Injectors. Injectors ready

Similar documents
LHC Machine check out

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

beam dump from P2 losses this morning

LHC Nominal injection sequence

Beam systems without failures what can be done?

S67: PRE-CYCLE & RAMP

1. General principles for injection of beam into the LHC

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

Full IEFC workshop Feb.

REVIEW OF LHC OPERATION

LHC COMMISSIONING PLANS

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS

Equipment Installation, Planning, Layout, organisation and updates

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump

LHC Beam Instrumentation Further Discussion

The 2011 LHC Run - Lessons in Beam Diagnostics

Linac3 experience for LHC ion runs

RF upgrade program in LHC injectors and LHC machine

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

arxiv: v1 [physics.acc-ph] 9 Aug 2016

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

RF PERFORMANCE AND OPERATIONAL ISSUES

HiRadMat facility: SPS extraction and Proton beam line Working Group. Notes from the meeting held on 24 February 2011

CLIC Feasibility Demonstration at CTF3

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

SPEAR 3: Operations Update and Impact of Top-Off Injection

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Linac 4 Instrumentation K.Hanke CERN

EPJ Web of Conferences 95,

What can be learned from HERA Experience for ILC Availability

New Filling Pattern for SLS-FEMTO

Fast Orbit Feedback at the SLS. Outline

Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram

Beam Loss Detection for MPS at FRIB

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

P. Emma, et al. LCLS Operations Lectures

Accelerator Controls Part2: CERN central timing system

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

G0 Laser Status Parity Controls Injector Diagnostics

North Damping Ring RF

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Status of the X-ray FEL control system at SPring-8

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

A Facility for Accelerator Physics and Test Beam Experiments

Commissioning of the CNGS Extraction in SPS LSS4

Digital BPMs and Orbit Feedback Systems

ANKA RF System - Upgrade Strategies

Present Status and Future Upgrade of KEKB Injector Linac

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017

CLEX (CLIC Experimental Area)

Assembly of the HIE-ISOLDE accelerator cavities in a clean room.

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

RF2TTC and QPLL behavior during interruption or switch of the RF-BC source

Detailed Design Report

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

Development of an Abort Gap Monitor for High-Energy Proton Rings *

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

Availability and Reliability Issues for the ILC

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

OPERATIONAL EXPERIENCE AT J-PARC

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

Status of SOLARIS Arkadiusz Kisiel

The FAIR plinac RF Systems

Current status of XFEL/SPring-8 project and SCSS test accelerator

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Top-Up Experience at SPEAR3

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Upgrading LHC Luminosity

Undulator Protection for FLASH and for the European XFEL

The Elettra Storage Ring and Top-Up Operation

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

Bunch-by-bunch feedback and LLRF at ELSA

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

Impacts of SEEs. LHC Performance Workshop Chamonix 2009

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

ALICE Muon Trigger upgrade

CONTROL OF THE LOW LEVEL RF SYSTEM OF THE LARGE HADRON COLLIDER

THE ANTIPROTON DECELERATOR (AD)

Requirements for the Beam Abort Magnet and Dump

PRESENT STATUS OF J-PARC

Transcription:

Injectors Injectors ready Linac2 > 04/02 ; PSB > 09/02 ; PS et TT2 > 11/02 ; SPS > 14/04; Ring patrol done Ti8 patrol done DSO Test Done 10/11 Feb EIS tests Ongoing Point 8/2 closed Alice/LHCb closed 12/13 Feb DSO transfer line TI8 TI 2 Point 8/2 closed Alice and LHCb closed 1

February Chamonix January LHC H/C & Machine check out S12 S23 S34 S45 S56 S67 S78 S81 17 CRYO MAINTAIN 18 ELQA 19 POWERING 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 BIC 10 11 LBDS Collimator 12 13 DSO TESTS 14 H/C Kicker 15 16 Machine check-out 17 18 20 BEAM OPERATION 21 Critical (snubber commissioning!)

Machine check out SPS Kickers MKE4 2 magnets changed System on Remote control Operational MKE6 EIS to be tested before DSO test. Conditioned and pulsed to nominal voltage(36 KV) Bets & Timing modification to operate HiRadMat done To be tested on remote HiRadMat & LHC to be validated Transfer Lines powering tests RBI 81607 and EIS Test 10-11 FEB Ongoing Point 2/8 Beam condition Alice and LHCb closed Powering after 14/02 HiRadMat should be finished 18/02 Heat run during week end 12/13 FEBRUARY

Machine check out HiRadMat 1 Finir cette semaine le lissage de la ligne TT66 (de la chicane en remontant jusqu'au dernier element installe dans TCC6). Avancer tous autres travaux possibles. 2 Vendredi 4 fevrier?/ Samedi 5 fevrier: Installer QTLF660500 et QTLF660504 dans TNC 3 Lundi 7 fevrier: alignement de ces deux QTF installation des QTLD660400 et QTLD660404 (TBC for QTLD660400, needs all TNC radioactive passage to be complete) continue les travaux/tests vide dans TCC6 4 Mardi 8 fevrier: - alignement ces deux QTLD installes la veille - installation des correcteurs MDS + instrumentation - continuer les tests vide dans TCC6 5 Shifts de fin de journee de jeudi 10 et vendredi 11 fevrier(18h - 23h, acces uniquement en BA7): - continuer l'alignement dans TJ7 et TNC - continuer les tests vide dans TCC6 14/15 February 17:00 23:00 priority TI2/TI8 Powering and Beam tests. Access in Ba7 during the day. 16 Until 2PM. Access in Ba7 Reviewing the situation

Machine check out Interlocks BIS test Extraction Beam 1 (sps side) Final global tests Vacuum interlock test (Alick, Gael,Vincent) next week» Kicker green light Experiments injection and beam dump signals (Alick) PIC BIS configuration Need PC s no interlock (pc s Operational, 4-8 Hrs) FMCM End of fill test WIC TL s and LHC WIC BIS connection Intervention finished OK

Machine check out Interlocks SMP tests System Test 31 January Commissioning during the machine checkout to ensure that the values received and transmitted by the SMPC are consistent with the operation of each machine. It is assumed that: 1. All the TESTING steps are completed. 2. The machines are cycling, but without beam.» SPS MC1 SPS PROBE BEAM FLAG» SPS MC2 SPS SETUP BEAM FLAG» SPS MC2 SPS CYCLE FLAGS SPS cycling 450, NO beam, MTG (9/2» LHC MC1 LHC MACHINE ENERGY» LHC MC2 LHC SETUP BEAM FLAG» LHC MC3 SQUEEZING FACTORS» LHC MC4 BEAM MODES» LHC MC5 MOVEABLE DEVICES AND STABLE BEAMS BCT,BPF,BETS,MTG,SIS 4/5 5/6 6/7 7/8 closed

SPS SMP

LHC SMP

Machine check out RF Module1B1 and Module2B2 conditioned and LLRF loops being adjusted. Hope that (at least) 1 module will be available for Controls tests by Monday. Module2B1 conditioned LLRF loops setting-up will not start before Monday Module1B2 problems on at least 2 cavities (quench and field emission). Pierre Maesen is working on it... RF request: We keep on working to-day (till 19:00) and Friday. Next week -> Zone closed all next week. Access may be needed during this period, but accesses should be grouped so as to take the minimum possible time. 9

Machine check out Co CCR server and CCC consoles upgraded operational CMW new functionality ready LSA changes to improve performance done LHC timing modified and tested OK Java version now 1.6.0_22 10

Machine check out BI TI2 BPMs: More detectors at start and end Dual-plane for all pickups LHC BLMs: Changes to capture mode Number of data values varies LHC BPMs: Changes to capture mode Data reduction reduced values to turn-by-turn except for some systems related to injection (LSS2/LSS8) for IQC Dedicated BPMs for bunch-by-bunch to be defined Changes to UDP structure to include synchronous orbit mode (OFC) Implementation of bunch-by-bunch orbits Tests Transfer line Instrumentation BTV Movement done some error Image done Logging 11

Vacuum Status of LHC vacuum system : Ring : ready CMS : ready Machine check out ALICE : vacuum ready, but need access to open manual valve and start annular ion pump in UX25 when possible. ATLAS will be ready Monday morning LHC-B, will be ready Monday afternoon Status of Solenoids : LSS5 finished and tested LSS2, LSS8 finished and will be tested today/tomorrow LSS1 finished but need test to check PVSS remote control and therefore access in US15 is required when possible Status of controls for interlock: CMS, LHC-B : ready ALICE : will be done today ATLAS need access in US15 when possible - Valve s interlock tests starting Monday 14 th 10 o clock onwards. - LHC vacuum system hand-over to CCC Monday evening. - LHC vacuum valves opened Tuesday 15 o clock by EIC.

Machine check out Collimators Software change to improve protection Completed Friday 4/02 Add gap limit as a function of Beta* New interlock logic for Ring Injection protection (TDI,TCLI) New strategy for Injection collimator motion inhibit when limits are reached. Deployed in IP7/IP8 under tests Conditions:» BIC Collimators operational» Energy & Beta available in timing (real or simulated) Full deployment in tunnel transfer lines Monday 7/02 Machine protection test ongoing in parallel to LVDT calibration fully on-track Global Collimator test Ramp interlock Sequence test 13

Machine check out TCDQ Preliminary test done Stefano Further test foreseen next week Dedicated sequence TCDQ independent from other collimators Stefano/Etienne Totem & Alfa roman pots Stefano Various software improvements ongoing until end of next week Need to validate all the interlocks with the new configurations TOTEM: full system of 24 pots (12 in 2010) ALFA: full system of 8 pots (none in 2010) Time requirement: about one shift per system TOTEM: individual interlock channels -> independent of other systems. ALFA: included in the ATLAS permit tests are not obvious Sigi is following this up. Global tests : another ~shift with tests coupled to machine modes. Combined with handshakes test (alick/reyes) 14

Op tests

Op Tests MONDAY 14/2/2011 09h00-10:00: Validation of Expt inputs to the BIS, and Injection Inhibits Reyes/Alick 10h00: HANDSHAKE FOR INJECTION (+ BEAM MODE changing) with all experiments --> we should get injection permit (TIx DOWNSTREAM, LHC IRX INJECTION) and user permits (LHC RING) 10h30: HANDSHAKE FOR ADJUST (+ BEAM MODE changing) with all experiments 11h00: HANDSHAKE FOR DUMP (+ BEAM MODE changing) with all experiments 11h30: HANDSHAKE FOR TI8 SETUP (BEAM MODE always SETUP) with LHCB 11h45: HANDSHAKE FOR TI2 SETUP (BEAM MODE always SETUP) with ALICE 12H00: HANDSHAKE FOR TI8/TI2 SETUP TOGETHER (BEAM MODE always SETUP) with LHCB/ALICE --> we should get injection permit (TIx DOWNSTREAM)

OP tests Friday 18/02 Tests LHC cycle from the point of view of modes, handshakes, interlocks and SMP.

MKD MKB BT HW changes and activities All change done System test will be finished this week Jan MKI Mike MKI2 / MKI 8 Operational On remote Software Start testing

BT

BT

Planning Exp s Vacuum OK DSO test B I C o k B I C o k B I C o k

BT Operational, procedure and SW changes Update LBDS for 4 TeV (tracking tables, voltage clamps) If 4 TeV table and voltage updated with relatives tests associated. Etienne If 4 TeV later in the year then time foreseen for test. New IQC functionality (LHCb BCM, TL trajectories, synchro error...) System test Conditions MTG injection, SPS cycling Verena/Lene New IQC latching philosophy Ongoing Lene/Delphine Implement operational settings for MKIs Setting for MKI Brennan/Etienne During setting up Tighten energy interlocks for TCDIs/TDIs/TCLIs Setting up with Beam Brennan New XPOC data modules and BLM ratios New module to compare TCDQ Beam position BPMS System Test Ongoing Jan/Nicolas Magnin

BT Operational, procedure and SW changes BLM changes (to collate with BLM team) System Test Diamond? Brennan/ BLM team Shielding installed for TCDIs and TDIs TCDIs done TDI simulation studies ongoing TDIs not for start up New injection procedure and ppm requests for intermediate beam 2012 Additional interlocking of injection oscillations Verena/ Lene /Laurette TCDI automatic setting up 2 priority not critical Brennan

MKD, MKB BT HW changes and activities Generator consolidation (to run up to 5 TeV), as we do during each small tech. stop - exchange of 2 MKD generators Done and tested (Jan/Senaj) Energy scan to 5 TeV done OK Regenerate setting ongoing Normal maintenance without any impact on LHC operation (equipment inspection, measurement of magnet contact resistance, change of one or two terminating resistors on MKI, etc.) Done (Jan/Senaj) New TI2 BPMs and dual-plane acquisition for all Check logging

BT Electronics and controls activities ALL systems Software upgrade Etienne Done To test from sequencer and application program (Arm, Inj Dump, Circulate & Dump Machine check out conditions General maintenance Etienne Done LBDS New dump triggering IPOC New TSU IPOC Ongoing test after with conditions. Not critical for start up TSU firmware upgrade (audit follow-up) Done To be tested with machine check out condition Etienne Additional MKD internal current diagnostic Done To be completed during First technical stop Update BEM firmware to correct any bus communication errors between BETS and PLC Done ok New thermal working point for MKD generator cooling system. Validation required. Done Regulate at 26 Degree OK

Electronics and controls activities MKI SbS extension (PFN secondary voltages + MAIN switch currents) Done System test after. MKI pulsing, Injection request, 4 sector at 450 GeV Increase sensitivity of fast interlock Done OK Implement additional diagnostic for KISS monitoring / failure diagnostic Done Updated By (G.H. &Lene ) Fine synchronisation improvements (reject noise captured from CIBO) Ongoing system test after. (Tentative improvement not sure will completely be solved.) Resynchronisation of AGK Needed machine check out condition ( timing synchro, prepulse BIS ok and all remote control 5 hrs.) Deployment of new KiTS software version with additional diagnostics for timing Done Updated by G.H

Injection kicker Kicker test: 45/56/67/78 Dipole at 450 Gev PIC s ok Vacuum valves ok Experiments vacuum ok Wic ok

LBDS LDBS: 45/56/67/78 Dipole at 3.5 TeV PIC s ok Vacuum valves ok Experiments vacuum ok Wic ok

Recommissioning Specific tests of all modifications Will be done as far as possible in system tests Integration tests involving ABT systems: Timing system upgrade: GPS down: no injections; injection sequencer, injection cleaning + soft interlocking strategy,... Some need fully-connected systems (BIC loops, access, DCCTs, timing, pre-pulse, RF): estimate 2-3 days of connected checkout needed

planning Machine check-out

planning Machine check-out

BT test planning Machine check-out

planning Machine check-out

planning Machine check-out

Machine check out page https://espace.cern.ch/lhcmachinecheckout/def ault.aspx

Machine check out Additional tests Driving magnets based on files for new Beta 90 meter Full LBDS interlock tests AC dipole to be tested (etienne,rossano) LHC MTG Injection system tests (MKI,TDI) TCDQ?? SIS interlock RF power and frequency interlock BLM,TL, Collimator,.

Machine check out HWC Aim to be finished around 12-13/02 Access system Lass software modification ready 31 January LHC DSO tests 12/13 FEB 37

Recommissioning Specific tests of all modifications Will be done as far as possible in system tests Integration tests involving ABT systems: Timing system upgrade: GPS down: no injections; injection sequencer, injection cleaning + soft interlocking strategy,... Some need fully-connected systems (BIC loops, access, DCCTs, timing, pre-pulse, RF): estimate 2-3 days of connected checkout needed System beam tests Subset of full 2010 checks: synchronisation, basic aperture checks, system functionality tests, interlocking checks, steering, protection device setup and validation, asynch dumps,... Full tests needed in areas where systems have been modified (MKI, MKD, TSU,...) Specific tests also for 4 TeV (BETS, protection) Abort/injection gap commissioning and full operational deployment Needs full breakdown, but expect that this is of the order of 12-14 shifts with beam to be confirmed before fixing this number Follow-up of intensity increase Standard tests as beam intensity increases

Sequencer Machine check out DATABASE 1. New simplified database scheme that allows 1.1. simplification of the sequence components definition ==> easy to maintain since the number of components is greatly reduced; 1.2. new functionality: 1.2.1. inheriting mechanism; 1.2.2. possibility to restrict the execution of sequence components to a given set of beam modes; 1.2.3. who, why, when the sequence was modified; 2. The sequences/tasks will be only accessible in the development database by the ROLE lhcseqeditor and tested using the development server of the sequencer. Once they work, they will be copied to the PRO database for normal execution. Therefore the PRO database won't be accessible directly anymore. A roll back mechanism will be supported to allow to roll back to the previous version in case of problems. 3. All the operational sequences will be moved to the new schema, the unused tasks/sequences will be deleted. The new database schema is already in the development DB and has been provided by CO/DM who is developing an API to easy the access to the data (no more direct queries). The API will be ready by end of January and then the Sequence Editor and the Sequencer Core will start implementation. This development will be done in the development servers and will be deployed as PRO once tested and validated. Most likely the full database functionality will be implemented in the sequencer core in steps. As first step the core will be updated to use the new schema; as a second step the inheriting mechanism will be implemented. SEQUENCE EDITOR With the new database schema, a new editor will be developed, more user friendly and with more functionality. NOMINAL SEQUENCE(S) Will be reviewed and re-structured to map the way we operate the machine. Components of the type CHECK-SET, where the 39 SET is implemented as on error task will be substituted by ENSURE tasks where appropriate.

EIS DSO DSO EIS TI2 & TI8 DSO