Peter Pan. Six pairs of Sennheiser headphones to be won! See p13 for details... The UK Arena Tour. Also Inside:

Similar documents
The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

Production Advance Information

Paradiso (ch. Václav Kuneš) (30min) Technical requirements / List of light equipment Focus sheet on demand - (standard focusing)

Section A: Front of House (FOH) Public Address (PA) Speaker System

TECHNICAL SPECIFICATIONS: STICKS STONES BROKEN BONES Company: Bunk Puppets, contact :Jeff Achtem,

Theatrical Planning Guide & Theatrical Chain Of Command

Pleasance London Main House Visiting Company Information Pack May 2017

T1 National Theater. Auditorium (Basement 1): 324 Under Balcony (Ground floor): 388 Royal Circle (Level 1): 161 Level 2: 316 Level 3: 422

Technical specifications Main theatre. Sound. Console: Soundcraft Si Performer 3

ISLAND HALL TECHNICAL INFORMATION

CONCERT. America July Copyright Lighting&Sound. Ultra Design

Little River Band Production Rider 2018

TOURING RIDER Where Magic & Motion Meet!

Main Stage Technical Specs - Hall #2

Theatre Technical Specifications

Content: Technical Rider 2018 Hotel Watercage

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

SR Wing space = 2m SL Wing space = 1.1m There is an upstage cross over with pass doors onto stage USR & USL.

TECHNICAL RIDER PA SYSTEM

Technical Rider Vocal Point Season Performing Arts Management

Auditorium Seating VISY THEATRE TECHNICAL SPECIFICATIONS

Technical Specifications

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

Project manager (PM): Pamela Næss Mail: Phone:

TECH SHEET AND INFORMATION (Updated )

ETC Congo Desk 1024 channels in two universes ( Universe 1 House dimming, Universe 2 Toured dimming) Digital light processor dimmers

Les Docks / Av. de Sévelin Lausanne. Technical Rider

FASO DANCE COMPANY KALAKUTA REPUBLIK

Multi Coloured Robe at Ostrava Festival

The Who s. First 50 Years. Creating distinctive lighting and video for the band s semi-centennial CONCERTS

Sioux Falls Arena. I:\AD\001\H01\H01035.Docx Page 1 of 5

Main House Technical Specification

Technical Specifications

Harbourfront Centre Theatre Technical Specifications As of Jan. 2018

There are 18 wheelchair positions which will result in the loss of one seat for every wheelchair position allocated.

ROSE THEATRE MAIN THEATRE

1400 MARKET STREET ST LOUIS, MISSOURI Main Number Main Fax

Dr JOHN GALLAGHER CONCERT CHAMBER

Amarillo Civic Center Auditorium 401 S. Buchanan Amarillo, Texas 79101

"The Road Is Just A Surface" by Anja Garbarek and Jo Strømgren Kompani Technical Requirements

Kenny Rogers Productions, Inc Production Requirements Indoor and Outdoor and Small Venue Performances

2017 TECHNICAL SPECIFICATIONS

SOMETIME BETWEEN NOW AND WHEN

Theatre Technical Specification

Rider Part1: Technical Requirements, A Cappella Show

Everyness. Wang Ramirez Company TECHNICAL RIDER

7774 Sashabaw Road Clarkston, Michigan 48348

068 VENUE

The Taal Inc. Rhythm Ensemble Tech Rider

There are 10 dressing rooms in Theatre Kerkrade.

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

Where performance matters

Atlanta Audio Services Information Sheet

Meadow Brook Music Festival 3554 Walton Blvd Rochester Hills, MI Tech Pack

DEREHAM MEMORIAL HALL

Enormous Room Technical Rider & General Lighting Plan

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

Matt Dann Cultural Centre

Liteup Events Equipment Brochure 2016

Please carefully read this entire form before completing any information.

Technical specifications Main theatre. Sound

Project manager (PM): Pamela Næss Mail: Phone:

The Tower Theatre Contact - Peter Heselden Theatre Manager Tel

Technical Specifications and Inventory Spring 2018

Technical Specification

JERWOOD VANBRUGH THEATRE

Technical Specifications. Taylor Little Theater

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

EbzB Productions Your World Is Our Stage!

ZOOM LED Spot. Market leading colour control and future proofed functionality with simplicity of use Designed and built in the UK

Technical Specifications for the Rival Theatre 2018

SKALAR Kraftwerk Powered with Pointes

HIRE AND TECHNICAL INFORMATION

Meeting Room Packages

USE OF JOHN M. GREENE HALL

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

Borderline. Company Wang Ramirez TECHNICAL RIDER

Technical Specification Pavilion Dance

Technical Data Sheet

The Breen Center for the Performing Arts Saint Ignatius High School

Robe Launches another 7 New Environmentally Friendly products at PLASA

Recording to Tape (Analogue or Digital)...10

Tickets will be sold through our ABC account and all tickets are scannable on entry.

SOUND. * All instruments and circuits have standard 2 pin and ground stage pin connectors. Page 1 of 5

Timber! Technical Rider

Faris Family Studio at the Dance Centre, Vancouver BC 677 Davie Street, Vancouver, British Columbia. V6B 2G6

Downtown Arts Center Tech Packet. General Information

CENTRE FOR PERFORMING ARTS

TECHNICAL RIDER (Page 1 of 3)

2012 HSC Entertainment Industry Sample Answers

A38 SHIP CONCERT HALL TECHNICAL RIDER 2018!

Rider for Pigeon Party! USA Tour 2009/10

Barney Simon Theatre Technical Specifications

Please note we do have some regular volunteer technicians but there is no full time technical manager.

Rider for Pigeon Party! USA Tour 2009/10

TECHNICAL REQUIREMENTS

Dance floor surface: Black marley dance floor on a sprung stage floor.

Film & Video Industry

Robe Reborn at TribalTech Brazil

YOUR TOOLKIT TO AMPLIFY YOUR SHOW

Transcription:

January 2014 entertainment, presentation, installation Peter Pan The UK Arena Tour Also Inside: Robe s Robin Pointe SSE & Wigwam On Tour: B4MV A New Dimension The luminaire examined in depth The benefits of integration... LSi reports from Manchester LSi reports on the new ipix Db1 PLUS! Venue: Cast, Doncaster A Great Hall for Leys School Flare Audio: Making Waves Audio File: Logical Conclusions Tech Focus: Love, Tech Style West Side Story On Tour Sustainability In Profile: Bob Schacherl, CEO Robe US Rigging Call Show Preview: ISE, Amsterdam - and more... Six pairs of Sennheiser headphones to be won! See p13 for details...

Peter Pan A Never Ending Story of Entertainment Technology Words & pictures by Sarah Rushton-Read

Billed as a visual adventure, the arena tour of Peter Pan: The Never Ending Story has been thrilling audiences across the UK throughout the festive period. A show where the virtual and the real work in synchronicity, it s a theatrical spectacular, packed with a surreal hybrid of animated film, theatre and music. Sarah Rushton-Read goes undercover as Tinkerbell to find out more... Directed by Luc Petit and produced by Music Hall, the arena tour of Peter Pan: The Never Ending Story is the artistic dream of Geert Allaert. It took two years to bring to the stage and reportedly cost 10m to produce. Watching the show, it s easy to see where that money has been spent - the artistry and detail of the entirely animated set, worthy of any Disney or DreamWorks studio, is undoubtedly the star of the show. Epic in size and ambition, this unique retelling of the classic Peter Pan story is communicated through an amalgamation of video, classic pop songs and narration, courtesy of reality TV star Stacey Solomon, who plays Tinkerbell, mostly from off stage. The show is further embellished with a talented ensemble of acrobats, dancers and singers, who play the pirates, Indians and lost boys, amongst others. There is no script to speak of and the main characters express themselves through an eclectic array of pop songs, including Rod Stewart s Sailing, Supertramp s Take the Long Way Home and Robbie Williams Angels; Wendy even leads the Darling family in a rendition of Our House by Madness. Captain Hook is defined by being the only character in the cast that expresses his feelings through opera. What makes the show stand apart is the epic scale of the scenic and technical design. Designed by Michel Soucy with video mapping by Dirty Monitor, the design pulls heavily on the latest in video mapping, automation, special effects and staging technologies. This makes for a scenic world that is as dynamic and exciting as any film. Every super-real scene is packed with activity: performers pop out of traps, fly in three dimensions above the stage, sometimes without wires. They deliver stunning dance and acrobatic sequences and shoot out over the audience on bungee cords. Yet somehow the focus is skilfully kept on the central story through precision-programmed lighting design from Luc Peumans, cleverly focused sound created by Alain Courieux and electrifying pyro. The experience is like being part of a huge 3D animation. In charge of this mammoth production is UK-based production manager David Wright. With experience in similar large-scale arena spectaculars, including Walking with Dinosaurs and How to Train your Dragon, Wright was brought in to ensure it toured without incident in the UK. The thing about this show is that it wants to move from venue to venue as fast and efficiently as any rock tour, but at the same time it needs to retain the artistic values of theatre, explains Wright. Until Birmingham, the show had only done a couple of showcase performances. However, in that format it was too large and cumbersome to tour. My brief was to ensure it could move in the allotted time and within the agreed budget. The aim was to be able to load in and build up on day one, and then hand over to stage management on day two. This is no mean feat given the size of the show - 42 tonnes in 22 trucks. The first venue on the schedule was the Birmingham NIA. However, Wright scheduled an extra build day to weigh the show: When we took over there was no accurate rigging information. I used a Load Cell system and along with my rigger, Mark Pretty Whittaker, we put together a weight table. We also pulled together a generic rigging plot, which will come in handy for other proposed tours. Wright is touring with a small, hand-picked team plus some of the original show crew from Holland and picking up crews locally at each arena. The tour is carrying its own power. We have a free-fall flying gag that uses a high-power wind turbine built into the stage. It s an important gag, so we didn t want to rely on local power. This has had a knock-on impact as we also needed a seven-tonne forklift to position the turbine and a boomlift for the focus and other rigging jobs. During the festive holidays I couldn t realistically have a forklift and a boomlift delivered to each arena as they re loading shows in and out, back-to-back, so I decided to hire a low loader for the forklift and a flat-bed mega truck for the turbine. What is most exciting for Wright is the 3D automation, which is supplied by Tait Technologies. This is something I ve not toured with before. It s been great to work with Tait and see how far down the touring automation track they are. For me, automation is the latest dark art and it fascinates me. 53

Head rigger Mark Pretty Whittaker was personally selected by Wright because of the unusual loads and forces exerted by the high power wind turbine. We worked together on Walking with Dinosaurs and How to Train Your Dragon, he says. In general, the rigging is pretty standard, there s just lots of it. Where it differs is when it comes to the wind turbine and the unusual and large opposing forces it exerts on the venue s infrastructure. Another challenge is the height the show requires. The 3D automation truss needs be a minimum of 14m above the stage at its outermost edges. The 14m trim allows performers to soar up to 10m above the stage and it also accommodates a large, triangular air deflector in the roof for the wind turbine. In fact, when it comes to the wind effect, the forces are considerable. The air tunnel can travel up to 175 kilometres an hour, explains Pretty. If it s not deflected it could actually pop the roof off! We calculated that the lift on the rig at the NIA was 158kg per point - that s 600kg of lift! The deflection system has to be totally secure, otherwise it would also lift. This means we require vertical support to the ground. Because of the forces involved, each venue also demands individual staging and rigging consideration. We re-positioned the show footprint for Wembley. The wind machine motor weighs around five tonnes not accounting for the additional downward force when it s running! The floor in Wembley is sprung and there s a swimming pool underneath. We ve positioned the stage at a point where the swimming pool is shallowest so it s easier to acro-prop the floor for support. All-in-all, Peter Pan demands 105 rigging points, seven two-tonne and the rest onetonne motors. We re using double-brake Lodestar motors for the 3D automation track and also the truss we call the Bungee truss uses double-braking, high-speed Kinesys motors. We have a number of flying gags, which require the chain to come down through the stage at a two-inch tolerance. It has to be perfectly positioned as performers clip on and then come flying out at speed from under the stage. If any chain is slightly out, it could have quite an impact. Also having quite an impact and forming the bulk of the set is Michel Soucy s scenography and illustrations in the form of a 120-minute movie created by a Belgian company Dirty Monitor, video mapped to the set and operated by Patrick Bellens of The Creative Factory. Bellens uses Avolites Media Ai Media servers to precision map content to the 3D greyscreen scenic objects. These comprise a row of super-sized books upstage, two huge books standing on end, stage right and left, which act both as scenic elements and IMAG screens. In addition, three book-shaped platforms - two closed, one open centrestage - provide different levels on which the action can unfold. We chose to use the Avolites Media Ai Media Server because we needed a powerful system that enabled us to visualise the show in 3D and precisely map it to the set pieces, explains Bellens. We re mixing live IMAG content with pre-programmed content and the Ai allows us to do this seamlessly. It gives us flexibility in change of heights and angles so we can adapt easily to different venues with the projection and still do the mapping of 14 projectors in less than three hours. The 3D visualiser also gives us a good picture of what is going on onstage. Throughout, the Avolites system has been invaluable in allowing us to import a 3D set model and then map the content directly onto it. We can also move through the show in real time in the visualiser. That has enabled the creative team to view the stage from all angles in the studio. Creating content for a show like this is an enormous undertaking and it has taken nearly a full year to complete. The video features a lot more pixels than a regular film, and the images are even bigger than those in the average movie. Every part of the set is covered. There is a moment when whales appear to surface in the virtual sea on the stage floor and blow water from their blowholes - just one instance where sound, lighting, video and staging combine to create a single, magical effect that makes it all so believable. All rely on precision coordination. In this case, the virtual whales have to line up perfectly with holes in the stage from which CO2 jets erupt, while sound effects are triggered to complete the impression. If just one of these effects is slightly out, the gag is lost. And there are many other places in the show where the virtual meets the real in similar ways. 54

55

Equally precise is Luc Peumans sharply focused and meticulously designed lighting. With a set that is almost entirely virtual, Peumans manages to deliver remarkably dramatic, sculptural lighting without compromising or dulling the impact of the video. The virtual and the physical blend seamlessly and Peumans lighting pulls the mood, light and atmosphere from the animated world into the 3D stage domain. The design is intricate, detailed and sharp, subtly keeping focus where the action is. With a constantly changing set the lighting has to run in absolute sync with the animation and Peumans cueing is strictly timed: Projection sets the scene and dictates the atmosphere and colour of a scene. It also prescribes the necessary angle of the key light and that can change as quickly as the animation, he explains. It s a completely different way to approach lighting design for arena shows. I had to keep it tight and avoid spill. I also wanted to keep the number of fixtures to a minimum. To do this, I chose to use Clay Paky Alpha 1500 profiles as the main workhorse fixture. They re high output and the dynamic response is super-fast. I can shape the beam to almost any shape, and the stay-sharp zoom function has been invaluable. In the main we re using standard gobos, which are always excellent, but we ve also had a fair few specials made. For general backlighting and further gobo projection Peumans uses Philips Vari-Lite VL3000 Spots. He also uses Robe Robin 1200 LEDwash and 600 LEDwash fixtures, with tophats, to extend the colour wash in the video projection areas. Control is from a GrandMA2 full-size triggered by the SMPTE timecode from sound and programmed by Cedric Eestermans. One of the most surprising effects in the show is the wind turbine, which provides enough lift to have Peter Pan flying high without wires. The force sees him fly almost as high as the lighting rig itself. The company that supplied the turbine, Aerodynium, also provided the body double that plays the flying Peter Pan. The turbine weighs about 3.5 tonnes, and has a five tonne, 630kW (roughly 871 horsepower) three-phase motor. The speed controller alone weighs in at about 1.5 tonnes. As mentioned previously, the system requires its own separate isolated power, which is overseen by James Gunson of Powerhire, who says: The fan is power intensive and not many venues have the power resources. We re using two 500kVA generators synchronised together. Most venues can only run the fan at 85% as it can cause issues with the roof. At 85% it is pulling about 700 amps a phase, so it burns a lot of diesel. Obviously the fan needs some considerable baffling, not only because of the noise but also because it has to suck air in from somewhere and there s a danger other things could be sucked in as well! The fan can be noisy, and balancing that with the soundtrack can be tricky for FOH sound engineer Raf Willems. At the heart of the show there are two Mac Pro computers (one main, one spare) running the entire LOGIC 9 show file, plus SMPTE timecode to lights, pyro, video and showcaller, explains Willems. It also runs a cue file to the Riedel intercom for followspot cues. The two MADI streams run through a DOTEC MADI switch to the DiGiCo SD8, which is at maximum capacity of ins and outs. We have 20 mics and over 30 inputs coming from the Macs; 12 IEM outputs and service outputs to backstage and dressing rooms. From top: L-R, programmer Cedric Eestermans, LD Luc Peumans and FOH sound engineer Raf Willems. Patrick Bellens of The Creative Factory. Head rigger, Mark Pretty Whittaker. Systems tech Neil Frazer (left) with automation operator Darren Williamson. The turbine from under stage. 56 The cast are all on in-ear monitors - PSM1000 by Shure with custom moulded earpieces. All the singers have two microphones - one DPA4088 and one Sennheiser MKE1, says Willems. Transmitters and receivers are also Sennheiser. To avoid the need for foldback on stage, the dancers also use an IEM system. We use one transmitter and they are all on the same frequency with just one mono-mix going out to them. I m extremely lucky to have Stijn Groessens along as our wireless tech. He s also responsible for the Riedel intercom, which is crucial

For Willems, having everyone on wireless has been one of his biggest challenges: The antenna setup was critical. We have a lot of stage to cover and actors are also up in the air. However, because the cast moves a lot, we are now using Sennheiser / Adidas sport ears for dancers, which are specially made for running. The PA is L-Acoustics and comprises 72 KARA and 24 SB18. To some degree, our speaker setup is dictated by the height of the venue, says Willems. In particular, we have to be mindful of the height of the side speakers because of the 3D flying system. For this tour we have a six-array system comprising up-to three SB18s and 14 KARA each. On the floor, we have one SB18 and two KARA underneath each main hang, in order to tilt the sound-image down. In charge of that 3D flying system and all the automation is veteran operator Darren It s a huge show, adds Williamson. At several points everything is moving at the same time. We had an initial week of programming before performances, but of course it continues to evolve. The show is using a new product, Technora, instead of the usual steel wire. It s a strong, synthetic rope, which is considerably lighter than steel. It s the first time we ve used this kind of rope with these winches, says Frazer. We had a few teething problems, but Tait s support and back-up has been invaluable. Taking care of special effects and the striking pyrotechnicals is pyro specialist Emerson Williams. The pyro adds dimension to the virtual by bringing it out into the real world. For example, Tinkerbell s first appearance is as a firework travelling down a wire at speed towards the up-stage projection surface from the upper circle. As soon as it hits the upstage screens, the video takes over and the fairy appears as a spark in the animation. It s such a huge production and pyro is woven into almost every other department in one way or another, says Williams. It s a big challenge to get everything fitted on time - each day takes up to four or five hours to set up. We have pyro effects, gas flames, CO2 blowholes, low-lying fog. Our effects are in every scene and area - from the stage floor to the flywires to props, automation and stage fittings. In terms of the voices, Willems says the EQs are all nearly flat. There is a little bit of dynamic EQ going on, some delay in the songs as effect. We use very little reverb because of the natural reverb we already get in the arenas we re playing, he adds. Williamson, assisted by systems tech Neil Frazer. Everything we re using is supplied by Tait Towers, says Frazer. We have a 3D flying rig, which comprises four zero fleet angle, high speed winches each capable of lifting 300lb at 15ft per second. The 3D rig can move 500lb at 12ft per second. It s a fast and very cool system. This enables us to fly a performer anywhere over the stage in three dimensions. Upstage we have two 2D rigs, which allow us to fly performers up, down, left and right across the back of the stage. We also have three stage lifts, which can rise up to eight feet and are in constant use. For control, Williams is using the Galaxis wireless firing system. Galaxis has never let us down. I control it all from FOH stage left. I am using the MA PC wing to control the flames, low smoke and the streamers at the end of the show and the Galaxis wireless controller for all the pyro. The arena tour of Peter Pan: The Never Ending Story is millions of miles from the traditional panto in almost every way. Packed with special effects, theatre, film and action it doesn t drop the audience for a moment. However, it s the concept and stage design, cleverly supported by the creative and homogenised use of technology, that are the true stars of the show. on this show for the safety of the actors and crew. To that end we have wireless posts that are backed up with a wired system. 57