Formulate Designer Series 10 Backwall - Kit 05

Similar documents
Formulate Designer Series 30 Backwall - Kit 05

Formulate Designer Series 20 Backwall - Kit 07

Formulate Designer Series 30 Backwall - Kit 05

Formulate 20 Straight

Modulate Magnetic Kit 10-07

Modulate Magnetic Kit 10-01

Tabletop Kit 03. features and benefits: dimensions: additional information:

Embrace 2.5 Backlit Push-Fit Tension Fabric Display

velocity standard 07 velocity features and benefits: dimensions: additional information:

velocity standard 08 velocity features and benefits: dimensions:

Coyote popup features

Order #XXXXX - ECO x10 Inline Display. Setups. 10 Plan View

DLMP Installation Instructions

DLMP-45/45R Installation Instructions

MIRAGE. Skyline Mirage Set-Up Instructions Skyline Exhibits

Installation Guide OvalSox TM Cable

Desk Mount Articulating Tablet Arm with Locking Security Clamp

M2 Antenna Systems, Inc. Model No: 23CM35

INSTRUCTION MANUAL. Model V-4R Collinear Gain Vertical for MHz. General SPECIFICATIONS

Tripod-1 Manual Rev B

TECHNICAL GUIDE. TOUGH GUN ThruArm G2 Series Robotic MIG Guns for FANUC Robots 100iC, 100iC-6L, 120iC, 120iC-10L INSTALLATION MAINTENANCE

Check what you have received against the component checklist and hardware above.

Simple and highly effective technology to communicate your brand s distinctive character

TECHNICAL GUIDE. TOUGH GUN ThruArm G1 Series Robotic MIG Guns for FANUC Robots 100iC, 100iC-12, 100iC-6L, 100iC-7L, 120iC, 120iC-10L, 120iC-12L

FOSC 450 C6 and D6 Closures

USER MANUAL. GOLDMUND LOGOS 1N-2N SPEAKER SYSTEM Active Speaker

Step 1. 2x Kep Nut 1x Left Motor Assembly

Setup Guide. Read me BefoRe unpacking!

WaveTrax. Fiber Cable Management System

2000i. Projector Replacement Guide. for Projector Replacement Kits. NEC MT1060R ( ) and NEC MT860R ( ) Interactive Whiteboard

RALLY SIGNS HAND HELD DOUBLE-SIDED SIGNS

READ ME FIRST. Touchstone TV Lift

lumenalpha spot Specification Sheet


Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

Step 1. 1x NXT Ultrasonic Sensor

PARTS LIST FOR CM-1250-A/C 1.5 HP

Panzer 3.0 Assembly Instructions & Checklist

Cable ISOBUS Active Termination

INSTALLATION GUIDE. Axle Weighing Truck Scale. 60,000 lb x 20 lb Factory Calibrated Includes Pre-interfaced Wireless Remote LED Scoreboard Displays

A449-6S 70 CENTIMETER FM YAGI ANTENNA MHz

KEL 24 Cable entry frames

A CENTIMETER FM YAGI ANTENNA MHz

#YourGearUpgraded. TV Stand Model EGTV1 INSTRUCTION MANUAL

24 Volt RGB/RGA Super Flat LED Rope Part Numbers: SFR-RGB-W, SFR-RGB-B, SFR-RGA-W, SFR-RGA-B

In-Wall Control Mount for ipod Touch

Model: LS-Zxx. Installation Guide for Large stage series super mobile screen


TV Lift System Model CL-65 Installation Instructions

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

Troubleshooting Guide 9630 Series

3M Distribution Box (DDB)

Extender for HDMI over one CAT5

Access Control Keypad for MK-DV, JB-DV

Desk Mount Articulating Dual Monitor Arm with Cable Management & Height Adjust

Check what you have received against the component checklist and hardware above.

3M SLiC 530/533/733-2 Port 0.61 Cable Entry Bracket 3M SLiC 530/533/733-2 Port-MSM 0.61 Cable Entry Bracket

WID-DL74 WID-DL74 BLP WID. Designed for. Installation guide for workitdesk interactive table for. BrightLink Pro

Folding Beauty Dish INSTRUCTIONS

Quick Release Roof-Mount Kit MB700

MP Maker Pro Mk.1. Quick Start Guide

HDMI over CAT5 HDBaseT Extender - 4K

K Service Source. Apple High-Res Monochrome Monitor

Cable entry systems. perfect innovative smart. Cable entry systems

3M Better Buried Closures

PRJTPFL inch PRJTPFL inch PRJTPFL inch. Fixed Wall Mount Projector Screen. Universal Home/Office Projector Viewing Display

CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

DL-AR2 Technical Specifications Universal HDMI Adapter Ring Rev

OFDC-B8-72. Outdoor fiber distribution closure. 6 Closing. Content 1 Introduction. 7 Re-entry. 2 Kit content. 3 Closure preparation

Splice Closure Fiber (SCF) Family

LUMIÈRE CONFIGURATION - D LUMIÈRE LIGHT WALL PRODUCT CODE: LLW20D

TO THE INSTALLER: BE SURE TO LEAVE THIS MANUAL WITH THE OWNER.

K Service Source. Apple High-Res Monochrome Monitor

3M Better Buried Compound Compression Closure System

REQUIRED TOOLS. Wire cutters Razor blade Soldering iron Pliers 11/16 Wrench for Tube 18mm Wrench for Ring

The Haply Development Kit

3. Electronics and MMU2 unit assembly

Table of Contents. One-Year Limited Warranty

Coyote popup display set up instructions

INSTRUCTION BOOK FOR. Fast-Fold NXT

CM MTC PARTS LIST

OPERATION AND MAINTENANCE MANUAL

RGB 5050 PixelControl LED Super Flat Rope Part Numbers: PSFR-RGB-W-20

Caution. Hanging the Screen:

Power Rack with Lat Pull

DisplayPort Signal Booster - DP Extender - 4K 60Hz

Assembly Instructions Clearlight Infrared Sauna: CE-C

Operation and Maintenance Guide Electric Needle Scalers

LED Panel Light. Specialists. in High Efficiency Lighting DLC 4.0

Product group 1. Product description. At a glance. Cable entry systems for entering pre-terminated cables

3M Locator Plate N

INSTALLATION GUIDE DYNAMIC TRIM CONTROL SYSTEM SERIES S

Installation Evaluation Form

IP-LINX. Installation Guide

Safety Rules Parts Check Lists and Photos Cable Diagrams for Various Crane Configurations Step by Step Instructions Tips for Packaging and Storage

75 Elliptical Antenna System

1-Touch Vibratory Sieve Shaker SS-10

3M Coupling Tray FDTC-10S-COUPLINGTRAY

SLiC Fiber Aerial Closure System

Transcription:

Formulate Designer Series 10 Backwall - Kit 05 FMLT-DS-10-05 Formulate TM Designer Series 10ft displays have unique stylistic features and shapes, are portable and easy to assemble. The aluminum tube frame features snap button and/or spigot connections and zipper pillowcase fabric graphics. All displays come in portable, wheeled transit cases. Simply pull the pillowcase fabric graphic(s) over the frame and zip. features and benefits: - Premium aluminum tube frames with spigot assembly - Easy to store and ship - Quick to set up - Weighted feet for added stability - Three zipper pillowcase fabric graphics - Lifetime limited hardware warranty against manufacturer defects dimensions: Hardware Assembled unit: 115.24 w x 98.27 h x 17.98 d 2927mm(w) x 2496mm(h) x 457mm(d) Approximate weight with cases: 66 lbs / 29.9 kgs Graphic Refer to related graphic template for more information. Visit: www.exhibitors-handbook.com/ graphic-templates Shipping Packing case(s): 1 OCE Case Shipping dimensions: OCE: Expandable case length (l) may vary 40-66 l x 18 w x 18 h 1016mm-1677mm(l) x 458mm(w) x 458mm(h) Approximate total shipping weight (includes cases & graphics): 79 lbs / 35.8 kgs additional information: Graphic material: dye-sublimation zipper pillowcase fabric We are continually improving and modifying our product range and reserve the right to vary the specifications without prior notice. All dimensions and weights quoted are approximate and we accept no responsibility for variance. E&OE. See Graphic Templates for graphic bleed specifications. 03/21/16

Included In Your Kit Tools, Components, Tube & Connectors ALLEN KEY SET x1 ES30 x26 LN114-SCRW x4 ES30-90B x2 LN114-S3 x2 LN114-S2-450 x2 DS-10-05-T17 x1 Graphics FMLT-DS-10-05-A-G x1 FMLT-DS-10-05-B-G x1 FMLT-DS-10-05-C-G x1

Included In Your Kit DS-10-05-T1 x2 DS-10-05-2-T2 x1 DS-10-05-T3 x4 DS-10-05-T4 x1 DS-10-05-T5 x2 Tubes DS-10-05-T6 x1 DS-10-05-T7-x4 DS-10-05-T8 x1 DS-10-05-T9 x1 DS-10-05-T10 x1 DS-10-05-T12 x1 DS-10-05-T13 x1 DS-10-05-T14 x1 DS-10-05-T15 x1 DS-10-05-T16 x1

Exploded View FRAME A FRAME B FRAME C

Labeling Diagram FMLT-DS-10-05 FRAME A FRAME B FRAME C OVERHEAD VIEW

Connection Methods Formulate structures use a number of different yet simple connection methods. Your kit will include one or more of the connection methods shown below. Steps within the Kit Assembly will reference a specific method for each connection point. Connection Method 1: ES30 / ES50 / ES75 Connection Method 2: Snap Buttons & Swage Connection Method 3: ES30-90B / ES30-I / ES30-C Swage Snap Buttons Compress the unlocked connector and slide one tube onto each end. Lock both screws carefully using your allen key tool. Be sure to lock securely, but do not overtighten. Locate the snap button on the connector or swage tube. Locate the hole on the corresponding tube. Press the snap button with your thumb and slide the tube and connector together so that the snap button snaps fully into the lock hole. To disassemble, press the snap button and pull apart. ES30-90B ES30-90B Compress one unlocked end of the connector and slide it through one tube end. Compress the other end of the connector and slide the second tube on. Lock both screws carefully using your allen key tool. Be sure to lock securely, but do not overtighten. Connection Method 4: Tube Clamps TCP TC TCH Be sure to fully assemble all frames before using clamps. With the clamp unlocked, place one tube of the first frame into the mouth of the clamp. Place the second tube (if applicable) into the second mouth of the clamp. With both frame s tubes in the clamp, be sure to lock securely, but do not overtighten.

Kit Assembly Step by Step Step 1. Gather the components neccessary for assembling Frame A and lay them flat on the floor. Assemble in the order the Labeling Diagram instructs. Please reference Connection Methods 1 and 3 for more details. Step 2. Gather the components neccessary for assembling Frame B and lay them flat on the floor. Assemble in the order the Labeling Diagram instructs. Please reference Connection Methods 1 and 3 for more details. Step 3. Gather the components neccessary for assembling Frame C and lay them flat on the floor. Assemble in the order the Labeling Diagram instructs. Please reference Connection Methods 1 and 3 for more details. Step 4. With Frame A laying flat on the floor, locate your pillowcase A graphic. With the pillowcase unzipped, encase Frame A by covering the Frame from top to bottom. Zipper located to the right side and bottom of Graphic A bottom of frame

Kit Assembly Step by Step Step 5. With Frame B laying flat on the floor, locate your pillowcase B graphic. With the pillowcase unzipped, encase Frame B by covering the frame from top to bottom. Zipper located to the side and bottom of Graphic B Step 6. With Frame C laying flat on the floor, locate your pillowcase C graphic. With the pillowcase unzipped, encase Frame C by covering the frame from top to bottom. Zipper located to the side and bottom of Graphic C bottom of frame bottom of frame Step 7. Gather both LN114-S2-450 assemblies, and (2) LN114 screws. Attach the foot to the left side of Frame A and right side of Frame C, in order as seen in the image to the right. Step 8. Gather both LN114-S3 assemblies, and (2) LN114 screws. Start by setting the hub on the foot into the ES30-90B. Next screw the foot and M10 spacer into Frame B in the order shown on the right. Tighten the screw on the ES30-90B to lock in place.