DIGGERS HOTLINE. Midwest Fiber Networks, LLC. CALL : (414) OR TOLL FREE (800) MIDWESTFIBERNETWORKS

Similar documents
Page Number Official Detail Name Contact Title Primary Contact E mail Secondary Contact E mail

TruePlate Structural Plate

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Site Plans, SWPPP Reviews, Checklists & Enforcement, OH MY!

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

City of Palm Coast Capital Projects Timeline - 2nd Quarter CAPITAL PROJECTS FUND

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

SUMMARY REPORT. Consultation Summary Report. January 2016

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES

Attachment 2 Wastewater

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

Township of Egg Harbor August 15, 2011 Planning Board

Minutes of the Planning Board of the Township Of Hanover JULY 28, Board Secretary, Kimberly Bongiorno took the Roll Call.

About Us. Agenda 11/12/2014. Maximizing Benefits from Telephone and Cable Agreements. Municipal Association of South Carolina November 12, 2014

Committee of the Whole Agenda Cover Memorandum

AMENDMENTS TO OPSS 409 (APR 99) CONSTRUCTION SPECIFICATION FOR CLOSED CIRCUIT TELEVISION INSPECTION OF PIPELINES

STATE OF VERMONT ENVIRONMENTAL COURT. } In re: Appeal of Beebe } Docket Nos Vtec (9-lot subdivision) } } Decision on the Merits

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

MINNEHAHA COUNTY ON-SITE WASTEWATER TREATMENT SITE EVALUATION WORKSHEET Form #1. Land Owner. Legal Description

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

TRAFFIC SIGNAL DESIGN GUIDELINES

Planning Commission Staff Report Street Vacation Hearing Date: December 11, 2013

PUP Zoning R-2 R-2 C-1 R-2 R-5 R-6 C-1 R-5 B-2C B-3C B-2 B-1 O-2C B-1 R-2 R-1 C-1 C-1. R-2A Tuckahoe District Patterson West EXISTING TOWER

Planning & Zoning Commission Meeting Date: June 18, 2012

Wireless Box Permit Block:3783 Lot: 009 Zip: 94103

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

SECTION [ ] [02730] WAX-COATED DECOMPOSED GRANITE SURFACING

Miscellaneous Documentary Research on the Hepworth Mine, Rural Alsey, Scott County, Illinois

Verizon Transition Update December 5, Process

LEE COUNTY BOARD OF COUNTY COMMISSIONERS

As Introduced. 131st General Assembly Regular Session H. B. No Representative Phillips Cosponsors: Representatives Rogers, Smith, K.

Aerial Cable Installation Best Practices

Attachment 7: 5/9/13 Neighborhood Meeting Summary

Bolt-A-Plate. We Support You.

Health & Safety. For your Event.

Innis College Rental Terms & Conditions

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

MINE-WIDE PANEL STABILITY MONITORING AT ANGLO PLATINUM UNION JV. D F Malan and P S Piper Groundwork Consulting (Pty) Ltd

PUBLIC WORKS COMMITTEE MEETING. September 27, 2000

Montezuma Wetlands Project Technical Review Team (TRT) Charter September 2002 (revised June 2008)

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS

Chapter PUBLIC IMPROVEMENTS* * Cross References: Public ways and property, CBJ Code tit. 62. ARTICLE I. GENERALLY

Damaged, unsecured, and broken poles

AltaLink Management Ltd.

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. ***

PINE RIDGE ELEMENTARY

COUNCIL ACTION FORM. The following streets will be within the closed area, but are not part of the race route:

Specifications For CCTV Inspection Of Sanitary & Storm Sewers (Revised Aug. 2018)

Integrated Skills in English ISE I

TOWNSHIP OF FRANKLIN ZONING BOARD OF ADJUSTMENT COUNTY OF SOMERSET, NEW JERSEY. REGULAR MEETING December 17, 2015

Pikes Peak Regional Building Department 2880 International Circle Colorado Springs, Colorado 80910

HEALTH AND SAFETY MANUAL

David Braley Health Sciences Centre Room Booking Policies

James W. Nunnally, Vice-Chairman Elizabeth G. Dwyer, Helen E. Harris Richard Kirkland, CBZA

All Local Agent Health Departments Regional Directors Attn: Food Safety and Recreational Licensing Sanitarians

Chairman Rolfsen called the Public Hearing to order at 7:37 P.M. and introduced the first item on the Agenda:

NOTICE OF CONTINUATION OF PROPOSED RULE-MAKING HEARING BEFORE THE COLORADO SOLID AND HAZARDOUS WASTE COMMISSION

Tony Winstead Photo. Dixon Riverfront Event Services. 115 S. Hennepin Ave. Dixon, IL (815)

Standard Method of Test for Random Method of Sampling Hot Mix Asphalt (HMA) SCDOT Designation: SC-T-101 (08/13)

GROUNDWATER MONITORING DATA RELEASE 2011 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE

Item 6A Page 1. Board of Directors. Gerhardt Hubner, District Administrator. Date: June 1, 2016

Escorting / Supervision of service providers and contractors

Scheme MOT Facility Improvements

Village of Glenview Appearance Commission

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

SHALER TOWNSHIP PLANNING COMMISSION April 18, 2016

SECTION 3 SPECIFICATIONS FOR TELEVISION INSPECTION OF SANITARY AND STORM SEWER 0053

PREMIER LAKEFRONT DEVELOPMENT SITE FOR SALE

MILWAUKEE AVENUE CORRIDOR COMMITTEE FEBRUARY 12, 2015 MEETING SUMMARY

TOWN OF FAYAL 4375 SHADY LANE, EVELETH, MN 55734

Transmission Cables Overhead/Underground Guidance

City Manager Briefing Report

ipump 622 Streaming Media Decoder Installation Quick Start Guide

City Council Report 915 I Street, 1 st Floor

Alberta Electric System Operator

WATER/RECYCLED FIFM Complex Works Assessment Sheet

Newsletter

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

2019 INDUSTRY EXPERT THEATERS GUIDELINES #HFSA rd Annual. Scientific. Meeting

Roads Analysis Report

FIRST Regional Planning Guide & Manual Section 11

1231 WLMRT THORNTON VERZION PROJECT # SMALL CELL 9901 GRANT ST. THORNTON, COLORADO ZONING DRAWINGS

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

City of Newport Park Board Meeting September 22, 2016

Appendix 1 CLOSED-CIRCUIT TELEVISION INSPECTION

[A quorum of the City Council may attend this meeting]

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES

May 8-11, Wisconsin State Fair Grounds West Allis, WI EXHIBITOR KIT

Palo Alto High School Facilities Steering Committee Agenda

Egypt Research Project

Appendix 6 St. Bernard Basin

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES

Transcription:

24.75' 24.75' 24.75' 70' RESERVED 24.75' 47.08' 10' NTH 80TH 70' 30' 6' 14' 6' ROAD RESERVED PUBLIC UTILITY EASEMENT 33' 80' 52' BRADLEY ROAD 6' 30' INGRESS & EGRESS 20' 20' AVENUE BRADLEY ROAD 52' NO 66' 70' 181 722.01' 76TH PLL. TO S/L OF 1/4' SEC. NTH 181 105' NO BRADLEY ROAD STM SEWER EASEMENT 20' 5' BRADLEY ROAD BRADLEY ROAD BRADLEY ROAD 72' 72' 58' 12' 12' W.E.P. CO. EASEMENT BRADLEY ROAD 100' R R R R 33' RR RR HUT R R SWITCH 33' 100' SEWER EASE. 12' 15' 13' 80' 601' BRADLEY ROAD W.E.P. CO. UNDERGROUND EASEMENT 12' 52.09' 30' 12' WISCONSIN 80' W.E.P. CO. UG EASEMENT 80' BRADLEY ROAD WISCONSIN 80' W.E.P. CO. UG EASEMENT 34.37' 30' VILLAGE OF BROWN DEER VILLAGE OF BROWN DEER CITY OF MILWAUKEE DRIVE NTH DRIVE NTH DEAN ROAD NTH GOODRICH LANE VILLAGE OF BROWN DEER CITY OF MILWAUKEE 67TH NTH 67TH NTH DEAN ROAD IVY NTH TOWER BRADLEY ROAD BRADLEY ROAD DRIVE NTH 70' NTH 66TH AVENUE VILLAGE OF BROWN DEER CITY OF MILWAUKEE GOODRICH NTH NTH 65TH NTH NTH 65TH LANE NTH VILLAGE OF BROWN DEER CITY OF MILWAUKEE IVY BRADLEY ROAD NTH 64TH 64TH DARNEL FAIRLANE VILLAGE OF BROWN DEER CITY OF MILWAUKEE DEAN ROAD DEAN ROAD DRIVE ARCH BRADLEY ROAD 20' DRIVEWAY EASE. WABASH VILLA SILVER ESTHER TOWER GOODRICH PLACE STH 100 STH 100 62ND BROOK 62ND NTH NTH 62ND R NTH AVENUE BRADLEY ROAD NTH LANE AVENUE AVENUE LANE AVENUE VILLAGE OF BROWN DEER CITY OF MILWAUKEE LANE 90' 61ST NTH 61ST NTH 75' W. WABASH AVE R W. DARNEL AVE W. FAIRLANE AVE W. TOWER AVE BRADLEY ROAD BOX CULVERT W. RANGE AVE W. DONNA DRIVE BOX CULVERT W. WAHNER AVE W. DEAN ROAD VILLAGE OF BROWN DEER CITY OF MILWAUKEE 59TH R BROWN DEER ROAD RANGE BETTY LANE 25' 25' 58TH NTH W. WAHNER AVE DEAN ROAD DEAN ROAD ESTER DONNA BRADLEY ROAD AVENUE 6' PLACE 57TH 30' NTH NTH 57TH DRIVE W. WAHNER AVE PUBLIC RESERVED F PLANTING STRIP UTILITY EASE. 6' 6' 6' BROWN DEER ROAD 56TH NTH 20' W. WAHNER AVE SERVICE RD. PUBLIC 75' 20' 20' BROWN DEER ROAD 30' 20' 54TH NTH WAHNER DONNA DEAN ROAD NOKOMIS 53RD ROSE DEAN ROAD TERRY 53RD AVENUE WABASH DRIVE AVENUE 75' GRANDVIEW CITY OF MILWAUKEE VILLAGE OF BROWN DEER EDGE O' WOODS 2034.47' CITY OF MILWAUKEE VILLAGE OF BROWN DEER BETHANNE NTH 60TH 100' NTH 52ND 52ND NTH AVENUE 75' 75' 75' BROWN DEER ROAD WABASH AVENUE DEAN ROAD DONNA DRIVE TERRY AVENUE 50' 100' NTH 60TH NTH 54TH NTH ARBON DRIVE NTH 50TH NTH 48TH NTH 51ST NTH 55TH NTH 51ST NTH 51ST 65' R 100' 50' 50' 75' 75' 75' 75' WABASH AVENUE 50' R 50TH WILLOW ROAD NTH 51ST NTH 50TH NTH 75' CHURCHILL 49TH NTH GOODRICH AVENUE 100' 90' 115' R 50' R LANE 48TH NTH 90' 50' R LANE 50' R NTH WABASH NTH 51ST NTH 60TH NTH 60TH NTH 51ST 65' R 54TH NTH NTH N 56TH ST. CHURCHILL NTH NTH 52ND LANE WILLOW CHURCHILL NTH ROAD NTH BRADLEY ROAD 54TH NTH ROAD 54TH 50' R WILLOW LANE GOODRICH LANE 65' R ROAD VACATED DEAN ROAD BRADLEY ROAD R 50' 50' VACATED UTILITY EASE. 6' VAC. VAC. BRADLEY 6' DRIVE ROAD LANE BRADLEY ROAD EDGE O' WOODS GRANDVIEW NTH 55TH NTH 51ST NTH 51ST GREENVIEW COURT 47TH 537' EASEMENT NTH 76TH S.T.H. 181 223.75' CITY OF MILWAUKEE NTH 64TH ST VILLAGE OF BROWN DEER VILLAGE OF BROWN DEER BOULEVARD 6' 6' LUEBBE 6' 30' 6' 6' 6' 6' 30' W BEAVER CREEK PARKWAY 6' RESERVED F PLANTING STRIP 6' 6' W BEAVER CREEK PARKWAY 30' PLACE 4.5' 4.5' W. GREENBROOK DRIVE W. GREENBROOK DRIVE W BEAVER CREEK PARKWAY W BEAVER CREEK PARKWAY N 55TH ST. N 55TH ST. N 55TH ST. N 55TH ST. N 51ST ST. N 51ST ST. N 55TH ST. N 55TH ST. N 56TH ST. NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH NTH 60TH FIS ENTRY POINT 4900 W. BROWN DEER RD. BROWN DEER, WI 53223 W. DEAN RD. N. 61st ST. W. FAIRLANE AVE. N. 60th ST. NTH 59TH W. DARNEL AVE. W. VILLA LN. W. ARCH AVE. NTH 60TH SPLICE POINT OF 76th ST. N. 65th ST. N. 64th ST. N. 64th ST. N. 64th ST. W. TOWER AVE. N. 6Ist ST. NTH 60TH NTH 60TH NTH 60TH NTH 76TH N. 73RD ST S.T.H. 181 UNION PACIFIC RAILROAD CO. N GRANVILLE WOODS RD NTH 67TH ST NTH 66TH ST NTH 66TH ST N. 66th ST. W. BRADLEY ROAD NTH 64TH CT NTH 60TH N. 60th ST. NTH 60TH CITY OF MILWAUKEE LIMITS CITY OF MILWAUKEE CITY OF MILWAUKEE STM SEWER

WISCONSIN W.E.P. CO. UG EASEMENT CITY OF MILWAUKEE VILLAGE OF BROWN DEER PARCEL 2 80' BRADLEY ROAD VILLAGE OF BROWN DEER CITY OF MILWAUKEE 80' WISCONSIN W.E.P. CO. UG EASEMENT

NTH 67TH ST VILLAGE OF BROWN DEER CITY OF MILWAUKEE BRADLEY ROAD

NTH 66TH ST BRADLEY ROAD VILLAGE OF BROWN DEER CITY OF MILWAUKEE 70' NTH 66TH ST

N. 64th ST. W. BRADLEY ROAD N. 66th ST. N. 65th ST. N. 64th ST. N. 60th ST. N. 64th ST. N. 6Ist ST.

BRADLEY ROAD VILLAGE OF BROWN DEER CITY OF MILWAUKEE NTH 60TH

R NTH 60TH

NTH NTH 60TH

W. DEAN RD. W. DARNEL AVE. W. VILLA LN. N. 61st ST. W. FAIRLANE AVE. W. ARCH AVE. N. 60th ST. W. TOWER AVE.

NTH 60TH

W. DARNEL AVE NTH 60TH BOX CULVERT BOX CULVERT

NTH 60TH W. DEAN ROAD

SCHOOL CROSSING WK HOURS ONLY BETWEEN 9AM AND 2PM WALK MUST BE OPEN BEFE AND AFTER SCHOOL. NTH 60TH W. DEAN ROAD WK AREA

NTH 60TH R NTH 59TH

NTH 60TH W. DONNA DRIVE

59TH NTH 60TH

NTH 60TH

NTH 60TH

NTH 60TH W. WABASH AVE

NTH 60TH W. RANGE AVE

NTH 60TH W. WAHNER AVE

W. WAHNER AVE

N 56TH ST. W. WAHNER A W. WAHNER AVE

BROWN DEER ROAD 30' SERVICE RD. N 56TH ST. CSM 1818 PARCEL 1 AC. VAC.

N 55TH ST. BROWN DEER ROAD

N 55TH ST.

N 55TH ST.

N 55TH ST.

N 55TH ST.

W BEAVER CREEK PARKWAY N 55TH ST.

W BEAVER CREEK PARKWAY

W BEAVER CREEK PARKWAY

N 51ST ST. W BEAVER CREEK PARKWAY

N 51ST ST. W. GREENBROOK DRIVE

W. GREENBROOK DRIVE 2016 FIS ENFCED FREEZE PERIODS - NO WK TO BE DONE ON FIS'S PROPERTY: NOVEMBER 21ST THROUGH NOVEMBER 28TH DECEMBER 10TH THROUGH JANUARY 6TH

2016 FIS ENFCED FREEZE PERIODS - NO WK TO BE DONE ON FIS'S PROPERTY: NOVEMBER 21ST THROUGH NOVEMBER 28TH DECEMBER 10TH THROUGH JANUARY 6TH

TRAFFIC CONTROL PLAN PLEASE REFERENCE SDD 15D21-4 F LANE CLOSURES TO POT HOLE EXISTING UTILITIES IN INTERSECTION. REFERENCE SDD 15D30-3 F PEDESTRIAN ACCOMMODATIONS AROUND INTERSECTION. TIME RESTRICTION WILL BE AS FOLLOWS: -EB STH 100/W BROWN DEER RD: NO TIME RESTRICTION F SINGLE LANE CLOSURE; MAY NOT CLOSE ME THAN 1 LANE OF TRAFFIC BETWEEN: 7AM - 9AM AND 3PM - 6PM. -WB STH 100/W BROWN DEER RD: NO TIME RESTRICTIONS F SINGLE LANE CLOSURE; MAY NOT CLOSE ME THAN 1 LANE OF TRAFFIC BETWEEN 7AM - 9AM AND 11AM - 7PM WK AREA MWFN IS REQUIRED TO PLACE A LANE CLOSURE SYSTEM (LCS) REQUEST 7 CALENDAR DAYS F A TWO LANE CLOSURE AND 3 BUISNESS DAYS F SINGLE LANE CLOSURE, PRI TO COMMENCING WK. BROWN DEER ROAD POT HOLES NEEDED BROWN DEER ROAD 30' SERVICE RD. WK AREA

EROSION CONTROL PLAN APPLYING TO WK DONE AT THE INTERSECTION OF STH 100 (W. BROWN DEER RD.) - N. 55TH ST - NOTES 1-6 APPLY TO ALL WK WETLANDS 8. No work will be performed within the banks or below the ordinary high watermark of the unnamed waterway or tributaries. 9. As much as practicable, the majority of work will be staged from the public roadways and road shoulders, keeping equipment out of adjacent wetlands. 10. All work will be conducted to minimize soil disturbance. No rutting will be allowed within the wetlands. 11. If soils are not frozen or stable to a point that avoids rutting, timber mats, mud tracks, or equivalent will be utilized to access pole locations. GENERAL NOTES 1. All of the conditions under this document will be met during construction of the project. 2. No stockpiling spoils on roadways or on shoulder. 3. If any spills (like gas, oil, hydraulic fluid) occur on site, stop work and contact supervisor immediately. CONTAMINATED SOILS 4. Whenever soil exhibiting obvious signs of contamination is encountered during excavation or installation, cease work immediately, take appropriate precautions to ensure worker health and safety, and contact operations supervisor or inspector. EROSION CONTROL 5. Erosion control measures will meet or exceed the approved WDNR Storm Water Management Technical Standards as outlined in http://dnr.wi.gov/runoff/stormwater/techstds.htm. 6. During winter, there will be no stockpiling spoils on ground. DEWATERING 7. Dewatering of pits or trenches shall be done in accordance with state standards. Use an approved sediment bag, a straw bale dewatering basin, a combination of both, or equivalent. 12. Excavated spoils will not be stockpiled in wetlands. All excess spoils will be removed from wetlands and placed in a suitable upland location. 13. Trenching and pit excavations within wetlands will include soil segregation to facilitate restoration of pre-construction soil stratification, and restoration to pre-construction elevations. 14. Any poles scheduled to be removed, and that occur within wetland will be cut at ground surface. 15. If soil disturbance occurs on slopes leading to wetlands, or within wetland, the disturbed areas will be stabilized and appropriate erosion control best management practices will be implemented. WATERWAYS 16. No work can be performed within the banks or below the ordinary high watermark of any navigable waterway or stream. No crossing of navigable waterways with equipment can occur. 17. Any soil being disturbed within 75 feet of an ordinary high water mark of any navigable waterway or stream to be stabilized within 24 hours of construction completion. SURFACE RESTATION 18. Temporary soft restoration to stabilize the work site shall be completed in a timely manner during and immediately following utility construction. 19. The contractor performing the work shall notify WisDOT as soon as final restoration has been completed and the work site is ready for inspection. FRAC-OUT 20. Refer to the frac-out contingency plan for any boring work being performed.