Request for Proposal (RFP)

Size: px
Start display at page:

Download "Request for Proposal (RFP)"

Transcription

1 Request for Proposal (RFP) Data Network for OCMS 017 Inquiries and requests regarding this RFP should be directed to: Michael Hale Technology Director Oconee County Schools PO Box 16 5-A School Street Watkinsville, GA 0677 (706) x108 (706) FAX Proposals and bids must be delivered no later than :00 PM on February 0, 017 to: Oconee County Schools PO Box 16 5-A School Street Watkinsville, GA 0677 Please note that all proposals must be received at the designated location by the stated deadline. Late proposals will be returned unopened and shall be considered void and unacceptable. After the deadline, proposals will be evaluated for this RFP. Not all proposal information is considered public, and only the final contract and costs of award will be available to the public. No proposal information will be shared until after the award. OCONEE COUNTY SCHOOLS RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS AND PROPOSALS AND TO AWARD IN PART OR IN TOTAL WHICHEVER IS DEEMED TO BE IN THE BEST INTEREST OF THE SCHOOL DISTRICT. Data Network for OCMS 017 1/0/017

2 Background Oconee County is located approximately eight miles from Athens, GA and the University of Georgia. Oconee County Schools (OCS) is re-wiring the remaining CAT5 network at Oconee County Middle School (OCMS). OCMS is located at 1101 Mars Hill Road, Watkinsville, GA. The building currently has a combination of network cabling since some areas of the building have already been updated to CAT 5e and CAT6. The CAT5 network was installed in the late 90 s. The IDFs are currently connected with laser-optimized 50/15 µm multi-mode fiber (OM), except for one fiber run to the OCMS Fieldhouse. It is 6.5 µm multi-mode fiber. This RFP addresses replacement of the CAT5 cabling with CAT6 cabling in the 00, 500, and 600 areas of the building as well as the gym. It also includes replacing the one run of 6.5 µm multi-mode fiber. OCS invites vendors to submit proposals in accordance with the terms and conditions of this Request for Proposal (RFP). This RFP provides the requirements and evaluative criteria for furnishing and installing a cabling system consisting of 80 CAT6 runs terminated and tested from each of the intermediate distribution frames (IDF) as well as from the MDF. Responses from all prospective vendors should address pricing, service descriptions, and implementation procedures. This project is funded using special purpose local and E-Rate funds. Details It is the intent of this Request for Proposal (RFP) to provide bidders with sufficient information to prepare a proposal to replace an existing CAT5 network with a new 80 drop network using CAT6 from IDFs and a MDF and also includes installing a laser-optimized 50/15 µm multi-mode fiber (OM) to the fieldhouse from the TV-IDF. This fiber run will have 6 strands and all strands will be terminated. The terminations will be LC connectors. Proposals are requested on products that are the functional equivalent or better than the brands listed below. References to brand names, trade names, model numbers, or other descriptions are made to establish a required level of quality and functional capabilities and are not intended to exclude other products of that level. Specific names of products listed below are intended to convey the type of equipment sought. Comparable products of other manufacturers will be considered if proof of comparability and compatibility is contained in the proposal. Vendors, if proposing other than specified, are to clearly identify the manufacturer and the model number and must provide written, complete justification as to how the product complies with all specifications outlined within this RFP as well as the complete list of manufacturer's published specifications related to the requested products. It shall be the responsibility of the bidders to furnish descriptive literature with their proposal such that specifications, catalog pages, brochures or other data will provide an adequate basis for verifying the quality and functional capabilities of the product offered. Failure to provide this data will be considered valid justification for rejection of the proposal. Services/equipment included within this agreement shall be delivered from May, 017 until July 10, 017. All wiring should be completed by July 10, 017. All contracts awarded will be contingent upon Board approval by the Oconee County Schools. The successful vendor must be responsible for the removal and disposal of any existing CAT5, CAT and coax cabling as well as unused raceways, including surface mounted raceway in the building. Existing fiber, already updated CAT5e and CAT6 cabling, intercom wiring and speakers, and classroom AV wiring will be protected.

3 The response must provide a list of major components used in the completion of the project: A description of the materials and quantity A description of the equipment A description of the cost of material and equipment Detail any other costs not included in proposal above Time estimates for the project. All costs must be included in the response. In Appendix A are the drawings of the OCMS with the network drop and IDF locations identified. In Appendix B are the drop counts per room and IDF. General Specifications 1. Cabling / Cabling System A. The copper twisted pair cabling system shall be the Siemon System 6 UTP Cabling System. B. All copper twisted pair cabling shall be blue jacketed and plenum rated. C. All cable shall be Siemon cable or approved Siemon cable partners. Acceptable CAT6 cables are: i. Berktek LanMark (reel) ii. Berktek LanMark (box) iii. Berktek LanMark (reel in a box) iv. Berktek LanMark v. General Cable GenSpeed vi. General Cable GenSpeed vii. Mohawk AdvanceNet 6E M5719 viii. Mohawk GigaLan 6E+ M571 ix. Siemon System 6 9C6P-E-06-RXA x. Siemon Premium 6 9C6P-E-06-RBA xi. Superior Essex DataGain B (reel) xii. Superior Essex DataGain B (brake box) xiii. Superior Essex DataGain B (POP box) xiv. Superior Essex Nextgain 5-7-B (reel) xv. Superior Essex Nextgain 5-6-B (reel in a box) D. Fiber backbone -main distribution frame (MDF) to horizontal and or intermediate distribution frame (IDF) i. Minimum of 1 fibers between distribution frames -adhere to manufacturer's installation procedures. All 1 fibers must be terminated. ii. Star configuration iii. Routed through Trade size 1 inner duct or armored. Below grade runs must use indoor/outdoor rated or outdoor rated water blocking fiber cable. iv. 50/15 μm LOMMF -OM laser certified multimode fiber that meets ISO/IEC standards. v. Each fiber backbone connection must support 10GB bandwidth performance. E. 50/15 μm Multimode fiber connectivity i. Connectors a. LC Duplex only -composite or ceramic ferrule ii. Fiber patch panels a. Rack mount b. 1 fiber adapter panels (LC Connectors only)

4 c. Splice trays if needed d. Rack unit trays only F. Cable Supports: i. Existing pathways may be used, but the vendor will be responsible for any new pathways needed. G. Fire stopping: The vendor is responsible for sealing conduit sleeves and openings used. H. Grounding, Bonding: i. Attach a #6 bare, solid ground wire from a local ground bar to each equipment rack/cabinet/tray using ground lugs. ii. Contractor to conform to NEC, EIA, ANSI, ASTM, UL, BICSI, TIA, and local regulations. IDFs The MDF is located in a closet off the 500 hallway. The vendor will install a new post U Open Frame Server Rack to replace the -post rack maintaining the integrity of the existing -post rack and wiring. It should meet EIA 19" standards and be Dell, HP, IBM, and Cisco compatible. Installation should include the backboard, grounding bar and cable management between the two racks. Before installation confirm location and positioning with owner. Station Drops The standard connector for all data outlet connections is a Category 6 RJ5 jack (keystone style). Each jack will be provided 10 ft blue patch cable and patch panel termination will be provided a blue patch cable (50% ft and 50% 5 ft). Category 6 balanced twisted-pair horizontal and backbone cables, whose length does not exceed 90 m (95 ft) for the basic link, and 100 m (8 ft) for the channel shall be 100 percent tested according to ANSI/TIA/EIA-568-B.1. Test parameters include wire map plus ScTP shield continuity (when present), length, NEXT loss (pair-to-pair), NEXT loss (power sum), ELFEXT loss (pair-to-pair), ELFEXT loss (power sum), return loss, insertion loss, propagation delay, and delay skew. All category 6 field-testing shall be performed with an approved level III balanced twisted-pair field test device. All installed category 6 channels shall perform equal to or better than the minimum requirements as specified by the table below: Performance Performance Performance 50MHz Insertion Loss 0. db 9.7 db.7 db NEXT Loss.1 db 7.5 db 6.1 db PS NEXT Loss 0.6 db 6.1 db.6 db ACR 1.8 db 7.8 db. db PS ACR 0. db 6. db 0.9 db ACR-F.9 db 17.9 db 15.9 db PS ACR-F 0.9 db 1.9 db 1.9 db

5 Return Loss 1.0 db 11.0 db 10.0 db Propagation Delay 58 ns 57 ns 56 ns Delay Skew 0 ns 0 ns 0 ns The final terminations will be in specified racks for IDFs TV, Gym and MDF. The terminations should be in a CAT6 patch panel. Network station drops should not use any surface mounted raceway or boxes. If conditions do not allow for other methods, the use of any new or existing surface mounted material must be approved prior to the use of the materials. Include a per network box raceway cost estimate. Fiber The multimode optical fiber cables for the horizontal subsystem must meet the following performance specifications shown in the following table: Media Type Maximum Attenuation Minimum Bandwidth 850 nm 100 nm 850 nm 100 nm 50/15 mm multimode.5 db 1.5 db 500 MHz - km 500 MHz - km LABELING Labeling shall conform to ANSI/TIA/EIA-606 standards. In addition, provide the following: A. Label each outlet with permanent self-adhesive label with minimum /16 in. high characters. B. Label each cable with permanent self-adhesive label with minimum 1/8 in. high characters in the following locations: Inside receptacle box at the work area. Behind the communication closet patch panel or punch block. C. Use labels on face of data patch panels. Provide facility assignment records in a protective cover at each telecommunications closet location that is specific to the facilities terminated therein. D. Use color-coded labels for each termination field that conforms to ANSI/TIA/EIA-606 standard color codes for termination blocks. E. Labels shall be machine-printed. Hand-lettered labels shall not be acceptable. F. Label cables, jacks, patch panels, and punch blocks with IDF patch panel number in which outlet is located, followed by the patch panel port number, i.e., 16, 01. Indicate riser cables by an R then pair or cable number. G. A set of as-built drawings shall be provided to OCS in electronic format (PDF or VSD). QUALITY ASSURANCE A. The contractor shall have worked satisfactorily for a minimum of five (5) years on systems of this type and size. B. Furnish a list of references with specific information regarding type of project and involvement in providing of equipment and systems. C. Equipment and materials of the type for which there are independent standard testing requirements, listings, and labels, shall be listed and labeled by the independent testing laboratory.

6 D. Where equipment and materials have industry certification, labels, or standards (i.e., NEMA - National Electrical Manufacturers Association), this equipment shall be labeled as certified or complying with standards. E. Material and equipment shall be new, and conform to grade, quality, and standards specified. Equipment and materials of the same type shall be a product of the same manufacturer throughout. F. Subcontractors shall assume all rights and obligations toward the contractor that the contractor assumes toward the owner. WARRANTY A. Unless otherwise specified, unconditionally guarantee in writing the materials, equipment, and workmanship for a period of not less than fifteen (15) years from date of acceptance by the owner. Acceptance shall be deemed as beneficial use by the owner. B. Transfer manufacturer's warranties to the owner in addition to the General System Guarantee. Submit these warranties on each item in list form with shop drawings. Detail specific parts within equipment that are subject to separate conditional warranty. Warranty proprietary equipment and systems involved in this contract during the guarantee period. Final payment shall not relieve you of these obligations. Proposal Details Award Criteria A) Qualifications of respondent: Point Value =0-5 1 Demonstrated competence and professional qualifications necessary for successfully performing the work required as stated in the RFP. Backgrounds and experience of the specific individuals to be assigned to this project. B) References: Point Value = 0-5 C) Extent to which the design concept meets the goals noted in this RFP: Point Value = Proposed approach/timeline in completing the work. Technical quality in design. Product quality/appropriateness/compatibility/performance Support and warranty D) Cost: Point Value = 0-50 RFP Process RFP Contact Inquiries and requests regarding this RFP should be directed to: Michael Hale Technology Director Oconee County

7 Schools PO Box 16 5-A School Street Watkinsville, GA 0677 (706) x108 (706) FAX Any and all questions relating to the content, timeline, or requirements outlined in this RFP, as well as the associated proposals, should be made via to: RFP Response Format Proposals submitted in response to this RFP are to be sent in a Word document or Adobe PDF format as an attachment to an to: mhale@oconeeschools.org. Also, hardcopies of the proposal are required, 1 original and copies. Proposals must be submitted in envelopes clearly marked "Oconee County Middle School 017 Network RFP", the name of the supplier, and either "Original" or "Copy," as applicable, on the outside of the envelope. Proposals are to be addressed as follows: Oconee County Schools PO Box 16 5-A School Street Watkinsville, GA 0677 Attention: Michael Hale Timeframe and Key Dates Activity Date RFP Issued 1/0/017 Vendor Q&A Forum Vendor RFP Responses Due 1/1/017 :0 PM /0/017 :00 PM Proposal Preparation Where signatures are required, the signatory must be authorized to act on behalf of the vendor, including, without limitation, authority to sign contracts on the vendor s behalf. Questions and Vendor Forum Meeting Oconee County Schools will help clarify any issues or questions regarding this RFP. It is the vendor s responsibility to seek this clarification. Please direct all questions via to mhale@oconeeschools.org. All questions and answers will be discussed at the Vendor Forum on 1/1/017 :0 PM. The meeting will take place at Oconee County Middle School Tech Barn, located at 1101 Mars Hill Road, Watkinsville, GA. Vendors are encouraged, but not required to attend this meeting. Vendor is limited to only representatives to attend the meeting. Proposal Evaluation Proposals will be evaluated and scored by Oconee County Schools. Vendors are urged to make their most attractive offer, since each vendor s ability to satisfy Oconee County Schools requirements as described in the RFP will be evaluated and scored basis of the proposal submitted. Upon completion of

8 the evaluation, each vendor will be advised as to whether or not it has been selected to move forward in the process. Bid Validity Any proposal submitted by vendor(s) during this process is considered legally binding and valid for the terms set forth in this document. Proposals will be considered an offer to do business with Oconee County Schools, and shall be binding for a period of 90 days from the proposal due date. Late Submissions Oconee County Schools has established the RFP process and timeline in a manner that is intended to benefit all participants. Please respect all dates and times, and adhere to established guidelines. Late submissions will not be considered for this RFP process. Pricing Vendors shall submit complete itemized pricing encompassing all products and services in the proposal. Payment will be made only on satisfactory completion of the work specified in this RFP. Company Experience and/or References OCS reserves the right to fully investigate the qualifications of any bidder(s) based on references supplied and publicly available information. Vendors are encouraged to supply evidence of experience on projects of similar nature and/or magnitude. Provide references listing: customer name, address, contact names, and telephone/ fax numbers. The vendors may also supply third party ratings to demonstrate their success in the IT marketplace. The winning respondent must provide: Certificate of Insurance naming Oconee County Schools as an additional insured. HB 87 Immigration Affidavit (copies available to download). E Rate SPIN Number

9 Appendix A IDF-TV IDF-800 IDF-MDF IDF-Gym C

10 Data Network for OCMS 017 Appendix B Room Drops IDF Total MDF MDF MDF TV MDF GYM MDF 11 9 MDF 1 6 MDF 1 MDF 17 9 MDF 19 9 MDF 1 9 MDF TV TV TV 507 MDF TV TV 51 6 TV 51 6 TV 51 6 TV 515 TV TV TV TV 5 TV 5 TV 55 7 TV 59 TV MDF MDF MDF 61 MDF MDF 61 6 MDF 6 6 MDF 6 6 MDF 66 6 MDF 67 6 MDF 68 6 MDF 69 6 MDF 66 6 MDF

11 68 6 MDF 75 8 GYM 78 GYM

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017 Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM-2017-2 Date: 05/26/2017 Additional specification information for data communication to cameras and between Library

More information

DESIGN!!GUIDELINES!!!!!

DESIGN!!GUIDELINES!!!!! DESIGNGUIDELINES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 1. Testing General 1.1. For acceptance, 100% of the media

More information

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting

More information

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting

More information

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25170 TESTING, IDENTIFICATION AND ADMINISTRATION 1. This section includes the minimum requirements for the testing, certification administration and identification

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and

More information

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1. PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS VOFP Cabling RFP 1 Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For The Village of Franklin Park 2014 VOFP Cabling RFP 2 TABLE OF CONTENTS I. PROJECT DESCRIPTION

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

STRUCTURED CABLE SYSTEM (SCS)

STRUCTURED CABLE SYSTEM (SCS) PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards. 27 08 00 Certification and Commissioning of Communication Systems (Revision date: 7/3/12) 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents. They are

More information

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project 1.1.0 GENERAL The purpose of this specification is to establish a requirement for the installation of a voice, video and data cable network. The cable (copper), wire, hardware, equipment racks, jumpers,

More information

Technical Specifications Florida Gulf Coast University

Technical Specifications Florida Gulf Coast University Technical Specifications Florida Gulf Coast University 9/19/2018 Page 1 of 21 Approved Vendors (alphabetical order) Aztek (CIP) Certified Installer Plus Mr. Scott Coyne 4730 Enterprise Avenue Suite #308

More information

Request for Proposals Fiber Optic Network Backbone Upgrades

Request for Proposals Fiber Optic Network Backbone Upgrades Introduction Request for Proposals Fiber Optic Network Backbone Upgrades RFP Released on February 18, 2015 The Dexter R-11 Public School District is seeking proposals from qualified service providers to

More information

SECTION TESTING OF COPPER CABLES

SECTION TESTING OF COPPER CABLES SECTION 27 08 13 TESTING OF COPPER CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

SECTION FIBER OPTIC STATION CABLES

SECTION FIBER OPTIC STATION CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

What really changes with Category 6

What really changes with Category 6 1 What really changes with Category 6 Category 6, the standard recently completed by TIA/EIA, represents an important accomplishment for the telecommunications industry. Find out which are the actual differences

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 08 20 COPPER TESTING PART 1 - GENERAL 1.1 SUMMARY A. Test measurements shall be taken for all balanced-twisted pair cabling, including horizontal and backbone copper cables and wall-to-rack

More information

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines. PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Support Structures 2. Cable trays and ladder rack 3. Racks (including wire managers) 4. Cables (copper and optical fiber) 5. Jacks and faceplates

More information

PREMIUM 5e F/UTP PRODUCTS

PREMIUM 5e F/UTP PRODUCTS Siemon s end-to-end cabling system is guaranteed to provide transmission performance margins in excess of industry standards for category 5e parameters, while featuring excellent EMI resistance. has been

More information

A. All communications equipment rooms shall be installed in a neat and workmanlike manner.

A. All communications equipment rooms shall be installed in a neat and workmanlike manner. SECTION 27 11 00 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION COMMUNICATIONS STRUCTURED CABLING

SECTION COMMUNICATIONS STRUCTURED CABLING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 27 15 00 COMMUNICATIONS STRUCTURED CABLING SPEC WRITER NOTES: 1. Edit this specification section between // //, to fit project, or delete if not applicable. 2.

More information

Follow The Leader In Shielded Technology

Follow The Leader In Shielded Technology 1970s Vampire Tap 1990s Shielded Modular Jack 190s 4 Position Data Connector Follow The Leader In Shielded Technology The new AMP-TWIST Jack is our latest shielded product evolution. It can be terminated

More information

CATEGORY 6A CABLING SOLUTIONS

CATEGORY 6A CABLING SOLUTIONS 10 Gigabit Ethernet is nowadays viable solution for destinations with very high data traffic concentration like data center, server farms, MAN s and backbones. Premium Line Category 6A Cabling Solutions

More information

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall obtain authorization from

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of: a door card

More information

LITWARRANTY Rev. 5 W a r r a n t y P r o g r a m S t r u c t u r e d C a b l i n g S y s t e m s

LITWARRANTY Rev. 5 W a r r a n t y P r o g r a m S t r u c t u r e d C a b l i n g S y s t e m s LITWARRANTY Rev. 5 W a r r a n t y P r o g r a m S t r u c t u r e d C a b l i n g S y s t e m s STRUCTUREd CAbLINg SYSTEm WARRANTY PRogRAm As transmission speeds continue to increase, HellermannTyton

More information

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project 1.1.0 GENERAL MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project The purpose of this specification is to establish a requirement for the installation of

More information

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:

More information

Telecommunication Infrastructure Project September 20, 2002

Telecommunication Infrastructure Project September 20, 2002 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing Publications and Standards B. Category rated UTP systems shall be provided and tested in accordance with the performance level established in Specification

More information

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11 Table of contents About Nexans 3 About Berk-Tek 4 LANmark-1000 Cat 6 UTP 5 LANmark-1000 Category 6 Plenum 6 LANmark-1000 Category 6 Riser 11 LANmark-1000 Category 6 Patch 16 21 7/10/07 - http://www.berktek.com

More information

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING Revision 05/01/2017 Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING PART 1 GENERAL 1.1 SECTION INCLUDES A. Voice, Data, and Fiber Cable Product materials B. Voice, Data, and Fiber Cable Execution

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective

More information

Volition TM RJ45 K5e Jacks

Volition TM RJ45 K5e Jacks Volition TM RJ45 K5e Jacks Part of our 3M Volition Network Solutions, the new K5e range is our ultimate Category 5e hardware component (ISO/IEC 11801, EN 50173 and ANSI/TIA/EIA-568). The K5e jack is a

More information

CATEGORY 6A CABLING SOLUTIONS

CATEGORY 6A CABLING SOLUTIONS 10 Gigabit Ethernet is nowadays viable solution for destinations with very high data traffic concentration like data center, server farms, MAN s and backbones. Need of 10 Gigabit Service Application as

More information

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for:

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for: Bid and Build Structured Cabling Technical Specification for: Horizontal & Backbone Requirements Page 1 of 30 PUBLICATION RECORD Document Version Publication Date Primary Author Description Revision 1.0

More information

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14 Table of contents About Nexans 3 About Berk-Tek 4 Hyper Plus 5e Cat 5e UTP 5 HyperPlus 5e Plenum 6 Hyper Plus 5e Riser 10 HyperPlus 5e Patch 14 HyperPlus 5e OSP 18 22 7/10/07 - http://www.berktek.com Page

More information

CATEGORY 6 CABLING SOLUTIONS

CATEGORY 6 CABLING SOLUTIONS With over 20 years experience and know-how on communicating products design & developing, Premium Line has built maturity systems both in high tech develop and research center & complete structural quality

More information

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project Family Health Centers, Inc. Request for Proposal for Family Health Centers East Broadway Data and Communications Cabling Project Date Issued: 06/07/2014 Date Due: 06/16/2014 Page 1 of 22 Table of Contents

More information

Delaware County Community College Project # Marple Campus Renovation - Phase % Construction Documents November 23, 2011

Delaware County Community College Project # Marple Campus Renovation - Phase % Construction Documents November 23, 2011 SECTION 271323 - COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING PART 1 - GENERAL 1.1 DESCRIPTION A. This section provides the specifications for the work related to the optical fiber system in the project.

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

City of Winter Springs, FL

City of Winter Springs, FL City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

SAK Information Technology Department. Invitation to Bid For the Implementation Of IP-CCTV

SAK Information Technology Department. Invitation to Bid For the Implementation Of IP-CCTV SAK Information Technology Department Invitation to Bid For the Implementation Of IP-CCTV Release Date: Oct 22, 2013 Table of Contents. 1.1 Introduction 03 1.2 Brief About The design 03 1.3 RFP Contact

More information

PATCH CORDS, PLUGS & CABLES

PATCH CORDS, PLUGS & CABLES PATCH CORDS, PLUGS & CABLES 3.1 SECTION CONTENTS Modular Cords...3.2 Cable Assemblies...3.3 Plugs & Connectors...3.4 Bundled Cable...3.5 Category 5e & 6 UTP Cable...3.6 Coax Cable...3.7 Fiber Optic Cable...3.8

More information

Connect with the industry s best CAT6 and CAT5e channel solutions!

Connect with the industry s best CAT6 and CAT5e channel solutions! Connect with the industry s best CAT6 and CAT5e channel solutions! Our CAT6 and CAT5e channel solutions far exceed the TIA/EIA specifications performance standards! To ensure consistent and continuing

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

GENERAL COMMUNICATIONS REQUIREMENTS

GENERAL COMMUNICATIONS REQUIREMENTS 27 00 00 GENERAL COMMUNICATIONS REQUIREMENTS 1. GENERAL A. Related sections: i. 00 73 01 Sole Source / Sole Brand ii. 27 05 26 Grounding and Bonding for Communication Systems iii. 27 05 29 Hangers and

More information

Project No. # Page 1

Project No. # Page 1 PART 1 - GENERAL This section of the has references, products, procedures, processes, and work descriptions/summaries that are common to many Washington State University Pullman (WSUP) campus telecommunications

More information

CABLING STANDARDS FOR

CABLING STANDARDS FOR RFB for Wiring in the Outagamie County Courtrooms Attachment B September 1, 2016 CABLING STANDARDS FOR GENERAL The purpose of this document is to provide guidelines for all structured cable installations

More information

VERIZON MARYLAND INC.

VERIZON MARYLAND INC. VZ MD 271 Attachment 207 VERIZON MARYLAND INC. Methods and Procedures for Access To Poles, Ducts, Conduits and Rights-of-Way for Telecommunications Providers VERIZON MARYLAND INC. Methods and Procedures

More information

Project No. # Page 1

Project No. # Page 1 PART 1 - GENERAL This section of the has references, products, procedures, processes, and work descriptions/summaries that are common to many Washington State University Pullman (WSUP) campus telecommunications

More information

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel 1993 Specifications CSJ 0924-06-223 SPECIAL SPECIFICATION 1160 8:1 Video (De) Mux with Data Channel 1. Description. This Item shall govern for furnishing and installing an 8 channel digital multiplexed

More information

GenSPEED Category 5e Cables 3

GenSPEED Category 5e Cables 3 Datacom GenSPEED Category 5e Cables 3 GenSPEED Category 5e cables are available in a wide variety of performance levels and constructions. With many options to pick from, you can select the GenSPEED Category

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

SPECIAL SPECIFICATION 1118 Dual OC-3 ATM MPEG-2 Encoder

SPECIAL SPECIFICATION 1118 Dual OC-3 ATM MPEG-2 Encoder 1993 Specifications CSJ 0521-04-190 SPECIAL SPECIFICATION 1118 Dual OC-3 ATM MPEG-2 Encoder 1. Description. Furnish, install, and make fully operational an Asynchronous Transfer Mode (ATM) Video Encoder

More information

RCIT Cable Certification Testing Revised 10/2017

RCIT Cable Certification Testing Revised 10/2017 RCIT Testing Revised 10/2017 General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall

More information

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices Berk-Tek recommends installing a well-designed structured cabling channel per the TIA standards. This includes up to 100

More information

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents WESLEYAN U N I V E R S I T Y Facilities 170 Long Lane Middletown, Connecticut 06457 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #3 Date: March 4, 2013 Project: To: CFA A Rehearsal Hall AHU Replacement Annual

More information

GENERAL COMMUNICATIONS REQUIREMENTS

GENERAL COMMUNICATIONS REQUIREMENTS 27 00 00 GENERAL COMMUNICATIONS REQUIREMENTS 1. GENERAL A. Related sections: i. 00 00 08 Design Professional Documentation Requirements & Deliverables ii. 00 73 01 Sole Source / Sole Brand iii. 27 05 26

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928) Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ 86442 (928) 758-3961 NOTICE OF REQUEST FOR PROPOSAL RFP NAME: 2018 MHS Office Low Voltage. MATERIAL OR SERVICE: CRUHSD is seeking

More information

CATEGORY 5e CABLING SOLUTIONS

CATEGORY 5e CABLING SOLUTIONS With the high speed data transmission requirement in LAN, 1998 IEEE ratified standard 802.3z defined protocol 1000BASE-T over Category 5e and higher level Ethernet cabling system. After that, with the

More information

SMART CLASSix 48 UTP Patch Panels (with patching switches) -

SMART CLASSix 48 UTP Patch Panels (with patching switches) - Features Front-mounted Patching Switches connect ports internally, dramatically reducing the need for patch cords Compatible to Unshielded Twisted Pairs (UTP) cabling systems High performance panel that

More information

C6 A modul and C6 A modul K. The new connection system for a wide variety of applications of course with Cat.6 A

C6 A modul and C6 A modul K. The new connection system for a wide variety of applications of course with Cat.6 A C6 A modul and C6 A modul K The new connection system for a wide variety of applications of course with Cat.6 A Intelligent system solution for structured cabling Nowadays the need for high data transfer

More information

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP 160000071 Department of Military and Veterans Affairs Division of Administrative Services Procurement Section P.O. Box 5800 Joint

More information

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 1.0 INTRODUCTION Customer to define background and introduction to the project based on

More information

DATA/TELECOMMUNICATIONS REQUEST FOR PRICING

DATA/TELECOMMUNICATIONS REQUEST FOR PRICING Category 6A 10Gig DATA/TELECOMMUNICATIONS REQUEST FOR PRICING TABLE OF CONTENTS 1. GENERAL 3 1.1. Work Included... 3 1.2. Scope of Work... 3 1.3. Regulatory References... 4 1.4. Quality Assurance... 4

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables NEMA Standards Publication WC 63.1-2005 Performance Standard for Twisted Pair Premise Voice and Data Communications Cables Published by: National Electrical Manufacturers Association 1300 North 17th Street,

More information

3M Telecommunications. Solutions for Networks. 3M MPO solutions. High Density Networks. Technology built for business

3M Telecommunications. Solutions for Networks. 3M MPO solutions. High Density Networks. Technology built for business 3M Telecommunications Solutions for Networks 3M MPO solutions High Density Networks Technology built for business 2 3M Telecommunications Solutions for Networks 3M Telecommunications Solutions for Networks

More information

Combining Value and Performance Like No One Else

Combining Value and Performance Like No One Else Combining Value and Performance Like No One Else SUPERIOR ESSEX believes that its premises wire and cable products should provide a total user experience that is unequaled in the industry. That is why

More information

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables NEMA Standards Publication Performance Standard for Twisted Pair Premise Voice and Data Communications Cables Published by: National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752

More information

FREEDM Loose Tube Interlocking Armored Cables

FREEDM Loose Tube Interlocking Armored Cables features and benefits Flexible, interlocking armor design Gel-free waterblocking technology Color-coded tubes and fibers UV-resistant, flameretardant jacket UV-Resistant Flame-Retardant Outer Jacket InterlockingArmor

More information

LCS2 Cat. 6 RJ 45 Patch panels and units

LCS2 Cat. 6 RJ 45 Patch panels and units 87045 LIMOGES Cedex Telephone: 33 0 5 55 06 87 87 - Fax: 33 0 5 55 06 88 88 LCS2 Cat. 6 RJ 45 CONTENTS Page 1. General characteristics....1 2. Presentation...2 3. Installation...2 4. Technical characteristics...2

More information

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 ITB 15-0012 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

Fiber Optics Redefined

Fiber Optics Redefined Fiber Optics Redefined Questions and Answers on the basics of fiber optic installation TECHLOGIX NETWORX Questions & Answers Questions and Answers Q: What are the two main types of fiber? A: The two main

More information

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cable Management and Ladder Rack

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cable Management and Ladder Rack PART 1 GENERAL 1.1 WORK INCLUDED Section 27 11 00 COMMUNICATION EQUIPMENT ROOM FITTINGS Section 27 11 23 Communications Cable Management and Ladder Rack A. Provide all labor, materials, and equipment for

More information

SECTION TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION

SECTION TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION SECTION 16747 TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Requirements for installation and modification of fiber optic distribution systems by Tenants,

More information

Request for Proposal Classroom Multimedia Presentation System, Intercom, Public Address System New Washington County High School Facility

Request for Proposal Classroom Multimedia Presentation System, Intercom, Public Address System New Washington County High School Facility February 11, 2014 Washington County Board Of Education P.O. Box 716 501 Industrial Drive Sandersville, GA 31082 (478) 552-3981 FAX (478) 552-3128 Request for Proposal Classroom Multimedia Presentation

More information

Description: Pair Color Code Chart: Pair Color Chart 1 Brown White Brown 2 Orange White Orange 3 Green White Green 4 Blue White Blue.

Description: Pair Color Code Chart: Pair Color Chart 1 Brown White Brown 2 Orange White Orange 3 Green White Green 4 Blue White Blue. Description: OZLINX CAT5e cable has a guaranteed performance; exceeds the Category 5e performance requirements and provides positive PSACR up to 155MHz for bandwidth requirement in the future. Product

More information

Section Communications Optical Fiber Backbone Cabling

Section Communications Optical Fiber Backbone Cabling Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related

More information

Uniprise Solution Brochure. North America/CALA.

Uniprise Solution Brochure. North America/CALA. Uniprise Solution Brochure North America/CALA Exceptional Value. Headroom to Standards. Simplicity by Design. Uniprise delivers quality, easy-to-use solutions that work from day one to support customer

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 15 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Connected Solutions. April $ Post, 19 Rack ELERK1FR BK

Connected Solutions. April $ Post, 19 Rack ELERK1FR BK Connected Solutions April 2018 $30.97 Punch & Go Tool ONQAC3400 $139.97 per 305M Category 6 Riser, UTP, 23 AWG, Blue 305 Meter/1000 FT Pull Box CAB24/4PS6FT4BLUHYP $137.97 2 Post, 19 Rack ELERK1FR1194400BK

More information

RFIs AND RESPONSES; ANSWERS ARE IN RED.

RFIs AND RESPONSES; ANSWERS ARE IN RED. January 4, 2013 ADDENDUM #3 TITLE OF RFQ: Gateway Audio Visual Bid REFERENCE: 12/13 B-30 Please note the following information regarding 12/13 B-30: 1. The due date is: January 11, 2013 at 1:00 p.m. in

More information

(X) INVITATION FOR BID VENDOR: BID OPENING:

(X) INVITATION FOR BID VENDOR: BID OPENING: WICOMICO COUNTY PURCHASING DEPARTMENT 125 N. DIVISION STREET, ROOM 205 SALISBURY, MARYLAND 21801 (X) INVITATION FOR BID PROJECT: DEPARTMENT: Fiber Optic Cabling for Camera System Department of Corrections

More information

SECTION CONTROL, COMMUNICATION AND SIGNAL WIRING

SECTION CONTROL, COMMUNICATION AND SIGNAL WIRING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 27 10 00 CONTROL, COMMUNICATION AND SIGNAL WIRING SPEC WRITER NOTES: 1. Edit this specification section between // //, to fit project, or delete if not applicable.

More information

Robert Burén. Product Manager. Nexans Cabling Solutions. 10G Solutions

Robert Burén. Product Manager. Nexans Cabling Solutions. 10G Solutions Robert Burén Product Manager 10G Solutions Nexans Cabling Solutions 1 10 Gigabit Ethernet.Performance 30 GByte can be transmitted within 24 seconds Example: MRI-scan size is 30GB as average A memory device

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components PART 1 - GENERAL 1.1 SECTION INCLUDES A. Broadband radio frequency active and passive components B. Broadband optical active and passive components C. Coaxial cable and connectors D. Support and termination

More information

C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects.

C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects. DIR-SDD-1898 Cabling Services and Related Products C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects. Please address all returns

More information

TEST REPORT NO.: CRT-081 RENDERED TO: Hubbell Premise Wiring 14 Lord s Hill Road Stonington, CT

TEST REPORT NO.: CRT-081 RENDERED TO: Hubbell Premise Wiring 14 Lord s Hill Road Stonington, CT 3933 US ROUTE 11, CORTLAND, NEW YORK 1345, U.S.A. Phone Number: 1-8-345-3851 Fax Number: 67-758-3648 PROJECT NO.: 322866-311 DATE: February 19, 29 TEST REPORT NO.: 322866CRT-81 RENDERED TO: Hubbell Premise

More information

APPENDIX A Verify All Part Numbers (Partial List of Approved Products)

APPENDIX A Verify All Part Numbers (Partial List of Approved Products) SECTION 16651 APPENDIX A Verify All Part Numbers (Partial List of Approved Products) SYSTIMAX SCS: OVER-VOLTAGE PROTECTION 1. Over-voltage Protection Device, 100-Pair with Enclosure, Product 489ACAI-100,

More information