Instrument Status Review. GSC Meeting October 2009

Similar documents
GMOS CCD Upgrade Options S. Kleinman, J. Jensen 26Sep08

Mosaic 1.1 Progress Report April, 2010

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

National Adaptive Optics Roadmap 2004 Revision. TMT Adaptive Optics Requirements

A new Scintillating Fibre Tracker for LHCb experiment

WE MUST BE MAD Pushing FIERA to its Limits

METROTOM. Visible Metrology.

I n d u s t r i a l M e t r o l o g y f r o m C a r l Z e i s s. METROTOM. Visible Metrology.

Durham Magneto Optics Ltd. NanoMOKE 3 Wafer Mapper. Specifications

SciFi A Large Scintillating Fibre Tracker for LHCb

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

APPLICATION NOTE. Fiber Alignment Now Achievable with Commercial Software

Instrument characterization from metadata & telemetry

David Mrnak, International Sales Department, eyevis GmbH

The Large TPC Prototype: Infrastructure/ Status/ Plans

End-to-end simulations of a near-infrared pyramid sensor on Keck II

Compact multichannel MEMS based spectrometer for FBG sensing

Nano-Imprint Lithography Infrastructure: Imprint Templates

Commissioning and Initial Performance of the Belle II itop PID Subdetector

The PHI VersaProbe operates with two essential software programs: PHI Summitt and Vacuum Watcher. A third program, MultiPak, handles data reduction.

Mahdad Manavi LOTS Technology, Inc.

M2-Measurement Report

Seniors: Stephan Meyer David Aaron Yazdani Team Members: Alex Rockwood Reed Hollinger Mark Woolston Advisor: Dr. Jorge Rocca

SPS BPM system renovation. Roadmap & Milestones

Readout techniques for drift and low frequency noise rejection in infrared arrays

CMS Upgrade Activities

Designing Intelligence into Commutation Encoders

The Effect of Plate Deformable Mirror Actuator Grid Misalignment on the Compensation of Kolmogorov Turbulence

Tender Notification for the procurement of a Scanning Electron Microscope" at IISc (Last Date for submission of tenders: 3 rd October 2018)

Experimental environment with optical lasers in 2020

DLP Discovery Reliability Application Note

A. All equipment and materials used shall be standard components that are regularly manufactured and used in the manufacturer s system.

Review Report of The SACLA Detector Meeting

High QE Photocathodes lifetime and dark current investigation

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

COMPLETE TISSUE PRODUCTION IMPROVEMENT SYSTEM

PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND. Doug Roberts U of Maryland, College Park

Building Your Own 2-Photon Microscope: Challenges, Advantages and Limitations

Comparison of SONY ILX511B CCD and Hamamatsu S10420 BT-CCD for VIS Spectroscopy

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

CBETA Quarterly Report 7

Lensed Fibers & Tapered Ends Description:

SOAR Project Status Jay Elias September 6, 2018

Transmissive XBPM developments at PSF/BESSY. Martin R. Fuchs

BTC and SMT Rework Challenges

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Analysis of WFS Measurements from first half of 2004

Progress Update FDC Prototype Test Stand Development Upcoming Work

Reducing CCD Imaging Data

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Color mixing or White-light LED (Light Emitting Diode) ERS-style product

A TARGET-based camera for CTA

LED Thunder S-150 Code 1097

SPEAR 3: Operations Update and Impact of Top-Off Injection

Engineered to meet your needs T he oldest name in stud welding,

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

Title: Members: Sponsors: Project Narrative: Small Projector Array Display System. Nicholas Futch, Ryan Gallo, Chris Rowe, Gilbert Duverglas

Helioseismic Magnetic Imager Program at LMSAL

The hybrid photon detectors for the LHCb-RICH counters

The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications

Best in Class SLOT LED. high-performance linear LED lighting solutions. wall. surface. pendant

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

XIPE Instrument Detector Unit DU 0, D EM and QM are not deliverable Gas Pixel Detector GPS D 1 3 1

B-AFM. v East 33rd St., Signal Hill, CA (888)

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

PACS Newsletter. Nr. 17, 16 April The PACS Picture of the Week. Fig.1: The PACS Operations Room empty, after months of hectic hustle and bustle.

HDCVI Eyeball Camera Lite

HDOB-ELS5IR28A. 5MP 4-in-1 Bullet Security Camera

Technical Progress Report. Third Quarter DEVELOPMENT OF A VIDEO-BASED SLURRY SENSOR FOR ON-LINE ASH ANALYSIS. Principal Investigators

POTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers

THE OMEGA UPGRADE. Section 1. OMEGA Upgrade System Design Update. l.a

-Technical Specifications-

GLAST Large Area Telescope:

Image Contrast Enhancement (ICE) The Defining Feature. Author: J Schell, Product Manager DRS Technologies, Network and Imaging Systems Group

I. Introduction. II. Problem

PRODUCT GUIDE CEL5500 LIGHT ENGINE. World Leader in DLP Light Exploration. A TyRex Technology Family Company

All-in-one solutions For applications with imaging challenges, we offer a wide range of TDI solutions.

ABSTRACT. 1 IfA Manoa, 2680 Woodlawn Drive, Honolulu, HI IfA Hilo, 640 North A ohoku Place, Hilo, Hawaii

Results of the June 2000 NICMOS+NCS EMI Test

CERN-RRB April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration

Fixture One XLR Signal Cable One Omega Clamp - Two Safety Chain One User Manual - One

PHI 5000 VersaProbe TM Operator s Guide

Service. Nu Instruments Service & Upgrades. ICP-MS, GD-MS, IRMS, Noble Gas.

CCD220 Back Illuminated L3Vision Sensor Electron Multiplying Adaptive Optics CCD

CHARACTERIZATION OF END-TO-END DELAYS IN HEAD-MOUNTED DISPLAY SYSTEMS

Product Presentation Digital Cinema Systems

Measurement of Microdisplays at NPL

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

HDCVI Camera User s Manual

Polygon Scanners Capabilities, Applications and System integration. considerations

XB-68 RF Detector & Camera Finder

In-process inspection: Inspector technology and concept

Small System Packages. Strand Dimming Systems

MONTHLY STATUS REPORT. Engineering & Technical Services July 2003

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

An extreme high resolution Timing Counter for the MEG Upgrade

Laser Beam Analyser Laser Diagnos c System. If you can measure it, you can control it!

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Transcription:

Instrument Status Review GSC Meeting October 2009 1

Quick Status NICI Campaign and Open Science going well Efficiency enhancements considered for 2 nd quarter 2010 Flamingos 2 Now undergoing on-site Acceptance Testing and Commissioning at Gemini South Acceptance Testing scheduled complete late (October) 2009 GNIRS Substantial progress; significant setbacks Mid 2010 commissioning now scheduled GMOS-N CCDs GPI HIA selected as Integration and Test vendor Ready for integration into GMOS-N mid-2010 Assembly of major components now underway Delivery to telescope no sooner than early 2011 GeMS (MCAO) Work continuing with incomplete staff Laser expected this year Commissioning with GSAOI 2011A 2

NICI Eta Carina by NICI FeII/BrG/H2 composite (preliminary reduction) Image courtesy Kris Davidson 3

NICI Science Campaign fully underway Available for general use as of 2009B Several upgrades in planning: Dichroics to replace 50/50 mirror but manufacture is difficult Additional filters ordered Optimized Spider, Pupil, and Focal Plane Masks mostly delivered Installation depends on delivery and end of 2010A observing block(s) Spare DM in procurement; possible delivery by end of year 4

Flamingos 2 First light images 5

Flamingos 2 Currently undergoing final acceptance testing and commissioning at Cerro Pachón On-telescope Acceptance Testing underway New Gate Valve baffle fixed K- band background; wheel mechanisms improved Array Dead pixels continue to be confined in one area New defects seen in first postship warm test of the array New HAWAII-2 ordered expected delivery by December Still no R3000 grating. Cold clamp to decrease pre-cool times is being tested New baffle mechanism currently limits F2 to side-looking ports F2T2 awaiting F2 and GeMS 6

GNIRS 7

GNIRS... lots of progress We now have a very good Aladdin-3 science array and a 3- quadrant spare + eng. Grade; mechanism and MUX tests underway OIWFS testing with Engineeringgrade array now complete Many optics and assemblies aligned All motors and sensors have been tested warm and are functional Vacuum tested; cold tests pending GNIRS Offner Assembly Testing at NOAO 8

GNIRS... and a few steps backwards Offner secondary scratched Replacement received and accepted, testing pending Continued lens coating problems (3 lenses) Limited to stoned and recently coated lenses from one manufacturer Internal Gemini Escalation Team worked with vendor to identify some problem areas in coating process Discovered a change in coating recipe from vendor Re-commission with1 good, 1 uncoated and 1 hot lens; replace hot and uncoated later when proper coatings can be procured OIWFS work took longer than expected now tested and working New bottom line: Acceptance Testing Feb 10; to Telescope Apr 10 9

GNIRS Optics coatings An unfortunate recurring problem with GNIRS optics note coating failure (crinkled areas) 10

GMOS-N CCDs Hamamatsu CCD in Socket with Cable 11

GMOS-N CCDs Hamamatsu won CCD down-select One Engineering-grade detector already delivered 3 Science-grade detectors selected, but awaiting verification of specifications Issued Contract to HIA for Integration and Testing Will use new ARC (SDSU) Generation 3 controller 4-channel readout should lead to faster reads Decided against prepping MIT/LL focal plane as a backup Contract work I&T timescale longer than anticipated delivery to Gemini North in 2 nd quarter 2010 Integration into GMOS-N will occur post-delivery 12

GMOS-N CCDs 13

GPI GPI dewar with new paint job 14

GPI Lots of recent GPI Progress Cal box nearing completion Integral Field Spectrograph dewar cold cycled New low-vibration cryo-coolers tested Integration and Testing plans re-worked Apodizer choices made MEMS still not delivered a contingency run is now scheduled Integration and Testing scheduled to start February, 2010 Acceptance Testing completion scheduled for end of 2010 Potential for delays in Integration and Testing, but working hard to minimize the possibility 15

GeMS Gemini MCAO System The laser infrastructure is now mounted on the Gemini South telescope. 16

GeMS Gemini MCAO System Laser Service Enclosure installed on telescope undergoing fine tuning and adjustments now Beam Transfer Optics some alignment completed; other tasks behind schedule Laser Keck laser undergoing Factory Acceptance Testing: finding bugs with software, but general specs looking good Laser Gemini laser delivery still scheduled for late 2009 Canopus (the AO bench) software upgrades and new features implemented; cooling system re-design on going Resource-limited: currently team operates on average at 60% of scheduled completion level due to operational needs (F2...) 17

GeMS Gemini MCAO System 2009B Plans Infrastructure Integration and Testing Beam Transfer Optics installed and commissioned Canopus cooling resolved Canopus wavefront sensor work If laser is received, commission inside the support enclosure 2010A + Plans Implementation of Laser Bench Beam Stabilizer system on telescope First light of Laser Guide Star Lab test Canopus with GSAOI and integrate at the telescope First light with Canopus towards end of semester 2011A Science commissioning 18

Summary NICI Full operation Upgrades ~2 nd quarter 2010? Flamingos 2 Commissioning late 2009B Not in time for 2010A call GNIRS Continued schedule delays due to coating failures Likely ready for commissioning in 2010A GMOS-N CCDs GPI CCD and I&T contracts issued Integration into GMOS ready late 2010A 2010 is Integration and Testing year Delivery to telescope no sooner than early 2011 GeMS (MCAO) Schedule hindered by late laser and limited human resources Commissioning with GSAOI 2011A 19