High Power Cyclotrons

Similar documents
Recent developments in cyclotrons for proton therapy at IBA

ACCELERATOR RELIABILITY - AVAILABILITY

The Elettra Storage Ring and Top-Up Operation

What can be learned from HERA Experience for ILC Availability

New Filling Pattern for SLS-FEMTO

Linac3 experience for LHC ion runs

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Availability and Reliability Issues for the ILC

1. General principles for injection of beam into the LHC

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

5 Project Costs and Schedule

Present Status and Future Upgrade of KEKB Injector Linac

DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

UPGRADE OF THE PSI CYCLOTRON FACILITY TO 1.8 MW

EPJ Web of Conferences 95,

High QE Photocathodes lifetime and dark current investigation

Activities from Cyclotron facility at German Cancer Research Center (DKFZ), Heidelberg

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

Radiation Safety System for Stanford Synchrotron Radiation Laboratory*

G. Pittá(*), S. Braccini TERA Foundation, Novara, Italy (*) Corresponding author.

Reduction of operating costs

Beam Loss Detection for MPS at FRIB

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

Status and Plans for PEP-II

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Implementing a Proton Beam Scanning System within an Operating Clinical Facility

The ESRF Radio-frequency Data Logging System for Failure Analysis

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

Equipment Installation, Planning, Layout, organisation and updates

DELIVERY RECORD. Location: Ibaraki, Japan

THE IBA SUPERCONDUCTING SYNCHROCYCLOTRON PROJECT S2C2

OPERATIONAL EXPERIENCE AT J-PARC

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Beam systems without failures what can be done?

100 MeV H - CYCLOTRON DEVELOPMENT AND 800 MeV PROTON CYCLOTRON PROPOSAL*

PRESENT STATUS OF J-PARC

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

K800 RF AMPLIFIER TUBE UPGRADE

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Upgrade of CEBAF to 12 GeV

Linatron - M9 & M9A. Modular high-energy X-ray source. 2.0 Performance

DISCLAIMER. Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

HD Review March 30, 2011 Franz Klein

RF Power Generation II

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility

SLAC R&D Program for a Polarized RF Gun

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

ANKA RF System - Upgrade Strategies

30 GHz Power Production / Beam Line

Design of the linear accelerator for the MYRRHA project

The PEFP 20-MeV Proton Linear Accelerator

LLRF at SSRF. Yubin Zhao

Improvements to Siemens Eclipse PET Cyclotron Penning Ion Source

A Brief History of High Power RF Proton Linear Accelerators

THE OPERATION EXPERIENCE AT KOMAC*

LW10-T600. P10 Led Wall Display

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Full IEFC workshop Feb.

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

Sensitivity Testing of the NSTAR Ion Thruster

Mechanical aspects, FEA validation and geometry optimization

ARIEL e-linac Machine Protection System Requirements

Linac 4 Instrumentation K.Hanke CERN

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

CLEX (CLIC Experimental Area)

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Therapy Control and Patient Safety for Proton Therapy

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

TOWARDS THE COMMISSIONING OF J-PARC

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

A Practical Look at SEU, Effects and Mitigation

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, B. Roeder and G. Tabacaru

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Single Event Characterization of a Xilinx UltraScale+ MP-SoC FPGA

Full Disclosure Monitoring

THE OMEGA UPGRADE. Section 1. OMEGA Upgrade System Design Update. l.a

CBETA Quarterly Report 7

III. Proton-therapytherapy. Rome SB - 3/5 1

B.6-68-ZZ EFFECT OF SUPERMAGNETS ON EXPERIMENTAL AREA LAYOUT. R. Stiening Lawrence Radiation Laboratory ABSTRACT

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

Teaching Plasma Nanotechnologies Based on Remote Access

An extreme high resolution Timing Counter for the MEG Upgrade

Advanced Photon Source - Upgrades and Improvements

Transcription:

Accelerator Reliability Workshop ESRF, Grenoble, 04-06.02.02 High Power Cyclotrons P.A.Schmelzbach 1. The PSI Proton Accelerator Facility 2. Failure Analysis 2000/2001 3. The weak Points 4. How to improve the Reliability/Avialability 5. Conclusion

The PSI Cyclotrons as backbone of a multiuser facility

What means availability/reliability? Typical operating schedule in the average :4000 to 5500 hours of beam production per year

Our definition: Availability = Ratio of beam time over 1.5 ma on the pion production targets to the scheduled beam time. Also to optimize: delivered charge on target Routine production is 1.8 ma (1.2 ma on SINQ with 4 cm thick Target E) Availability (%) 100 90 80 70 60 50 40 30 20 10 1989 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 0 0 250 500 750 1000 1250 1500 1750 2000 Beam current (µa) Availability of the beam on the meson production targets as it developed since 1989. Plotted is the percentage of the scheduled beam time during which the beam current exceeded the values given on the x-axis

The good performance is shadowed by single events AND1 beam damage and Target E repair 500 Number of beamtrips per day 450 400 350 300 250 200 150 100 50 0 Beamtrips EEC repair 25.06 / W26 Average availabilit y 85.6 % Minishutdown AHB repair 7.10 / W40+41 18 23 28 33 38 43 48 EEC repair 22.11 / W47 100 6.3 Ah delivered charge Week 90 80 70 60 50 40 30 20 10 0 Charge * 10 [Ah]; Availablity [%] High Energy Operation at the PSI Accelerators in 2001: Availability, main failures, delivered charge and beamtrips due to discharges in the electrostatic elements inside the Ring cyclotron What reduces the availabilty? Short interruptions after beam trips: 20 s to ramp the intensity, more if operator intervention is needed. About 10000 per year = 1% of the beam time, but nevertheless disturbing for some users. Failures of components, infrastucture,, repairs, cause outage of >10% of the schedulded beam time

Which conditions cause beam interruptions? 2500 inputs in accelerator interlock/run permit system 140 beam loss monitors (ionization chambers, slits) users devices (IP, Medicine, SINQ) Personel protection 25.0 Failure distribution for years 2001/2000 % of total downtime 20.0 15.0 10.0 2001 2000 5.0 0.0 Magnets Septum repairs Beamtrips Miscellaneous Cooling Target High Frequency Power supplies Site power Control Vacuum PSA CW Characterization of the 590 MeV-accelerator downtimes. The total downtime was 440 hours

Distribution of beam interruptions > 1 minute in 2001. The weak points: A few events are responsible for large downtimes - e.g. Cooling: missing redundancy - e.g. Magnets: save on spare parts, repairs time consuming - e.g. RF: components used untill they fail - e.g. Target :used untill they fail - e.g. Septa: used untill they fail. Causes?

The electrostatic elements in the Ring Cyclotron are responsible for most of the beam trips. This problem seems to become particularily critical as the power increases (1.5 -> 1.8 ma?). Ways to improve the situation: In most of the failure categories a reduction of the down time rate to less than 0.5 % (or even 0.2%) of the schedulded beam time is not a technical but only a financial problem. The ongoing improvement program includes: New Ring central region with plug-in magnets Replacement of the 25 years old power supplies (also relevant for the beam stability) Fully assembled spares for some magnets (now coils only) Redundancies in the cooling water plant (?) Preventive replacement (Target E), modularity (e.g. RF) The reduction of beam trips remains a major problem. The number of trips due to interlocks from the RF-system has been dramatically reduced by a fast, on-line discharge analysis (see contribution by Peter Sigg). Part of the problem is however only shifted to another components (Extraction septum?). The behaviour of the electrostatic elements is by far not fully understood. R&D is needed (design, sensitivity to RF-leakage and X-Rays, surface physics, beam halo, ) The interlock system should be improved to allow for a better sequence analysis. More intelligence, e.g. by inclusion of transient detection and more sophisticated decision making procedures, can suppress unnecessary beam interruptions.

Conclusions The unschedulded outage is dominated by single events, in some case with an occurrence of once in 25 years. Stastitical analysis? Improving the present reliability of the utilities is not a technical problem. Components should be redesigned such that repair is fast (plug-in techniques, exchange of whole modules, Wechselflaschen ) The electrostatic elements are the talon d Achille of the Ring cyclotron. The elimination of this problem requires a considerable R&D effort. Alternative solution?