First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

Similar documents
FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Present Status and Future Upgrade of KEKB Injector Linac

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

Trigger-timing signal distribution system for the KEK electron/positron injector linac

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

The Elettra Storage Ring and Top-Up Operation

Linac upgrade plan using a C-band system for SuperKEKB

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

PEP II Design Outline

Operational Status of PF-Ring and PF-AR after the Earthquake

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

RF considerations for SwissFEL

SPEAR 3: Operations Update and Impact of Top-Off Injection

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

Digital BPMs and Orbit Feedback Systems

KARA and FLUTE RF Overview/status

CLIC Feasibility Demonstration at CTF3

Proton Engineering Frontier Project

Current status of XFEL/SPring-8 project and SCSS test accelerator

TOWARDS THE COMMISSIONING OF J-PARC

Requirements for the Beam Abort Magnet and Dump

A Facility for Accelerator Physics and Test Beam Experiments

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Detailed Design Report

Upgrading LHC Luminosity

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Status of RF Power and Acceleration of the MAX IV - LINAC

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

What can be learned from HERA Experience for ILC Availability

INFN School on Electron Accelerators. RF Power Sources and Distribution

EPICS-based control system for compact-erl and ibnct

SSRF Beam Diagnostics Commissioning. LENG Yongbin on behalf of SSRF BI group

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

30 GHz Power Production / Beam Line

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

Status of SOLARIS Arkadiusz Kisiel

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

KEKB Accelerator Physics Report

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

Status of CTF3. G.Geschonke CERN, AB

P. Emma, et al. LCLS Operations Lectures

Pulses inside the pulse mode of operation at RF Gun

Top-Up Experience at SPEAR3

Status of the X-ray FEL control system at SPring-8

PRESENT STATUS OF J-PARC

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

CONSTRUCTION AND COMMISSIONING OF BEPCII

DATA ACQUISITION SYSTEM FOR SUPERKEKB BEAM LOSS MONITORS

Beam Position Monitor Developments at PSI

Status of Elettra, top-up and other upgrades

Precision measurements of beam current, position and phase for an e+e- linear collider

The FLASH objective: SASE between 60 and 13 nm

CLEX (CLIC Experimental Area)

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

SUMMARY OF THE ILC R&D AND DESIGN

LHC Beam Instrumentation Further Discussion

Status of KEK X-band Test Facility and its future plans

Status and Plans for PEP-II

Photo cathode RF gun -

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

G0 Laser Status Parity Controls Injector Diagnostics

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

J-PARC timing system

Towards an X-Band Power Source at CERN and a European Structure Test Facility

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

DELIVERY RECORD. Location: Ibaraki, Japan

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

The PEFP 20-MeV Proton Linear Accelerator

4.4 Injector Linear Accelerator

The KEKB injector linac

CLIC Feasibility Demonstration at CTF3

Fast Orbit Feedback at the SLS. Outline

Accelerator Systems of the TPS

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

North Damping Ring RF

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Hall-B Beamline Commissioning Plan for CLAS12

Jae-Young Choi On behalf of PLS-II Linac team

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz

BUNCH BY BUNCH FEEDBACK SYSTEMS FOR SUPERKEKB RINGS

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

HAPD and Electronics Updates

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

ARES Status 2004(JFY)

Thoughts on Project Standard in Japan

Accelerator Controls Part2: CERN central timing system

LIGHT PROTON THERAPY PROJECT

A New 4MW LHCD System for EAST

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

Activities on FEL Development and Application at Kyoto University

12GeV CEBAF Commissioning

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Overview of NLC/JLC Collaboration *

STATUS AND FUTURE PROSPECTS OF CLIC

Sérgio Rodrigo Marques

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Transcription:

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1

Overview of Linac Beam Operation 2010/9/16 2

3 Simultaneous Top-up for three rings in KEK Accelerator Complex in KEK Tsukuba Campus Linac 600-m-long e-/e+ injector 50 Hz Two Rings for High Energy Physics KEKB 8 GeV e- 1 nc x2 bunch 3.5 GeV e+ 1 nc x2 (10 nc primary e ) Two Light Sources: PF 2.5 GeV e- 0.1 nc PF-AR 3 GeV e- 0.2 nc

4 Simultaneous Top-up for three rings in KEK Accelerator Complex in KEK Tsukuba Campus Linac 600-m-long e-/e+ injector 50 Hz Two Rings for High Energy Physics KEKB 8 GeV e- 1 nc x2 bunch 3.5 GeV e+ 1 nc x2 Four independent rings share only one injector. (10 nc primary e ) Two Light Sources: PF 2.5 GeV e- 0.1 nc PF-AR 3 GeV e- 0.2 nc

Linac Parameters Linac parameters should be changed to a optimized one for each beam injection. Timing (trigger/delay) RF phase Magnet settings Positron Target Insertion/Extraction etc. 2010/9/16 5

Linac Parameter Switch for KEKB e- 2010/9/16 6

Original Beam Operation for KEKB e-/e+, PF KEKB e-/e+ : every 90 min. PF (PF-AR) : twice daily KEKB e- PF KEKB e+ Luminosity 2010/9/16 7

Improvement of Integrate Luminosity at KEKB Continuous Injection Mode (CIM) Quasi Top-up Injection Linac Parameters are frequently switched CIM Mode KEKB e- mode 1 min. Linac Bema-Mode Change 30 sec. KEKB e+ mode 4 min. 2010/9/16 8

More Improvement Much higher current stability is required for KEKB. At the same time, PF Top-up is also strongly required. 2010/9/16 9

Linac Upgrade: Simultaneous 3-rings Top-up 2010/9/16 10

Operation Scheme for Simultaneous Top-up (Multi-energy Linac Scheme) Common DC Magnet Setting Several Pulsed Magnets Fast Beam Energy Control Fast Low-Level RF Phase Control Fast High Power Klystron Timing Control 2010/9/16 11

Fast Switching of 3 different beams 2010/9/16 12

Beam Energy along linac for each Injection Beam 2010/9/16 13

Beam Energy along linac for each Injection Beam 2010/9/16 14

Fast Timing Control - Event Based System - 2010/9/16 15

Event System: MRF230 EVG/EVR One EVG x1, EVR x21 (on EPICS/VxWorks) To change ~100 parameters in every 20 ms. Trigger/delay for Klystron, Pulsed magnet, Gun, etc. Low-Level RF Phase DAC 2010/9/16 16 ADC EVR

2010/9/16 17

2010/9/16 18

2010/9/16 19

2010/9/16 20

New PF-BT 2010/9/16 21

Original PF-BT 2010/9/16 22

Original PF-BT 2010/9/16 23

Construction of New PF-BT 2010/9/16 24

Pulsed Bend and Power Supply Pulsed bend: Beam bending angle: 7 deg. (up to 3 GeV) Max. magnetic field: 1.36 T Gap: 157 x 30 mm (W x H) Coil: 1 turn Power supply: Max. current: 32 ka (12.5 Hz) 27 ka (25 Hz) Pulse width: 200 ms (half-sinusoidal) Stability: 0.1% Ceramic chamber: Length: 1200 mm Coating: Ti (1 mm) 2010/9/16 25

Fast Switching Between e- and e+ Operation 2010/9/16 26

Photograph of New Target 2010/9/16 27

Fast Switching e-/e+ Scheme 2010/9/16 28

Fast Switching e-/e+ Scheme 2010/9/16 29

Result of Beam Study Old scheme New scheme 2010/9/16 30

ast Beam Position Measurement 2010/9/16 31

BPM-DAQ System Upgrade: Old System: 5 GSa/s, 8 bits, 1 GHz Analogue BW GPIB control Measurement performance: up to 1 Hz New System: 10 GSa/s, 8 bits, 1 GHz Analogue BW 100 Mbps/GbE Network DAQ Speed: more than 50 Hz Twenty four systems have been installed. Old System (VME + Oscilloscope with GPIB) New system EPICS embedded IOC

SIMULTANEOUS TOP-UP OPERATION OF KEKB e-/e+ and PF 2010/9/16 33

Simultaneous Top-up Operation Beam current stability in Original Operation - KEKB: 300 ma (~ 50 %) - PF: 240 ma (~ 53 %) KEKB e- PF KEKB e+ Luminosity 2010/9/16 34

Simultaneous Top-up Operation Beam current stability since Original Apr. 2009 Operation - KEKB: 1300 ma ma (~ 0.05%) (~ 50 %) : e-: 12.5 Hz, e+: 25 Hz - PF: 0.05 240 ma (~ 53 0.01%) : 0.5 Hz KEKB e- PF PF KEKB e- KEKB e+ KEKB e+ Luminosity Luminosity 2010/9/16 35

Remaining Problem: PF-AR Injection AR-BT and KEKB-BT share the long part of beam line. AR-BT: ~ 3.1 GeV Tight tunnel space 2010/9/16 36

Toward SuperKEKB Operation Beam lifetime ~ 10 minutes. PF-AR injection will be a crucial problem Interrupt top-up injection (15 min. twice daily) In SuperKEKB operation, Beam Energy will be changed. e-: 8 GeV => 7 GeV e+: 3.5 GeV => 4 GeV e+ beam with 4 GeV will be available for PF-AR injection. AR-BT Upgrade Pulsed Bend switching between AR-BT and KEKB-BT 2010/9/16 37

Summary and Future Plan Simultaneous Top-up for KEKB e-/e+, and PF was achieved successfully. Beams with different energy and charge (0.1 nc to 10nC) 2.5 GeV (PF), 3.5 GeV (KEKB e+), 8 GeV (KEKB e-) Development of Many Subsystems and Many Beam Studies. Many People's Contributions and Efforts Great Improvement of Experimental Efficiency at both of KEKB and PF Towards SuperKEKB: We are planning the simultaneous injection including PF-AR. Simultaneous top-up (SKB e-/e+, PF) and PF-AR 4 GeV e+ injection 38 2010/9/16

Thank you for your attention! 2010/9/16 39