Webcasting Manual 2018

Similar documents
SWISS TIMING Service catalogue FIS World Cup Ski Jumping / Ski Flying 2017/2018

SWISS TIMING Service catalogue FIS World Cup Ski Jumping Ladies 2017/2018

SWISS TIMING Service catalogue FIS World Cup Cross Country 2017/18

Swiss Timing Service catalogue FIS World Cup Cross Country 2015/2016

Ohio Valley HD Replay Integration

United Nations Climate Change Conference

TECHNICAL REQUIREMENTS. UWW IT Secretariat Media

Internet Video Live Streaming Guidelines. Technical Guide for the Implementation of Intern et Video Live Streaming

SWISS TIMING Service catalogue FIS World Cup Nordic Combined 2018/2019

27 th October 2016 ACCREDITATION. Accreditation for Media has closed as the allocated quota has been reached.

1. Service. (final) Jam session. ers. Tablets with Head judge Head judge. TV graphics. Live Timing. graphics or post production.

United Nations Climate Change Conference

COP 23/CMP 13/CMA 1.2

United Nations Climate Change Conference

GUIDELINES Season

TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS

Venue Specifications

Marc Segar Director of Technology NEP Australia

United Nations Climate Change Conference

Crew Positions Outdoor Camera

TITANIUM & INTEGRATED

In this issue... NEW! MS input HD PPU Shipping! MCU remote camera controller User story

Scale of Hire Charges

Equipment & Hospitality Riders

Brandlive Production Playbook

The Dejero LIVE Platform

Contents. About m:idea. The UrbanWire. m:idea Units. Marcomm. Social Media Rates. Contact Details. Inspire Design. Klix Photography.

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

STAND-UP POSITIONS FOR THE NATO SUMMIT 2018

INTERNATIONAL BROADCAST CENTRE (IBC)

Model: S-4904T/R. Wireless HD Transmission System. User Manual. Please read this User Manual throughout before using.

Today s Speaker. SMPTE Standards Update: 3G SDI Standards. Copyright 2013 SMPTE. All rights reserved. 1

SHORT FILM GUIDELINES

FILM CREW JOB DESCRIPTIONS This is a partial list and explanation of typical roles on the filmmaking team.

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

TIME-COMPENSATED REMOTE PRODUCTION OVER IP

VNP 100 application note: At home Production Workflow, REMI

National Folk Festival PA Specs 2018 MARQUEE

Scale of Hire Charges

When PRESENTER provides the accommodations, the following requirements must be met:

VIDEO JUDGE SYSTEM SETUP & CAPTURE

CITY OF DIXON REQUEST FOR PROPOSAL

Filmair Cinema Services

Questions and Answers to the Call for Tender

Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents

2. Are there any outside connectivity requirements? No, we will not have a need to allow outside devices to connect

REDFISH TECHNOLOGIES

PRICING SCHEDULE JSE LIMITED VENUE PRICING

C8000. sync interface. External sync auto format sensing : AES, Word Clock, Video Reference

BROADCASTERS MANUAL GENERAL

Sep 16 th (Sun) ~ 19 th (Wed), 2018

STUDENT RECITAL APPLICATION ACADEMIC YEAR

CROCODILE AUSTRIA VIDEOSYSTEM

East Hampton Studio THE HAMPTONS LARGEST VENUE.

Life Changers International Church. Job Description

AMPHITHEATRE APPLICATION & INFORMATION. types of performances. Concessions facilities and limited restroom facilities are provided.

TV Production Guidelines 2017

In November, the Federal

Dejero LIVE+ 20/20 Transmitter

Monday, January 7, 2019

3GSDI Fiber Optic Extender

Meetinghouse Webcast Setup Guide for the Europe Area Sending Site

Conditions and procedures for the orchestras and the choirs to participate in the Eurochestries festivals

VIDEO RECORDING (DIGITAL) REGIONAL COMPETITIONS

Introducing MX1 Sports & Events. September 2017

LEIOC. In this document you will find:

Plus Kit. Producer PTZOPTICS. a four (4) camera solution. for Streaming and Recording 8/14/2017

TECHNICAL SPECIFICATIONS FOR THE DELIVERY OF CLOSE TO TRANSMISSION TELEVISION PROGRAMMES TO THE

Media and Video Services Service Request and Fees

Broadcast and Media Facilities (18 July 2013)

How to be a Good Location Manager and Scout

3150 SW 15th Street Deerfield Beach, FL

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Work Philosophy 3. How We Do It 4. Transmiters & Recievers 5. Monitors (OnBoard & Handheld) 6. Monitors 7. Recorders 8. Extras 9. Camera Equipment 10

MAYHEM POETS CONTRACT RIDER

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

Station Positions Section 2: Executive Board 2a. Station Manager within reason 2b. News Department 2b- 1. News Director 2b- 2.

CHIEF BROADCAST ENGINEER

Professional Signage Solutions Toshiba Europe GmbH Hammfelddamm Neuss Deutschland Telefon: 0049 (0) Fax: 0049 (0)

ACDA Production Guide for Participating Schools

1 P a g e Annex Y to the Minutes of the 67the FAI/IPC Plenary Meeting, Faro, Portugal 2017

MAJESTIC (Circus Tent)

National Park Service Photo. Utah 400 Series 1. Digital Routing Switcher.

CMS Plans for the LHC First Beam Event, 10th Sept Lucas Taylor

EVENT MANAGEMENT ROLES

Research & Development. White Paper WHP 318. Live subtitles re-timing. proof of concept BRITISH BROADCASTING CORPORATION.

See Tech Rider for info

Staatskapelle Weimar Orchestra of Germany Technical Addendum Page 1. Addendum to Contract

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

Kourou Media Guide. All accreditation requests from journalists, photographers or other media technicians must be made in the following manner:

SAFETY AND NOTICE TABLE OF CONTENTS

23 February 2017 / Philip Chan. XANESS Interactive Limited Corporate Presentation

Integrated UltraHD/HD Camera with HDBaseT

KLIF RADIO STATION HANDBOOK. Briar Cliff University Department of Mass Communications

General Information (Section information comes in a separate document)

Iowa State University Department of Music Fall 2017 Applied Trumpet Syllabus

Content: Technical Rider 2018 Hotel Watercage

KM-H Series. Multi-format digital production switchers KM-H3000E KM-H3000U KM-H2500E KM-H2500U

New Generation Paperless Multimedia Congress System

National Park Service Photo Utah 400 Series 1 Digital Routing Switcher

Transcription:

Webcasting Manual 2018

The following list presents what is required from the Event Organiser in the perspective of the Webcasting set up. Glossary: Resp.: Responsible person(s) (IFSC / / IWP) : Event Organiser H: Event Organiser Handbook IWP: IFSC Webcasting Provider JP: Jury President TD: Technical Delegate CRS: Chief Route Setter b.e.: Before Event / a.e. : After Event Glossary - Theme: 1 - COOR: Coordination 2 - : Field Of Play 3 - HR: Human Resource 4 - LOG: Logistic 5 - TEC: Technical 12.1. For all events Theme Item Resp. Scope of Service Timeline layout layout is specified in the H. Event Organiser is required to make the layout available to IWP 90 days b.e. Connection availability Test connectivity prior to the event on Speedtest.com and screenshot submitted as proof to IFSC and IWP 1 Day b.e. + 24 hrs a.e. Connection speed Connection speed: Minimum 6 mb/s upload to provide a HD stream on YouTube and a SD stream via another platform. The connection needs to be stable and for web streaming exclusive use (not shared) to provide the required level of service. The connection needs to be available at 9am on set up day and for 24 hours after the event finishes. If the internet line at the venue is disconnected after the event, an alternative needs to be provided in a building close to the event venue or in the event hotel, in order for the webcasting crew to complete uploading news cut highlights for the media (web and TV). 1 day b.e.24 hours a.e Connection Back Up Minimum 6 mb/s connection available at hotel or sheltered area in the venue in case of bad weather

Theme Item Resp. Scope of Service Timeline Desk placement Restricted access zone; max 20m from the judges position; visibility over. In case of outdoor events, a warm and dry sheltered area should be provided to IWP in order to protect its equipment from the weather elements (e.g. rain) and to allow the crew to be warm while editing and uploading files. Platforms - Boulder 4 platforms 1.5 sqm; 0.5 meters above stage level or 1 m above ground to be available at start of set up day. Raised position for commentator in front of wall (can be at back of arena) for clear sight of action when commentating Platforms - Lead 4 platforms; 2 low (see Platforms B) 2 high (5m+) Camera placement -Boulder To be set at Preliminary Coordination Meeting; view over all, use of Platforms; judges instructed on not being in cameras' way. Priority over other Media. Camera above the wall if safe access available; camera (GoPro) set in transparent hold on wall where available. Camera placement - Speed To be set at Preliminary Coordination Meeting; view over all ; judges instructed on not being in cameras' way. Priority over other Media. Camera running along the wall Camera placement - Lead To be set at Preliminary Coordination Meeting; view over all, use of Platforms; judges instructed on not being in cameras' way. Priority over other Media. Camera above the wall; camera (GoPro) set in transparent hold on wall Mandatory; 1 or 2 big screens, dimensions depending on venue. Minimum dimension:3m x 2m Big screen IWP can provide an additional mixer to enable to choose between showing webcast, results, flags or own other feed on big screen. to confirm if required in advance

Theme Item Resp. Scope of Service Timeline Camera operators 4 English speaking professional camera operators available 1 hour before coverage of the event starts until the end of finals. The camera operators need to be available for training during the set up day. In some situations, the IFSC may require 1 person to assist during qualifications on interviews and features DJ booth / commentator Limit bass level; booth and / or speakers placed not close to cameras or IWP desk DJ/Booth commentator: Sound check to be performed with IWP for webcast on set up day. Commentary / music Make available an MC feed clean from Public Announcements (i.e: no music in the feed) Daily LOG Venue Access to provide contact details to IFSC and IWP 2 days b.e. and 1 day a.e. LOG Communications to communicate schedule changes to IWP, before and during the event. If changes aren t communicated, graphics will be incorrect for live webcast (and post event highlights) b.e and during LOG Communications to advise day / date / time when venue can be accessed by IWP for set up 24hrs before qualifications commence

Theme Item Resp. Scope of Service Timeline Storage room at venue to be locked and covered by insurance, covering IWP equipment LOG Storage room Secure location for IWP truck within the venue, or 24 hour security guard. If the IWP is not secure, IWP reserve the right not to provide the webcast service at the event. Truck location and secure storage to be agreed by IWP in advance of IWP crew travelling to event. Protection from bad weather where webcasting crew are not in truck. Protection for equipment from elements at production desk. LOG Airport The provides transportation from and to the airport included webcasting crew and equipment. TEC Power supply Power supply for the van; power supply for cameras (220V) TEC Power supply backup Backup for power failures at overseas events to be provided by ; for events in Europe to be provided by IWP 12.2. Specific items for European Event No Theme Item Resp. Scope of Service Timeline 1,8 COOR Van (IWP) Placement 20-40m meters from Field of Play 30 days b.e. 1,9 COOR Van Security Event Organiser is to provide a safe and secure place of parking for the Outside Broadcasting van from the time of arrival to the time of departure (generally 24hrs after competition has concluded) In the occurrence that the Event Organiser should provide static and / or roaming security guard services or secure / locked car parking, any costs related to these services shall be borne by the IFSC 7 days b.e.

12.3. Specific items for NON-European Event No Theme Item Resp. Scope of Service Timeline 1,10 COOR Equipment Provision of tripods (as well as cables already documented) to be provided by the. This is to reduce excess baggage costs in flight. 1 Day b.e. 1.11 COOR Equipment A desk and 3 chairs, with 220v power for equipment (with backup power supply), located a maximum of 20m away with visibility over the Field of Play. The desk and camera positions should be away from speakers 1 Day b.e 1.12 COOR Equipment A reasonable Mid-range Uninterruptible Power Supply (UPS) must be provided in order to provide power to the IWP desk if the power is lost. Details can be provided by IWP 1 Day b.e 1.13 COOR Equipment Backup for power failures at overseas events to be provided by 1 Day b.e 3,8 LOG Accommodation Within 5 km from the venue for a minimum of 3 crew and transport to and from. 3,9 TEC Cables Overseas events to provide 10 cables HD-SDI on cable wheel (drum) + 4 XLR cables, length depends on the venue layout 60 days b.e. IWP coordinates with

NOTE: 1,11 Equipment: Example Sony EX1 Camera Example LIBEC TH650V Tripod BNC Cables x 6 (length appropriate to cable from cameras to production desk location)

XLR Cable x 2 Full HD monitor 1920 x 1080 with a DVI connection