1 Addendum #2 for: REQUEST FOR PROPOSAL FOR "Bid # 2 EESD ERATE C2" USAC/E-RATE 470 # QUESTIONS FROM SERVICE PROVIDERS FEBRUARY 27, 2018 Are bidders allowed to bid portions of the bid or must they bid everything outlined in the RFP? Yes, bidders are allowed to bid portions of the RFP, but only entire Options within the Sections. Specifically: The cabling portions may be bid without bidding the Network Equipment portions. The Network Equipment portions, UPS s, Network Switches, Routers, Firewalls and Basic Maintenance, can be bid individually or two or more at a time. The only partial bidding that is allowed is for Cabling Bidders to also bid the Option 4 Hybrid with large number of SM Fibers from IDFs to MDFs where Cabling Bidders can also bid the Fiber Media Converter and Power over Ethernet Injection portions. Are there school site maps available showing MDF and IDF locations? Yes, the eight (8) school site maps are attached in Appendix A. Each map is marked at a corner with a two character code signifying the site. Those same site codes are noted in the RFP on pages 12 and 13. For the cabling project we have school site maps showing the building/room coverage by MDF and IDF cabinet.
2 Questions: 1. For Option 1 and 2 What are the Lengths needed for the Fiber Optical Patch Cords. SM LC to LC 2. For Option 1 and 2 What type of fiber optical patch cord Duplex or Simplex 3. For Option 1 There is no line item for MDF fiber termination. 4. For Option 1 and 2 will you provide a line item for how much innerduct will be needed. 5. For Option #2 are you going to show a line item for Cable Pathway and a budget of $30, per school. 6. For the fiber optical connectors, do you want Mechanical, Fusion splice on connectors, or Fusion splice pigtails. 1. Fiber optic Patch Cords, SM LC to LC need to be 1 Meter each. 2. Fiber optic Patch Cords should be Duplex. 3. For Option 1 has added a line item for MDF fiber termination. (*See Additions to the charts from the RFPs below.) 4. For Option 1 and 2 please use 100 of innerduct, 50 on each end, as a bid calculation. (*See Additions to the charts from the RFPs below.) 5. For Option 2 please include a per campus Conduit Pathway estimate of adding 100 feet of 2 underground conduit and trenching as a pathway addition per IDF cabinet. EESD will cut, remove and replace any concrete and/or pavement for the installer. Installer is responsible for digging, conduit installation and replacing sand/dirt/gravel in the trench. (*Again, See Additions to the charts from the RFPs below.) 6. Fiber optic connectors should be Fusion splice on connectors or Fusion splice pigtails.
3 OPTION 1-12-strand (minimum) SM Fiber Section: *Additions/Changes are in light green. Single Mode Fiber & CAT 6A by Site AM BC LV MI MV PA RO SM TR Totals *MDF Fiber termination in new Cabinet *IDF Fiber termination in existing Cabinet MDF and IDF Cabinets (Existing Total) Estimated Length per IDF N/A *Estimated Innerduct Length per IDF N/A *Total Estimated Innerduct Length by site *Conduit Pathway addition est. feet / IDF N/A *Conduit Pathway total addition to Bid 900 1, , ,200 Number of SM LC to LC Patch Cables Total SM Fiber Length by Site CAT 6A Copper Cables (200ft each est.) Total CAT 6A Copper Cables OPTION 2-36-strand (minimum) SM Fiber Section: *Additions/Changes are in light green. Single Mode Fiber & CAT 6A by Site AM BC LV MI MV PA RO SM TR Totals *MDF Fiber termination in new Cabinet *IDF Fiber termination in existing Cabinet MDF and IDF Cabinets (Existing Total) Estimated Fiber Length per IDF N/A *Estimated Innerduct Length per N/A
4 IDF *Total Estimated Innerduct Length by site *Conduit Pathway addition est. feet / IDF N/A *Conduit Pathway total addition to Bid 900 1, , ,200 Number of SM LC to LC Patch Cables Total SM Fiber Length by Site CAT 6A Copper Cables (200ft each est.) Total CAT 6A Copper Cables
5 1. For CAT 6A cable how many faceplates, how many data per faceplate 2. How many IDF s How many cables per IDF ( This will make a difference on Patch Panels) 3. Do we need to provide raceway, If so How much 4. Who will need to provide and install the Exterior water proof boxes, 5. For the CAT 6A cabling do we need to provide any new IDF cabinets ( if so what are the requirements.) 1. For CAT 6A cable please see the site map of four classrooms below: 1 Wallplate is Dual Jack with two cables. See the green stacked triangles. 3 Wall-plates are Dual position with one cable installed. See the green single triangles 3 Biscuit Block Jacks are single position and single cable. See the orange single triangles. The only change from this drawing is that all new RFP copper cables will be CAT6A. 2. There will be a single new IDF in the new PACE school Office building. There will be 100 CAT6A cables coming out of this IDF. 60 of these CAT6A cables will exit the PACE Office building and extend to portable classrooms. The inter-building CAT6A cables will route underground via provided 2 conduit. 3. No raceway will be needed. All cables will be installed in provided pathway within the walls. 4. EESD will provide and install the exterior water-proof boxes for outdoor CAT6A jacks. 5. EESD will provide the required additional IDF cabinet. See the next page for a Sample CAT6/CAT6A Cabling Map from a recent Lassen View School Project:
6 Sample CAT6/CAT6A Cabling Map
7 Do you have a preference on how the fiber is terminated for on this project? Fiber optic connectors should be Fusion splice on connectors or Fusion splice pigtails. A question was asked about whether or not participation in the separate project of EESD's "WiFi Challenge" will impact EESD's RFP bid response evaluation. The evaluation factors EESD will use to evaluate the RFP responses to our erate RFP "Network Switching Refresh" are as follows: Factor W e i g h t Price of the E-rate eligible products and services 2 5 % Price of the E-rate ineligible products and services 1 0 % Ability of the Proposal to Support District's three Primary Objectives 2 0 % Vendor s prior experience with District 1 5 % Vendor s qualifications, experience, and references 1 5 % Local service response speed 1 5 %
8 Total % Whether or not a bidder participates as a vendor partner in the WiFi Challenge is not an evaluation factor.
9 1) If perspective (sic) bidders are bidding the Network Equipment only, do they need provide fiber patch cables and copper patch cables in their bids? 2) Can perspective (sic) bidders have access to an editable version of the Bid Form? 1) No, Network Equipment Bidders do not need to provide any Fiber Patch cables. EESD has requested adequate Fiber Patch cables in the Cabling portion of the RFP. See Page 23 for details. Bidders to the Cabling portion are being asked to provide bids for the required Single Mode Patch Cables. 2) Yes, The original editable version is a Microsoft Word file (.docx). This version will be made available via EPC and the District website. EESD will also be producing and Excel and Google Sheet version and will it to all vendors that attended the mandatory bidders meeting. EESD prefers submissions be in Excel or Google Sheet format.
10 NOTES FROM FEB 9, 2018 MANDATORY BIDDER CONFERENCE/JOB WALK Bid # 2 EESD ERATE C2 RFP Meeting Notes 2/9/18 at 9 am In attendance: Phil Brown Eric Zane Michael Harsh Dimitri Kristensen Logan Lemming Ryan Belcastro from World Telecom Drew Stark from AMS.net Jeff Bauer from Comer Communications Eric Stoxen from DGI John Jenkins from DGI Eric Zane: This is the mandatory bidders meeting for Cabling, LAN Switches and WAN Routers, as put out in our RFP. For cabling we will be discussing the Single Mode cabling and one group of quantity 100 CAT6A cables needed at the Monte Vista Campus. Regarding Network Equipment Technical Support, Equipment Replacement and Software/Hardware licensing we are looking for a 5 year contract but are trying to achieve a 10 year fixed cost. California Education Code only allows 5 year contracts, but we would like additional extensions that we could exercise to achieve a 10 year fixed cost if legally possible. The RFP response has to be a printed hard copy, it cannot be ed. The job walk today is only for those bidding on the cabling Section(s). The Request for Information (RFI) deadline is Feb. 21, Questions should all be ed to erate@eesd.net prior to that deadline. Is EESD going to wait for funding before starting the project? We can self-fund, we will not be waiting for funding, this will be a summer 2018 project. The plan is to be taking delivery of switches in April and starting installs. As long as erate allows us start work on April 2nd, that is our intention. But we shouldn t be expecting invoices to be paid or generated until July 1, correct? Correct, per my understanding of erate rules we cannot be legally invoiced until July 1st. Eric Zane: Last year we cancelled a similar RFP because we believed the switches were physically too deep for our IDF cabinets. We have found a solution to this issue. We will need to, and WILL, cut the power cable management support off the power supplies for Cisco Meraki and/or Cisco Catalyst 9000 series switches. We will not be changing all of our IDF cabinets. We asked Cisco Meraki and Cisco Traditional sales representatives for an inch and a half less depth, by modifying the back of the power supply and angling the power cable 90 degrees. Neither Cisco switch type sales team presented a viable option. We need right LEFT 90 degree angle power cords for the Power Supply. [This direction of turn changed after the Mandatory Pre-Bid Meeting: We need the power cord to plug into the Power Supply with the cord exiting the plug to the right side. That is the power cord needs to route across the back of the switch versus routing
11 into the removal tab on the Power Supply.] We want to keep the warranty after cutting the power cable management support off the power supplies. We DO REQUIRE a statement from each Network Equipment bidder regarding whether or not the warranty will be honored or voided when we cut the power cable management support off the power supplies. Eric Zane: We are planning on replacing MDF cabinets. This change is not to house new switches but to make changes to put our Video Surveillance Servers into the new MDF cabinets too. We have installed two APC Netshelter Cabinets so far at Mistletoe and Lassen View. We are also pulling MPOE telephone cabling etc. off the nearby walls, and putting it into the MDF cabinets too. Will the new MDF cabinets be in place by April? Yes. 2 of the 7 required cabinets are done already, the rest should be done before April 2 nd. Do we need a letter or an actual bid bond? And do you want it shown as separate line items for performance and material? The RFP is written up as letter evidencing bondability, not an actual bid bond. And either way, we will evaluate it based on total project cost. Yes, we d like the performance and materials bond costs as separate line items. We are also asking for 4 hours response time. It reads that 4 hours response time is both manufacturer support and vendor support. We just need 4 hour response time for vendor support.
12 Transportation is a non-educational site? What about PACE and RCA? PACE and RCA are both at our Monte Vista site which is an educational site. PACE and RCA combine student counts as they are physically on the same site. There is no cabling needed at the Transportation Site, just need to change out the switch and routing equipment. If erate allows us start work on April 2nd, that is our intention. Eric Zane: We need a network that achieves our Three Primary Objectives. First, is our North- South objective, we are looking to achieve per hop visibility, the bare minimum is from Chromebook to the exit from the WAN side to the Firewall, we need to know how much time it took. Second is the East-West between school sites; including IoT, malware, bad actors on the network, we are trying to hold down number of bad things that can be done. Third is our Ongoing Cost Reductions. Is there a fiber aggregation switch in Option 3? While reviewing the LAN switching and routing options we see a line was left out of Option 3. The Cisco Catalyst X Fiber-Aggregation switch was missed in Option 3.
13 Corrected LAN Switches & WAN Routers - Option 3 Network Switches by Site Model Name/Number or equivalent *Additions/Changes are in light green. AM BC LV MI MV PA RO SM TR Totals Number of MDFs N/A Number of IDFs N/A Cisco ASR 1001-X Cisco ASR 1001-X *Cisco Catalyst X Fiber-Aggregation switch Catalyst X Cisco SFP-10GB-LRM SFP Module (MDF) SFP-10GB-LRM *Cisco 1M SFP+ Twinax uplink cable (MDF) 1M SFP+ Twinax Cisco Catalyst UXM Catalyst UXM Cisco Catalyst UX Catalyst UX Catalyst Redundant Power Supply PWR-C1-1100WAC= Cisco 3M SFP+ Twinax uplink cable(mdf) 3M SFP+ Twinax Cisco SFP-10GB-LRM SFP Module (IDFs) SFP-10GB-LRM Cisco Stacking cable 1 Meter STACK-T1-1M Cisco Stacking cable 3 Meter STACK-T1-3M These are needed to complete the stacking from top to bottom. Meraki Fiber-Aggregation Switch MS Meraki MS225-48FP MS225-48FP Meraki Stacking cable MA-CBL-40G-3M Each switch includes a stacking cable. These are needed to complete the stacking. Meraki Redundant Power Supply 1025W Power Supply Meraki 3M SFP+ Twinax uplink cable 3M SFP+ Twinax Meraki MA-SFP-10GB-LRM SFP Module (IDFs) MA-SFP-10GB-LRM Meraki USA AC Right Angle Power Cable MA-PWR-CORD-US * Cisco USA AC Right Angle Power Cable CAB-TA-NA-RA= * Note: This part number needs to be changed to be a Right Angle cable. The District requires both 5 and 10 year Licensing options and seeks to achieve 10.
14 Is all routing on each site through the ASRs for Option 3? It is for Option 2 and 3. Option 1 uses Meraki MX devices for routing. Also, we will add the 9500 that we missed and all Meraki switches in Option 3 will go into the 9500 for fiber aggregation. In Option 3, the Meraki is strictly for IoT, all student and admin devices are riding back to the The only computers that could be there [on the IoT network] are the video surveillance server. Would you need 100% separation? EESD needs routing between the separate subnets. Option 4 is my attempt to have zero Cat 9K switching in any IDF cabinets. We are doing our best to put completely dumb devices in IDF cabinet, taking any end user device that comes into an IDF via a WAP or via copper cable, immediately into a Media Converter. The WAPs go into a Media Converter and it all will have a Single Mode Fiber connection back to the MDF, thus removing a need for Cat 9K switching. Cat 9K switching will all be in the MDF s. IoT will still be on Meraki. We don t want to pay for Cisco DNA licensing on per port basis for ports that we re not using and probably never will use. In general, this is a semi-defined design build; the quantities are fixed and we need to play tetris to see what fits in. Yes, the goal is to put EESD at a lower total cost of ownership for both ownership and on-going management costs.
15 Do you want all of the the Fiber Optic cable terminated or dark? Bid it all as terminated, if you both bid it that way it will be apples to apples. We mutually decided during during this meeting that all Fiber Optic Cable for this RFP would be Tight Buffered cable. For LAN Switches - Option 1 there are dual 24-port switches listed. Is there physically only one 48- port in each of those spaces currently? Yes, but we have 1 Rack U blank underneath and will be using the 1 U space of that blank. Currently Meraki 48-port switches do not support multigig, is there an option of swapping out WAP s now? The premise is Meraki will figure out a way to make cost of one 48-port equal two 24-ports. If a 48- port is not available by April 2 nd then we ll probably hold off and wait to purchase. We will not be swapping out all WAPs now. We have so many other things that need switching now. Also, we will be having a WiFi Challenge this month therefore no WAP s or other WiFi equipment is listed in this RFP. The AX standard is being created now. Waiting for WAPs will mean we get better WAPs with a longer future. It has to be bid this way right now so it s fair, but we don t intend to buy it that way. If you want to bid just cabling that s fine, or you can bid cabling and UPS s or you can bid the Media Convertor equipment only in Option 4. You want a separated bid for each? Yes, you can bid all 4 Options or just one Option. The Options expectation is that they are turn key; installed and done, and everything we have working now will continue to work. You can bid switching options as well, but not just a rack and stack. At one site, Monte Vista, PACE school, 2 of 7 planned classrooms exist so we are making a general estimate of what s needed for CAT6A cabling. The CAT6A specs could be old and wrong if someone notices a correction to be made please list it as an RFI.
16 Do electronic drawings have to be Visio or can it be AutoCAD? We require Visio. We will entertain options prior to submission. Are we just dropping off UPS or stacking them too? We didn t think about that, we will need to specify labor install. Labor and Installation are required for the UPS quotes. Also, regarding UPS quotes, please use the Part Numbers that include the pre-installed UPS management cards. We do not want to be installing them separately or paying a vendor to install these cards. Are you asking for Live Action because you are not confident that Meraki Insight can do all of it? With both Cisco DNA and Meraki Insight, they are both such young products and Live Action is Mature product. Our view of Live Action is that it is not much extra cost over 10 years, we might as well have another option to help validate results. What about ISE? ISE and Stealth Watch are part of achieving our Objectives too. We expect ISE and Stealth Watch licensing to be included. If there s another option given, that will also be looked at.
17 What is possibility of moving to Option 2, 3 or 4 if a 48-port switch is not available? If Option 1 achieves our 3 Primary Objectives and the pricing is the lowest we will wait for Option 1 [48-port mgig switches] over moving to Options 2, 3, or 4 if need be. If it s simply waiting for a multigig 48-port switch then we will wait. On the redundant power supplies, they are off by 1. It is because the 9500 switch was accidentally deleted from Option 3. All of the DNA features will need to be included? Specifically what does that mean to EESD? We are trying to get to the capability of VXLANs. The complete software defined network would be outside of the box [what EESD needs]. If we have to buy software/licenses to get required features then we want the function of that configured. I.e. if we have switches then want to be able to manage that under DNA. The focus is on those 3 objectives. 45 apps do need to be configured. Option 3 is not asking for mgig on the Meraki side. We have changed Meraki switch models to 225 on Option 3. There are no UPoE needs. Is SSL encryption required at any point? It is on our radar, yes. We are asking for the best features to accomplish the 3 Primary Objectives. It is our expectation that the winning bidders will prepare required erate Item 21 forms in a timely manner. Since this is kind of design building, but semi-fixed, an occasional run may need an LR optic vs an LRM. We will decide that when getting to the point of purchasing, it could be a substitution. We are aware of of our fiber runs that require LRM optics. Appendix A - Maps for EESD:
18 Mistletoe Elementary School (MI)
19 Shasta Meadows Elementary School (SM)
20 Parsons Junior High School (PA)
21 Rother Elementary School (RO)
22 Alta Mesa Elementary School (AM)
23 Lassen View Elementary School (LV) Boulder Creek School (BC)
24
25 PACE Academy & Redding Collegiate Academy (MV - Monte Vista - Shared location)
Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling
Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting
More informationBILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School
BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street
More informationRequest for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points
Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting
More informationRequest for Proposals Fiber Optic Network Backbone Upgrades
Introduction Request for Proposals Fiber Optic Network Backbone Upgrades RFP Released on February 18, 2015 The Dexter R-11 Public School District is seeking proposals from qualified service providers to
More informationCable Installation Tips
Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)
More informationCable Installation Tips
Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)
More informationAmendment No. 1 SOLEDAD UNIFIED SCHOOL DISTRICT Request for Proposal DISTRICT NETWORK CABLING UPGRADE
March 4, 2016 Amendment No. 1 SOLEDAD UNIFIED SCHOOL DISTRICT 2016 Request for Proposal DISTRICT NETWORK CABLING UPGRADE NOTICE TO ALL BIDDERS This amendment is made a part of the above entitled specifications
More informationColorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)
Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ 86442 (928) 758-3961 NOTICE OF REQUEST FOR PROPOSAL RFP NAME: 2018 MHS Office Low Voltage. MATERIAL OR SERVICE: CRUHSD is seeking
More informationFacilities Management Design and Construction Services
Facilities Management Design and Construction Services ADDENDUM NO. 1 April 4,, 2019 REQUEST FOR PROPOSALS AUDIO/VISUAL SYSTEMS Indefinite Delivery Indefinite Quantity (IDIQ) UNIVERSITY OF ARKANSAS, FAYETTEVILLE
More informationREQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus
REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,
More informationCity of Winter Springs, FL
City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual
More informationSPECIAL SPECIFICATION 6559 Telecommunication Cable
2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,
More informationجامعة مؤتة العطاءات املركزية توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة. Central Tenders Mu tah University
عطاء رقم 3 /ل/ 2019 توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة 1. 20U Network Rack: (QTY:- 1 pieces) 1. Wall Mounted Type. 2. Dimension (H x W x D): 20U x 600 x 600. 3. Material: Steel. 4. Front Door:
More informationSECTION FIBER OPTIC STATION CABLES
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationSPECIAL SPECIFICATION 8540 Telecommunication Cable
2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,
More informationCUSTOM-LENGTH PATCH CABLES CUT-TO-LENGTH BULK FIBER PRE-TERMINATED FIBER MULTI-COLORED FIBER
CUSTOM-LENGTH PATCH CABLES CUT-TO-LENGTH BULK FIBER PRE-TERMINATED FIBER MULTI-COLORED FIBER 1.877.877.2269 BLACKBOX.COM OUR CUSTOM CAPABILITIES When you re looking for specialized copper or fiber cables
More informationSection Communications Optical Fiber Backbone Cabling
Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related
More informationTender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*
Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:
More informationULTRA HIGH DENSITY SOLUTION GUIDE
ULTRA HIGH DENSITY SOLUTION GUIDE About A global leader in fiber optic technology, AFL Hyperscale brings together over 70 years of design and manufacturing expertise to create next generation, end to
More informationUNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE
UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and
More informationRequest for Quotation (RFQ) for the supply of LAN Cabling Reticulation at Entabeni for the CSIR. CSIR RFQ No. 5300/22/02/2018
Request for Quotation (RFQ) for the supply of LAN Cabling Reticulation at Entabeni for the CSIR Date of issue: 05 February 2018 Compulsory briefing session and Venue: Tuesday, 13 th February 2018 at 11H00
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective
More informationMarch 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/
Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013
More informationSAK Information Technology Department. Invitation to Bid For the Implementation Of IP-CCTV
SAK Information Technology Department Invitation to Bid For the Implementation Of IP-CCTV Release Date: Oct 22, 2013 Table of Contents. 1.1 Introduction 03 1.2 Brief About The design 03 1.3 RFP Contact
More informationExperience The Difference With C2G!
QUICK FINDER Experience The Difference With C2G! Technical Support We offer free technical support on every product we sell! Talk to certified industry experts that are ready to help you immediately! Email
More informationBUSD Ramona Middle School Gymnasium Project AV Project
BUSD Ramona Middle School Gymnasium Project AV Project Scope: Provide all part necessary for the completion of an AV System for the new Middle School Gymnasium per the attached parts lists and drawings.
More informationPre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017
Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM-2017-2 Date: 05/26/2017 Additional specification information for data communication to cameras and between Library
More informationFurnish & Install Video Surveillance System for Lot B. Exhibits
C-1443 Furnish and Install Video Surveillance System for Lot B Ernest N. Morial New Orleans Exhibition Hall Authority 900 Convention Center Boulevard New Orleans, LA 70130 ADDENDUM NO. 1 Project Name:
More informationRequest for Proposal (RFP)
Request for Proposal (RFP) Data Network for OCMS 017 Inquiries and requests regarding this RFP should be directed to: Michael Hale Technology Director Oconee County Schools PO Box 16 5-A School Street
More informationFollow The Leader In Shielded Technology
1970s Vampire Tap 1990s Shielded Modular Jack 190s 4 Position Data Connector Follow The Leader In Shielded Technology The new AMP-TWIST Jack is our latest shielded product evolution. It can be terminated
More informationPURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationArista 40G Cabling and Transceivers: Q&A
Arista 40G Cabling and Transceivers: Q&A 40G Cabling Technical Q&A Document 40Gigabit Cables and Transceivers Q. What 40G cables and transceivers are available from Arista? A. Arista supports a full range
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided
More informationMonday, January 7, 2019
ADDENDUM NO. 3 TO THE REQUEST FOR PROPOSALS (RFP) FOR VIDEO AND ACCESS CONTROL SYSTEMS VARIOUS LOCATIONS CITY WIDE FOR THE CITY OF HYATTSVILLE, MARYLAND RFP #DPW18-010 Monday, January 7, 2019 The City
More informationCalifornia Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationFamily Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project
Family Health Centers, Inc. Request for Proposal for Family Health Centers East Broadway Data and Communications Cabling Project Date Issued: 06/07/2014 Date Due: 06/16/2014 Page 1 of 22 Table of Contents
More informationC. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects.
DIR-SDD-1898 Cabling Services and Related Products C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects. Please address all returns
More informationGATOR PATCH. The ultimate fiber distribution terminal
The ultimate fiber distribution terminal PRODUCT OVERVIEW Rugged, Fast, Reliable! Trust the original Gator Patch for all your fiber distribution needs The Gator Patch is a unique, rugged, factory terminated
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems
1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of
More informationPreferred ordering guide for NETCONNECT
Preferred ordering guide for NETCONNECT MEA Region Contents Copper solutions Category 6A products 3 Category 6A and Category 7 shielded copper cables 3 Category 6A modular shielded panels 3 Category 6A
More informationSTRUCTURED CABLE SYSTEM (SCS)
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationMinimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)
PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer
More informationAPPENDIX A Verify All Part Numbers (Partial List of Approved Products)
SECTION 16651 APPENDIX A Verify All Part Numbers (Partial List of Approved Products) SYSTIMAX SCS: OVER-VOLTAGE PROTECTION 1. Over-voltage Protection Device, 100-Pair with Enclosure, Product 489ACAI-100,
More informationSPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel
1993 Specifications CSJ 0924-06-223 SPECIAL SPECIFICATION 1160 8:1 Video (De) Mux with Data Channel 1. Description. This Item shall govern for furnishing and installing an 8 channel digital multiplexed
More informationLyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:
Lyndhurst Secondary Technology Package Addendum #7 8.29.2017 Bid Date: Wednesday, August 30, 2017 @ 1:00PM Items issued in this addendum: A. Contractor questions and responses B. Clarifications A. Contractor
More informationTelecommunication Infrastructure Project September 20, 2002
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing Publications and Standards B. Category rated UTP systems shall be provided and tested in accordance with the performance level established in Specification
More informationPHORCE (standalone version)
PHORCE (standalone version) PRODUCT BRIEF The PHORCE product family is designed to extend the SuperSpeed USB3.0 connections beyond the typical 3 meter reach of copper cables. The standalone version of
More informationRFIs AND RESPONSES; ANSWERS ARE IN RED.
January 4, 2013 ADDENDUM #3 TITLE OF RFQ: Gateway Audio Visual Bid REFERENCE: 12/13 B-30 Please note the following information regarding 12/13 B-30: 1. The due date is: January 11, 2013 at 1:00 p.m. in
More informationMichigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE
PAGE 271800-1 SECTION 271800 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP
P.O. Box 281 o Nome, Alaska 99762 ADDENDUM NO. 6 DATE: May 22, 2017 TO: Proposers FROM: Joy Baker, Project Manager RE: PORT OF NOME SECURITY CAMERA PROJECT RFP NOTES TO PROPOSERS: The Proposal submittal
More informationCASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS
CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized
More information5e. Max bandwidth is 400MHz Cat 6 max bandwidth of 500MHz Cat 6E max bandwidth of 550MHz ( E stands for enhanced ) Cat 6A max bandwidth of 625MHz
Before we talk about Hubbell s range of Copper connectivity products we first need to understand the difference between the various categories of copper products! Quite simply put the category of a copper
More informationQuickNet Copper Cabling in the Data Center
Application Guide QuickNet Copper Cabling in the Data Center QuickNet Copper Cabling Systems With the benefits of quick network deployment, assured performance, quality, and easy redeployment, the Panduit
More information3M Coupling Tray FDTC-10S-COUPLINGTRAY
3M Coupling Tray FDTC-10S-COUPLINGTRAY for use with 3M Fiber Dome Closures FDC 10S Instructions July 2010 3 1.0 Introduction The 3M Coupling Tray FDTC-10S-COUPLINGTRAY can accommodate up to 10 loose tubes.
More informationUNM IT/Telecommunications Guide Specification Labeling 11/07/
Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 3 DATE: January 14, 2015 RE: RFP NUMBER: RFP TITLE: District Four, Regional Transportation Management Center Video Wall Replacement Notice is hereby given
More informationSECTION TESTING OF COPPER CABLES
SECTION 27 08 13 TESTING OF COPPER CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,
More information3M Telecommunications. Solutions for Networks. 3M MPO solutions. High Density Networks. Technology built for business
3M Telecommunications Solutions for Networks 3M MPO solutions High Density Networks Technology built for business 2 3M Telecommunications Solutions for Networks 3M Telecommunications Solutions for Networks
More informationPurchasing Department Finance Group INVITATION TO BID
Purchasing Department Finance Group July 3, 2013 INVITATION TO BID The City of Norwalk is soliciting bids for the Building Management Department for Network Video Recording (NVR) Equipment for the existing
More informationBest Friends General Trading FZE
Welcome to Best Friends General Trading FZE Tel. +97 1 50-5426 202, Fax. +971 6 7407428, info@bestfgt.com, besttrd@eim.ae Infrastructure Product Guide Best fgt is UAE based company, operational for last
More informationSECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION
683 SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683.01.01 GENERAL A. The Contractor shall furnish the designated quantity of Video Optical Transceiver (VOTR) pairs
More informationBelden IBDN System 10GX Enabling Technologies
Belden IBDN System 10GX Enabling Technologies by Paul Kish Director, Systems and Standards Revision 1 November 2008 Belden Belden IBDN System 10GX Enabling Technologies 1/17 Introduction The IEEE 802.3an
More informationPreparing a home for TransACT fibre-to-the-premise (FTTP) services
Preparing a home for TransACT fibre-to-the-premise (FTTP) services A guide for builders, telecommunications cablers and home owners transact.com.au For more information call TransACT s FTTP Sales Manager,
More informationCABLING STANDARDS FOR
RFB for Wiring in the Outagamie County Courtrooms Attachment B September 1, 2016 CABLING STANDARDS FOR GENERAL The purpose of this document is to provide guidelines for all structured cable installations
More information16 SFP ports and 16 BNC. built in. 24 SFP ports, 8 BNC
Product Overview 2018 BarnOne Frames BTF1-01 BTF1-02 BTF1-03-08 BTF1-03-16 BTF1-04 BTF1-05-08 BTF1-05-16 BTF1-06 BTF1-07-08 BTF1-07-16 BTF1-08-08 BTF1-08-16 16 SFP ports 16 SFP ports and 16 BNC 16 SFP
More informationCI-218 / CI-303 / CI430
CI-218 / CI-303 / CI430 Network Camera User Manual English AREC Inc. All Rights Reserved 2017. l www.arec.com All information contained in this document is Proprietary Table of Contents 1. Overview 1.1
More informationFiber Optics Redefined
Fiber Optics Redefined Questions and Answers on the basics of fiber optic installation TECHLOGIX NETWORX Questions & Answers Questions and Answers Q: What are the two main types of fiber? A: The two main
More informationNO MORE LOOSE ENDS PRE-TERMINATED FIBER CABLE: FAST. TESTED. READY TO GO (BBOX) BLACKBOX.COM/PRETERMFIBER
NO MORE LOOSE ENDS PRE-TERMINATED FIBER CABLE: FAST. TESTED. READY TO GO. BBOX APPLICATIONS PANELS & BBOX APPLICATIONS & MARKETS ICON SET ESSORIES PRE-TERMINATED FIBER CABLE AWARD WINNING CONNECTORS, ADAPTERS
More informationOptical Distribution Box 300 Installation Guide. Version : R0.0
Optical Distribution Box 300 Installation Guide Document No. : OD16-546-L-01 Version : R0.0 Date: 21-Mar-2018 IMPORTANT INSTRUCTIONS When using fiber optic equipment, basic precautions should always be
More informationCAPEX and OPEX Savings in HD Camera Deployments Using a Powered Fiber Cable System. Chris Raynor CommScope
CAPEX and OPEX Savings in HD Camera Deployments Using a Powered Fiber Cable System Chris Raynor CommScope The rise of Security Cameras Where are cameras? Source: http://www.emc.com/collateral/solution-overview/h14230-federal-surveillance-market-so.pdf
More informationSECTION 7 -- CROSS-CONNECT SYSTEMS
DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.
More informationBelden IBDN System 10GX The next level of cabling performance
Belden IBDN System 10GX The next level of cabling performance by Paul Kish Director Belden IBDN Systems and Standards Introduction There is a new standard under development in the IEEE 2.3an task force
More informationMPS Webinar Technical Series
MPS Webinar Technical Series Making Connections: Navigating Fiber Optic Cabling and Interconnection Requirements microwave photonic systems Expand Your RF Horizons Introduction Microwave Photonic Systems
More informationPeak Atlas IT. RJ45 Network Cable Analyser Model UTP05. Designed and manufactured with pride in the UK. User Guide
GB05-7 Peak Atlas IT RJ45 Network Cable Analyser Model UTP05 Designed and manufactured with pride in the UK User Guide Peak Electronic Design Limited 2001/2013 In the interests of development, information
More informationStructured Cabling. Product Line Brochure
Structured Cabling Product Line Brochure High Performance and Reliable Solution Infinique structured cabling products are manufactured to international standards and are certified for performance and
More informationBrown University. Communications Standard Parts List
CIS - NTG Brown University Communications Standard Parts List All data installations must receive the 25-year Mission Critical Warrantee from Hubbell Premise Wiring. All fiber installations must receive
More informationThomas R. Proctor High School. Section 4 Telecommunications Breadth Work
Section 4 Telecommunications Breadth Work 71 4.1 Telecommunications System Addition In order for Thomas R. Proctor High School to be considered an emergency data recovery site, emergency power cannot be
More informationSC Connector. Fiber Optic Connectors. MDR Electronics
SC Connector Fiber Optic Connectors MDR Electronics www.mdrelectronics.com Table of contents 1. Introduction 3 2. Image and line drawing 4 3. Types of connector 5 4. Specifications 6 5. Ask for assistance
More information1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GENERAL
More informationMfgr. Berk Tek ea , Berk Tek ea , Berk Tek ea. Berk Tek ea ,350.
8. Pricing Schedule The undersigned has rd and understands all conditions and terms of RFP 336-, is authorized to submit this proposal on behalf of the company, and hereby offers to perform the services
More informationHow to Specify MTP Pre-terminated Optical Cabling. January White Paper. Published
White Paper How to Specify MTP Pre-terminated Optical Cabling Published January 2009 The benefits of pre-terminated cabling The two principal advantages of pre- terminated cabling are reduced time on site
More informationRequest for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS
VOFP Cabling RFP 1 Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For The Village of Franklin Park 2014 VOFP Cabling RFP 2 TABLE OF CONTENTS I. PROJECT DESCRIPTION
More informationConnectivity accessories by Nestor Cables
Connectivity accessories by Nestor Cables NesCon product family includes essential installation and connection accessories for fibre optic networks, from ODFs to joint closures and terminations. www.nestorcables.com
More informationTown Hall Meeting Fiber to Home Q&A January 28, 2016
Town Hall Meeting Fiber to Home Q&A January 28, 2016 **Answers are summarized and may not be verbatim. Please refer to audio for full responses. QUESTION ANSWER RESPONSE GIVEN BY 1) What all do we get
More informationConnectix Cabling Systems
Connectix Cabling Systems Cabling Standards and CPR Update Connectix CEP Fibre Optic Solutions Jason Holroyd CNID Director of Business Development Types of fibre Agenda Introduction Uses Construction Transmission
More informationB. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.
PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Support Structures 2. Cable trays and ladder rack 3. Racks (including wire managers) 4. Cables (copper and optical fiber) 5. Jacks and faceplates
More informationProject No. # Page 1
PART 1 - GENERAL This section of the has references, products, procedures, processes, and work descriptions/summaries that are common to many Washington State University Pullman (WSUP) campus telecommunications
More informationViavi T-BERD 5800 CPRI Testing Guide with ALU BBU Emulation
Viavi T-BERD 5800 CPRI Testing Guide with ALU BBU Emulation Scope Version 4 January 2018 Firmware 26.0.0.6c1973b or Later REQUIRED! This document describes Common Public Radio Interface (CPRI) testing
More informationProduct Catalogue. Fiber Optic Assemblies & Adapters. Table of Contents General Description... 2
Product Catalogue Fiber Optic Assemblies & Adapters Table of Contents 1. General Description... 2 2. Connectors... 3 2.1 SC/UPC... 3 2.2 SC/APC... 3 2.3 FC/UPC... 3 2.4 FC/APC... 3 2.5 ST/UPC... 3 2.6
More information3GSDI Fiber Optic Extender
3GSDI Fiber Optic Extender GEF-3GSDI-FO-141 User Manual www.gefenpro.com ASKING FOR ASSISTANCE Technical Support: Telephone (818) 772-9100 (800) 545-6900 Fax (818) 772-9120 Technical Support Hours: 8:00
More informationInformation Technology Services DESIGN AND INSTALLATION STANDARDS
Requirements and Guidelines for: New Construction, Renovations, Upgrades, and Retrofits. Revised: June 5, 2015 VIU ITS Network Services 2 TABLE OF CONTENTS 0 GENERAL... 5 1 FIBER OPTIC CABLING... 5 1.1
More informationNC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM
NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC
More informationPROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP
PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX 75078 NOTICE TO BIDDERS RFP 03-2019-IFP Section I General Information Prosper ISD (PISD) is seeking proposals
More informationTechnical Specifications Florida Gulf Coast University
Technical Specifications Florida Gulf Coast University 9/19/2018 Page 1 of 21 Approved Vendors (alphabetical order) Aztek (CIP) Certified Installer Plus Mr. Scott Coyne 4730 Enterprise Avenue Suite #308
More informationTITLE: FIBER OPTIC SHOCK FIXTURES
ENGINEERING PRACTICE STUDY TITLE: FIBER OPTIC SHOCK FIXTURES 18 January 2007 STUDY PROJECT 60GP-2006-019 FINAL REPORT Study Conducted By Dave Leight DSCC-VAT Fiber Optic Group Prepared by: Dave Leight
More informationC Clear Touch Interactive Touch Screen Panels Bid
C-207-19 Clear Touch Interactive Touch Screen Panels Bid Newton County Schools is soliciting sealed bids for the purchase of select Clear Touch Interactive Panels and accessories. The pricing provided
More informationMIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project
1.1.0 GENERAL The purpose of this specification is to establish a requirement for the installation of a voice, video and data cable network. The cable (copper), wire, hardware, equipment racks, jumpers,
More informationRCIT Cable Certification Testing Revised 10/2017
RCIT Testing Revised 10/2017 General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall
More informationHIGH COURT OF BOMBAY AT GOA
HIGH COURT OF BOMBAY AT GOA Calling Quotations for Supply and Installation of Wireless Synchronized Digital Clocks Quotations are invited from the Manufacturers/Suppliers of Wireless Synchronized Digital
More informationRETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP
RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP 160000071 Department of Military and Veterans Affairs Division of Administrative Services Procurement Section P.O. Box 5800 Joint
More information