AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

Similar documents
Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Request for Proposals Fiber Optic Network Backbone Upgrades

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

>> By Jason R. Kack, LS

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

AltaLink Management Ltd.

SUMMARY REPORT. Consultation Summary Report. January 2016

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan

CHAPTER 98: CABLE TELEVISION Tampering with city cable system prohibited Fees

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY

ATV-HD Project Executive Summary & Project Overview

EXHIBIT A Zones Zone 1 (Urban): Zone 2 (Suburban): Zone 3 (Exurban) Blended Rates/Multiple Zones:

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

FIRST ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement

Telecommunications, Pay Television, and Related Services 119

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

General Questions. Q: What s the big deal about fiber? Why is it better than what I have today? Q: How is the fiber going to be installed to my home?

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Town Hall Meeting Fiber to Home Q&A January 28, 2016

A Discussion with Neighborhood Representatives RPI 3/13/2017-1

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

Huawei AT815SN Brochure-Detailed

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

GLX Project Green Line Extension Project. March 2, 2016 Public Meeting

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. ***

Metrotown Station and Exchange Upgrades

Smooth Media Production Internet T.V / Internet Radio

Statement of Work. Falcon Stadium Locker Room Audio-Visual & Telecommunications Package. 3 May 2018

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Selecting the correct cable type for Outside Plant Application

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

FIFTH ADDENDUM TO THE MEMORANDUM OF UNDERSTANDING Fiber Optic Network Agreement

Proposal Endorsement Signatures

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA


THEATRE DIRECTOR, Beck Theatre

Appendix 6 St. Bernard Basin

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

ORDINANCE NO

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

DOLORES COUNTY BROADCASTING NETWORK D C B N. Development Progression

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM

Smart Communities Using GIS

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Cable Broadband Premises Installation and Service

Loco or Train No. Device that Failed Location Collision or Derailment? Cause /25/1995 SP CTC Amtrak No. 6 Signal 7274 East Riverton, UT N

Addendum: Rain Dial Installation and Programming Guide Update

Escorting / Supervision of service providers and contractors

File: /2018- Director, Arts, Culture and Heritage Services Vol 01

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

RATE INCREASE FAQs. Can you tell me what one TV station/network costs?

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront

APPENDIX D TECHNOLOGY. This Appendix describes the technologies included in the assessment

2178-L/S Series Fiber Optic Splice Case with Gasket

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

Licensing & Regulation #379

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS

800 MHz Band Reconfiguration

Impacts on Cable HFC Networks

Powerful 2x2 MIMO airmax BaseStation. Datasheet. Models: RM2-Ti, RM5-Ti. Rugged Weatherproof Die-Cast Aluminum Enclosure

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

GATOR PATCH. The ultimate fiber distribution terminal

Bravo AV s Structured or Whole-House Wiring Approach

Verizon Transition Update December 5, Process

Identification - electrical services

FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS

RECENT FRANCHISE RENEWAL PEG ACCESS OUTCOMES (re HD, VOD, EPG, Funding)

Brief History of the MUTCD

STATE OF VERMONT PUBLIC SERVICE BOARD

Upgrade of 450/550 MHz Cable Systems to 600 MHz Using a Phase Area Approach. Robb Balsdon Vice President, Engineering Services Rogers Engineering

3 Locating and Marking Products DOCUMENT OBSOLETE

Ralph Engelstad Arena. PROMOTER S GUIDE Technical Facility Information. REA Technical Facility Information Updated 7/28/14

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

INVITATION TO BID SURVEILLANCE SYSTEM UPGRADE

The FiberMark1 offers an ideal solution for

Modernized Day Sensor Assembly (M-DSA)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

2. SUPERPATH Mbps Digital Service 2.1. General

Quante BPEO Splice-Protection Closure for Optical Fiber Cables. Features Advantages Benefits

FIVE FLAGS CENTER FEASIBILITY STUDY REPORT

Notice of Copyright. Citing Resources from the Western History Collections

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

High performance circuit breakers

IndyGo Facility Upgrades Project 35671EE

GV2P05. Main. Device short name. Device application

Libraries. Goals. The City will:

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

Transcription:

NYSDOT / Amtrak Hudson Line Improvement Program Craig O. Weed A Amtrak David W. Emerich, PE CHA

Project Partners

NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding Total NY Project Funding (approximate): $551M Federal Funds $130M State & Local Matching Funds Progress around $65M expended including: 2 completed projects 9 projects in construction 4 projects in design

NYSDOT High Speed Intercity Passenger Rail Program Sustained Effort to Secure Funding

Hudson Line Projects Under Construction

Hudson Line Projects Overview Stakeholder Management: NYSDOT and Amtrak are partners in improving the Hudson Line Amtrak s role as the responsible entity for the maintenance and operation of passenger rail service along the Empire Corridor is facilitated by support from NYSDOT NYSDOT is the Engineer of Record dfor all of the Hudson Line projects Affiliated Stakeholders include: FRA, CSX, Canadian Pacific, CHA, HNTB, Jacobs, Baker & Local Municipalities / Utilities

Hudson Line Projects Overview Stakeholder khld Management:

Hudson Line Projects Overview Stakeholder Management:

Hudson Line Projects Overview

Hudson Line Projects Overview Project Benefits Albany Schenectady Double Track, Federal Funding $ 91.2M Adds 17 miles of second main track between Albany and Schenectady, allowing for train travel in both directions. i Empire Corridor Capacity Improvements Federal Funding $ 58.1M, State 4.9M 4th Track at Rensselaer Station Adds additional capacity for trains to pull into the platforms at Rensselaer Station, replaces obsolete 30 year old signal equipment with new state of the art system. Hudson Line Signal Wire Relocation Rl Phase 2 Replaces and buries signal wire between Rdh Redhook and Rensselaer making signal system more reliable. Track and Platform Improvements at Schenectady Station Constructs new track and platforms at Schenectady Station, waterproofs under tracks preventing leaks into future station. Hudson Line Signal Improvements Phase 1 Fd Federal lfunding $ 79M 7.9M, State t $1.9M Replaces and buries signal wire between Redhook and Poughkeepsie making signal system more reliable. Hudson Line Grade Crossing Improvements $ 2.45M, State $0 Improves safety at 12 highway h rail grade crossing along the Hudson Line by upgrading warning devices

Hudson Line Capital Maintenance Update

Hudson Line Capital Maintenance Update Territory Limits under a 50 year long term lease with CSX are from MP 75.0 Poughkeepsie NY to MP 169.9 Hoffman's, NY Operated, Dispatched and maintained by Amtrak for four years September 2011 Over $10M in State of Good Repair Projects by Amtrak Forces 2015 construction season including: $5.6M Tie and Timber Replacement $0.2M Roadbed d Stabilization ti $2.8M Curve Patching $1.3M Bridge Work $0.1M Culvert Work

Hudson Line Capital Maintenance Tie & Timber Replacement Projects

Hudson Line Capital Maintenance Update

Hudson Line Signal & Crossing Improvements Overall Program Highlights The $42M Hudson Line Signal Upgrade Projects Reliability, quality and overall functionality of the signal system will be greatly enhanced. Project Limits: Poughkeepsie MP 75 to Rensselaer MP 138 Also included in these projects are safety and warning device upgrades at 13 at grade crossings of local roads on this stretch of the Hudson Line. A continuous Fiber and Power Backbone as building block for future PTC and Signal System Improvements. Last, but not to be shadowed by the other improvements, the removal of the pole line will greatly add to the aesthetics of these 63 miles along the shore of the Hudson River for residents, travelers, and visitors alike.

Hudson Line Signal & Crossing Improvements 2015 Construction Season Highlights Combined: Hudson Line Signals Phases 1 and 2 and Grade Crossing Work from Rensselaer to Poughkeepsie work continues Includes burying of power and signal cable & conduit Installation & termination i of fiber Termination of underground power Upgrade of 8 existing crossings with new mechanisms Complete Installation of new Ice House Road Crossing The contractor portion of the Signals Projects is due to be substantiallycomplete this construction season at a cost of about $21M.

Hudson Line Signal & Crossing Improvements

Hudson Line Signal & Crossing Improvements

Hudson Line Construction Projects 4th Track at Rensselaer Station Albany Schenectady Double Track Schenectady StationTrack Work Combined into one contract! Projects Include: Earthwork and Grading 16 bridge rehabilitations 22 culvert repairs New interlockings New signal system from Rensselaer to Schenectady Platform extensions at Rensselaer Station Track work for new Schenectady Station New 4 quadrant gates at three grade crossings in Colonie, NY

Albany Rensselaer Station Fourth Platform Track

Albany Rensselaer Station Fourth Platform Track

Albany Rensselaer Station Fourth Platform Track Projects Include: Earthwork and Grading New 4th Track at Platform A New closed drainage system New power services 1 bridge rehabilitation 3 culvert repairs 6 New interlockings New signal system including fiber backbone for PTC Signal system changing from Wayside to Cab signals Extension of both platforms, longest one will be 1050 FT 4 new storage tracks with 480v standby power and water services

Albany Rensselaer Station Fourth Platform Track Project Milestones Interlocking/CP s are the critical path and must be consecutively cutintoservice. CP 138 in service August 2015 (first one) CP LAB (Last One) to be cut into service February 2016. Platform extensions A & B open for service Late Spring 2016. New Storage Tracks Completed Fall 2015 Substantially Complete December 2016

Albany Rensselaer Station Fourth Platform Track

Double Track Project Albany to Schenectady NY

Double Track Project Albany to Schenectady NY Projects Include: Earthwork and Grading 16 miles of double track capacity, 12 miles of new main line track New power services 15 bridge rehabilitation 19 culvert repairs 6 New interlockings High speed Crossover at New CP 149 Interlocking 3 New Quad Gate at grade highway crossings New signal system including fiber conduit for future fiber & PTC Signal system changing from Wayside to Cab signals Relocated CSX Sidings

Double Track Project Albany to Schenectady NY Project Milestones Interlocking/CP are the critical path and consecutively cut into service. CP 145 in service April 2016 (first one) CP 161 (Last One) to be cut into service December 2016. Civil work from CP145 to CP156 to be completed by Dec 2015 TLM schedule for Aprilthru May2016 Bridge rehabilitations substantially completed Fall 2015 Culvert rehabilitations completed summer 2016 Overall Project to be substantially completed Dec 2016

Double Track Project Albany to Schenectady NY

Double Track Project Albany to Schenectady NY

Schenectady Station Existing Station 1,022 square feet New Station 2,000 square feet

Schenectady Station Work to be completed under Albany Schenectady Sh td Double Track

Hudson Line Projects Questions / Answers