myer Music Bowl Noise Management Plan. November 2016

Sidney Myer Music Bowl Noise Management Plan. November 2016 November 2016 1 Document History Revision # Date Author Comments 1.0 20 October 2008 John Arthur 2.0 27 July 2009 Kym Burgemeister Prepared by ARUP for VACT 3.0 13 April 2012 Glen Hirst Update to ARUP

More information

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time. DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.

More information

Reorganisation of the DTT LCN listing and changes to Digital UK s LCN Policy STATEMENT

Reorganisation of the DTT LCN listing and changes to Digital UK s LCN Policy STATEMENT Reorganisation of the DTT LCN listing and changes to Digital UK s LCN Policy STATEMENT Published: 3 April 2017 1 [BLANK] 2 Contents 1 Executive Summary... 4 1.1 Introduction... 4 1.2 The consultation...

More information

93.3 KIOA s Gadget Grab

93.3 KIOA s Gadget Grab 93.3 KIOA s Gadget Grab 93.3 KIOA s Gadget Grab is an on-air contest that will be conducted from Monday, September 17 th to Friday, October 19th in which up to 75 listeners will have the chance to win

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

PRODUCT/PROCESS CHANGE NOTIFICATION

PRODUCT/PROCESS CHANGE NOTIFICATION PRODUCT/PROCESS CHANGE NOTIFICATION PCN MMS-MMY/07/3303 Notification Date 12/26/2007 M24256, 256Kbit Serial I2C Bus EEPROM Upgrade and Die Optimization MMY - MEMORY 1/12 PCN MMS-MMY/07/3303 - Notification

More information

Roadmap for the MHz frequency band in the Slovak Republic

Roadmap for the MHz frequency band in the Slovak Republic Roadmap for the 470 790 MHz frequency band in the Slovak Republic Approved by the Minister of Transport and Construction of the Slovak Republic 11 June 2018 1 Analysis of the current state of the 470 790

More information

RESPONSE FROM BRITISH TELECOMMUNICATIONS PLC ( BT ) TO DMOL S CONSULTATION ON PROPOSED CHANGES TO THE LOGICAL CHANNEL NUMBERS (LCN) LIST

RESPONSE FROM BRITISH TELECOMMUNICATIONS PLC ( BT ) TO DMOL S CONSULTATION ON PROPOSED CHANGES TO THE LOGICAL CHANNEL NUMBERS (LCN) LIST RESPONSE FROM BRITISH TELECOMMUNICATIONS PLC ( BT ) TO DMOL S CONSULTATION ON PROPOSED CHANGES TO THE LOGICAL CHANNEL NUMBERS (LCN) LIST Introduction BT Vision is BT s digital TV service that combines

More information