Preliminary Layout for LCLS. Direction Stake-out

Similar documents
Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA

Summer / Fall 2004 Downtime AEG Preparation Work

A Facility for Accelerator Physics and Test Beam Experiments

1231 WLMRT THORNTON VERZION PROJECT # SMALL CELL 9901 GRANT ST. THORNTON, COLORADO ZONING DRAWINGS

Setting up a RTK Survey Using Trimble Access

Requirements for the Beam Abort Magnet and Dump

. SLAC-P~ December 1995

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

PEP-II Disassembly Technical Systems

Scavenger Extraction. Karen Goldsmith Shawn Alverson

Future Performance of the LCLS

SLAC ILC Accelerator R&D Program

30 GHz Power Production / Beam Line

Energy Upgrade Options for the LCLS-I Linac

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

North Damping Ring RF

Tutorial: Measuring a Scene

LCLS Injector Technical Review

PEP-II IR-2 Alignment

Report on the LCLS Injector Technical Review

Advanced Photon Source - Upgrades and Improvements

P. Emma, et al. LCLS Operations Lectures

5 Project Costs and Schedule

SPEAR 3: Operations Update and Impact of Top-Off Injection

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

C-Band LNB Focal Depth (f/d) And Skew Settings

CLEX (CLIC Experimental Area)

CASE HISTORY#3 COOLING TOWER GEARBOX BEARING FAULT. Barry T. Cease Cease Industrial Consulting

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

ADDENDA COVER PAGE. The following Addenda have been currently released for this project, and are attached to this cover page:

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

Traffic Sign Life Expectancy Investigation LAB943

Particle and Ray Tracing Codes (PARMILA & TURTLE Introduction)

Suntracer KNX. Weather Station. Technical specifications and installation instructions

PEP II Design Outline

PEP II STATUS AND PLANS *

User Manual. LPA_Tool. Prepared by: Customer Support. Date: November 25, 1999 WaveRider Document N o.: LPA_Tool User Manual_V2-0.

VBOX3i Dual Antenna. Measures Slip and Pitch/Roll (RLVB3iSL) Features

Status and Plans for PEP-II

RSH27 Nixie Tube Socket with LED

RF considerations for SwissFEL

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

RADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

This document last edited May 2015 for version Some commands may not be available in previous versions of firmware.

VBOX 3i Dual Antenna RTK

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Beam-based Feedback Systems

Availability and Reliability Issues for the ILC

Tolerances on Magnetic Misalignments in SESAME Storage Ring

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

>> By Jason R. Kack, LS

Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University. Cathode-Ray Oscilloscope (CRO)

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

- special pressure ranges - variety of electrical and mechanical. Characteristics. - other versions on request

Beam Commissioning of GRIFFIN Beam Line

Status of CTF3. G.Geschonke CERN, AB

PEP-II STATUS REPORT *

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

RF Power Generation II

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

VBOX 3i. 100Hz GPS Data Logger. Features

ASF 2050 COMBO USER MANUAL

VBOX 3i Dual Antenna Measures Slip and Pitch/Roll (RLVB3iSL)

INSTRUCTION MANUAL V Barometric Pressure Sensor. May Copyright 2007 Campbell Scientific (Canada)Corp.

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

Hydrostatic Levelling Systems (HLS) on ILC - general aspects and possible realization -

THERMIONIC GUN CATHODE-GRID ASSEMBLY TEST PROCEDURE

Upgrading LHC Luminosity

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Status of SOLARIS Arkadiusz Kisiel

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

PEP II Status and Plans

Detailed Design Report

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005

POLARIZED LIGHT SOURCES FOR PHOTOCATHODE ELECTRON GUNS AT SLAC?

LONGITUDINAL AND TRANSVERSE PHASE SPACE CHARACTERIZATION

Proceedings of the 1972 Proton Linear Accelerator Conference, Los Alamos, New Mexico, USA ALIGNMENT PHILOSOPHY, DESIGN AND TECHNIQUES USED AT LAMPF*

Leonard P. Kessler papers, 1972 FLP.CLRC.KESSLER

GUIDELINES FOR VHF/UHF SUBMISSIONS RELATED TO TERRESTRIAL BROADCASTING SERVICES (outside the frequency and geographical scope of GE06 Agreement)

Upgrade of CEBAF to 12 GeV

CANDELARIA BUSINESS CENTER

THE OPERATION OF A CATHODE RAY TUBE

A Novel Wire Scanner for High Intensity Pulsed Beams *

Cathode Studies at FLASH: CW and Pulsed QE measurements

SRS and ERLP developments. Andrew moss

LCLS-II Controls & Safety Systems Status

Color Codes of Optical Fiber and Color Shade Measurement Standards in Optical Fiber Cables

Tripod-1 Manual Rev B

DMP 335 DMP 335. Industrial Pressure Transmitter. Welded, Dry Stainless Steel Sensor. Pressure Transmitter. Industrial

Results of Vibration Study for LCLS-II Construction in FEE, Hutch 3 LODCM and M3H 1

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

Transcription:

Preliminary Layout for LCLS Direction Stake-out

Scope of the Job Part 1 Mark the direction of the accelerator in the research yard and to the radiation fence. Chosen solution: Use existing feature such as FFTB housing or roof of klystron gallery to get the direction. For each chosen feature, set-up a TC2002 near tower 20 and stake every 50 feet in both directions. Run a GPS/RTK survey of all stakes. Best fit a line to assess each staking process.

Step1: Find a direction to buck-in Step2: Set-up the instrument Step3: Move prism to line of sight and stake Step4: Survey all stakes using GPS/RTK

Linac roof center line FFTB edge line Note: Linac roof center line marked with blue paint in the research yard and blue flagging tied to orange stakes elsewhere

Residuals to Orange Best Fitted Line 0.100 0.080 0.060 0.040 0.020 meters 0.000-0.020-0.040-0.060-0.080-0.100-100 0 100 200 300 400 500 600 700 800 900 meters Orange Fitted Line Orange Extension

Residuals to Purple Best Fitted Line 0.100 0.080 0.060 0.040 0.020 meters 0.000-0.020-0.040-0.060-0.080-0.100-100 0 100 200 300 400 500 600 700 800 900 meters Purple Fitted Line

Scope of the Job Part 2 Determine the offset of the two painted lines to the accelerator tube line. Chosen solution: Select some brass plates in the klystron galley and install a PK nail in the road for each plate. Set-up a TC2002 on each chosen brass plate, backsight on one of the neighboring plate and survey the PK nail in the road. Run a GPS/RTK survey of all the PK nails on the road. Correct for the nominal offset of the klystron brass plates with respect to the accelerator tube and fit a line to these values.

End of Part 2 Transform the 2 painted lines into this new line system and evaluate the offset of each stake. External Check: Perform a local survey of M20 with respect to both lines and transform both results into the accelerator line to compare with the published SLC values. Select SLC survey monuments directly observable by GPS/RTK and perform similar transformation and comparison. Remaining Field Work as of 2/25 Stake out the actual accelerator tube line using a new GPS/RTK survey based on above calculated offsets.

PK nails versus Klystron Gallery Brass Plates Sector 1 2 3 21 28 29 29 30 Dx (m) 9.999 10.017 9.996 10.012 10.002 10.004 10.004 9.999 Dz (m) -1.516-3.263-3.254-1.786-3.253-3.253-3.253-1.943

Center Line Klystron Gallery Typical Section of Klystron Gallery and Accelerator Housing Looking East 6 10 SLAC Drawing # SK - GE 5153 - A Brass Plate Alignment Reference Mark (6 x 4 ) The nominal X offset of all klystron gallery brass plates to the accelerator tube is: 6 10 + 1 9 1 7 = 7 Accelerator Service Shaft 1 9 Center Line Accelerator Housing PK nail at Sector # 1 2 X Offset to Acc.(m) 12.133 12.151 1 7 3 21 12.130 12.146 Accelerator Tube 2 9 28 12.136 Brass Plate Alignment Reference Mark (6 x 4 ) 29 30 12.138 12.133

GPS-RTK California Zone3 State Plane Linac Extensions 603300 603200 603100 M40 Northing (meters) 603000 602900 602800 602700 602600 1846000 1846500 1847000 1847500 1848000 1848500 1849000 1849500 1850000 Easting (meters) Linac Offset Nails FFTB Extension (South Line) Linac Center Extension (North Line) M40

LCLS Preparation Survey 0.50 0.00-0.50 Sector 1 Sector 21 Sector 30-1.00-1.50 meters -2.00-2.50-3.00-3.50-4.00-4.50-4000.0-3000.0-2000.0-1000.0 0.0 1000.0 meters Accelerator Beamline Orange Line Orange Extension M20 Purple Line

Tower 20 / M20 survey mark SLC published values on March 26, 1986 X = -0.48673 m Z = 533.44932 m Transformed fitted offset on February 17, 2004 d = -0.483 m

Miscellaneous 2/13/04: Extend the orange line to Alpine road and locate on this line elevation 245 above sea level. 2/24/03: Determine distance from end of LINAC to end of pavement in the research yard.

Location of Elevation 245 above sea level using GPS/RTK set in NAD83 coordinates Given H = 245 = 74.676 m Knowing from model GEOID99 at latitude 37 25 and longitude -122 12 15 N = -32.508 m P ε h P o H earth s surface Found h = 42.168 m Q N Q o geiod ellipsoid

Last Orange Stake at Alpine Road Start of the Orange Line Extension

Distance from Edge of Pavement to these Walls 216.51 m 213.76 m 125.91 m

Edge of Pavement Stake Point Name Grey Wall White Wall End FFTB PK O36 PK O35 PK nail O32 PK O32 51.013 Pavement Horizontal Distance (m) 151.141 148.389 60.537 16.679 0 65.368