CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

Similar documents
24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

IP-LINX. Installation Guide

IP-LINX Fiber :: X-XXXX

3M Distribution Box (DDB)

HCS - HES Cabling Systems

LGX Compatible (LSX) Connector Module) User Manual)

FOSC 450 C6 and D6 Closures

3M Fiber Optic Wall Mount Enclosure 8430 Series

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

Optical Distribution Box 300 Installation Guide. Version : R0.0

Gel-sealed in-line fiber optic closure

Next Generation Frame (NGF) Fiber Combination Block (FCB) User Manual)

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

INSTALLATION INSTRUCTIONS

Medium Box for Cable Termination

GF-KSW-48 Series of Fiber Optic Distribution Box. Instruction Manual

HD Flex Patch Panel. ASSEMBLY VIEW (FLEX1UPN** shown) FS128B. CONTENTS: (#) indicates FLEX4UPN** quantity

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

OFDC-B8-72. Outdoor fiber distribution closure. 6 Closing. Content 1 Introduction. 7 Re-entry. 2 Kit content. 3 Closure preparation

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

ADF Module. Installation Guide. 1.1 Overview

SLiC Fiber Aerial Closure System

2178 Fiber Optic Splice Case and 2181 Cable Addition Kit

MiniXtend Cable with Binderless* FastAccess Technology Jacket and Buffer Tube Removal Procedures. 1. General. 2. Precautions

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

Coyote popup display set up instructions

INSTALLATION INSTRUCTIONS

Panduit Recommended Best Case Practice Split Fibre

NGF optical distribution frame

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table

2178-L/S Series Fiber Optic Splice Case with Gasket

FOSC-450D. Fiber Optic Splice Closure. 1 Introduction. Content. 5 Cable termination. 6 Fiber routing. 2 General. 7 Installation of the gel block

18mm ECAM Cable Entry Port

SCdefault. 900 Installation instructions. Accessories Part No. Group Date Instruction Part No. Replaces :36-29 Sep

DS1 Cross-Aisle Panel

Installation instructions, accessories. Subwoofer. Volvo Car Corporation Gothenburg, Sweden. Page 1 / 29

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

3M SLiC 530/533/733-2 Port 0.61 Cable Entry Bracket 3M SLiC 530/533/733-2 Port-MSM 0.61 Cable Entry Bracket

Water blocking tape. Locator ridge HPA-0486

27mm ECAM Double Cable Entry Port

Clearview. Classic Cassettes. Installation Manual. Clearview Classic (HD) High Density. Part #: Rev: A Updated:

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

Crimp & Cleave Termination Instructions for SEL ST Connectors

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

3M Coupling Tray FDTC-10S-COUPLINGTRAY

Installation Instructions

FIST-GCO2-OTIAN I N S T A L L A T I O N I N S T R U C T I O N

INSTALLATION INSTRUCTIONS MO023A

Section Communications Optical Fiber Backbone Cabling

Instructions. Cable with Armor F CAUTION. October Rev A

3M Fiber Optic Splice Tray 2527 with 3M PLC Optical Splitter

CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories

LANmark-OF ENSPACE Patch Panel

Loose Tube Cable Mid-Span Access for Splicing For Series 11D, 1GD, 12D, 1AD, 1DD, 1CD, 11, 1G, 12, 12L, 1A, 1D, 1C, 1NY, 13, 1H, HZD and HZA

Fiber Cable Preparation, Splicing, and Termination Instructions (CFDP210-EL24 Charlesr Fiber CFDP2 Pedlockr OSP Pedestal)

ALTOS LITE Loose Tube, Gel-Free Cables with FastAccess Technology, Fibers

3. Electronics and MMU2 unit assembly

GENUINE PARTS CAUTION

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

3M Better Buried Compound Compression Closure System

Cable and Power Management Open-Frame Rack Cable Managers

FOSC 400. Ordering Guide For Closures and Accessories. Section I 3. Section II 5. Section III 9. Section IV 11. Section V 15

Broadband Connectivity System II

3M Fiber Optic Splice Closure 2178-L/S Series with Gasket

INSTALLATION INSTRUCTIONS

RACKS, ENCLOSURES AND CABLE MANAGEMENT

Coyote popup features

BCS 4R DSX-3 Connectivity System. Models , , and User Manual

FACT Cable Termination Unit

Instruction manual. Midi Fiber Dome. Instruction manual

Furcation of a Central Tube Ribbon, Gel-Free, Non-Armored, 96- to 192-Fiber Cable into an OSE-UD

FOSC-450 Product Range Ordering Guide

LANsense Modular Patch Panel for 24 Snap-in Connectors 1 HU. empty. Clip-on. with Sliding mechanism. Black or white INSTALLATION GUIDE

4320 SS-25 Self-Strip Terminating Block

Mid-Span Access of Loose-Tube Ribbon Fiber Optic Cable

3 SLiC Aerial Closure with Rubber End Seal

INSTALLATION GUIDE. LANmark-OF Zone Distribution Box

GCO2-BC6/16-XX GCO2-BD6/16-XX GCO2-BE6/16-XX

WaveTrax. Fiber Cable Management System

Fiber ICT. Optical Fiber Catalogue

Cable ISOBUS Active Termination

Replacing the PanelMate epro PS, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-12 Series Backlight Assembly

INSTALLATION INSTRUCTIONS

VITALink Taped Splice Straight Through Crimp

AUDIO ROOF KIT P/N , , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

The FiberMark1 offers an ideal solution for

SUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxMSOS-2 HIGH PERFORMANCE OSP TUBE CABLE SERIES WITH GALVANIZED STEEL INTERLOCKED ARMORING

3M Scotchcast Reenterable Signal and Control Cable Splicing Kits 78-R Series

OCT 15 Rev B

Ordering Guide of the Fiber-Optic Splice Closure (FOSC-400)

TeamWork Installation Guide

Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

OmniReach FTTX Solutions RealFlex DLX Universal Drop Cable Instruction Sheet

Gigabit Multi-mode SX to Single Mode LX Converter. User s Manual NGF-728 Series. Warning COPYRIGHT

Buffer Tube Midspan Access Tool Accessing fibers in buffer tube procedure

Channel Cable Tray - Accessories

Transcription:

CONNECTING THE FUTURE 19" LINXS LIGHTWVE INTEGRTED CROSS-CONNECT SYSTEM USER MNUL 109003 Issue Rev 2

19" Lightwave Integrated Cross-Connect System (LINXS) User Manual Document Number 109003 Issue Rev 2 Copyright Telect, Inc., 1998, ll Rights Reserved. Telect and Connecting the Future are registered trademarks of Telect, Inc., 2111 N. Molter Rd., Liberty Lake, Washington 99019 Note: Telect assumes no liability from the application or use of these products. Neither does Telect convey any license under its patent rights nor the patent rights of others. This document and the products described herein are subject to change without notice. ii 109003 Issue Rev 2

Contents Section 1 Descriptions 19" LINXS... 1-1 asic Options... 1-1 Other Options... 1-1 Main ssemblies... 1-2 Section 2 Installation Installation Considerations... 2-1 Inspection... 2-1 Equipment to be Installed... 2-1 Required Tools... 2-2 Installation Procedure... 2-2 Mounting to a Rack... 2-2 Mounting to a Wall... 2-3 Fiber Tray Installation... 2-4 Cabling the Rack... 2-5 Standard Splice Tray Cabling (PN 026-0010-xxxx)... 2-6 Standard Patch Tray Cabling (PN 026-0021-xxxx, Left) (PN 025-0022-xxxx, Right)... 2-11 TF Splice Tray Cabling (PN 026-0060-xxxx)... 2-14 TF Patch Tray Cabling (PN 026-0023-xxxx)... 2-19 Storage Tray Cabling (PN 026-0040-0000)... 2-21 Issue Rev 2 109003 iii

1 Descriptions 19" LINXS LINXS (Lightwave Integrated Cross-Connect System) is an advanced, integrated fiber optic cable management system. It provides a central location for fiber splicing, patching, and storage. It includes shelves, trays that mount into the shelves, and accessories. Telect engineered the 19" LINXS for private network and CEV environments or for any application where 19" equipment racks are standard. However, the 19" LINXS can also be installed in 23" racks. asic Options LINXS shelves come in three sizes one, three, or six trays. Shelves come with or without trays installed. There are six tray types left patch, right patch, splice, total front access (TF) patch, TF splice, and storage. shelf can hold a mix of these trays. Splice pads specific to different splice methods are available. dapters, connectors, cable assemblies. Other Options Wall-mounting brackets Filler panel (covers empty rack space and protects equipment) Issue Rev 2 109003 1-1

Descriptions 19" LINXS User Manual Working tray (mounts to the front of the LINXS shelf) Industry standard pigtails, patch cords, and multifiber cable assemblies Preterminated patch trays K2 Post&Gate cable management components Extender panels Preterminated shelves Multifiber cable assemblies Cable management products MIN SSEMLIES Each shelf consists of a metal chassis, front and rear access door, and cable management components. The shelf comes with two reversible rack-mounting brackets and mounting screws (eight 12-24 and eight 6-32 screws) for use with either 19" or 23" equipment racks. The cable management components on the shelf consist of front and rear Enry Links, which provide bend-radius control for cable into the LINXS shelf, and attachment points for the K1 Fiber Channel in the trays. Trays include Fiber Routing rcs, two K1 Fiber Channels, K1 Gate Clips, flexible tubing (splice trays only), Patch Plate (patch trays only), designation strips, and warning label. Each tray type has a unique configuration of Fiber Routing rcs and K1 Fiber Channels. The following drawing shows components for a standard left Patch Tray. See cabling instructions in Installation for component location for specific tray types. Front Entry Link Rear Entry Link 1-2 109003 Issue Rev 2

2 Installation INSTLLTION CONSIDERTIONS Telect engineered the 19" LINXS for private network and CEV environments or for any application where 19" equipment racks are standard. However, the 19" LINXS can also be installed in 23" racks. INSPECTION Compare the contents of the 19" LINXS shipping container with the packing list. Call Telect if anything is missing. Telect is not liable for shipping damage. If the shipping container is damaged, keep it for the carrier s inspection. Notify the carrier and call Telect s Customer Service Department: 1-800-551-4567 or 1-509-926-6000 Keep the container until you have checked equipment operation. If you experience any kind of problem, call Telect s Customer Service Department. Use the original, undamaged container if you are instructed to return the 19" LINXS to Telect. Equipment to be Installed LINXS shelf and trays Cable clamp kit Splice mechanism Issue Rev 2 109003 2-1

Installation 19" LINXS User Manual Splice pad appropriate for splice method dapters (for patch trays) Pigtails or patch cords (for patch trays) Optional K2 Post & Gate cable management components Optional 3/8" heat-shrink tubing (for outside plant cable to splice tray) Optional Wall-mount brackets Contact a Telect Customer Service Representative if you need to order any of the parts listed above or parts listed in "asic Options" or "Other Options" in Section 1, Descriptions: 1-800-551-4567 or 1-509-926-6000 If you order cable clamp kits (PN 027-1000-1001 through 1005) and K2 Post & Gate (PN 027-0000-2000) cable management components, specify rack or shelf clamping, and if shelf, front or back. Required Tools Cable stripper Kevlar cutter Screwdrivers Phillips and small flathead uffer tube stripper INSTLLTION PROCEDURE Mounting to a Rack The two mounting brackets can be reversed, making it possible to mount the shelf to either a 19" or 23" equipment rack. If possible, mount the shelves intended for splicing between 20" and 50" (51 127 cm) from the floor for easy access and central location. 2-2 109003 Issue Rev 2

19" LINXS User Manual Installation Step ction 1. 19" Rack ttach the broad side of both mounting brackets to each side of the shelf using four 6-32 screws. 23" Rack ttach the narrow side of the brackets to each side of the shelf. See photo. 2. ttach the shelf to the rack using four 12-24 mounting screws on each side. See photo. Mounting to a Wall You need the wall-mount brackets for this installation. Step ction 1. ttach the wall-mount brackets to the shelf using the screws supplied with the bracket kit. 2. Hold the shelf against the wall and mark the locations of the mounting holes. 3. ttach the wall anchors to the wallat the marked locations. 4. nchor the shelf to the wall. Issue Rev 2 109003 2-3

Installation 19" LINXS User Manual Fiber Tray Installation Step ction 1. Open the front shelf door by pulling outward on the spring-loaded latches at the top. 2. Fully extend the tray guides. Shelf 3. Position the nose of the left tray tab into the middle of the tray guide slot, behind the nub, where the slot is the most expandable. Left Tray Guide Lower Groove Tray (Top Left Corner) 4. Snap the tab into the tray guide slot by squeezing the tray guide against the support between the thumb and forefinger. This may require a moderate amount of force. This should result in the left edge of the tray correctly placed in the lower groove of the guide. Tab Tray Guide Lower Groove Tray (Top Left Corner) Front View It will not be possible to snap the tab into position near the ends of the tray guide, nor exactly next to the metal shelf, where the slot is not expandable. 2-4 109003 Issue Rev 2

19" LINXS User Manual Installation 5. end the end of the right tray guide out sufficiently (about 1/4") to position the nose of the right tray tab into the slot of the tray guide. 6. Repeat Step 4 on the right side of the tray. 7. Close tray fully and confirm that it seats properly. Cabling the Rack K2 Posts & Gates can route, protect, and store fiber cable on racks. The racks can be 19" or 23", and unequalflange or equal flange with extender panels. K2 Posts & Gates mounted back-to-back on extender panels that are attached to any kind of rack can serve as storage spools. Step ction 1. Snap open the K2 gates. 2. Route fiber cables over the K2 posts. 3. Close the K2 gates to retain the cables. Post Gate Issue Rev 2 109003 2-5

Installation 19" LINXS User Manual 4. Use cable clamps to attach loose-tube and breakout fiber cable to the rack or to the LINXS shelf. This photo shows shelf clamping; the drawings below show how to attach and use the clamp. Cable Top Rear Corner of Shelf ttach bracket with 3 screws from bracket kit. Fiber undles C Insert cable through clamp until bundles extend beyond bottom of the clamp. E ttach ground lug, insert strength member, and tighten lug screw. Dielectric/ Strength Member Remove 3 shelf screws. D Tighten screws. Ground Lug Standard Splice Tray Cabling (PN 026-0010-xxxx) K-1 Fiber Channel Rear Entry Link ttachment Point Tray Tab Tray Link Tray Link Splice Pad Fiber Routing rc TOP lthough the splice tray is removable, Telect does not recommend removing it when splicing cables. Ensure that each splice tray contains the correct splice pad for the splicing method. 2-6 109003 Issue Rev 2

19" LINXS User Manual Installation This subsection shows the cabling procedure for splicing outside plant cable to twenty-four 2 mm fiber pigtails inside the LINXS tray. You can follow a similar procedure and sequence for cabling and splicing to 900 µm pigtails. However, if you use 3 mm pigtails, one tray will accommodate only 12 splices. Step ction 1. Remove 76" (193 cm) or more of the outer jacket and kevlar from the cable. 2. Clean off the cable. 3. Cut off the central strength member to 16" (40 cm) from the cut end of the outer jacket. 4. ring the cable to the back of the panel and secure it with a cable clamp. 5. ttach a ground lug (provided in the clamp kit) to the rack at least 5" (13 cm) from the clamp. Rack Plant Cable Fiber uffer Tubes Plant Cable Clamp Dielectric/ Strength Member K2 Gate Rack Rack Flange Ground Lug 6. Insert the strength member into the ground lug, tighten the lug firmly, and cut off the excess length. 7. Remove the 6-foot length of flexible tubing and the K1 Gate Clips from the splice tray. 8. Outside plant cable requires the application of flexible tubing to the 6- or 12-strand fiber bundles in place of the stiffer buffer tube: a. Extend the buffer tube from the cable clamp to the Entry Link on the rear corner of the LINXS shelf. b. Cut the buffer tube jacket 2 inches (5.1 cm) before the Entry Link and remove it from the cable. Issue Rev 2 109003 2-7

Installation 19" LINXS User Manual c. Clean the gel from the fiber strands and apply talcum powder, if desired, to reduce friction. d. Cut the flexible tubing in half. e. Feed the fiber strands through one piece (about 3 feet or 0.91m) of the flexible tubing. f. Slide the flexible tubing over the end of the buffer tube with 1/2" (1.5cm) of overlap. The flexible tubing should fit tightly over the buffer tube. g. Optional pply 3/8" (0.95 cm) heat-shrink tubing (not provided) to further secure the flexible tubing to the buffer tube. h. If necessary, repeat Step8a through 8g for the second buffer tube. However, do not repeat Step 8d (do not cut the flexible tube in half again). 9. Remove the K1 Fiber Channel from the side of the tray that will receive this incoming cable. a. With the tray open, detach the channel from its Tray Link by lifting up on the locking tab of the link with a small screwdriver and pulling off the channel. See drawing. b. With the tray closed, detach the channel from its Entry Link: Push a small screwdriver into the last small hole underneath the attachment point to release the locking tab, then pull the channel from the link. See drawing. Channel Link Channel Tray Link Locking Tab Entry Link (Rear) c. Remove the channel from the tray. 10. With the tray closed, place the flexible tubing containing the fiber strands 2-8 109003 Issue Rev 2

19" LINXS User Manual Installation into the K1 Fiber Channel, and attach K1 Gate Clips to one in every three or four links to secure the tubing within the channel. See drawing. 11. Secure the flexible tubing to the rear Entry Link with a cable tie threaded through the slots in the link. See drawing. Cable Tie Flexible Tube Entry Link 12. Reattach the K1 Fiber Channel to the rear Entry Link and place the channel into the back of the tray. 13. With the tray open, reattach the K1 Fiber Channel to its Tray Link. 14. Route the flexible tubing in the tray by wrapping it around the Fiber Routing rcs in the back of the tray a few times in a circular pattern, counterclockwise. Secure the tubing with cable ties through the slots in the arcs. ack rcs 15. Now wrap the remaining tubing clockwise around the front Fiber Routing rcs at least three times. This leaves enough fiber for repeated splice attempts. Fibers Front rcs Fiber Routing rcs ensure the proper bend radius. 16. Route the fibers to the splice pad (see the illustration for Step 15). 17. Repeat Steps 9 through 13 for the pigtails which enter the other side of the splice tray. Issue Rev 2 109003 2-9

Installation 19" LINXS User Manual 18. Route the pigtails across the first Fiber Routing rc and secure them with a cable tie. 19. Flexible tubing is not necessary for pigtails. However, remove the jacket from the pigtails where they extend beyond this cable tie point. 20. Wrap the pigtail fiber strands around the routing arcs several times (to leave fiber for future splicing) in a figure-eight or circular pattern. 21. Now fiber can be spliced and stored: From the rear of the splice pad to the front, each spice requires about 1/4" more fiber length than the previous one. a. Guide two fiber strands (cable and pigtail) into the rearmost splice position and adjust their length so that after being prepared, spliced, and wrapped, they will lie neatly across the splice tray. b. Remove the fiber strands to the splice table. c. Prepare the fiber, then splice according to the splice manufacturer. d. Place the completed splice into the splice pad. e. Repeat Steps a through d for the remaining splices, working forward from the rearmost position. f. fter the splices are complete, wrap the slack fiber around the spools. 22. Secure the fiber strands to the Fiber Routing rcs with cable ties through the slots in the arcs. 23. Identify each splice on the designation strip in the tray and/or on the strip on the front of the tray. 24. Replace the plastic splice compartment cover and close the splice tray. 2-10 109003 Issue Rev 2

19" LINXS User Manual Installation Standard Patch Tray Cabling (PN 026-0021-xxxx, Left) (PN 025-0022-xxxx, Right) You can purchase LINXS patch trays with or without adapters. Specify adapters Telect stocks most of the industry standards even when you order trays without them to ensure proper-sized mounting holes. Step ction 1. Open the patch tray. 2. If adapters are installed, go directly to Step 3. To install adapters: a. Remove the four Phillips screws that secure the patch plate to the tray, then pull out the plate. b. Mount the adapters on both sides of the patch plate with the slots all facing upward. c. Secure the patch plate in the tray by reinstalling the four screws. 3. Remove the rear K1 Fiber Channel from the tray. a. With the tray open, detach the channel from its Tray Link by lifting up on the locking tab of the link with a small screwdriver and pulling off the channel. See drawing, next page. b. With the tray closed, detach the channel from its Entry Link: Push a small screwdriver into the last small hole underneath the attachment point to release the locking tab, then pull the channel from the link. See drawing, next page. Issue Rev 2 109003 2-11

Installation 19" LINXS User Manual Channel Link Channel Tray Link Locking Tab Entry Link (Rear) c. Remove the channel from the tray. 4. With the tray open, connect the pigtails or patch cords from one side of the tray to the adapters, beginning with frontmost patch position and routing the fiber to accommodate cable length. If a Fiber Routing rc interfers with cable routing, it may be removed. Use a Phillips screwdriver to remove the screw holding the arc from underneath the tray. 5. Continue to load the patch cords or pigtails from the one side of the tray in a similar manner until they are all connected, routing the fiber cable for the rearward positions as shown. 6. Place the fiber cable into the K1 Fiber Channel. 7. Reattach the channel to the Tray Link. 2-12 109003 Issue Rev 2

19" LINXS User Manual Installation 8. ttach K1 Gate Clips to one in every three or four links to secure the cable within the channel. See drawing. 9. Route the K1 Fiber Channel through the back of the tray. See photo. 10. With the tray closed, reattach the K1 Fiber Channel to its rear Entry Link. 11. Detach the forward K1 Fiber Channel on the other side of the tray, from its front Entry Link as in Step 3b. It is not necessary to remove this channel from the Tray Link in order to load the pigtails or patch cords on this side. 12. Connect the patch cords or pigtails from this side to the adapters, working from the front to the back. 13. Place the pigtails or patch cords from this side into the K1 Fiber Channel and attach K1 Gate Clips to one in every three or four links to secure them. See photo. 14. Reattach the channel to the front Entry Link. completely cabled patch tray looks like photo : Issue Rev 2 109003 2-13

Installation 19" LINXS User Manual 15. Remove the designation strip from the front of the tray, identify each patch using either side of the strip, and replace the strip. 16. Close the patch tray. TF Splice Tray Cabling (PN 026-0060-xxxx) lthough the splice tray is removable, Telect does not recommend removing it when splicing cables. Ensure that each splice tray contains the correct splice pad for the splicing method. This subsection shows the cabling procedure for splicing outside plant cable to twenty-four 2 mm fiber pigtails inside the LINXS tray. You can follow a similar procedure and sequence for cabling and splicing to 900 µm pigtails. However, if you use 3 mm pigtails, one tray will accommodate only 12 splices. Step ction 1. Remove 76" (193 cm) or more of the outer jacket and kevlar from the cable. 2. Clean off the cable. 3. If you are grounding the system to the front of the rack, cut off the strength member to 6" (15 cm) from the end of the outer jacket. If you are grounding to the rear of the rack, cut off the strength member to 16" (40 cm) from the end of the outer jacket. 4. ring the cable to the front or back of the panel, and secure it with a cable clamp. Rack Plant Cable Fiber uffer Tubes 2-14 109003 Issue Rev 2

19" LINXS User Manual Installation 5. ttach a ground lug (provided in clamp kits) to the rack at least 5" (13 cm) from the clamp (front of rack shown). Plant Cable Clamp Dielectric/ Strength Member K2 Gate Rack Rack Flange Ground Lug 6. Insert the strength member into the ground lug, tighten the lug firmly, and cut off the excess length. 7. Remove the 6-foot length of flexible tubing and the K1 Gate Clips from the splice tray. 8. Outside plant cable requires the application of flexible tubing to the 6- or 12-strand fiber bundles in place of the stiffer buffer tube: a. Extend the buffer tube from the cable clamp to the Entry Link on the front corner of the LINXS shelf. b. Cut the buffer tube jacket 2 inches (5.1 cm) before the Entry Link and remove it from the cable. c. Clean the gel from the fiber strands and apply talcum powder, if desired, to reduce friction. d. Cut the flexible tubing in half. e. Feed the fiber strands through one piece (about 3 feet or 0.91m) of the flexible tubing. f. Slide the flexible tubing over the end of the buffer tube with 1/2" (1.5cm) of overlap. The flexible tubing should fit tightly over the buffer tube. g. Optional pply 3/8" (0.95 cm) heat-shrink tubing (not provided) to further secure the flexible tubing to the buffer tube. h. Repeat Step 8a through 8g for the second buffer tube. However, do not repeat Step 8d (do not cut the flexible tube in half again). Issue Rev 2 109003 2-15

Installation 19" LINXS User Manual 9. Remove both K1 Fiber Channels from the side of the tray. a. With the tray open, detach the channels from their Tray Links by lifting up on the locking tab of each link with a small screwdriver and pulling off the channel. See drawing. b. Detach each channel from its Entry Link: Push a small screwdriver into the last small hole underneath the attachment point to release the locking tab, then pull the channel from the link. See drawing. Channel Link Channel Tray Link Locking Tab Entry Link (Rear) c. Remove the channels from the tray. 10. Place the flexible tubing containing the fiber strands into a K1 Fiber Channel, and attach K1 Gate Clips to one in every three or four links to secure the tubing within the channel. See drawing. 11. Secure the flexible tubing to the front Entry Link with a cable tie threaded through the slots in the link. See drawing. Cable Tie Flexible Tube Entry Link 12. Reattach the K1 Fiber Channel to the front Entry Link and the Tray Link. 13. Wrap the flexible tubing around the Fiber Routing rcs several times in a figure-eight or circular pattern. See photo, next page. 2-16 109003 Issue Rev 2

19" LINXS User Manual Installation 14. Cable-tie the tubing through the slots in the arcs. See photo. 15. Wrap the bundle of fiber strands to be spliced clockwise around the splice pad area two or three times. This leaves enough fiber for repeated splice attempts and ensures proper bend radius. Wrap the bundle of fiber strands from the second buffer tube similarly, but counterclockwise. 16. Repeat Steps 10 through 12 for the pigtails which enter the other side of the splice tray. 17. Route the pigtails across the first Fiber Routing rc and secure them with a cable tie. 18. Flexible tubing is not needed for pigtails. However, remove the jacket from the pigtails where they extend beyond this cable tie point. See photo. 19. Wrap the pigtail fibers around the routing arcs two or three times (to leave fiber for future splicing) in a figure-eight or circular pattern. See photo. Issue Rev 2 109003 2-17

Installation 19" LINXS User Manual 20. Now fiber can be spliced and stored: From the rear of the splice pad to the front, each spice requires about 1/4" more fiber length than the previous one. a. Guide two fiber strands into the rearmost splice position and adjust their length so that after being prepared, spliced, and wrapped, they will lie neatly across the splice tray. b. Remove the fiber strands to the splice table. c. Prepare the fiber, then splice according to the splice manufacturer. d. Place the completed splice into the splice pad. e. Repeat Steps a through d for the remaining splices, working forward from the rearmost position. f. fter the splices are complete, wrap the slack fiber around the spools. 21. Secure the fiber strands to the Fiber Routing rcs with cable ties through the slots in the arcs. 22. Identify each splice on the designation strip in the tray and/or on the strip on the front of the tray. 23. Replace the plastic splice compartment cover and close the splice tray. 2-18 109003 Issue Rev 2

19" LINXS User Manual Installation TF Patch Tray Cabling (PN 026-0023-xxxx) You can purchase LINXS patch trays with or without adapters. Specify adapters Telect stocks most of the industry standards even when you order trays without them to ensure proper-sized mounting holes. Step ction 1. Open the patch tray. 2. If adapters are installed, go directly to Step 3. To install adapters: a. Remove the four Phillips screws that secure the patch plate to the tray, then pull out the plate. b. Mount the adapters on both sides of the patch plate with the slots all facing upward. c. Secure the patch plate in the tray by reinstalling the four screws. 3. Number or otherwise label the designation strip provided in the tray and place it as shown in photo. 4. Connect the pigtails or patch cords from one side of the tray to the adapters, beginning with the frontmost patch position. See photo. Issue Rev 2 109003 2-19

Installation 19" LINXS User Manual 5. Wrap the cables around the Fiber Routing rcs and secure them in place with cable ties through the slots in the arcs. If a Fiber Routing rc interfers with cable routing, it may be removed. Use a Phillips screwdriver to remove the screw holding the arc from underneath the tray. 6. Detach the channel from its Entry Link: With the tray closed, push a small screwdriver into the last small hole underneath the attachment point to release the locking tab, then pull the channel from the link. It is not necessary to remove this channel from the Tray Link in order to load the pigtails or patch cords on this side. 7. Place the pigtails or patch cords from this side into the K1 Fiber Channel and attach K1 Gate Clips to one in every three or four links to secure them. 8. Reattach the channel to the front Entry Link. 9. Perform Steps 4 through 8 with the pigtails or patch cords on the other side of the tray. Locking Tab Channel Link Entry Link (Rear) 2-20 109003 Issue Rev 2

19" LINXS User Manual Installation completely cabled patch tray looks like photo. 10. Remove the designation strip from the front of the tray, identify each patch using either side of the strip, and replace the strip. See photo. 11. Close the patch tray. Storage Tray Cabling (PN 026-0040-0000) The LINXS storage tray can be used to store excess fiber cable and as a cross-over point for patch cords. Step ction 1. Open the storage tray. 2. Place the fiber cable into the K1 Fiber Channels. 3. Secure the cable in the channel using the K1 Gate Clips, provided with the tray, as needed. 4. Route the cables around the fiber routing guides to take up the slack. See photo on the next page. Issue Rev 2 109003 2-21

Installation 19" LINXS User Manual Many configurations are possible; see photo. 5. Close the tray. 2-22 109003 Issue Rev 2