RIDER C: TECHNICAL RIDER TO CONTRACT

Similar documents
VENUE TECHNICAL REQUIREMENTS

HUECO / Technical Rider

Theater Technical Rider

N AI-NI C HEN & T HE A HN T RIO

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

TECHNICAL RIDER GENERAL INFORMATION

PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

Live From Nashville TECHNICAL RIDER

Russian National Ballet Technical Addendum 1

THE NUTCRACKER, A CANADIAN TRADITION Technical and Hospitality Rider

TECHNICAL RIDER FOR THEATER (rev. 1/2/18)

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

TECHNICAL RIDER FOR THEATER (rev. 11/30/17)

HALFWAY TO DAWN TOUR

Not Fade Away. The Ultimate Buddy Holly Experience. TECHNICAL RIDER Video Projection is Recommended

RHAPSODY & RHYTHM Technical Rider

CONTACTS Jani Lauzon Managing Artistic Director

ADDENDUM A / TECHNICAL RIDER

TECHNICAL SPECIFICATIONS AND INVENTORY RIALTO THEATER

TECHNICAL RIDER African Roads, American Streets

JAMIE ADKINS. Circus INgognitus. Technical Rider Version: January, 2014

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

TECHNICAL RIDER March 30th 2015

Preliminary Technical Rider (Updated 04/04/11)

STAND BY YOUR MAN: THE TAMMY WYNETTE STORY Preliminary Technical Rider Updated 5/10/2015

Timber! Technical Rider

Technical Rider. GöteborgsOperans Danskompani. Tour to xxx. Alaska. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

Technical Specifications. Taylor Little Theater

The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

Kenny Rogers Productions, Inc Production Requirements Indoor and Outdoor and Small Venue Performances

* All public events require the presence of Centerville High School Security. Contact Theatre Manager for details.

FIVE FLAGS THEATER SERVICES STATEMENT

NEW JERSEY PERFORMING ARTS CENTER NEWARK, NEW JERSEY

[technical list] updated 27/09/2017. Groupe Emile Dubois My Ladies Rock Creation September Playing time : 1h15 without intermission

SUBJECT TO CHANGE ADDENDUM ATTACHED AND MADE PART OF THE CONTRACT BETWEEN PRODUCER, BOOKING AGENT, AND THE LOCAL PRESENTER.

Technical Rider. GöteborgsOperans Danskompani. Untitled Black. Tour to.. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

Flamenco Vivo Carlota Santana

ADDENDUM TO NEW COLLEGE THEATRE HANDBOOK: TECHNICAL INFORMATION

Studio 180. Electronic and Print versions of the venue ground plan are available from the Technical Director.

TOURING RIDER Where Magic & Motion Meet!

TECH SHEET AND INFORMATION (Updated )

Technical Rider. Ryan McFarling Illusionist. General Stage Requirements

ARTPARK MAINSTAGE THEATER TECHNICAL PACKET

Enormous Room Technical Rider & General Lighting Plan

Facility Rental Reservation & Contract

HAMLET S BIG ADVENTURE TECHNICAL RIDER

Tabarnak Technical Rider

Harbourfront Centre Theatre Technical Specifications As of Jan. 2018

THEATRICAL TECHNICAL RIDER Revised: May 2017 Technical Contact: Brant Murray, Page: 1 of 8

Technical Rider "THEATRE" by SUPERAMAS

SHUBERT THEATER 247 College Street, New Haven, CT

Technical Rider. Update: may 6th 2008

Technical Information

Addendum to Contract TORONTO SYMPHONY ORCHESTRA

THE BIBLE (abridged) TECHNICAL RIDER

Darren & Heather Stevenson. REVISED 2018 PUSH Physical Theatre s DRACULA Technical Rider

Technical Information Guide PLEASE FORWARD TO TECHNICAL DIRECTOR

Barney Simon Theatre Technical Specifications

The Breen Center for the Performing Arts Saint Ignatius High School

Staatskapelle Weimar Orchestra of Germany Technical Addendum Page 1. Addendum to Contract

The Willoughby Brothers

STUDENT PRODUCTION JOBS

Master Electrician Handbook

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

THE CAPITOL CIVIC CENTRE MANITOWOC, WISCONSIN RENTAL RIDER and SPECIFICATIONS As of September 2015

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

See Tech Rider for info

UVA Drama Department Rehearsal and Performance Guidelines

TECHNICAL RIDER (Page 1 of 3)

THE LEELA DANCE COLLECTIVE TECHNICAL RIDER SPEAK Touring Requirements

LOAD-IN SET UP SOUND

Technical Manual/Rider for A Christmas Carol Updated 03/16/17

SECREST AUDITORIUM TECHNICAL PACKAGE

Duties and Responsibilities Handbook

MAYHEM POETS CONTRACT RIDER

JERWOOD VANBRUGH THEATRE

THE LEELA DANCE COLLECTIVE TECHNICAL RIDER Son of the Wind Touring Requirements

EbzB Productions Your World Is Our Stage!

DEREHAM MEMORIAL HALL

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

Sandusky State Theatre Technical Specifications

Concert Hall Technical Specifications

Performance Dates and Times Date Time You Arrive Time Audience Arrives Performance Time Anticipated End Time

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

The Bapo (horn) Show

Studio Theatre. Technical Specifications. Theatre Manager Kim Scarlata Box Office Coordinator Laura Johnston

B. Building electrician is required to be on call from stage call to load out.

Dance floor surface: Black marley dance floor on a sprung stage floor.

SR Wing space = 2m SL Wing space = 1.1m There is an upstage cross over with pass doors onto stage USR & USL.

TECHNICAL RIDER SEVEN Tour

TOURING INFORMATION AND TECHNICAL REQUIREMENTS THE ADVENTURES OF ALVIN SPUTNIK: DEEP SEA EXPLORER BY TIM WATTS

The Ultimate Musical Odyssey

Technical Specifications and Inventory Spring 2018

Scheman Building Suite 102, 1805 Center Drive, Ames, IA Fax Number: Website:

FASO DANCE COMPANY KALAKUTA REPUBLIK

Patriots Theater at the War Memorial Technical Data

Concert Hall Technical Specifications

Faris Family Studio at the Dance Centre, Vancouver BC 677 Davie Street, Vancouver, British Columbia. V6B 2G6

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

Performance: Romanesco

Transcription:

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 1 of 9 RIDER C: TECHNICAL RIDER TO CONTRACT THIS TECHNICAL RIDER SHALL BE USED IN TANDEM WITH ADDENDUMS, BASED ON THE REPERTORY PRESENTED. THESE ADDENDUMS ARE ATTACHED AS SEPARATE ADDENDUM DOCUMENTS AND SHALL BE CONSIDERED AS INSEPERABLE ATTACHMENTS TO, AND CARRYING THE FULL FORCE OF, THIS DOCUMENT. THIS TECHNICAL ADDENDUM IS PART OF THE ATTACHED CONTRACT, THE SIGNED TECHNICAL ADDENDUMS MUST BE RETURNED TOGETHER WITH THE SIGNED CONTRACT IN ORDER FOR THE CONTRACT TO BE FULLY EXECUTED. GENERAL INFORMATION: The touring staff of RIOULT consists of the Artistic Director, Associate Artistic Director/Rehearsal Director, one to three (1-3) technical staff (depending on program), and nine to eleven (9-11) dancers. We require the Presenter to provide round trip transportation of costumes, sets, props and technical equipment between New York and the performing venue. We require the local Presenter, at the Presenter's expense, to provide the following. TRANSLATORS (For International Tours only): Presenter must provide at least one translator for Company s production stage manager. The translator must be present in the theater at all times the production staff is in the theater. The translator should be literate in general theatrical and stage terms and not a member of the crew. STAGE REQUIREMENTS: Minimum dancing areas: Minimum proscenium opening: Crossover behind the stage: 38 feet wide (12 meters) by 30 feet deep (9 meters). 38 feet wide (12 meters) by 22 feet high (7 meters). 6 feet wide (2 meters). The crossover must be indoors without steps, with blue running lights where needed. Minimum number useable line sets: 24 (includes electrics and all soft goods). Minimum Grid Height: Pipes clear 60 (18 meters) Theater must be equipped with the following: 1. Five (5) sets black legs 2. Five (5) black borders 3. One (1) seamless white cyclorama 4. One (1) seamless black scrim. FLOOR: The stage floor, off-stage and backstage areas must be clean and free of nails, tacks, staples, splinters and any other protrusions or objects that might cause injuries to bare foot dancers. All areas must be thoroughly swept and wet-mopped at the discretion of Company s Production Manager. The Company requires a sprung dance floor. The floor must be smooth, level and even. Any holes or cracks are to be filled and stopped with wood or cork. WOOD OVER A CONCRETE FLOOR OR OVER A CEMENT FLOOR IS NOT ACCEPTABLE. Company requires a black Marley dance floor that must cover the entire stage area. The floor must be free of rosin. Sufficient non-shiny gaffer's style tape to match the color of the floor must be supplied for installation and maintenance of the floor. Company prefers all lighting and sound cable be kept off the floor in all cases. In situations where this is not possible, Company requires that the Presenter provide sufficient floor covering to cover these cables.

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 2 of 9 HEATING: The stage, off-stage areas, studios, rehearsal rooms and dressing rooms must maintain proper heat levels between 68 and 76 degrees Fahrenheit (20 and 25 degrees Celsius) during all rehearsals, classes and performances. LIGHTING: Presenter must provide the following: All equipment and power needed to execute Company s light plot and hookup. The Company s supplied light plot MUST be completely hung, circuited and tested PRIOR to arrival of the Lighting Supervisor. The Company s lighting cues MUST be pre-loaded into the venues lighting console. The Company s Production Manager will provide a PDF copy of the cues. Show files will be provided when available. Computer light control. ETC Ion/Eos lighting console is preferred by the Company. Company hookup uses 400 channels. Company light plot consists of 165 lighting instruments, of the following specifications: 16 ETC Source 4 19 Degree 575w (or equivalent) 36 ETC Source 4 26 Degree 575w (or equivalent) 59 ETC Source 4 36 Degree 575w (or equivalent) 24 8 Fresnelle s (1kw) -or- Par 64 WFL [CP63] (1kw) Three-color-cyc lighting units appropriate to venue; both from an electric position and from a ground row. 8 10' boom pipes with six, eighteen inch (18 ) sidearms each. 21 Template holders for profile fixtures, as specified in light plot. 2 Drop-in Iris for profiles, as specified in light plot. 2 Hazers (L Maitre Neutron Pro or equivalent) as specified in light plot. All gels as specified in light plot. Lamps, hanging hardware, safety cables, and gel frames for all lighting instruments. A red spotting lamp on centerline front of house. Production table with six power outlets, one headsets and remote lighting console, or remote node with lighting console monitors. Blue running lights backstage left and right. All Necessary Cable, Connectors, Spare Lamps, Gel Frames, Safety Cables required to successfully hang the Company s lighting plot. Any Zetex, or additional masking Company will provide the following: All gels required for sidelight color change. All Templates. Presenter s Technical Director must supply scale drawing of theater, repertory plot, light, sound, and soft goods inventory, and a line set schedule six (6) weeks in advance of the performance. If the Presenter needs the light plot prior to three (3) weeks in advance of the first performance, please contact Company s Production Manager.

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 3 of 9 SCENERY & EFFECTS: There is no scenery innate to the general repertory plan of the company. Scenic needs will be based on the repertory performed at the venue. Please see Addendums attached to this document. The Company s Stage Manager will require a position back stage (stage right, or left) at the plaster line to call the stage cues during the performances. This position should be created by a podium, or lectern, if a permanent position does not exist in the theatre. Music stands are not a suitable substitution. SOUND: There should be sufficient stereo amplification and loud speakers for the house. The theater must be equipped with the following: Mixing console with five (5) inputs Four (4) stage monitors, located in wings, near bottom of booms in wing #1 and wing #3 left and right. Two (2) Stereo CD players with auto pause capabilities One (1) microphone at tech table The Company requires headset communications for this production. The following number of headsets must be provided, on a one-channel system: Two (2) backstage -- one Down Left and Down Right; One (1) for light board operator; One (1) for sound board operator; Two (2) in fly gallery for fly person; One (1) for house curtain operator if located other than the fly gallery; One (1) additional in the house at the production table, for cueing and tech only. Under No circumstances are walkie-talkies, or two-way radios, an acceptable substitution for Headset Communications. PROPS: The Company requires two prop tables (minimum 6 feet long), located stage right and stage left with blue running lights. If space does not allow for prop tables, blue lights and chairs must be supplied for storage of props and costume pieces. PERSONNEL: This is NOT a YELLOW CARD attraction. The number of crew reflected here should be considered base line, and does not include any additional crew required for repertory presented. Please see Addendums for piece specific requirements. All crew personnel who work during the performance must also have worked, in the same capacity for all rehearsal periods. See the example schedule for crew call timing. At least one crewmember will handle communication with LD over headset. Load-in and load-out: One (1) fly person Two (2) loaders Two (2) carpenters Six (6) electricians One (1) wardrobe One (1) sound person Focus: One (1) light board operator Four (4) electricians One (1) fly person One (1) carpenter

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 4 of 9 PERSONNEL (CONTINUED): Show Run: One (1) light board operator and load-out: One (1) sound board operator One (1) fly operator One (2) deck electrician One (1) wardrobe SCHEDULING: The theater and stage must be made available to the Company prior to the first performance for the purpose of unloading and setting up technical equipment; hanging scenery; hanging, circuiting, and focusing lighting; inspecting sets and costumes; and rehearsing. Please see an example schedule attached to the end of this document. Load in: Typically, twelve (12) hours of work are required on the day prior to the first performance. Technical Rehearsal: eight (8) hours of technical work, including a technical rehearsal, are required, on the day of the first performance. Performance: Typically four (4) hours for the show call Load out: The load-out usually requires less than four (4) hours of work. Outdoor Venues: In outdoor venues, two nights before the first performance are required for technical work; the first night is required to focus the lighting; the second night is used for a technical rehearsal. WARDROBE: Presenter to provide Company with the following: One (1) wardrobe room, for the preparations of costumes, and prop fabric panels One (1) iron, one (1) ironing board One (1) industrial fabric steamer. One (1) costumer for a minimum of four (4) hours and a maximum of eight (8) hours on the day of each performance. Laundry facilities (washing machine, dryer, etc.) are to be provided daily and at the Company s disposal. One (1) dresser may be required for quick changes during the performance. DRESSING ROOMS: All dressing rooms must be equipped with running hot and cold water, sinks or wash basins, private/non-public restroom facilities and showers. Rooms should be clean (swept and mopped), well-lighted with chairs. Male and female dressing rooms need three (3) costume racks in each room and artistic director requires one costume rack. Dressing room breakdown is as follows: One dressing room for five (5) male performers; One dressing rooms for six (6) female performers; One dressing room for the artistic director and associate artistic director; One room to be used as production office (as close to the stage as possible) containing a chair, desk, telephone with local service, fax machine and internet access. It is requested that all dressing and production rooms be LOCKABLE with keys provided to the Company s Production Stage Manager. At minimum, Company requires a secure and lockable space. All Dressing rooms must be for the exclusive use of the Company only, during the period of load-in through the completion of load out.

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 5 of 9 REHEARSAL SPACE: The stage on which the performance is to be given must be available to the Company six (6) hours prior to each performance and must be furnished with ballet barres sufficient to accommodate twelve (12) dancers. A heated studio or large room (complying with the sections labeled FLOOR and HEATING) is required for a class in the afternoon on the day of the Company s arrival and prior to the first rehearsal. A studio or the stage area will also be needed each day that the Company is in residence at the Presenter's facility. The studio or stage area will be needed for daily class for the dancers and should be equipped with ballet barres and a suitable floor. LOCAL TRANSPORTATION AND FREIGHT: The Presenter agrees to provide, at the Presenter's expense all local transportation for dancers, artistic personnel, and production staff, including airport/train/bus station pickup and return, as well as transportation between all performance and rehearsal sites, residency activities and related events, and the Company s lodgings. This includes transport of theatre/flight cases. (The production staff, at times, travels separately from the Company, separate travel arrangements are required in these circumstances. On occasion arrangements need to be made to transport baggage separately from the Company.) Shipping of equipment and freight to and from the venue as arranged directly with the Company s Production Manager. Note: Standard shipping occurs Monday through Friday hence arrangements may be required for weekend storage. PROGRAM: The Company shall furnish the Presenter with exact program copy for all performances. The Presenter agrees to have it printed, at its expense, and available for distribution at the time of the performance. No copy will be altered or edited by the Presenter without written permission from the company. The Company requires fifteen (15) programs for archival purposes to be given to the production manager. Program deadline is noted in the contract. HOSPITALITY: The Artist requires the Presenter to supply the following during all rehearsals and performances: Non-carbonated bottled water (e.g. Evian, Poland Spring, etc.); Twenty (20) cans or bottles of assorted regular and diet sodas; Twenty (20) assorted juices (e.g. orange, grapefruit, etc.); Twenty (20) pieces of assorted fresh fruit, or cut up fruit for fifteen (15); Cheese, crackers for fifteen (15); Hot coffee and assorted teas to accommodate fifteen (15), with sugar, sugar substitute and milk; Appropriate utensils and cups; Drinking water in individual bottles with reusable caps located on each side of the stage; A bucket of ice with Ziploc bags, following each performance. Hospitality is for the exclusive use of the Company. Should the Company be required to load-in, tech, and perform in the course of one working day or perform twice in one day, it will be the responsibility of the presenter to provide a catered meal for fifteen (15) at the theater.

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 6 of 9 Information in the above Rider, and in included addendums, is agreed to and accepted by: Presenter (signature) Presenter's Technical Director (signature) Presenter (printed name and title) Technical Director (printed name) Address Address Phone Phone Fax Fax

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 7 of 9 Typical Production Schedule This should be used for example purposes only. The production schedule, for each event, shall be created based on the specific needs in each venue. The production schedule will be created by the Company s Production Manager, in consultation with the Technical Director in each venue. This schedule example is based on the requirements in the technical rider, which stipulate that the lighting plot must be hung and prepared for the company s arrival to the theatre. This schedule does not account for the time that will be required to accomplish the hanging of the light plot. Day 1 Load-in Focus ~ For Example Time Crew Technical Dancer 9:00 1 Flyman 2 Loaders 2 Carpenters 6 Electricians 1 Light Board Operator 1 Sound 11:00 Break Load In -Scenic Install -Sound -Lighting Boom Placement Set Electric and Border Trim TECH TABLE IN THE HOUSE 11:15 Load In (continued) Lighting Focus 1:00 Lunch 2:00 4 Electricians 1 Carpenter 1 Flyman 1 Light Board Operator 4:00 Break Lighting Focus 4:15 Lighting Focus (continued) 6:00 Dinner Break 7:00-10:00 1 Light Board Operator 1 Electrician Lighting Cueing 10:00 End of Day

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 8 of 9 Day 2 Performance # 1 ~ For Example Time Crew Technical Dancer 8:00 Cueing 12:00 Lunch Break Class on Stage 1:00 Notes Break 2:00 Spacing Rehearsal Spacing Rehearsal 3:00 Break 15 minute call 3:15 1 Light Board Dress Rehearsal Dress Rehearsal 1 Sound Board 2 Electrician 1 Carpenter 1 Flyman 4:45 Notes Notes 6:00 Dinner Dinner 7:00 1 Light Board Sweep the stage/dimmer check Stage Available 1 Sound Board 2 Electrician 1 Carpenter 1 Flyman 7:30 Half Hour Half Hour 8:00 Curtain Curtain 10:00 Strike End of Day 12:00 End of Day End of Day

RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 9 of 9 CONTACT INFORMATION PAGE Please fill out completely, and return to the company. For Pascal Rioult Dance Theatre Name Title Phone Mobile Fax Email Elizabeth Executive LaCause Director 212-398-5901 212-398-5902 liz@rioult.org Managing Amy Director Harrison (Booking) 212-398-5901 646-232-3604 212-398-5902 amy@rioult.org Spencer Anderson Production Manager (tech and company management For Presenting Organization General Organization Contact: 212-398-5901 650-218-1542 212-398-5902 spencer@rioult.org Publicity Contact: Name Title Phone Fax Email Transportation Contact: Hotel/Lodging Contact: Technical Contact: Other: