November 5,1999. The NLC Injector UCRL-JC

Similar documents
THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

PEP II Design Outline

OF THIS DOCUMENT IS W8.MTO ^ SF6

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

Present Status and Future Upgrade of KEKB Injector Linac

SUMMARY OF THE ILC R&D AND DESIGN

Overview of the X-band R&D Program

A Facility for Accelerator Physics and Test Beam Experiments

Status of CTF3. G.Geschonke CERN, AB

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

PEP II STATUS AND PLANS *

PEP II Status and Plans

POLARIZED LIGHT SOURCES FOR PHOTOCATHODE ELECTRON GUNS AT SLAC?

CLIC Feasibility Demonstration at CTF3

Status of RF Power and Acceleration of the MAX IV - LINAC

SLAC R&D Program for a Polarized RF Gun

STATUS AND FUTURE PROSPECTS OF CLIC

P. Emma, et al. LCLS Operations Lectures

The Elettra Storage Ring and Top-Up Operation

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

New Filling Pattern for SLS-FEMTO

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

SLAC ILC Accelerator R&D Program

Design Studies For The LCLS 120 Hz RF Gun Injector

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

STATUS OF THE INTERNATIONAL LINEAR COLLIDER

LCLS Injector Technical Review

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

The PEFP 20-MeV Proton Linear Accelerator

4.4 Injector Linear Accelerator

30 GHz Power Production / Beam Line

Report on the LCLS Injector Technical Review

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

TESLA FEL-Report

The SLAC Polarized Electron Source *

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

ILC-LNF TECHNICAL NOTE

Availability and Reliability Issues for the ILC

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

Digital BPMs and Orbit Feedback Systems

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

DARHT II Scaled Accelerator Tests on the ETA II Accelerator*

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Current status of XFEL/SPring-8 project and SCSS test accelerator

CLIC FEASIBILITY DEMONSTRATION AT CTF3

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

SLAC X-band Technology R&D. Tor Raubenheimer DOE Briefing June 11 th, 2010

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Beam Losses During LCLS Injector Phase-1 1 Operation

Status of Elettra, top-up and other upgrades

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

SPEAR 3: Operations Update and Impact of Top-Off Injection

High Rep Rate Guns: FZD Superconducting RF Photogun

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

Linac upgrade plan using a C-band system for SuperKEKB

PEP-II STATUS REPORT *

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

CLIC Feasibility Demonstration at CTF3

Development of an Abort Gap Monitor for High-Energy Proton Rings *

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

Photo cathode RF gun -

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

Experimental Results of the Active Deflection of a Beam from a Kicker System

Detailed Design Report

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

Upgrading LHC Luminosity

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

North Damping Ring RF

KEKB Accelerator Physics Report

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Linac 4 Instrumentation K.Hanke CERN

Top-Up Experience at SPEAR3

GA A26497 SOLID-STATE HIGH-VOLTAGE CROWBAR UTILIZING SERIES-CONNECTED THYRISTORS

Summary of the 1 st Beam Line Review Meeting Injector ( )

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Status of SOLARIS Arkadiusz Kisiel

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Precision measurements of beam current, position and phase for an e+e- linear collider

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *

PEP-I1 RF Feedback System Simulation

* Work supported by Department of Energy contract DE-AC03-76SF RF Pulse Compression. for F'uture Linear Colliders* SLAC-PUB

5 Project Costs and Schedule

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Transcription:

Preprint UCRL-JC-13-6450 The NLC Injector System V. Bharadwaj, J.E. Clendenin, P. Emma, J. Frisch, R.K. Jobe, T. Kotseroglou, P. Krejcik, A. V. Kulikov, Z. Li, T. Maruyama, K.K. Millage, B. McKee, G. Mulhollan, M.H. Munro, C. E. Rago, T.O. Raubenheimer, M.C. Ross, N. Phinney, D.C. Schultz, J. C. Sheppard, C. M. Spencer, A. E. Vlieks, M.D. Woodley, K. van Bibber, S. Takeda This article was submitted to 1999 Particle Accelerator Conference, New York City, NY, March 27-ApriI2, 1999 U.S. Department of Enemv November 5,1999 Approved for public release; further dissemination unlimited

DISCLAIMER This document was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the University of California nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or the University of California. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or the University of California, and shall not be used for advertising or product endorsement purposes.

THE NLC INJECTOR SYSTEM* V. Bharadwaj. J. E. Clendenin, P. Emma, J. Frisch, R. K. Jobe, T. Kotseroglou, P. Krejcik, A. V. Kulikov, Z. Li, T. Maruyama, K. K. Millage, B. McKee, G. Mulhollan, M. H. Munro, C. E. Rago, T. 0. Raubenheimer,.M. C. Ross, N. Phinney, D. C. Schultz, J. C. Sheppard*, C. M. Spencer, A. E. Vlieks, M. D. Woodley, SLAC K. van Bibber, LLNL S. Takeda, KEK et Chicane SBand et Prelinac L-Band 3.50m e+ Booster (2 GeW Figure 1: Layout of the NLC Positron Injector System. Abstract The Next Linear Collider (NW) Injector System is designed to produce low emittance, 10 GeV electron and positron beams at 120 hertz for injection into the NLC main linacs. Each beam consists of a train of 9.5 bunches spaced by 2.8 ns; each bunch has a population of 1.15~10 ~ particles. At injection into the main linacs. the horizontal and vertical emittances are specified to be YE, = 3~10.~ m-rad and py = 3~10~~ m-rad and the bunch length is 100 l.tm. Electron polarization of greater than 80% is required. Electron and positron beams are generated in separate accelerator complexes each of which contain the source, damping ring systems, L-band, S-band, and X- band linacs, bunch length compressors, and collimation regions. The need for low technical risk, reliable injector subsystems is a major consideration in the design effort. This paper presents an overview of the NLC injector systems. 1 INTRODUCTION In the NLC [l] Injector System, the electron and positron beams are generated in separate accelerator complexes *Work supported by the U.S. Department of Energy under Contract NOS. DE-AC03-76SF00515, SLAC and W-7405-ENG-48, LLNL, Email: jcs@slac.stanford.edu located at the entrances to the two main linacs, separated by about 32 km. Each injector complex consists of a source system, a damping ring complex, and a prelinac and bunch length compression system. A schematic layout of the positron injector systems is shown in Figure 1. In the electron injector (not shown), redundant electron sources feed the e- Booster which is coupled directly to the e-damping Ring (there is no e- Predamping Ring). Table 1 lists the beam parameters at injection to the main linacs. 1 Yable 1: NLC Injector System Beam Parameters Energy E 10 GeV Energy Spread Am-E 1% Single Bunch (3a (JEE 1.5% Horizontal Emittance K 3~10~~ m-rad Vertical Emittance YEY 3~10 ~ m-rad Bunch Length 100 l.trn Electron Polarization : >80% Positron Polarization PC, No Particles/Bunch nb 1.15x1o1o Number of Bunches Nb 95 bunches Bunch Spacing Tb 2.8 ns Repetition Rate f 120 Hz In the electron injector, polarized electrons are produced using a III-V semiconductor photocathode, accelerated to 1.98 GeV in an S-band linac and injected into a damping ring. Upon extraction from the damping ring, the bunch length is compressed and the beams are accelerated to IO GeV in an S-band linac. Initial transverse coilimation is o-7803-5573-3/99/$10.00@ 1999 IEEE. 3447

done prior to transport through a 180 turn-around. Second stage bunch length compression is accomplished using a 1 GeV X-band linac followed by a dipole chicane. An optical matching section and diagnostic region follow the compressor chicane. Tune-up dumps permit full beam preparation prior to injection into the 180 turn-around and into the main linac. On the positron side, electrons are produced using a thermionic cathode and accelerated to an energy of 6.22 GeV in an S-band linac before impacting a target to produce positrons. Initial capture and acceleration of positrons to the damping ring energy of 1.98 GeV is done in an L-band linac system. Redundant e- and e+ sources are incorporated into the design to enhance availability. The large positron emittances are initially damped in a predamping ring prior to injection into the damping ring. The positron damping ring and subsequent accelerator systems are identical to those on the electron side with the notable exception that polarization spin manipulation solenoids and polarimeter are omitted. The positron beamlines allow for installation of spin preserving solenoids should the NLC be configured for electronelectron collisions. The NLC emittance budget allows for dilution of the beam emittances by 20% in the horizontal and 50% in the vertical between extraction from the damping rings and injection into the main linacs. This budget is used to calculate tolerances. The values of y~~ = 3~10~~ m-rad and p,. = 3~10~~ m-rad are the undiluted design emittances at extraction from the damping rings. 2 ELECTRON PRODUCTION Polarized electrons are produced using a conventional dc gun and III-V semiconductor photocathode. Electron polarization of greater than 80% is required. The design has a 714 MHz, 2 cavity subharmonic bunching system to allow for a luminosity upgrade to 1.4 ns bunch spacing. The population of individual bunches is a relatively modest 2~10 ~ e-/bunch from the gun. This single bunch intensity target has been achieved in routine SLC operations with 80% polarization. The requirement of 95 successive bunches per beam pulse presents a significant challenge for initial electron production from the cathode due to the charge limit phenomenon [2]. R&D directed towards an NLC cathode capable of producing the requisite charge and polarization is ongoing at SLAC and Nagoya University. Care is also taken in the design of the bunching and linac systems to compensate for the long range longitudinal wakefield effects on the 95 bunch train. 3 POSITRON PRODUCTION Positrons are produced by targeting a 6.22 GeV electron beam into an SLC style positron production system consisting of a water-cooled, 4 r.1. W-Re target followed by a 5.8 T magnetic flux concentrator, a 1.2 T tapered field solenoid, and a 0.5 T uniform field solenoid, L-band accelerator sections are used in the initial capture region to accelerate the beams to 250 MeV. After separation and removal of the electrons, the positrons are accelerated to the predamping ring energy of 1.98 GeV in an L-band linac. A yield of 2 positrons per electron into a phase space edge acceptance of 0.06 m-rad is expected. This yield normalized by the incident electron energy is a factor of 4 improvement over the SLC [3]. L-band (1428 MHz) has been chosen because of the large transverse aperture and longitudinal acceptance which are fully utilized in defining the acceptance and subsequent yield calculations. Energy loading in the initial capture regions is compensated using a AP correction scheme. AT compensation is employed in the rest of the L-band linac i.41. The 1998 failure of the SLC target has caused significant concern regarding the viability of the NLC positron system design which is based on the SLC system. The concern is whether the SLC system failed in an acute manner from exceeding the target damage threshold or from accumulated stress on the target. The former requires a significant redesign of the NLC positron systems whereas the latter means that the design is viable albeit the targets will age and require preemptive replacement. Analysis of the SLC target failure is being undertaken in collaboration with LLNL and LANL. This analysis is expected to be completed during the summer of 1999. 4 DAMPING RINGS The vertical emittance of the beams is reduced by a factor of 3000 in the damping rings. The rings operate at 1.98 GeV and the design output emittances are & = 3~10~~ m- rad and R = 3~10.~ m-rad. The transverse damping time is 5.2 ms. Damping occurs dominantly from radiation produced in a 50 m wiggler section. Beams are damped in the rings for 25 ms (three inter-pulse periods); at any one time there are three pulse trains in each ring; the circumference of the rings is 300 m. A 1 MW, 714 MHz rf system generates gap voltages of 1.5 MV utilizing 3 PEP-II style damped, rf cavities [5]; the bunch length at extraction is CJ, = 4 mm. The rings are designed to operate at a maximum intensity of 1.6~10 particles per bunch whereas the nominal operating intensity is about 1.2~10 ~. A predamping ring reduces the initial positron rms emittances from ptiy = 0.04 m-rad down to fily = 100~10-~ m-rad for injection into the positron main damping ring. Beams are predamped for 16.6 ms; there are two pulse trains in the system at any time; the circumference of the predamping ring is 210 m [6]. 5 INJECTOR LINACS Seven rf linacs, six capture regions, and four compressor sections are required in the NLC Injector System. These linacs are based on L-band, S-band, and X-band rf systems. S-band linacs are used for the initial 3448

acceleration of electrons on both the electron and positron side, for energy compression of electrons prior to injection into the damping ring, and for acceleration from 1.98 GeV to 10 GeV after the damping rings on both sides. L-band linacs are used for the initial positron capture and acceleration to 1.98 GeV. L-band rf sections are also employed for energy compression of positrons prior to injection into the predamping ring and for the first stage of bunch length compression of both electrons and positrons. The linacs used for the second stage bunch length compression are based on the X-band technology being developed for the NLC main linacs. The beam loaded gradients in the L-band and S-band linacs have been chosen to be 13 MV/m (15 MV/m) and 17 MV/m (21 MV/m unloaded), respectively [7]. The operating gradient at X-band is 46 MV/m loaded (66 MV/m unloaded). The standard L-band rf module consists of a single klystron feeding a single SLED system which in turn powers three 5 m long accelerator sections. A standard S- band rf module has a single klystron powering a single SLED system with the outputs of two SLEDS combined to power six 4 m long accelerator sections (each klystron effectively feeds 3 accelerator sections). A standard NLC X-band klystron 8-pack powers twelve 1.8 m accelerator structures. Both the L-band and S-band systems use double iris, sidewall coupled KEK style SLED-I rf compression systems [8]. The L-band SLED systems are scaled versions of the S-band SLEDS with modification to the coupling p for performance optimization. A single klystron feeds a SLED system. The outputs of the S-band SLEDS are combined and distributed to the accelerator sections. The combination of the SLEDS permits vernier control of the rf waveform for beam loading compensation while allowing for constant power delivery to the structures in the event that beam pulses are suppressed or shortened during a machine protection system fault and recovery. At X-band, a modified DLDS is used for rf pulse compression. Modification is required because the distance between the triplets of sections is reduced in the Injector System design with respect to the layout in the NLC main linacs. The DLDS is doubled in length and folded back upon itself. The output of the S-band klystron is 65 MW for 5 ps. It is essentially an improved version of the SLAC 5045 tube. L-band klystrons of 75 MW, 6 ps should be achievable with existing technology. The X-band tubes are standard NLC 75 MW, 1.5 us devices. In total, the NLC Injector System design has 441 accelerator sections powered by 157 klystrons and 136 SLEDS at S-band, 44 accelerator sections powered by 23 klystrons and 14 SLEDS at L-band, and 24 accelerator sections powered by 16 klystrons and 2 DLDSs. All of this hardware needs to be developed. 6 BUNCH LENGTH COMPRESSION The bunch length of the extracted damping ring beam is reduced in 2 stages. An 80 MeV section of L-band linac and a lo-dipole wiggler reduces (T, from 4 mm to 500 pm prior to injection into the prelinac. After acceleration to 10 GeV and precollimation, transport through a 314 m long 180 turn-around, a 1 GeV X-band linac, and a 32- magnet dipole chicane reduces oz from 500 pm to 100 pm for injection into the main linacs. Three bunch length diagnostic stations provide tune-up and monitoring capability. Each o, station contains an optical port for streak camera measurements and an rf cavity for parasitic monitoring. For <TV = 100 pm, streak camera resolution may not adequate in which case fourier spectroscopy techniques will be used. As a backup, the first diagnostic station in the main linac can be used as a bunch length monitor using a standard cross-phasing technique. 7 SPIN SYSTEM AND PRECOLLIMATION Superconducting solenoids are used in conjunction with the bending in the damping ring transport lines to rotate the electron spin into the vertical for damping and then into arbitrary orientation for injection into the prelinac system. After the damping ring, the asymmetry in beam emittances dictates that the solenoids be split and separated by an optical transformation of +I in X and -1 in Y to prevent vertical emittance dilution due to coupling. A Compton polarimeter located at injection to the main linac utilizes a laser wire IP, polarized laser light, and the second tune-up dumpline. Polarization measurements require dedicated beam time. Initial collimation of transverse beam halo and tails occurs prior to transport through the 180 turn-around of the second bunch length compressor. Collimation is done using a set of 8 horizontal and 4 vertical, adjustable jaw pairs. Additional cleanup of the debris generated by the collimation takes place downstream in the high dispersion regions of the 180 turn-around. 8 REFERENCES [ l]nlc Zeroth-Order Design Report, SLAC Report 474, also hnn://www-~roiect.slnc.st~ford.edu/lc/z~~nlc zeroth.htm [2] H. Tang, et al., Experimental Studies of the Charge Limit Phenomenon in NEA GaAs Photocathodes, Proc. EPAC94, 46 (1994). [3] H. Tang, et al., Design of the NLC Positron Source, Proc. Linac96, CERN 96-07.647 (1996). [4] Z. Li, et al., Beam Loading Compensation for the Low Frequency RF Linacs and Compressors in the NLC, presented at PAC99, (FRA43). 1513. Corlett, et al., The NLC Damping Ring Complex, presented at PAC99, (FRA20). [6] J. Corlett, ef al., The NLC Damping Ring RF Systemex, presented at PAC99, (MOP60). 171 Z. Li, et al., Parameter Optimization for the Low Frequency RF Linacs of the NLC, presented at PAC99, (FRA44). [8] H. Matsumoto, et al., High Power test of a SLED system with dual side-wall coupled irises for linear colliders, NIM A330 (1993) 1. 3449