UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Similar documents
MEDICAL UNIVERSITY OF SOUTH CAROLINA DEPARTMENT OF PUBLIC SAFETY

HSE Learning from Fatal Coating Plant Accident

the CenterStage Policies & Procedures

Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents

This Chapter does not apply to applications and decisions on, development on land reserved in corridor maps.

DEPOSITION OF C.B. JONES MAY 10, A: Beats me. My dad was a trucker. Called me C.B. That handle just stuck.

Staatskapelle Weimar Orchestra of Germany Technical Addendum Page 1. Addendum to Contract

Plan for Generic Information Collection Activity: Submission for. National Transportation Safety Board (NTSB).

*** no equipment put on roofs or buildings. Dish must be put in ground 3 feet from building to allow for mowing. ***

Operating Instructions for the UCOWS Cow Activity Collector

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

2.0 SOUND SOURCES AT PINE RIDGES INLAND CLAMSHELL OPERATION AREA

Engineering Instruction

CHAPTER 98: CABLE TELEVISION Tampering with city cable system prohibited Fees

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

ADMINISTRATIVE DIRECTIVE MOBILE DIGITAL VIDEO RECORDING EQUIPMENT

CHIEF BROADCAST ENGINEER

Escorting / Supervision of service providers and contractors

RESPONSE OF THE NATIONAL ASSOCIATION OF THEATRE OWNERS (NATO) To the report and recommendations of The Federal Trade Commission

Instructor/Participant Guide PREVIEW ONLY. 209: Escalator: Electrical Systems. Module 1: General Electrical Safety Procedures

883 COMBI FLIP- FLOW SCREEN

Longwood University Department of Communication Studies Communication Studies Facilities and Equipment. Policies & Procedures

About Us. Agenda 11/12/2014. Maximizing Benefits from Telephone and Cable Agreements. Municipal Association of South Carolina November 12, 2014

AB CRUNCH SIT UP BENCH MODEL# 8642AB PRODUCT MANUAL - VERSION

Subject PARKING CITATIONS. 21 December By Order of the Police Commissioner

Reynolds Performance Hall Facility Regulations and Fee Schedule

Maintenance Service Bulletin

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.

Katharine Cornell Theatre University at Buffalo

NOW THEREFORE, in consideration of the mutual covenants and conditions herein contained, the parties hereto do hereby agree as follows:

Operation Manual VMS 3.0 Video System

ADVANCED TELEVISION SYSTEMS COMMITTEE, INC. CERTIFICATION MARK POLICY

GOSHEN PLAYERS, INC. VOLUNTEER USHER GUIDE. Volunteer Basics

Website: Tel: ADDRESS: 6475 Las Positas Rd. Livermore, CA Item No. E5B/E5S Installation Guide

TC Mbps - 622Mbps FIBER OPTIC MODE CONVERTER/REPEATER (Rev A0.1) User's Manual

HEALTH AND SAFETY MANUAL

STATEMENT UNDER OATH CHESTER RUNYON. Taken pursuant to Notice by Miranda. Notary Public in and for the State of. West Virginia, at the MSHA Bridgeport

DLP ANTENNA INSTRUCTION MANUAL. Dielectric LLC 22 Tower Road Raymond, Maine Phone:

OPERATION AND MAINTENANCE MANUAL

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626)

Brunswick Town Council Workshop with Rail Officials Town Council Chambers, Brunswick Town Hall Monday, October 30, 2017, 7:00-9:00 PM


User Instructions. 16 SCB Sync Station.

SV-LCD50. Installation and User Guide. Thin-Film Transistor (TFT) Liquid Crystal Display (LCD) Color Rear Vision Monitor. Version 1.

Seated Risers. Staging Canadell s Seated Risers use an Executive Stage foundation to create tiered seating for bands, choirs or audiences (see page 3)

X-ray inspection system Dymond

Student Television Network 2019 Film Convention City of Seattle Filming Guidelines and Information

Power Rack with Lat Pull

USE OF JOHN M. GREENE HALL

Cable System Installation Guide

Instruction Manual Model 5620 Power Controller

CENTRAL BLOWER COMPANY 211 S. 7th Ave. City of Industry, CA (626) Fax (626)

WIRELESS PLANNING MEMORANDUM

Personnel Procedures and Policies

Approved by Principal Investigator Date: Approved by Super User: Date:

ACCESS CHANNEL POLICY NORTH SUBURBAN COMMUNICATIONS COMMISSION JANUARY 14, 2019

Studio 180. Electronic and Print versions of the venue ground plan are available from the Technical Director.

April 2018 TALL FOOD & PHARMA PRODUCT INSPECTION

Elbert Theatre Rental Application

MP-7424 Football Scoreboard with MP5000 Console

LANH39 SQA Unit Code H52S 04 Install hard-standing sub-layers

IBC. CODE AND COMMENTARY Volume 2

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

PSC300 Operation Manual

ITU-T Y.4552/Y.2078 (02/2016) Application support models of the Internet of things

Guide for installers. METTLER TOLEDO MultiRange System solution analog Ex1. Hazardous area. Safe area

Installation Operation Maintenance

Florida Department of Education CURRIUCULUM FRAMEWORK. Digital Television and Media Production

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

- 1 - LICENSEE S INFORMATION: (Please complete all for processing) Licensee s Name: Licensee s Address: City, State, Zip Code:

Qianglong Furniture Co., Ltd.

Theatre Royal Pre-Production Requirements

SBN Pendant Pushbutton Station. Instruction Manual. Part Number: R1 January 2016 Copyright 2016 Magnetek Material Handling

National Zoo Training Films Collection,

SHALER TOWNSHIP PLANNING COMMISSION April 18, 2016

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

6X3W RGB LEDS PROJECTOR FOR PROFESSIONAL TRUSSES USER GUIDE / Version 1

TWIC IMPLEMENTATION ACCESS AND ESCORTING

POLICIES FOR THE USE OF BEACH/SCHMIDT PERFORMING ARTS CENTER AT FORT HAYS STATE UNIVERSITY (Effective Updated March, 2010)

The oldest Broadcast Antenna Company in North America.

User s Manual. Squirrelly Adventure Tree House TM VTech All rights reserved Printed in China US

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

Mobile Satellite TV Antenna With FastFind Remote Operating Manual

Theater Technical Rider

SIM 5 series Lamp Kit

Rickman High School Theatre RENTAL INFORMATION

CASS TL-3 (Utilizing C-Shaped Post) Maintenance and Repair Manual

SECTION TESTING OF COPPER CABLES

Vibratory Deck Sieves 15 in. (380 mm)

Installation Guide OvalSox TM Cable

Circulating Feed Delivery System Installation Instructions for Model 55, 75, 90, & HMC FLEX-AUGER Feed Delivery Systems

Six-Channel TDM Multiplexers for 3G, HD, SDI, and ASI. Installation and Operations. Manual

UIL One Act Play Competition 3A-Area 2 - Region 4

Rental Information For Campus Clients

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

User Manual. Adjustable Speed Vortex. Fixed Speed Vortex

SECREST AUDITORIUM TECHNICAL PACKAGE

CENTENNIAL SCHOOL DISTRICT 2015 GRADUATION BROADCAST AND VIDEO SERVICES QUOTE #Q15-005

Lighting Information

NDT Supply.com P.O. BOX 7350 Shawnee Mission, KS USA

Transcription:

MAI-2011-10 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Sand and Gravel) Fatal Slip/ Fall of Person Accident September 23, 2011 Freedom Pit Lafarge North America, Inc. Delevan, Cattaraugus County, New York MSHA I.D. No. 30-01582 Investigators Thomas J. Shilling Mine Safety & Health Inspector Kenneth J. Chamberlain Mine Safety and Health Specialist Originating Office Mine Safety and Health Administration Northeast District 178 Thorn Hill Road, Suite, 100 Warrendale, Pennsylvania 15086-7573 Donald J. Foster, Northeast District Manager

OVERVIEW On September 23, 2011, John P. Collingwood, plant operator, age 32, was killed when he fell from a screen deck work platform 56 feet to the ground below. He was standing on two steel clamping bars that had been placed between the midrail of the protective rail surrounding the screen deck work platform and the screen structure to create a step. Collingwood stood on the step to reposition a screen. He was positioned above the confines of the protective railing when he slipped and fell. The accident occurred because management policies, procedures, and controls did not ensure that persons could safely perform maintenance on the secondary screen tower. Routine maintenance required that the screens be replaced periodically. The height of the opening for the screen being replaced was 64 inches from the work platform, making it difficult for persons to gain the leverage necessary to safely remove the screen. No procedures had been established to ensure that persons could safely reach the elevated screen from the provided work platform. To gain the needed leverage on the screen, the victim had to be positioned above the protective railing on the screen deck work platform. He was not wearing a safety belt and line where there was a danger of falling. The victim s fall protection was attached to a man lift that had been used earlier to lift the screens to the elevated platform. 1

GENERAL INFORMATION Freedom Pit, an open pit sand and gravel mine, owned and operated by Lafarge North America, Inc. is located near Delevan, Cattaraugus County, New York. The principal operating official is Gregory S. Owens, plant manager. The mine normally operates one 8-hour shift per day, 5 days a week. Total employment is six persons. Material is mined in the pit with a front-end loader that digs directly into a bank. The material is placed into a primary grizzly at the pit and then transported via belt conveyor to the plant where it is sized, screened, and washed. Finished materials are sold for construction aggregate. The last regular inspection of this operation was completed on May 24, 2011. DESCRIPTION OF ACCIDENT On the day of the accident, John P. Collingwood, (victim) reported to work at 7:00 a.m., his normal start time. Gary W. Barber, superintendent, assigned duties to John C. Prutsman, plant operator, Doug J. Preston, plant operator, and Collingwood. Barber told them to change screens on the secondary screen located on the secondary screen tower. The crew was to work until 1:00 p.m. when a luncheon was to be served to commemorate 13 years of no lost time accidents at the mine. Collingwood, Prutsman, and Preston locked and tagged out the screen and got a man lift to place the new screens into the work area. At 7:30 a.m., William M. Law, laboratory technician, arrived and began helping the other crew members change the screens. Law entered the bottom screen by going through the opening at the rear lower area of the screen housing. Prutsman entered the screen housing middle deck. Prutsman and Law removed the bolts holding the screens in place. After all the fasteners were removed, the crew removed the three screens that needed replaced. Collingwood and Preston assisted in the removal of the screens from outside of the screen. They attempted to place the first screen into the middle deck while Prutsman and Law were on the inside of the screen housing. Shortly before 8:00 a.m., the screen became wedged on a water spray bar. To provide additional height and leverage to assist with the installation of the screen, Collingwood placed two steel clamping bars from the midrail of the protective railing to the back plate of the screen deck housing. These two steel clamping bars were each approximately 2 ½ inches wide. 2

Collingwood stepped up onto the bars and was attempting to pull the screen out when he slipped backwards over the top of the handrail. Preston caught Collingwood s leg as he fell but was unable to hold him. He screamed to the others that Collingwood had fallen. Prutsman and Law exited the screen and saw Collingwood on the ground. About 8:00 a.m., Preston called for help on the radio. Barber responded, went to the scene, and contacted Gregory S. Owens, plant manager, to call for Emergency Medical Services (EMS). Barber checked Collingwood but he was nonresponsive. Barber and Prutsman provided Cardiopulmonary Resuscitation (CPR) until EMS arrived at 8:23 a.m. Collingwood was transported to a local hospital where the attending physician pronounced him dead at 9:03 a.m. The cause of death was attributed to multiple blunt force traumas. INVESTIGATION OF THE ACCIDENT On September 23, 2011, the Mine Safety and Health Administration, (MSHA) was notified of the accident at 8:41 a.m. by the National Call Center. Kevin H. Abel, safety specialist, was then informed of the accident. An investigation was started the same day. In order to ensure the safety of all persons, an order was issued pursuant to 103(j) of the Mine Act. This order was later modified to section 103(k) of the Mine Act when the first Authorized Representative arrived at the mine. A Part 50 citation was issued for untimely reporting. MSHA s accident investigation team traveled to the mine, conducted a physical inspection of the accident site, interviewed employees, and reviewed conditions and work procedures relevant to the accident. MSHA conducted the investigation with the assistance of mine management and employees. DISCUSSION Location of the Accident The accident occurred at the secondary screen tower area. Weather The weather consisted of cloudy skies with a temperature of approximately 58 degrees Fahrenheit and was not considered to be a factor in the accident. Equipment Involved The screen involved in the accident is a Seco Screen Type F, model no. 3620. The screen box is 6 feet wide by 20 feet long. It contains three screens that separate previously crushed and screened material according to the size of the material. 3

The screen is surrounded on three sides by a 45-inch wide work platform. The protective rail surrounding the screen deck work platform has a 37-inch high top rail and an 18-inch high midrail. Training and Experience John P. Collingwood (victim) had 10 years and 5 months of experience, 10 years at this mine. Doug J. Preston had 5 years and 4 months of experience at this mine. William M. Law had 10 years and 3 months of experience at this mine. Gary W. Barber and John C. Prutsman each had more than 10 years of experience at this mine. A representative of MSHA's Educational Field Services conducted an in-depth review of the mine operator s training records. The training records for the victim and the crew working with him were examined and found to be in compliance and up-to-date with MSHA training requirements. The mine operator established a written Job Safety Analysis (JSA) for the task of changing screens and trained all persons regarding these safe procedures. The mine operator also trained all persons in the use of fall protection where there is a danger of falling. Root Cause Analysis A root cause analysis was conducted and the following root cause was identified. Root Cause: The accident occurred because management policies, procedures, and controls did not ensure that persons could safely perform maintenance on the secondary screen tower. The victim was having difficulty gaining the leverage necessary to remove the screen. To gain the needed leverage on the screen, he had to be positioned above the protective railing on the screen deck work platform. He was positioned above the protective railing on the screen deck work platform and was not wearing a safety belt and line where there was a danger of falling.. Corrective Action: Management established a written Job Safety Analysis (JSA) for the task of changing screens and trained all persons regarding these safe procedures. The mine operator also trained all persons in the use of fall protection where there is a danger of falling. 4

CONCLUSION The accident occurred because management policies, procedures, and controls did not ensure that persons could safely perform maintenance on the secondary screen tower. Routine maintenance required that the screens be replaced periodically. The height of the opening for the screen being replaced was 64 inches from the work platform, making it difficult for persons to gain the leverage necessary to safely remove the screen. No procedures had been established to ensure that persons could safely reach the elevated screen from the provided work platform. To gain the needed leverage on the screen, the victim had to be positioned above the protective railing on the screen deck work platform. He was not wearing a safety belt and line where there was a danger of falling. The victim s fall protection was attached to a man lift that had been used earlier to lift the screens to the elevated platform. ENFORCEMENT ACTIONS Issued to Lafarge North America, Inc Order No. 8647267 was issued on September 23, 2011, under the provisions of Section 103(j) of the Mine Act: A fatal accident occurred on September 23, 2011 at the Mill/Prep Plant. A verbal 103 J order is issued prohibiting all persons from entering the area with the exception of Rescue personnel and investigators. The order was issued by Kevin Abel to William Law at 9:05 a.m. The order is issued to assure the safety of persons at this operation and prohibits any work in the affected area. This order was modified to section 103(k) of the Mine Act when the first Authorized Representative arrived at the mine site. This order was terminated on September 27, 2011, after conditions that contributed to the accident no longer existed. Citation No. 8647277 was issued on October 24, 2011, under provisions of 104(a) of the Mine Act for a violation of 30 CFR 56.15005: A fatal accident occurred at this operation on September 23, 2011, when an employee fell approximately 56 feet. The victim was performing maintenance work from a screen deck platform where there was a danger of falling. He was not wearing a safety belt and line while the work was being performed. This citation is a Rules to Live By priority standard and was terminated on October 25, 2011. The mine operator established a written Job Safety Analysis (JSA) for the task of changing screens and trained all persons regarding these 5

safe procedures. The mine operator also trained all persons in the use of fall protection where there is a danger of falling. Approved: Donald J. Foster District Manager Date: 6

LIST OF APPENDICES Appendix A-Persons Participating in the Investigation Appendix B-Victim Data Sheet 7

APPENDIX A Persons Participating in the Investigation Lafarge North America, Inc. Brian D. McNamara, Division Safety Manager Gregory S. Owens, Plant Manager Gary W. Barber, Superintendent Vikram A. Wagh, Vice President Council for Lafarge North America, Inc. Law Office of Adele L. Abrams P.C. International Union of Operating Engineers Joseph W. Palmeri, Business Representative Mine Safety and Health Administration Thomas J Shilling, Mine Safety and Health Inspector Kenneth J. Chamberlin, Mine Safety and Health Specialist 8

Appendix B 9