Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017

Similar documents
1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees...

Annexes to Realisation Agreement

These restrictions, also called Network Constraints, are characterized by:

Specification. NGTS Issue 1 October 1993

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

Hornsdale 2 Wind Farm. FCAS Capability Test Plan

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization

Maschinenfabrik Reinhausen Germany Power Quality

COMMUNICATIONS OUTLOOK 1999

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

COMMUNICATIONS OUTLOOK 1999

Load Frequency Control Structure for Ireland and Northern Ireland

Table of Contents - 2 -

COMMUNICATIONS OUTLOOK 1999

VAR Generator Operation for Maintaining Network Voltage Schedules

SIWAREX FTA Weighing Module for High Accuracy Requirements Calibrating SIWAREX FTA with SIWATOOL FTA

S4C Clips and Rushes Policy. July 2016

Working Document. Chapter 1. Subject matter and scope This Regulation establishes ecodesign requirements for simple set-top boxes.

Text with EEA relevance. Official Journal L 036, 05/02/2009 P

StrataSync. DSAM 24 Hour POP Report

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

Stage 05: Draft Final Modification Report

Operation of offshore wind power plants connected with HVDC

67. LEVEL TRANSITION FROM LEVEL NTC TO LEVEL 1 (SYSTEM VERSION 2.Y)

TECHNICAL REPORT IEC/TR

OUR CONSULTATION PROCESS WITH YOU

Tender Ref.: ELCOT/Networks/OT/33178/VCS/DOTE/

Manual FERROFISH A16 MK-II. advanced audio applications. professional 16 channel AD/DA converter

Applying to carry BBC content and services: a partners guide to process

VIDEO-ON-DEMAND DOWNLOAD AND STREAMING

Demand Side Engagement Document

Australian/New Zealand Standard

COMMUNICATIONS OUTLOOK 1999

Marc Richter Vice President Regulatory Services. June 3, 2015 CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION. By Electronic Delivery

GC0100/101/102 Code Administrator Consultation Responses. Rob Wilson. Grid Code Panel 8 th Feb 2018

COMMUNICATIONS OUTLOOK 1999

Heads of Agreement. New Zealand International Convention Centre

Verizon NY Section 2 Network Services Issue C, December, 2001

K-BUS Dimmer Module User manual-ver. 1

Mandate to CEN and CENELEC for standardization in the field of machines

Dynamic Performance Requirements for Phasor Meausrement Units

Intelligent solutions for Onshore Power Supply

OPERATION MANUAL. FA-9600 LUT-Converter. Version Higher

X-Sign 2.0 User Manual

VFA Participation Agreement 2018 (Year 5)

Licence for the transmission of digital terrestrial television multiplex service

127566, Россия, Москва, Алтуфьевское шоссе, дом 48, корпус 1 Телефон: +7 (499) (800) (бесплатно на территории России)

Terms of Use and The Festival Rules

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Download of classical music in the form of incidental music or signature tunes is permitted 4

4. The Filmmaker/s/Screenwriter/s retain/s all submission and intellectual property rights.

Grid Code Review Panel Meeting

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference

If you want to get an official version of this User Network Interface Specification, please order it by sending your request to:

NOTIFICATION FORM. Section 1 Market definition

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

REPUBLIC OF SERBIA Negotiating Group on Intellectual Property Rights Bilateral screening Chapter 7

Getting started with

DATA SHEET. Synchronisers, FAS-113DG ANSI code 25

NOTICE. (Formulated under the cognizance of the CTA R4 Video Systems Committee.)

Notes Generator Verification SDT Project

TO BE PUBLISHED IN THE GAZETTE OF INDIA EXTRAORDINARY, PART III SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA NOTIFICATION

IEEE C a-02/26r1. IEEE Broadband Wireless Access Working Group <

Electronic Thesis and Dissertation (ETD) Guidelines

Summary Project Specification Consultation Report

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

-Technical Specifications-

Licensing & Regulation #379

CENELEC GUIDE 13 FAQ. Frequently Asked Questions on the Frankfurt Agreement. Edition 1,

Official Journal L 191, 23/07/2009 P

Council of the European Union Brussels, 26 June 2017 (OR. en)

Adapting PV*SOL for the UK Feed-In and Export Tariffs

1C.5.1 Voltage Fluctuation and Flicker

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to

A. Almeida.do Vale M. J. Dias Gongalves Zita A. Vale Member,IEEE

ConeXus User Guide. HHAeXchange s Communication Functionality

14380/17 LK/np 1 DGG 3B

Toronto Hydro - Electric System

Head-end in the Sky - A Digital Reality

Common Tariff K

CALL FOR APPLICATIONS EUROVISION SONG CONTEST A DAL 2019 (THE SONG 2019)

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

Manual Supplement. This supplement contains information necessary to ensure the accuracy of the above manual.

VELCO Operating Committee 11 a.m. MINUTES FINAL. October 18, 2012, 11 a.m. 3 p.m. GMP Colchester Office

Business Intelligence & Process Modelling

The new BBC Scotland Channel: Proposed variation to Ofcom s Operating Licence for the BBC s public services. BBC Response

ICTE TLR 5 Investigation Report Flowgate (West Memphis Xmfr 161/500kv ftlo San Souci Shelby 500kv) TLR Level 5: June 20, 2011 Report Issued:

CITY OF ISSAQUAH CABLE COMMISSION

REDFISH TECHNOLOGIES

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE

MUSIC IN FILM: the short Producer s Guide

Introduction of digital TV in Bosnia and Herzegovina - Support for Public Broadcasting System

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Best Practice Regulatory Frameworks for Mobile TV. forum

16 th Annual PQSynergy International Conference and Exhibition 2016

Guide for installers. METTLER TOLEDO MultiRange System solution analog Ex1. Hazardous area. Safe area

ConeXus Process Guide

Policy on the syndication of BBC on-demand content

KNX Technical Reference Manual Busch-EnergyControl

Transcription:

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Type: Q&A Overview Date: 15 December 2017 Release version Release date.0 01 November 2017.0 15 December 2017 Disclaimer: the content of this document is disclosed for information purposes only. In no way does this document constitute rights for (potential) connected parties, or bind TenneT legally. Since all information should be available to all parties involved, questions asked will be published in anonymized form in this Q&A document on TenneT's website, including TenneT's response. In case the question relates to responsibilities of Economic Affairs / RVO, these questions should be submitted via RVO (woz@rvo.nl) and will be published via the Q&A logs by RVO.

Q&A OVERVIEW REPORT 1. Q&A 23 Agreements When will the mutual planning as mentioned in REA 6.1 be elaborated? 22 General Could you provide further insight into the scope of the compensation payments? A mutual planning may be agreed after the signing of REA/CTA, as part of the Project Working Group. If desired, additional milestones can be included in the mutual planning, if both parties agree. In addition to the national regulation (Besluit van 23 maart 2016, houdende regels met betrekking tot de schadevergoeding bij niet-beschikbaarheid van het net op zee) and the Ministerial ruling (Regeling schadevergoeding net op zee van 22 maart 2016) on compensation in case of delay and/or unavailability of the offshore grid; an assessment framework ("Beoordelingskader") for claims will be elaborated prior to the commissioning of the first offshore grid connection by TenneT, in cooperation with the ministries, ACM and consulting offshore wind farms. 21 Agreements Could you provide a cost estimate for access to platform? 20 Agreements Could you provide a cost estimate for compliancy activities? If the onshore grid is unable to transmit all the electricity generated due to a shortage of transmission capacity, then one or more energy producers will have to scale back their production. This is done in accordance with free-market principles, i.e. through bids. This scaling back of production is arranged through the congestion management system. Annex 6 to CTA, paragraph 3.1 ("Access to the platform") describes in which situations accompaniment of a TenneT representative is required. TenneT will also charge the Connected Party for other activities performed upon request of the Connected Party and requiring the presence of TenneT. As an indication, the previously mentioned (2016) figures may be used: 1.800,- p.p. per day (12 hours max). For CTV (12 pers.) if arranged by TenneT: 3.000 5.000 per day. All tariffs and fees are subject to regulatory supervision. In the English versions of REA 5.3 and CTA 8.2 (for information purposes) should be added that TenneT and the Connected Party shall discuss and agree upon the costs referred to in this Article within the Project Working Group ("PWG") as

PAGE 3 of 5 referred to in Article 6 of the Realisation Agreement before TenneT shall make these costs. As an indication, the previously mentioned (2016) figures may be used: approximately 60.000 per site. 19 Technical When will the memo with Root loci for HKZ become available? 18 Technical I saw that the annexes was uploaded the 1st of November and this lead to the following question. At the information session offshore grid HKZ (11 September 2017) the green line below was presented as the reactive power capability the grid needed from the HKZ Wind Power Plant. This memo has been published 1 December 2017, and is available via: www.tennet.eu/netopzee Select "Net op zee Hollandse Kust (zuid)" Scroll down to "Latest Developments" Until the Grid Code has formally changed, TenneT is bound to the current Grid Code requirements. Based on technical considerations provided by connected parties in Borssele, TenneT has allowed a permissive practice as stipulated in Annex 5, Clause 5.2. This same allowance is granted by TenneT to other connected parties, until the Grid Code requirements for this topic have changed. Currently, TenneT is in the formal process of submitting a proposal to change the requirements for reactive power capability offshore in the Grid Code. This proposal takes into account future designated wind areas and lead to the presented graph 11 September 2017. In the annexes published the 1 st of November 2017 the reactive power capability required by the Wind Power Plant is presented by the red line below.

PAGE 4 of 5 It can be seen that the required reactive power have been increased in the annexes compared to the presented need at the meeting in September. What is the reason for changing the requirement in the annexes from the need presented at the meeting in September? 17 Permit What is the validity of the permit of the grid connection for HKZ? 16 Technical After looking at the document Slide 12: Please show what is the meaning of the word section in an SLD. 15 Technical After looking at the document Slide 12: There is reference to a 20 kv winding that is not shown in the SLD at slide 9, are other voltage levels foreseen to be used besides the ones shown in the slide 9 for the active filters? 14 Technical After looking at the document The water permit for the platforms of HKZ is valid until January 1, 2055 (including decommissioning) Section is busbar Correct: it is a high level SLD. The 33 kv voltage level onshore (shown in slide 9) is not meant for filtering (neither passive nor active). This voltage level is only used for reactive power compensation. If WPO would need to apply harmonic filters, then it shall be to filter as close to the source as possible. For this TenneT has a 20 kv connection point available on the platform. Given the restricted space and restricted pay loads, TenneT reckons with active filters only. No, it is not affected.

PAGE 5 of 5 Slide 11: is the P-Q requirement (see below figure) affected by the change in the U-Q requirement? 13 Technical After looking at the document Slide 11: please confirm that the new U-Q requirement (i.e. the doted green quadrilateral) is the one that has to be fulfilled for Hollandse Kust Zuid. 12 Technical After looking at the document Slides 10 and 11: please provide the meaning of the different types of lines and colors used on the U-Q figures. 11 Technical After looking at the document Slide 9: the 66kV side of the substation is not equipped with a tap changer. This means that the WF developer still will be challenged by the reactive power balance at park level. Would it be possible to change the substation design in this regard? 10 General Where can I find more information about the wind tenders? TenneT is applying for a change in the grid code (Netcode). Until then TenneT is referring to the articles in the CTA/REA (Connection and Transmission Agreement / Realization Agreement). These slides are only indicative (and for the purpose of the presentation in particular meeting). The bigger envelope of slide 10 are the current U-Q capabilities as described in the current grid code (Netcode). The smaller envelope represents the voltage regulation band of 66 kv. SLD in slide 9 is a high level SLD. The offshore transformers are equipped with tap changer. It is only not shown (unlike onshore transformer). According to the grid code (Netcode), WPO still needs to be able to operate in voltage mode. For information about the tender Wind op zee Hollandse Kust (zuid), see the site of RVO http://offshorewind.rvo.nl/generalzh.

PAGE 6 of 5 9 Agreements Is there already material/information (e.g. Borssele agreements or HKZ drafts) available? Model agreements and technical papers for a connection to Hollandse Kust (zuid) Alpha are available via TenneT's website: www.tennet.eu/netopzee Scroll down to "Projects", click on "Net op zee Hollandse Kust (zuid)" and refer to "Latest developments". Concluded agreements as such will not be published. 8 Agreements When is the final commissioning date for Hollandse Kust Based on "Ontwikkelkader" the commissioning date is 30 June 2021 for HKZ (zuid)? Alpha. 7 Platform What is the maximum of weight of the harmonic filter? The maximum is 60 tons per two windfarms. 6 Platform Where is the location of the harmonic filters? The location is on the top deck of the platform. Because of the relative limited size of the equipment the filters are placed in containers. The location can be found in the plot plans. Plot plans of the whole platform can be provided upon request. Please send your request to netopzee@tennet.eu. 5 Platform Where can we find the memo about scour protection? See the website www.tennet.eu/netopzee 4 Overplanting Does TenneT agree on the statement that short peaks don't have a high impact on temperatures? 3 Overplanting Preloading conditions of 67% seems to low, what is the reason for this restriction? Scroll down to "Projects", click on "Net op zee Hollandse Kust (zuid)" and refer to "Latest developments". During operations TenneT uses the temperature (not the period) as an indicator to take appropriate measures. TenneT aims at stable grid configuration. The ampacity calculations are made for two kinds of cables. Outcome of the simulation by TenneT shows ~200 hours, similar with the situation offshore Borssele. The Position Overplanting Hollandse Kust (zuid) with further explanation is published on TenneT s website: www.tennet.eu/netopzee Scroll down to "Projects", click on "Net op zee Hollandse Kust (zuid)" and refer to "Latest developments". 2 Harmonics When will the data regarding harmonics be available, and can these data be changed afterwards? The outcome of actual calculations will be published on Tennet's website. These

PAGE 7 of 5 data are based on different grid behaviours. In theory data can be changed in 1 General How do compensation payments work in case of delay or unavailability of the TenneT Infrastructure? case of changes in grid behaviour There are two situations: offshore and onshore. If the grid connection is not commissioned by TenneT on the agreed date the "compensatieregeling" is applicable (Besluit van 23 maart 2016, houdende regels met betrekking tot de schadevergoeding bij niet-beschikbaarheid van het net op zee). If the onshore grid is unable to transmit all the electricity generated due to a shortage of transmission capacity, then one or more energy producers will have to scale back their production (this is done in accordance with free-market principles, i.e. through bids). This scaling back of production is arranged through the congestion management system.