Intra-train Longitudinal Feedback for Beam Stabilization at FLASH

Similar documents
Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

The FLASH objective: SASE between 60 and 13 nm

Implementation of the feed forward correction for the FLASH photo injector laser and future plans for a feedback system

Intra bunch train arrival time and compression feedback

Beam Instrumentation for X-ray FELs

ATCA-based LLRF System for XFEL

RF considerations for SwissFEL

TESLA FEL-Report

Klystron Lifetime Management System

Research and Development on Superconducting Radio-Frequency Technology for Electron Linear Accelerators. Deliverable

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Digital BPMs and Orbit Feedback Systems

Lasing with Long Bunch Trains

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

KARA and FLUTE RF Overview/status

LLRF at SSRF. Yubin Zhao

Photoinjector Laser Operation and Cathode Performance

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

ANKA RF System - Upgrade Strategies

Current status of XFEL/SPring-8 project and SCSS test accelerator

Photo cathode RF gun -

Progress in Finite State Machine Developments at FLASH. Olaf Hensler MCS

Bunch-by-bunch feedback and LLRF at ELSA

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

North Damping Ring RF

Detailed Design Report

Summary of the 1 st Beam Line Review Meeting Injector ( )

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Precision measurements of beam current, position and phase for an e+e- linear collider

The FAIR plinac RF Systems

Pulses inside the pulse mode of operation at RF Gun

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

The PEFP 20-MeV Proton Linear Accelerator

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Beam Position Monitor Developments at PSI

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

Activities on FEL Development and Application at Kyoto University

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator

The ESRF Radio-frequency Data Logging System for Failure Analysis

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

New Filling Pattern for SLS-FEMTO

Status of the X-ray FEL control system at SPring-8

Summary report on synchronization, diagnostics and instrumentation

4.4 Injector Linear Accelerator

LHC Beam Instrumentation Further Discussion

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

CLIC Feasibility Demonstration at CTF3

INFN School on Electron Accelerators. RF Power Sources and Distribution

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

GFT Channel Digital Delay Generator

PEP-I1 RF Feedback System Simulation

GFT Channel Slave Generator

Beam Loss Detection for MPS at FRIB

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

INTRODUCTION. SLAC-PUB-8414 March 2000

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Design Studies For The LCLS 120 Hz RF Gun Injector

CHEETAH-X Compact Picosecond Laser. Customized systems with SESAM technology*

sflash First Seeding at FLASH On behalf of the sflash team Jörn Bödewadt Hamburg University

G0 Laser Status Parity Controls Injector Diagnostics

Fast Orbit Feedback at the SLS. Outline

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

ALL-OPTICAL FEMTOSECOND TIMING SYSTEM FOR THE FEL

LIGHT PROTON THERAPY PROJECT

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

LLRF (WP02) Update. S. Simrock for the LLRF Team

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Summary of recent photocathode studies

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

New Spill Structure Analysis Tools for the VME Based Data Acquisition System ABLASS at GSI

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

2 MHz Lock-In Amplifier

The Elettra Storage Ring and Top-Up Operation

Libera Hadron: demonstration at SPS (CERN)

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

PROJECT DESCRIPTION. Project Name. Broader Impact. Real Time Simulator for ILC RF and CryoModules

Practical Application of the Phased-Array Technology with Paint-Brush Evaluation for Seamless-Tube Testing

STATUS OF THE SwissFEL C-BAND LINAC

The extremely compact laser head is approximately 480 mm long and can

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Front End Electronics

Status of CTF3. G.Geschonke CERN, AB

Present Status and Future Upgrade of KEKB Injector Linac

Linac 4 Instrumentation K.Hanke CERN

ESS Linac WP8 Radio Frequency Systems and Test Facilities

XFEL High Power RF System Recent Developments

LCLS Injector Technical Review

SPATIAL LIGHT MODULATORS

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Application Note #63 Field Analyzers in EMC Radiated Immunity Testing

1 Digital BPM Systems for Hadron Accelerators

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Results of recent photocathode studies at FLASH. S. Lederer, S. Schreiber DESY. L. Monaco, D. Sertore, P. Michelato INFN Milano LASA

Undulator Protection for FLASH and for the European XFEL

First Results and Future of the Photo Injector Test Facility at DESY Zeuthen PITZ. introduction first measurements future schedule

DIGITAL INSTRUMENTS S.R.L. SPM-ETH (Synchro Phasor Meter over ETH)

Transcription:

Intra-train Longitudinal Feedback for Beam Stabilization at FLASH Ch. Behrens 1), M.-K. Bock 1), M. Felber 1), P. Gessler 1), K. Hacker 1), W. Koprek 1), H. Schlarb 1), S. Wesch 1), C.Schmidt 1), S. Schulz 2), B. Steffen 1), J. Szewinski 3) 1) Deutsches Elektronen-Synchrotron, Hamburg, Germany 2) University of Hamburg, Germany 3) The Andrzej Soltan Institute for Nuclear Studies, Swierk, Poland Holger Schlarb, DESY Bjorn Wiik Prize, 19.11.2007

Motivation Demanding requirements for the bunch train stability at FLASH sflash experiment HHG laser pulse length ~ 40 fs longer electron bunches with flat peak current ~ 120 fs bunch arrival time jitter < 40 fs Pump-probe experiments Two types of experiments Single shot resolved mainly interested in measurement of arrival time, repeatability Integrating experiments detectors integrate over entire macro pulses and every bunch must come at the same time beam arrival time as good as possible (<10fs out of spec) 2

FLASH Overview 4x3.9GHz Cavities (ACC39) New ACC module (ACC7) sflash Replaced ACC1 Replaced ACC3 New RF-Gun TUOBI2 - talk from S. Schreiber 3

FLASH Pulse Mode Operation Energy loading Trigger Bunch train Field decay Interrupt 100ms Trigger RF Pulse 2048 us intra-pulse Adaptation algorithms pulse-pulse algorithms t LLRF control systems stabilize field in the cavities: Intra-pulse feedback Pulse-pulse feedback Beam based feedback stabilize beam properties Intra-train feedback Pulse-pulse feedback 4

Beam Based Feedback Implementation Goals Actuators: LLRF Systems Sensor: Beam diagnostics fast (intra-bunch) adaptive (pulse-pulse) 5

Beam Diagnostic Components Toroid Toroid Toroid Laser BC2 ~~ Gun ACC1 3 rd ACC2 ACC3 ACC4 ACC7 BC3 RF Master Oscillator BAM BAM BCM BAM BCM BAM Master Laser Oscillator (MLO) Beam Arrival Monitors (BAM) Bunch Compression Monitors (BCM) Charge Measurement (by toroids) Master Laser Oscillator (MLO) 6

Optical Synchronization System Installation at FLASH More details in poster from Sebastian Schulz THPA05 and in the following talk by Matthias Felber 7

Beam Arrival Monitor Detector 8

Beam Arrival Monitors Front-end Electronics Top view to LLRF Bottom view More details in posters from Patrick Gessler THPA04 and THPA06 9

Beam Compression Measurement Detector Radiation process: electron beam passes slitted metallized screen expanded electric field from bunch is diffracted screen tilt of 45 allows observation Coherence effect: wavelength is comparable or longer than bunch length radiated power is inversely propotional to bunch length scales quadraticaly in charge Courtesy of S. Wesch (DESY) Diffraction radiator (backview) Detection: pyro electric element LiTaO3 (2mm x 2mm x 27 um) deposited heat induces surface charge metallization forms a capacitor optional black coating increases response at low λ s Pyro element 10

Beam Compression Measurement Front-end Electronics LLRF Oscillation at 1.17 MHz Pile-up effect 11

Low Level RF Control Systems Laser BC2 ~~ Gun ACC1 3 rd ACC2 ACC3 ACC4 ACC7 BC3 A A A A LLRF LLRF LLRF 2 x LLRF LLRF LLRF Systems upgrade during FLASH shutdown allowed implementation of the beam based feedback All modules controller by the same hardware board SIMCON-DSP Unified firmware and software Connected signals from beam diagnostic systems SIMCON-DSP LLRF Control Systems Stabilize amplitude and phase of the accelarting field in the cavities Intra-pulse feedback with MIMO controller Pulse-pulse algorithms (tables adaptation, calibration, ) Frequency control of the cavities using piezo sensors and actuators 12

Low Level RF Control Systems System setup master oscillator RF Timing Vector Modulator Klystron power transmission for/ref power cavity LO Generation LO DAC DAC Digital Feedback Board FPGA DSP ADC ADC ADC IF RF probe LO 13

Beam Based Feedback Installation Laser BC2 BC3 ~~ Gun ACC1 3 rd ACC2 ACC3 ACC4 ACC7 A Toroid Toroid Toroid A A A BAM BAM BCM BAM BCM BAM LLRF LLRF LLRF LLRF LLRF Beam Based Feedbacks: BAM before BC2 corrects phase in RF-Gun BAM and BCM after BC2 simultaneously correct amplitude and phase in ACC1 and 3rd harmonic BAM and BCM after BC3 correct amplitude and phase in ACC23 Results from BBF running at BC2 14

Low Level RF Control Systems Intra-train BBF Implementation FPGA Control Tables LLRF SP Table SIMCON-DSP Set point Beam Based Signals ADC Optolink Intra-train BBF Algorithm Intra-train beam based feedback SP Modulation Cavity Probes ADC Field Detection Vector Sum + - Error Signal Feedback Controller DAC To Klystron Intra-pulse LLRF feedback 15

Low Level RF Control Systems Intra-train BBF Implementation Control System Toroid ADC9 Charge Measurement Q toroid Pyro SP Table LLRF Control Tables LLRF SP Table BCM ADC10 BAM Optical Link Peak Detection t sample Gating FPGA Charge Correction Q nom - ΔU Δt Transfer Matrix ΔΦ ΔA/A I SP Signal Modulation I Q Q MPS 16

Low Level RF Control Systems Pulse-pulse BBF Implementation Operator & LLRF expert Setpoints: A, & Parameters: timing, Beam based SP correction Model based FF & SP tables Learning Feed forward Bunch Pattern FPGA SP_CORR table SP table FF table FF_CORR table FF_BLC table Q MPS + + Beam signals Intra-train BBF Algorithm Rot FF-total table Field detection - MIMO + Rot DAC DAC 17

BBF Calibration Transfer Matrix Determination BC2 Gun ACC1 ACC39 measure BAM Pyro A/ A/ t C/ z Actuators Monitor system ACC1? ACC39 scanning calculate 18

BBF Calibration Transfer Matrix Determination off crest ACC1 ACC39 on crest Beam Arrival Time Change >> Bunch Compression Change >> 19

Measurements Learning Feed Forward Operator & LLRF expert Setpoints: A, & Parameters: timing, CPU Beam based SP correction Model based FF & SP tables ratio Learning Feed forward Bunch Pattern SP_CORR table SP table FF table FF_CORR table FF_BLC table SP_BBF table Q MPS Q MPS + + FPGA Beam signals - a b c d Rot Error signal FF-total table LFF Field detection - MIMO + Rot DAC DAC 20

Measurements Learning Feed Forward 21

Measurements Learning Feed Forward 0.5 ps 4 ps 22

Low Level RF Control Systems Intra-train BBF Implementation FPGA Control Tables LLRF SP Table SIMCON-DSP Set point Beam Based Signals ADC Optolink Intra-train BBF Algorithm Intra-train beam based feedback SP Modulation Cavity Probes ADC Field Detection Vector Sum + - Error Signal Feedback Controller DAC To Klystron Intra-pulse LLRF feedback 23

Measurement Intra bunch train arrival time Conditions: Full BBF on ACC1 and ACC39 Measured after BC3 3000 macro pulses taken Single RF pulse BBF latency ~ 4μs mean ~35fs - good enough for sflash? 24

Measurement Macro pulse arrival time jitter No Beam Based Feedback Learning Feed Forward ON rms = 74 fs With Beam Based Feedback running in ACC1 and ACC39 rms = 5 fs LLRF Regulation Performance ΔA 1 / A 1 ~10e-4 Δφ 1 < 0.03 O rapid fluctuations averaged out resolution of BAM ~ 10 fs for single shot can be reduced to ~ fs for macro pulse 25

Summary Commissioned interfaces between LLRF system and beam diagnostic systems Well defined and implemented a new concept of the beam BBF in the LLRF systems BBF modules set point table no direct interference with the LLRF controller feedback loop Robustness limiters on the BBF correction signals reduce risk for increased beam losses Successful tests with BBF on BC2 Prove of the concept Reduction of the intra-train bunch arrival time jitter Significant reduction of pulse-pulse beam arrival time jitter Reduction of the repetitive errors by Learning Feed Forward 26

Thank you for your attention References: TUOBI2 S. Scheriber, FLASH upgrade and first results THOA3 M. Felber et al., RF-based Synchronization of the Seed and Pump-Probe Lasers to the Optical Synchronization System at FLASH THPA04 P. Gessler et al., Longitudinal Bunch Arrival-Time Feedback at FLASH THPA05 S. Schulz et al., Performance of the FLASH Optical Synchronization System Utilizing Commercial SESAM-Based Erbium Laser THPA06 P. Gessler et al., Real-Time Sampling and Processing Hardware for Bunch Arrival Time Monitors at FLASH and XFEL M. K. Bock, M. Felber, P. Gessler, K. E. Hacker, F. Loehl, F. Ludwig, H. Schlarb, B. Schmidt, J. Zemella, DESY, Hamburg, Germany, S. Schulz, L.-G. Wissmann, University of Hamburg, Germany, RECENT DEVELOPMENTS OF THE BUNCH ARRIVAL TIME MONITOR WITH FEMTOSECOND RESOLUTION AT FLASH, Proceedings of IPAC 10, Kyoto, Japan F. Löhl, Optical Synchronizations of a Free-Electron Laser with Femtosecond Precision, DESY- THESIS-2009-031, 2009 S. Schulz, Hamburg University, Germany, M. K. Bock, M. Felber, P. Gessler, K. E. Hacker, F. Ludwig, H. Schlarb, B. S chmidt, T. L amb, L.-G. Wissmann, Deutsches Elektronen-Synchrotron (DESY), Hamburg, Germany, Performance of the FLASH Optical Synchronization System with a Commercial SESAM-Based Erbium Laser, Proceedins of IPAC 10, Kyoto, Japan C. Behrens, B. Schmidt, S. Wesch, Deutsches Elektronen-Synchrotron DESY, Hamburg, Germany, D. Nicoletti, INFN-Roma, Roma, Italy, UPGRADE AND EVALUATION OF THE BUNCH COMPRESSION MONITOR AT THE FREE-ELECTRON LASER IN HAMBURG (FLASH), Proceedins of IPAC 10, Kyoto, Japan 27