IEEE 1904 ANWG Opening Report

Similar documents
Material about the patent policy is available at

Electrical Interface Ad-hoc Meeting - Opening/Agenda - Observations on CRU Bandwidth - Open items for Ad Hoc

IEEE P802.3av GEPON Task Force. Meeting Summary and Action Items

Abbreviated Information for Authors

ATSC Structure and Process

Two-Level Fronthual Architecture and Requirements. Liuyan Han and Jinri Huang China Mobile

1.2 The NAB is the leading representative of South Africa s broadcasting industry representing:

All members as well as the current production cast and crew may participate in all social events planned by the Masquers.

Two-Level Fronthual Architecture and Requirements. Liuyan Han and Jinri Huang China Mobile

Meeting Minutes Group: IEEE P802.3ca 100G-EPON Task Force

ITU-T Y Reference architecture for Internet of things network capability exposure

ANADA MUSIC FOR CHILDREN MUSIQUE POUR ENFANTS

Meeting Minutes Group: IEEE P802.3ca 100G-EPON Task Force

Information for Authors and Editors

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

IoT Standardization. in ISO/IEC/JTC1/SC41. Wei Wei (IBM)

New York State Board of Elections Voting Machine Replacement Project Task List Revised

Accredited Standards Committee C63

The fundamental purposes of the educational and public access channel are as follows:

Law Library. Hofstra. Supporting the Curricular and Research Needs of the Students and Faculty of Hofstra Law. FACULTY EDITION

Video System Characteristics of AVC in the ATSC Digital Television System

Postings, Decorations, Electronic Campus Display and Information Distribution Standards

Rules and Policies WRBB 104.9FM. Fall 2018 (Last Updated 5/2018)

Publishing India Group

Link Budget Analysis for Broadband Services in IEEE b

Allocation and ordering of audio channels to formats containing 12-, 16- and 32-tracks of audio

Akron-Summit County Public Library. Collection Development Policy. Approved December 13, 2018

FAR Part 150 Noise Exposure Map Checklist

ITU-T Y.4552/Y.2078 (02/2016) Application support models of the Internet of things

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE

Information for Authors

EUROPEAN TRANSPORT CONFERENCE 4-6 October 2017

Music Administrator, Temple Church

CONSTITUTION FOR THE FLYING VIRGINIANS AT THE UNIVERSITY OF VIRGINIA

Terms of Use and The Festival Rules

Regulation No. 6 Peer Review

2017/2018 ATSSB Region 23 Rules Updated 7/17/2017

AMERICAN NATIONAL STANDARD

INSULATED CONDUCTORS COMMITTEE

For Immediate Release

Achieving Compliance to TVWS Spectrum Emissions Mask

Capital Works process for Medium Works contracts

COMMUNICATIONS OUTLOOK 1999

Digital Signage Policy ADM 13.0

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

Phase 2 of System Protection Coordination (Requirement revisions to PRC ) Hydro Québec TransÉnergie

IEEE Broadband Wireless Access Working Group < On Concatenation of Block Turbo Codes for OFDMA

Student Conducting Awards Application Guidelines

IEEE Broadband Wireless Access Working Group <

Author Frequently Asked Questions

Off-Air Recording of Broadcast Programming for Educational Purposes

Group Minutes X12N TG8 June 4 June 7, 2012

COMMUNICATIONS OUTLOOK 1999

Draft Minutes Automation/Drive Interface (ADI) Working Group Ad Hoc Meeting T10/07-206r0 7 May :00 AM 1:00 PM PDT

CPS Department of Arts Education Music Festivals Handbook

PPM Rating Distortion. & Rating Bias Handbook

ATSC Standard: 3D-TV Terrestrial Broadcasting, Part 1

COMMUNICATIONS OUTLOOK 1999

ATSC Candidate Standard: A/341 Amendment SL-HDR1

PRNANO Editorial Policy Version

IEEE P802.3ae 10 Gigabit Ethernet Minutes Task Force Plenary Meeting Nov 13 th 15 th, 2001 Austin, TX.

SHOW DIRECTOR CONTRACT

7 - Collection Management

ATSC Standard: A/342 Part 1, Audio Common Elements

OPERATING GUIDELINES Cape Elizabeth Television Adopted April 10, 1989 (revised effective June 8, 2009.) Introduction

QT Plus Quick Launch Overview Guide. Revised February 2018

Term Sheet Reflecting the Agreement of the ACCESS Committee Regarding In-Flight Entertainment November 21, 2016

Document No: GSC16bis-IPR-07. Source: Association of Radio Industries and Businesses. Contact: Tadaaki YOKOO. GSC Session: IPR Working Group

TCTV Templeton Community Television

Mason Hall Policies. Rev. February 28, School of Music SUNY Fredonia User Services Policy Manual

ITU-T Y Functional framework and capabilities of the Internet of things

Start Recording on Site

ITU Smart Sustainable Cities and Communities Initiatives: Towards a Smart Global Vision Bilbao, Spain June IoT Week 2018 #IoT4SCC. Ramy A.

ATSC Digital Television Standard: Part 6 Enhanced AC-3 Audio System Characteristics

8 March Ms. Diane Rhéaume Secretary-General Canadian Radio-Television & Telecommunications Commission Ottawa, Ontario K1A ON2

Thieme Dissector Manual

Broadcasting Decision CRTC

IEEE C a-02/26r1. IEEE Broadband Wireless Access Working Group <

Network Operations Subcommittee SCTE STANDARD SCTE SCTE-HMS-QAM-MIB

NOVA Digital Media System Guidelines Northern Virginia Community College 2017

Palomar Pacific Chapter Barbershop Harmony Society Mission, Goals, Policies and Procedures

IEEE Broadband Wireless Access Working Group <

The Telecommunications Act Chap. 47:31

Author Guidelines. Table of Contents

Musicians Handbook. RENO POPS ORCHESTRA P.O. Box 20952, Reno, Nevada

Applying to carry BBC content and services: a partners guide to process

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE ) ) ) ) ) ) ) ) ) ) ) ) ) C.A. No. COMPLAINT

COLUMBIA BUSINESS SCHOOL VENTURE FOR ALL CLUB CHAPTER

CHAPTER 98: CABLE TELEVISION Tampering with city cable system prohibited Fees

143 rd Annual Westminster Kennel Club All Breed Dog Show Monday-Tuesday, Feb , 2019 / Piers 92/94 and at Madison Square Garden

AMERICAN NATIONAL STANDARD

69 th INTERNATIONAL ASTRONAUTICAL CONGRESS BREMEN, GERMANY 1-5 OCTOBER 2018 INSTRUCTIONS TO AUTHORS

Franchise Broadcast Info

IEEE P802.3cd Ad Hoc meeting January 17, 2018

Broadcasting Authority of Ireland Guidelines in Respect of Coverage of Referenda

ATSC Proposed Standard: A/341 Amendment SL-HDR1

Broadcasting Order CRTC

COMMUNICATIONS OUTLOOK 1999

IEEE Broadband Wireless Access Working Group <

AGENDA Cable TV Commission

Transcription:

IEEE 1904 ANWG Opening Report Glen Kramer, ANWG Chair glen.kramer@ieee.org August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 1

Introductions Please, state Your name Your affiliation IEEE SA Standards Board Operations manual 5.3.3.1 Disclosure of affiliation Each participant's affiliation shall be disclosed at any working group or project meeting. The chair or the chair's delegate shall inform the meeting of the requirement for disclosure of affiliation (see 5.2.1.5 of the IEEE-SA Standards Board Bylaws). This shall be via a sign-in (e.g., sign-in sheet, electronic signin, verbal disclosure, or electronic communication) that provides for disclosure of employer and any other affiliation, a reminder of the definition of affiliation, and possible penalties for non-compliance. The minutes of each working group or project meeting shall record a list of attendees and the disclosed affiliation of each attendee. August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 2

Updates since April meeting Received a liaison statement From ITU-T SG9 Q13: LS/r on new versions of the Access Network Transport (ANT) Standardization Overview and Work Plan (reply to SG15 LS216) Posted at http://www.ieee1904.org/meeting_archive/ 2015/08/anwg_1508_ils127_sg9q13.pdf For information only. August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 3

Plan for this meeting RMTF Review 8 open maintenance requests Review a new proposal from Arris on holdover period range 1904.2 TF Suspended 1904.3 TF Review 8 technical contributions Discuss and vote on baseline proposals Action items for the next meeting Discuss if an outbound liaison needed August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 4

Motion to Approve the Agenda Motion #1 Approve the agenda for the August 2015 meeting as presented in anwg_1508_agenda.pdf Moved: Marek Hajduczenia Seconded: Kevin Bross (Procedural, required > 50%) Motion passed by voice vote without opposition August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 5

Approval of Last Meeting s Minutes Motion #2 Approve minutes of June 2015 meeting as recorded in anwg_1506_minutes_unapproved.pdf. Post the approved minutes on the WG website as anwg_1506_minutes_approved.pdf Moved: Jouni Korhonen Seconded: Zhou Zhen (Procedural, required > 50%) Motion passed by voice vote without opposition August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 6

Call for Patents August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 7

Updated patent materials The following patent materials have been updated: a) Patent Slides for Standards Development Meetings b) Patent Letter of Assurance (LOA) Form c) Patent Letter of Assurance (LOA) Cover Letter d) FAQs: Understanding Patent Issues during IEEE Standards Development e) Relationship of IEEE-SA Patent Policy/LoAs to Modification of IEEE Standards by Other Standards Bodies These materials are available from http://standards.ieee.org/about/sasb/patcom/materials.html. You may need to refresh your web browser (or clear the cache) to see the current (2015) versions. August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 8

Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: Show slides #1 through #4 of this presentation Advise the WG attendees that: The IEEE s patent policy is described in Clause 6 of the IEEE-SA Standards Board Bylaws; Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged; There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development. Instruct the WG Secretary to record in the minutes of the relevant WG meeting: That the foregoing information was provided and that slides 1 through 4 (and this slide 0, if applicable) were shown; That the chair or designee provided an opportunity for participants to identify patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance. It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 14 and 15 on inclusion of potential Essential Patent Claims by incorporation or by reference. Note: WG includes Working Groups, Task Groups, and other standards-developing committees with a PAR approved by the IEEE-SA Standards Board. (Optional to be shown) 15 March 2015

Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: Shall inform the IEEE (or cause the IEEE to be informed) of the identity of each holder of any potential Essential Patent Claims of which they are personally aware if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents Should inform the IEEE (or cause the IEEE to be informed) of the identity of any other holders of potential Essential Patent Claims (that is, third parties that are not affiliated with the participant, with the participant s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Slide #1 15 March 2015

Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/develop/policies/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/develop/policies/opman/sect6.html#6.3 Material about the patent policy is available at http://standards.ieee.org/about/sasb/patcom/materials.html If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at patcom@ieee.org or visit http://standards.ieee.org/about/sasb/patcom/index.html This slide set is available at https://development.standards.ieee.org/myproject/public/mytools/mob/slideset.ppt Slide #2 15 March 2015

Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Slide #3 15 March 2015

Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don t discuss the interpretation, validity, or essentiality of patents/patent claims. Don t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don t discuss the status or substance of ongoing or threatened litigation. Don t be silent if inappropriate topics are discussed do formally object. --------------------------------------------------------------- See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy for more details. Slide #4 15 March 2015

Project Information and Status August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 14

Ground Rules No audio recording, No video recording, and No photography No job recruiting NO product pitches NO corporate pitches NO prices This includes costs, ASPs, etc. no matter what the currency NO restrictive notices Attendance of the press should be announced August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 15

P1904 Website Located at http://www.ieee1904.org/ Archived technical contributions and reflector messages are public ANWG Password-protected area Standard drafts are password-protected (IEEE SA rules) All online submission forms are password-protected to avoid spam. TF2: http://www.ieee1904.org/private/2/tf2_presentproc.shtml TF3: http://www.ieee1904.org/private/3/tf3_presentproc.shtml RMTF: http://www.ieee1904.org/private/revision/rmtf_maint_request.shtml The same username/password for all task forces under 1904 WG Username: **** Password: **** August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 16

Email Reflectors 1904 WG Reflector Used for general discussions/announcements. Everyone MUST subscribe!!! Archive is public: http://www.ieee1904.org/wg_pub_archive.shtml Subscription instructions: http://www.ieee1904.org/wg_reflector.shtml 1904.2 TF Reflector Used for 1904.2 (Universal Management Tunnel) technical discussions Archive is public: http://www.ieee1904.org/2/email/index.html Subscription instructions: http://www.ieee1904.org/2/tf2_reflector.shtml 1904.3 TF Reflector Used for 1904.3 (Radio-over-Ethernet) technical discussions Archive is public: http://www.ieee1904.org/3/email/index.html Subscription instructions: http://www.ieee1904.org/3/tf3_reflector.shtml RMTF Reflector Used for Revision & Maintenance technical discussions Archive is public: http://www.ieee1904.org/revision/email/index.html Subscription instructions: http://www.ieee1904.org/revision/rmtf_reflector.shtml August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 17

Join.Me teleconferencing tool IEEE IT has provided a teleconferencing tool, called Join.Me, for use by our WG. Any WG member can organize a teleconference to discuss any technical or procedural matters. But you are allowed to use this tool for 1904-related matters only. For more information, visit http://www.ieee1904.org/private/wg_joinme.shtml Note: we can have only one call at any given time. When you schedule a call, please post an announcement on the main reflector, so that other people don t try to schedule another call for the same time. We were unable to use this tool during the dry run call. For this WG meeting, we switched to WebEx. August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 18

Standardization Status RMTF 1904.3 1904.2 Sponsor Approved PAR SASB Approved PAR WG meetings Proposals selected Yes Draft 1 WG review Draft technically complete No Draft 1.n++ No Yes Working Group Review No Draft 2 WG letter ballot > 75% Yes New Unresolved Comments No Technical Changes No WG approval No Yes Yes Yes Draft 2.n++ Working Group Ballot No No Draft 3 Sponsor ballot > 75% Yes New Unresolved Comments No Technical Changes No Sponsor approval No Yes RevCom review StB approval Yes Yes Yes Approved Standard Draft 3.n++ Sponsor Ballot August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 19

2015 Meetings February 2-6 CableLabs, Louisville, CO April 1-3 CableLabs, Louisville CO June 2-3 China Mobile, Beijing August By teleconference October Intel, Hillsboro, OR December Host needed August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 20

2015 Meeting Calendar January 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 February 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 March 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 May 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 June 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 July 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 September 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 October 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 November 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 December 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ANWG window IEEE 802.3 BBF CableLabs IETF ITU-T/FSAN Conferences 2/2-2/6 1/12-1/16 3/2-3/6 3/1-3/4 Winter Conf. 3/22-3/27 FSAN: 2/2-2/6 3/22-3/26 - OFC 3/9-3/12 6/8-6/12 8/3-8/5 Summer Conf. 7/19-7/24 SG15: 3/24-4/4 4/11-4/16 NAB Show 6/1-6/5 5/18-5/22 8/31-9/4 11/1-11/6 FSAN: 5/5-5/9 5/5-5/7 Cable Show 8/24-8/28 7/13-7/16 11/16-11/20 FSAN: 9/1-9/5 9/27-10/1 - ECOC 10/26-10/30 9/14-9/18 FSAN: 10/27-10/31 10/13-10/16- SCTE Expo 12/7-12/11 SG15: 11/24 12/5 Holidays China 1/1-1/3, 2/19-2/25, 4/4-4/6, 5/1-5/4, 6/20-6/22, 9/26-10/7 Israel 4/9-4/11, 4/22-4/25, 5/24, 9/11-9/15, 9/22-9/28, 10/4-10/5 Japan 1/1-1/3, 1/12, 2/11, 4/29, 5/4-5/6, 7/20, 9/21-9/23, 10/12, 11/3, 11/23, 12/23, 12/28-12/31 US 1/1, 1/2, 5/25, 7/3, 9/7, 11/26-11/27, 12/24-12/31 August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 21

Thank You August 19-20, 2015 IEEE 1904 Access Networks Working Group, Teleconference 22