Status of the Front Tracker GEM and INFN Electronics

Similar documents
Rome group activity since last meeting (4)

Outline. GEM R&D and assembly facilities at UVa. Cosmic test results. Update on the cm 2 GEM prototype

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

The field cage for a large TPC prototype

The Silicon Pixel Detector (SPD) for the ALICE Experiment

SuperFRS GEM-TPC Development Status Report

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA

TG 3 Status Report. C. Cattadori on behalf of TG3

Reading a GEM with a VLSI pixel ASIC used as a direct charge collecting anode. R.Bellazzini - INFN Pisa. Vienna February

Large Size GEM for Super Bigbite Spectrometer (SBS) Polarimeter for Hall A 12 GeV program at JLab

Drift Tubes as Muon Detectors for ILC

DEPFET Active Pixel Sensors for the ILC

CGEM-IT project update

PART. Maxim Integrated Products 1

G. Pittá(*), S. Braccini TERA Foundation, Novara, Italy (*) Corresponding author.

DSO138mini Troubleshooting Guide

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

BEMC electronics operation

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Multi-Key v2.4 Multi-Function Amplifier Keying Interface

with Low Cost and Low Material Budget

The video-signals on 128K ZX Spectrum models

A Cylindrical GEM Detector with Analog Readout for the BESIII Experiment. Gianluigi Cibinetto (INFN Ferrara) on behalf of the BESIIICGEM consortium

ADF-2 Production Readiness Review

The Full Scale Prototype of the Cylindrical-GEM as Inner Tracker in Kloe2

RTPC 12 Simulation. Jixie Zhang Aug 2014

Towards mass production of MICROMEGAS (Purdue/3M) Jun Miyamoto, Ian Shipsey Purdue University

MONO AMPLIFIER KIT ESSENTIAL INFORMATION. Version 2.2 CREATE YOUR OWN SPEAKER DOCK WITH THIS

Status of GEM-based Digital Hadron Calorimetry

Tracking Detector R&D at Cornell University and Purdue University

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features

NewScope-7A Operating Manual

Fixed Audio Output for the K2 Don Wilhelm (W3FPR) & Tom Hammond (NØSS) v August 2009

AI-1664LAX-USB. Features. 100KSPS 16-bit Analog Input Unit for USB AI-1664LAX-USB 1. Ver.1.01

4-Channel Video Reconstruction Filter

Update on Mass Produced Micro Pattern Gas Detectors. Operation of GEMS in Negative Ion Gases (Purdue/Temple/WSU)

Front End Electronics

MAX2660/MAX2661/MAX2663/MAX2671 Evaluation Kits

RAKK dac. RAKK dac Mark IV. RAKK dac Mark IV. Assembly and Installation Manual

T1 Electronic Design Review

32 Channel CPCI Board User Manual

LUDLUM MODEL ALPHA-BETA SAMPLE COUNTER SERIAL NUMBER PR AND SUCCEEDING SERIAL NUMBERS. February 2016

Output Board - v2* 4.1 Overview. 4.2 Audio Circuitry Program and Audition Outputs

Laboratory 10. Required Components: Objectives. Introduction. Digital Circuits - Logic and Latching (modified from lab text by Alciatore)

Building a MidiBox LCD Cable

Digital Effects Pedal Description Ross Jongeward 10 December 2014

4-Channel Video Filter for RGB and CVBS Video

Tip: Faller Mittelstadt Apartments with Controlled LED Lighting Date: , Addition

New gas detectors for the PRISMA spectrometer focal plane

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Temposonics. Magnetostrictive Position Sensors. L Series (Model LH) to G-Series Linear-Position Sensor. Cross Reference A

Riccardo Farinelli. Charge Centroid Feasibility

DIY Guide - Building Franky v1.1, the SEGA Audio and Videocard for MSX

Features. = +25 C, LO = 0 dbm, Vcc = Vcc1, 2, 3 = +5V, G_Bias = +2.5V *

A new Interlock Design for the TESLA RF System

PACSystems* RX3i. Isolated Thermocouple Input Module, 6 Channels, IC695ALG306-EB Isolated Thermocouple Input Module, 12 Channels, IC695ALG312-EB

Mitsubishi WS-55859: Changing out your capacitors when your set will not Turn On, the "Green Light is Flashing" and it won't give you an Error Code.

Connection Guide of the MOTOTRBO radio to the radioserver as a control station

Connection Guide of the MOTOTRBO radio to the radioserver as a control station

Atari PICO Composite Mod Board Installation Instructions:

Models 5360 and 5365 Four Channel Analog to Digital Video Converters and Embedders Data Pack

DOGM GRAPHIC SERIES 132x32 DOTS

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND. Doug Roberts U of Maryland, College Park

Hamamatsu R1584 PMT Modifications

FISCHER MINIMAX TM SERIES

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

PACSystems* RX3i Thermocouple Input Module, 12 Channels, IC695ALG412-CB

arxiv:hep-ex/ v1 27 Nov 2003

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

ELECTRICAL PERFORMANCE REPORT

NanoCom ADS-B. Datasheet An ADS-B receiver for space applications

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

XTAL Bank DDS Version 0.02 Sept Preliminary, highly likely to contain numerous errors

SWITCH: Microcontroller Touch-switch Design & Test (Part 2)

Front end electronics for a TPC at future linear colliders

Sega MegaDrive 1 RGB Bypass Installation Guide Rev 1.1

J R Sky, Inc. tel: fax:

SLICE6 3-CHANNEL SENSOR CONNECTOR ASSEMBLY DOCUMENT

Front End Electronics

Aging test: integrated vs. non-integrated splices shield continuity systems.

QUICK START GUIDE FOR DEMONSTRATION CIRCUIT /12/14 BIT 10 TO 65 MSPS DUAL ADC

Pelican PL-957. Adding additional Tos Link (Digital Optical) inputs, and / or IR Remote

The Large TPC Prototype: Infrastructure/ Status/ Plans

FE-I4B wafer probing. ATLAS IBL General Meeting February David-Leon Pohl, Malte Backhaus, Marlon Barbero, Jörn Große-Knetter.

SUBSYSTEMS FOR DATA ACQUISITION #39. Analog-to-Digital Converter (ADC) Function Card

Connection manual manual-en-connection-mmmi-parrot-bury.v1.1

Bartels Micropumps. ( ) Rev. 2.8

HN Connectors. Automatic Connector. Introduction. Contents. 631/ FAX 631/

Application Note AN-LD09 Rev. B Troubleshooting Low Noise Systems. April, 2015 Page 1 NOISE MEASUREMENT SYSTEM BASELINES INTRODUCTION

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1

Video 3 Input/Output Boards Users Manual And Troubleshooting Guide

SVT DAQ. Per Hansson Adrian HPS Collaboration Meeting 10/27/2015

Dust Sensor using GP Y

Theremino pulsometer

PATCH PANEL Easy Patch INSTRUCTION MANUAL

Transcription:

Status of the Front Tracker GEM and INFN Electronics 2013 Apr 10 SBS Weekly Meeting INFN Catania, Genova, Bari and Rome GEM Production First Tests on module 0 Improvements in design Electronics Continue SRS INFN comparison New MPD revision 4 10/Apr/2013 SBS-Meeting - FT Status 1

Stretching and gluing Reference pins Reference pins inserted during compression 10/Apr/2013 SBS-Meeting - FT Status 2

GEM preproduction Frst module assembled beginnig of March Shipping to Rome (from Sicily/Catania) second half of March HV and gas (temporary setup) completed the first days of April Major issues: 1. Some dust in the mylar (6 m) gas window hard to clean -> move to 12 m and sligtly different gluing procedure; also stretch of 6 m difficult 2. Gas leak inside the reference holes and in 3 point near edges (black arrow in picture) 3. Noticeable pressure drop (~0.5 mm deformation of honeycomb plane) Second module assembled and ready to be shipped 10/Apr/2013 SBS-Meeting - FT Status 3

HV Test up to HV: 750 350 750 370 750 370 750 ----- 4090 Backplane Currents < 10 na 10/Apr/2013 SBS-Meeting - FT Status 4

Move Protection resistors outside the frame Detail of resistors in the GEM foil during assembling a) Use simple kapton circuit, soldered on the resistors pads; it «extents» the GEM foil; the resistors soldered on the kapton b) Modify the GEM foil in the next production Pros: Both solutions will permit the «cleaning» protocol proposed by Rui Cons: Resistors are not protected by the frames; additional soldering... 10/Apr/2013 SBS-Meeting - FT Status 5

Signal from last GEM Finally got a good signal from GEM plane (small chamber)... Better grounding (expecially between HV and output connector) Work in progress on timing (suspended for work on large chamber...) Signal from 90Sr, similar for 55Fe 10/Apr/2013 SBS-Meeting - FT Status 6

Current Setup Large chamber with 4 + 4 INFN cards Small Chamber with SRS + 2 INFN cards Independent HV modules Same LV modules (common ground at this level) No common ground near detector (?) 3 MPD used (2 old, 1 new) 10/Apr/2013 SBS-Meeting - FT Status 7

Pedestal and Noise, cards connected Pedestal RMS Sensitive to adapter layout INFN SRS Where we started Larger noise when INFN cards are connected respect to SRS 10/Apr/2013 SBS-Meeting - FT Status 8

Same noise level in small GEM Improved ground between SRS and INFN Same HDMI cable lengths RED: Large Chamber (INFN only BLUE: Small Chamber (SRS+INFN) HV Electronics same ground Noise level in small chamber ~ 15 ADC chs Removed unconnected cards 10/Apr/2013 SBS-Meeting - FT Status 9

90Sr source on small GEM (no ped subtr.) INFN? SRS Sligtly better SRS sensitivity (?) Nominal GEM gain ~ 4800 (HV=3940) 10/Apr/2013 SBS-Meeting - FT Status 10

SRS disconnected from GEM INFN noise pretty low! Sensitive to SRS card 10/Apr/2013 SBS-Meeting - FT Status 11

SRS connected to GEM SRS sensitive to other cards (no grounding or shielding) No unique effects from order of the cards in backplane (next) 10/Apr/2013 SBS-Meeting - FT Status 12

Analog lines below cards inputs Shielding the middle cards slightly improves noise Noise should increase from right to left (but could be a sligtly different grounding due to the work to insert the shielding kapton foil) NOTE: the analog signals are on differential lines Before After 10/Apr/2013 SBS-Meeting - FT Status 13

Noise on large chamber Left: 1 backplane on x Old MPD SRS Right: 2 backplanes (7 cards) on x and y New MPD Old MPD SRS Broken card Absolute ch APV ch Confirm noise depends on cards connected on perp. Strips New MPD has lower gain! Note: pattern of Noise very similar between SRS and INFN (different in small GEM) 10/Apr/2013 SBS-Meeting - FT Status 14

Internal and External Signal Test... 2500 Signal through ~3 pf capacitor soldered on 4 channels ADC ~ 6.5Charge_int +30 2000 ADC ~ 4.6Charge_ext +110 1500 Internal and external test signal provide similar gain ADC count 1000 500 C1 C2 C3 C4 C5 From Fulvio De Persio 0-5 0 5 10 15 20 25 30 MIP 24 ke- 10/Apr/2013 SBS-Meeting - FT Status 15

Summary of comparison (up to now) Results are still preliminary, (hopefully converging): 1. No significant difference in noise and sensitivity with internal and external pulse (one more test required with SRS) 2. SRS more stable versus setup and grounding 3. INFN need «strong» grounding in small GEM (with flex adapters); if well done, noise similar to SRS (14 ADC ch), lower if only one side connected (7-8) 4. Very preliminary sensitivity/gain test on small GEM shows SRS sligtly better than INFN cards 5. Noise on large chamber (only INFN, direct connection), looks much more stable: <20 (only one side connected) or 25-35 (two side connected). No grounding study done till now. 6. Large chamber electronics affect noise level in SRS (maybe via MPDs) 10/Apr/2013 SBS-Meeting - FT Status 16

Work in progress - Second GEM mudule ready to be shipped to Rome - First GEM module is under test in Rome - MPD v4, 2 boards under test - DAQ improvements (delayed analysis!!) - Electronics further tests 10/Apr/2013 SBS-Meeting - FT Status 17