2003. 6. 23-24 ( ) (ETRI) ( SDI) ( )
Contents
Place: Renaissance Harborside Hotel, Baltimore,USA Time: May 23(Fri) 9:00am 5:00pm Room: Guilford Room May 24(Sat) 9:00am 5:00pm Room: Guilford Room 1. Opening of the meeting / Tentative organizer 2. Introduction and confirmation of the membership / Tentative organizer 3. Confirmation (1) Minutes of Beijing meeting / Tentative organizer and Shibata(PT62341 PL) (2) Draft agenda / Tentative organizer (3) Tentative voting results on N290 and NP291 / Tentative organizer 4. Discussion related OEL display (OLED) (1) Ground Design / Tentative organizer and Shibata (2) Examination of the Documents / Shibata Term, Definition and Letter symbol which were discussed in Beijing meeting (3) Explanation and Discussion about NP291(Generic Specifications) / NP291 Project Leader (4) Explanation and Discussion about NP290 ---- (Postpone)etc. 5. Information Exchange about hot topics / all members 6. Any other business ( New management system of OEL-G, Movement of SC47C toward TCxx etc.) / Tentative organizer and all members 7. Next meeting / Tentative organizer and Shibata 8. Close of the meeting / Tentative organizer 1/19
tative Organizer Dr. Changhee Lee, Inha University, Korea e tentative organizer, Secretary of SC47C, Mr. Hideo Iwama, egated his position to Dr. Changhee Lee) ntry ea an ntry ea an na Members Dr. Changhee Lee (member), Inha University Dr. Jeongno Lee (member), Samsung SDI Dr. Lee-Mi Do (member), ETRI Dr. Sung-Sik Park (member), Orion Electric Co. Dr. Sang-Geun Lee (Observer), Korean agency for Technology and Standards Dr. Kenichi Shibata (member), Sanyo, Mr. Masami Tsuchida (member), Pioneer Mr. Yuji Yoda (member), Otsuka Electronics Mr. Nobutoshi Asai (member), Sony Corporation Dr. Shigeo Mikoshiba (Observer, SC47C Chairman), University of Electro-Communications Member Absent Mr. Ki-Beom Kim (member), LG Electronics Mr. T. Tanabe (member), Pioneer Dr. Yong Qiu (member), Tsinghua University Dr. Genyu Ying (member), Tsinghua University Dr. Guifang Dong (member), Tsinghua University 2/19
3. Confirmation (1) Minutes of Beijing meeting / Tentative organizer and Shibata (PT62341 PL) Dr. K. Shibata reported the minutes of the Beijing meeting, which was agreed by the members. (2) Approval of the agenda The tentative organizer explained the draft agenda (OEL03-BAL-01) (3) Checking of documents The documents from OEL03-BAL-01 to OEL03-BAL-12 were catalogued. OEL03-BAL-01 Draft agenda for the meeting of SC47C/OEL-G Baltimore Meeting 2003. OEL03--BAL-02 Membership of the PT62341 OEL03--BAL-03 Unconfirmed Minutes (Part-1) of the meeting of SC47C/PT62341 held in Beijing, China in Oct. 29 and 30, 2002. OEL03--BAL-04 Unconfirmed Minutes (Part-2) of the meeting of SC47C/PT62341 held in Beijing, China in Oct. 31, 2002. OEL03--BAL-05 Result of Voting on NP-Document 47C/290/NP OEL03--BAL-06 Result of Voting on NP-Document 47C/291/NP OEL03--BAL-07 SMB/2530/R OEL03--BAL-08 IEC61747-1: Liquid crystal and solid-state display devices Part 1: Generic specification OEL03--BAL-09 Revised document of PT62341 OEL03--BAL-10 PDP03-BAL-05: PDP Standards Grand Map OEL03--BAL-11 PDP03-BAL-06: TC47/SC47C/WG4 Programme of Work OEL03--BAL-12 PDP03-BAL-16: Standard structure of LCD (IEC61747 Series) (4) Tentative voting results on NP290 and NP291 Dr. Shibata explained that both NP290 and NP291 are approved. (OEL03-BAL-05/06) 3/19
. Discussion related OEL display (or OLED) ) Ground design Review the status of LCD standardization (OEL03-BAL-12) and PDP standardization (OEL03-BAL-10) Discussion on the ground design of the standardization for the organic light-emitting diode display (see attached file) Flexible display will be included after further discussion in future meetings. ) Explanation and discussion about NP291 (Generic Specifications) Dr. Jeong No Lee (proposed project leader) explained new contents for NP291, Generic Specification. Revise the NP291 as the similar structure as the LCD s generic specification. The mechanical test is included in 5. Test and measurement procedures. The annexes will be included after further discussion in future meetings. ) Examination of the documents PT62341 (Terms, Definitions and Letter symbols) The terms and definitions of fundamental terms from F-18 to F-53 were reviewed. The physical property terms from P-1 to P-24 were reviewed. Some terms such as OEL, OLED and OELD were left for further discussion when other delegates fr China, USA, The Netherlands, Finland and France will attend. ) Explanation and discussion about NP290 Discussion on NP290 was postponed because of the absence of the project leader (Dr. Y. Qui) and Chin members. 4/19
Information Exchange about hot topics / all members OLED products 20 A-Si AMOLED, etc. Any other business - New management system of OEL-G, Movement of SC47C toward TCxx. SMB meeting on New management system of OEL-G, Movement of SC47C toward TCxx etc. will b held by 2003-06-13. The scope should include the organic light-emitting diode display (or organic electroluminescent display should be revised after the SMB approval and the movement to TC110. After that TCxx (perhaps TC110) Next meeting The IEC General meeting will be held in Montreal, Canada but SC47C will not be held since TC47 will n be held there. The possible meeting place will be either Eindhoven, The Netherlands or Fukuoka prefecture, Japan durin IDW2003. The tentative organizer, SC47C secretary Mr. H. Iwama will decide the next meeting according to th recommendation by all members via an e-mail. Close of the meeting All discussion items were finished according to the agenda with common consensus. The tentative organizer declared the closing of the meeting, and thanked all the delegates for the participation. 5/19
Contents 6/19
Panel & Set Maker Strategy Market Request Assurance of quality Cost cutting Equipment, Components, Materials Cost cutting Assurance Standard processes Reduce inspection time Users Assurance of quality 7/19
OLED Market Trend OLED(OELD) Revenue ($000) Forecast 2001 to 2007 8/19 Source: DisplaySearch 2002
OLED(OELD) Market Share by Revenue & Application urce: DisplaySearch 2002 9/19
OLED Development Status MOLED OLED Motorolla (Pioneer) Samsung (SNMD) LG (Pioneer) Pioneer 3 Samsung SDI (SNMD 2 ) SK 2.2 yo 5.5 QVGA, 14.7 1280x720 Sony 13 SVGA 10/19 Samsung SDI 2.2 QCIF, 15.1 XGA IDT 20 a-si OLED
Status of Standards for LCD IEC SC47C/WG2 Roadmap 94-11 98-02 98-04 95-04 94-11 94-1 98-04 98-06 96-06 97-11 94-11 initiated 97-05 98-09 94-1 initiated 00-10 11/19 initiated 00-10 initia 97-0
History of Standards for LCD 95 96 97 98 99 00 01 m. &C o cells as. Methods o Cells & modules al modules Visual Mono cells Sec. Spec. Mono Segment modules BD Spec. Mono PM modules Gen. Spec. ER&C Mono PM modules Sec. Spec. Mono Segment cells BD Spec. Mono Seg. cells Meas. Methods Mono AM modules (Transmissive type) Sec. Spec. Color PM modu BD Spec. Color PM modu 12/19 Environmental
Status of Standard for LCD 1. Generic Specification (61747-1) Terminology and Letter Symbols (61747-1) 2. Sectional Specification LCD Modules (61747-2) PM LCD Cells (61747-3) 3. Blank Detail Specification PMLCD Monochrome Modules (61747-2-1) Matrix Color LCD Modules (61747-2-2) PMLCD Cells (61747-3-1) 4. Essential Ratings LCD Cells (61747-4) Matrix Color LCD Modules (61747-4-2) 5. Environmental, Endurance Test Environmental, Endurance Test (61747-5) Visual Inspection (61747-5-2) 6. Measuring Methods Transmissive Type (61747-6) Reflective Type (61747-6-2) under consideration 13/19
Standards for LCD (IEC WG2) uments 61747-1 Ed.1.0 Part 1: Generic specification (FDIS Dec. 2002) 61747-2 Ed.1.0 Part 2: Liquid crystal display modules - Sectional specification 61747-2-1 Ed.1.0 Part 2-1: Passive matrix monochrome LCD modules - Blank detail specification 61747-2-2 Ed.1.0 Part 2-2: Matrix Color LCD modules - Blank detail specification 61747-3 Ed.1.0 Part 3: Sectional specification for liquid crystal display (LCD) cells 61747-3-1 Ed.1.0 Part 3-1: LCD cells - Blank detail specification 61747-4 Ed.1.0 Part 4: LCD cells - Essential ratings and characteristics 61747-4-2 Ed.1.0 Part 4-2: Matrix LCD Color Modules - Essential ratings and characteristics 61747-5 Ed.1.0 Part 5: Environmental, endurance and mechanical test methods 61747-5-2 Ed.1.0 Part 5-2: Visual Inspection 61747-6 Ed.1.0 Part 6: Measuring Methods for Matrix LCD Modules Transmissive Type 61747-6-2 Ed.1.0 Part 6-2: Measuring Methods for Matrix LCD Modules Reflective Type 14/19
Status of Standards for PDP Area IEC SC47C/WG4 Roadmap 61988-1 Term. & Letter Symbol 61988-2 Measuring Methods 61988-3 Generic/S ectional specificati on Essential ratings & Character istics Blank Detail Specificat ions 61988-4 Reliability Panel & odules color IEC 61988-1 Ed.1.0 Optical 61988-2-1 Optoelectri cal 61988-2-2 Quality 61988-2-3 IEC 61988-3 Ed.1.0 Guideline s of mechanic al interface IEC 61988-4 Ed.1.0 Environ.. Endurance and mechanica testing methods 15/19
Standards for PDP (IEC WG4) ocuments C 61988-1 Ed.1.0 Plasma Display Panels Part 1: Terminology and letter symbols (C IS Dec. 2002) C 61988-2-1 Ed.1.0 Plasma Display Panels Part 2-1: Measuring Methods -Optical DIS, IS Publication Oct. 2002) C 61988-2-2 Ed.1.0 Plasma Display Panels Part 2-2: Measuring Methods - ptoelectrical (CDV, FDIS Dec. 2002) C 61988-2-3 Ed.1.0 Plasma Display Panels Part 2-3: Measuring Methods Quality P295, 2003. 1) C 61988-3 Ed.1.0 Plasma Display Panels Part 3: Guidelines of mechanical interface P, CD Dec. 2002) C 61988-4 Ed.1.0 Plasma Display Panels Part 4: Environmental, endurance, and echanical test methods (NP, CD May 2003) 16/19
Proposal by Korean National Committee 2002 2003 2004 2005 2006 PT62341 Terms, definition and letter symbols NP290: Measuring methods: Otical and electrical NP291: Generic Specification: Quality Assessment Ground Design (2003. 5) Measuring Methods 2: Image quality (defects, visual inspection) Environmental, endurance and mechanical test Sectional Spec.: Mechanical test of Flexible displays 17/19
Grand Roadmap of OLED Standards IEC SC47C/OLED-G Roadmap 6234 1 62341-1 Measuring Methods rea Term. & Letter Symbol Generic specification Meas. Method 1 Meas. Method 2 Meas. Method 3 Sectional Specification Blank Detail Specifications Essential ratings & Characteristics Relia l es Color IEC 62341 IEC 62341-1 (NP291) Quality Assessment IEC 62341-6 (NP290) Optical and electrical Image (Defects, image sticking, etc.) Mechanic al Envi Endu an mech test meth 18/19
Ground map for OLED standardization was designed. - Review market and technology trends of OLEDs - Review LCD roadmap -Review PDP roadmap Two new projects are approved - NP291 Generic Specifications (project leader: Dr. Jeong-No Lee, Korea) - NP290 Measuring Methods: Optical and Electrical Characteristics (project leader: Dr. Yong Qiu, China) Reviewed PT62341 (Terms, definitions and symbols) 19/19