ELECTRICAL SAFETY INSPECTION REPORT.

Similar documents
ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

Identification - electrical services

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM

Specification. NGTS Issue 1 October 1993

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

IECEx International Conference 2017 Shanghai, China. Electrical Installations Design, Selection, Erection and Inspection Part 2 of 2

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

IndyGo Facility Upgrades Project 35671EE

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

User Manual. 360W LED Moving Zoom KEEP THIS MANUAL FOR FUTURE NEEDS. 36pcs10W 4 in 1 RGBW LEDs

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Public Works Division Lighting District Fiber Optic Specifications April 2009

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Laying of cables and lines in electrical installations and data networks

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

Power and Control T YPE BY RAVI GANATR November/December IAEI NEWS

OPERATION AND MAINTENANCE MANUAL

Safety Codes Council Conference Banff C Panel Discussion

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003.

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Cable installation guidelines

ATT-TP Common Systems Cable and Wire Installation and Removal Requirements Cable Racks and Raceways

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

Kwangil Electronic Introduction

Lighting Busway: Case Study Busway Vs Cable

Automatic Test System AT-S + with STAR + Technology Features

Signalling Cable Equivalent Sizes

Engineering Instruction

ICS Digital Menu. Installation Guide Version 1.1

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN

SQM40/41 Actuators for air and gas dampers

Instruction Manual MODEL RSP SANITARY ELECTRONIC PRESSURE TRANSMITTER

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

Preventing Fieldbus Physical Layer Problems

ECS INSTALLATION OF SERVICE WAYS AND CABLES (SCHNEIDER ELECTRIC)

4-PROJECTOR BAR WITH 3 X 9W LEDS AND 1 X 1W FLASH LED USER GUIDE

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

Electrical Installation Booklet Shipyard Standards

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

Metrotown Station and Exchange Upgrades

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

Operating Instructions Dimmer for V Incandescent Lamps

Preparing a home for TransACT fibre-to-the-premise (FTTP) services

Errata NFPA 70. Proposed 2014 Edition

POLICY & APPLICATION GUIDE FOR 11kV POLYMERIC CABLES

AGENDA. NEC Code-Making Panel 16. Report on Proposal Meeting. Jan. 9-14, Hilton Head, SC

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

UNM IT/Telecommunications Guide Specification Labeling 11/07/

2178-L/S Series Fiber Optic Splice Case with Gasket

Lighting Information

African Development Bank Group

Caution. Hanging the Screen:

Dragonfly Quad. User Manual V1.4. Order code: EQLED101

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

Unlocking of building entrance door shall be possible by pressing the monitor's door-opener button.

ECS COMBINED CUT-OUT AND CT CHAMBER INSTALLATION

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION

Building + Mounting Learn Rooftop Basics

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

Schedule of Rate for Electrical Items Name of work:- Supplying of electrical items for day to day electrical maintenance work.

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR

Vibratory Deck Sieves 15 in. (380 mm)

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL


Section Communications Optical Fiber Backbone Cabling

Technical Specifications

CLF Manuals CLF Colour Par CLF Colour 12 Par CLF Colour Par 12 Version 1.0 November 2012 Version 1.0 1

DMX LED light effect with 4 lenses

B2590/65SNZ. Crank-Up. Installation & Operation Instruction Manual NZ Iss 1

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

Draft for Public Comment

USER MANUAL Table of Contents

4 Wiring Brochure Wiring and installation of specific control

City of Winter Springs, FL

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES... 4

VGAD-12 ORDERCODE

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

Transcription:

ELECTRICAL SAFETY INSPECTION REPORT., Plot no: 72 & 82, DEPZ, Ganakbari, Savar, Dhaka, Bangladesh. Factory List: 1.Experience Clothing Company Ltd. Inspected on March 31, 2014

SUMMARY Experience Clothing Company Ltd., factory is established in a two five storeyed (G+4) building and 1 shed. The building reportedly,constructed in 1993. The factory began production in 1996. The building was approved for industrial purpose and the factory during survey, reported had about 3100 workers working on regular basis. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for approval. Page 2 of 7

FINDINGS AND RECOMMENDATIONS E- 1 Transformer room is congested. Maintain safe working space surrounding the existing power transformer. Barrier is very close the transformer. 6 Months E- 2 Transformer breather not installed. Transformer breather must be installed to prevent moisture ingression. Breather is damaged. E- 3 Cables terminating to transformer bushings are not supported. Cable riser supporting cables must be firmly fixed. Power cable connected to the LV side of transformer. Page 3 of 7

E- 4 SWITCH BOARD & PANELS Crowded inside panel (MCCB, MCB, Bus bars and Wires) Panel must not be crowded with devices and apparatus. Each panel must be installed with devices and apparatus to maintain safety clearances inside panel. Wires are crowded inside the common busbar panel. E- 5 SWITCH BOARD & PANELS Multiple cables terminating to MCCB in panel. Multiple cable connecting at a MCCB terminal must be disconnected. Existing multiple circuits may be distributed through bus bars. MCCB inside distribution panel. E- 6 SWITCH BOARD & PANELS Multiple cables connected at a terminal of the bus bar. Multiple cable terminating at a terminal in busbars must be separated. Bus bar inside the distribution board. Page 4 of 7

E- 7 SWITCH BOARD & PANELS Insufficient working area in front of panel (Operating area). Adequate working space must be provided in front of every panel for operators (operating platform). Panel installed on raised plinth must have platform constructed for operators. 3 Months MDB installed in the washing area very close to the machine operation area. E- 8 GENERATOR ROOM Cables terminating to generator output terminal box are laid on floor. Cable terminating at Generator output terminal box must be supported on riser and protected. Existing cables laid on floor may be installed in cable trench or on trays. Cables on the floor in generator room. E- 9 CABLE & CABLE SUPPORTS Power cables installed close to steam lines. Existing power cables installed along side the steam line must be covered to protect against external heat from the steam lines. Adequate clearance may be provided from the steam lines. Power cables and steam carrying pipe. 3 Months Page 5 of 7

E- 10 CABLE & CABLE SUPPORTS Cables in electrical shafts are not protected. Cables in electrical shaft must be securely clamped to the tray/ladder and must be protected. Power cable goes through one floor to another without protection. E- 11 GENERATOR ROOM Inadequate working space around the generators. Expand the existing generator room to provide safe working space. generator placed very close the wall. 6 Months E- 12 Transformer guarded with wire mesh fencing. Transformer may be separated from panels by constructing barrier walls. Substation transformer guarded with wire mesh fencing. 6 Months Page 6 of 7

E- 13 WIRINGS Cables terminating to distribution panels (switchboards) are not protected. Cables, terminating to panel, between floor and base of panel must be protected in rigid conduits with ample strength. Conduit must be securely fixed to the wall with saddle or clamps. Wiring through flexible PVC conduit. E- 14 CABLE & CABLE SUPPORTS Cables from electrical shaft exiting at various floors are not supported. Cables leaving supports (tray/ladder) in electrical shafts must be supported till the cables are terminated at the panel. From the LT panel cables are going to different floor. 3 Months E- 15 CABLE & CABLE SUPPORTS Cables partially supported in tray and raceways (cables are not placed inside tray in few sections). Cables supported in tray must be securely laid in the tray and fixed securely. Cables laid on cables tray below ceiling Page 7 of 7