INSTALLATION INSTRUCTION PEM1368ENG ENGLISH

Similar documents
INSTALLATION INSTRUCTION PEM1423ENG ENGLISH

PEM1126ENG ENGLISH STPKR. TERMINATION KIT FOR PAPER CABLE WITH LEAD SHEATH 1 kv INSTALLATION INSTRUCTION

PEM1124ENG ENGLISH. STK TERMINATION KIT FOR PLASTIC CABLE WITHOUT ARMOURING 1 kv STKR TERMINATION KIT FOR PLASTIC CABLE WITH ARMOURING 1 kv

Instructions. Cable with Armor F CAUTION. October Rev A

TFT-150R-G. Tape Shield Cable (page 2) Suggested Installation Equipment (not supplied with kit) Wire Shield Cable (page 7)

LEGEND POWER SYSTEMS

3M Cold Shrink QS-III Silicone Rubber Splice Kit 5488A-TOW/WOT

Cold Shrink Straight Joint

3M Cold Shrink Splice Kit QS-III 5416A

3M Cold Shrink Splice Kit QS-III 5515A

Cold Shrink Three-Conductor Splice Kit QS-III for use on Armor and Non-Armor Cables Instructions IEEE Std kv Class 250 kv BIL

3M Cold Shrink Splice Kit QS-III 5514A

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN-4/0-500

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN

Quick Term III. 3M Cold Shrink 3 Core Indoor Termination. 3.3 kv mm 2

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN-2-4/0

3M Cold Shrink QS4 Integrated Splice Kit QS4-35TS

3M Cold Shrink QS-III Splice Kit 5467A(S)-WF

3M Cold Shrink QS4 Integrated Splice Kit QS4-15SP-2-4/0

3M Cold Shrink Foldback Splice Jacket Kit

Industrial Loadbreak Elbow

3M Motor Lead Inline Splice 5331, 5332, 5333 & 5334

Cold Shrink Silicone Rubber Termination QT-II

3 Foam Sealed Closure 2" (50 mm) with Compound Compression

Quick Term II. Cold Shrink Silicone Rubber Termination (With High-K Stress Relief) Instruction Sheet. Quick Term II. Silicone Rubber Termination Kits

F CAUTION. Jacketed Concentric Neutral (JCN) Cable. Concentric Neutral (CN) Cable. IEEE Std. No. 48 Class 1 Termination 15 kv Class 110 kv BIL

3M Scotchcast Mine and Portable Cable Splice and Jacket Repair Kit M-40

HSK Mine and Portable Cable Splice

3M Better Buried Compound Compression Closure System

3M Better Buried Closures

3M Cold Shrink Rubber Splicing Kit 5552

Quick Term II Silicone Rubber Termination Kits for Shielded Cables Instruction Sheet

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

3M Sensored Termination (15 kv) QX-T15I-vi1-E

Cable installation guidelines

3M Better Buried Closure (with 3M Scotchlok Shield Bond Connector 4462-FN and 3M High Gel Re-enterable Encapsulant 8882)

ENERGY /// TRICKS OF THE TRADE TRICKS OF THE TRADE

3 SLiC Aerial Closure with Rubber End Seal

FOSC 450 C6 and D6 Closures

3M Cold Shrink QT-III Silicone Rubber Skirted Termination Kit


L1-CHE-SPE-299 TECHNIQUES & MATERIALS FOR THE JOINTING & REPAIR OF RAILWAY SIGNALLING MULTI CORE AND POWER SUPPLY CABLE

3 Cold Shrink Products

Sections 1. Application Equipment 2. Cable Preparation 3. Assembly 4. Termination Procedure 5. Inspection 6. Repair 7.

Instrukcja montażu. FLEX LED Neon Instalacja

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES

STRAIGHT TWO WAY JOINT3/C, PAPER INSULATED, SHIELDED, LEAD COVERED CABLE. Revised: October 10, 2008 Revised By: SGL Approved By: RHS SPLICES

3M Scotchcast Flexible Power Cable Splice Kits 82-F Series

Adapter Selection. Entry Size (Continued) Table E. Multiplication. factors for wire bundles. with Equal Size Wires. This table provides multiplication

Solutions for Electronic Specialty Markets (ESM)

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

2178-L/S Series Fiber Optic Splice Case with Gasket

COOPER POWER SERIES. 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions. Deadbreak Apparatus Connectors MN650017EN

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

27mm ECAM Double Cable Entry Port

Aging test: integrated vs. non-integrated splices shield continuity systems.

Cables for robot applications

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

Aruba Outdoor AP Antenna Weatherproofing

Medium Box for Cable Termination

3M Scotchcast Reenterable Signal and Control Cable Splicing Kits 78-R Series

Installation instructions Roxtec RM BG systems

VITALink Taped Splice Straight Through Crimp

MOTOR LEAD TO DOWN HOLE CABLE SPLICE PROCEDURE

INSTRUCTION MANUAL [J] [E] [C] [G] [B] [I] [H] [D] [F] [A] 0 INTRODUCTION 1 RECOMMENDATIONS 2 ACCESSORIES INCLUDED

Coaxial Cable Feedline Choke Kit - 50 Ω

3M Distribution Box (DDB)

2016 Cable Splicing Courses

Installation instructions Roxtec RM BG B systems

TERMINATIONS AND JOINTS FOR XLPE-INSULATED kv MEDIUM VOLTAGE CABLES

Water blocking tape. Locator ridge HPA-0486

Installation instructions Roxtec RM PE B

K & B Flame Retardant Building Riser Closures

FIST-GCO2-OTIAN I N S T A L L A T I O N I N S T R U C T I O N

Student Services & Classroom Addition

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

SPECIFICATION. Spec No : VSS-1402-CS603B

Installation instructions Roxtec RM ES B

Amphenol. Amphenol-Tuchel Electronics GmbH. C 112 Series M12 - Connectors

Installation instructions Roxtec RM ES systems

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

Low Voltage Splices, 1000 V or less

SLiC Fiber Aerial Closure System

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

TO THE INSTALLER: BE SURE TO LEAVE THIS MANUAL WITH THE OWNER.

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

UNSIGNED HARDCOPY NOT CONTROLLED

THE CABLE TRAY SYSTEM

CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

K Service Source. Apple High-Res Monochrome Monitor

ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE Test Method for Cable Weld Integrity

3. Electronics and MMU2 unit assembly

Installation instructions Roxtec CM PE systems

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

Transcription:

INSTALLATION INSTRUCTION PEM1368ENG 2015-01 ENGLISH COLD SHRINK HYBRID JOINT CJH11.42 FOR SINGLE CORE CABLES WITH Cu WIRE SHIELD Uo/U = 20.8/36 kv, Um = 42 kv

2/10 CJH11.42 PEM1368ENG 2015-01 GENERAL INFORMATION - Check that the kit is suitable for the cable type. - Check the materials listed in the bill of materials for completeness. - Read the installation instructions carefully before starting the installation. - Install carefully and make sure the materials are clean during the installation. - Clean the working place after the installation. GENERAL INSTRUCTIONS FOR HEAT SHRINKING - Please note that in some working places a hot work permit is needed. - Use a propane burner with a flame length of approx. 20-30 cm. Do not use too large or sharp flame. - Move the flame all around the cable on the shrinking direction. Move the flame continuously to avoid overheating. - Make sure that the ventilation is good and there are no flammable materials around. - Clean the cable surfaces before shrinking. - When shrinking, always follow the installation instructions and the relevant sequence to avoid trapped air. - Check that the tube has shrunk evenly around the cable before you continue shrinking. - If the tube turns around at the end of shrinking, straighten the tube by directing the flame inside the tube from the opposite direction. - After shrinking the tubes should be smooth and even following the shape inside. LEGAL NOTICE - The product must be installed only by a competent person with sufficient training in installation practices and with sufficient knowledge of good safety and installation practices in respect of electrical equipment. If local legislation contains provisions in respect of such training or sufficient knowledge in respect of installation of electrical equipment such provisions shall be fulfilled by the said person. - Ensto accepts no liability concerning claims resulting from misuse, incorrect installation or ignored national safety regulations or other national provisions. - WARNING: Failure to follow the installation instructions may result in damage to the product and serious or fatal injury.

PEM1368ENG 2015-01 CJH11.42 3/10 GENERAL INSTRUCTION FOR COLD SHRINK - Ensure the cold shrink tubing is placed upon the cable core prior to installing the lug, for ease of assembly. - When using cleaning solvents, ensure there is no residue remaining after cleaning. Solvent or other residue will impair the joint performance. - Ensure that the plastic tape is straightened within the tube. If it is wrapped around the conductor, rotate the cold shrink assembly counter clockwise, to ensure the tape is straight, before attempting to withdraw the tape. - Once you have correctly placed the cold shrink tube, the plastic spiral may be withdrawn with a steady pulling action. Take care to ensure the unwound spiral is not tightening around the cable. The excess spiral can be cut if required, as it is withdrawn. - Double check the position of the tube as it begins to shrink. There is only a limited time to adjust the position of the tube NO SPIRAL POSITION BEFORE BEGINNING THE SHRINKING OF THE TUBE WRONG spiral position Cold shrink tube Spiral tube YES RIGHT spiral position PULL Cold shrink tube UNWIND Spiral tube

4/10 CJH11.42 PEM1368ENG 2015-01 Reference line Surplus part Surplus part 1. Check the length of each core according to the final installed position. Table 1 Type Min. diam. on the cable insulation mm 36kV mm² 42kV mm² A mm B mm C mm Connector dimensions max. length mm D min. diam. mm CJH11.4202(C) 18,4 10-95 10-95 190 155 315+-5 160 18,4 CJH11.4203(C) 25,3 70-240 70-240 225 190 385+-5 230 25,3 CJH11.4204(C) 25,3 120-400 120-400 220 185 375+-5 230 25,3 CJH11.4205(C) 31,1 400-630 400-630 220 185 375+-5 230 31,1 Outer sheat Reference line 70 A 2. Remove the outer sheat for a distance of A mm from the core end. Mark a reference line 70 mm from the outer sheat cutting point. Fold back and pull together the screen wires and if needed fix them temporarily with some PVC tape.

PEM1368ENG 2015-01 CJH11.42 5/10 Semiconductive layer Insulation 1/2 connector length 3. Remove the semiconductive layer for a lenght of B mm. 35 B Conductor If necessary, remove any remainings of the semiconductive layer with a piece of glass. Use the grinding paper included in the kit to smooth the insulation. Remove the insulation for a lenght of 1/2 of the connector lenght.! Appropriate tools should be used to avoid any damage to the semiconductive layer or the conductor core. Heat shrink tube (CPEEL/CPEEPL) Ground copper braid (tubular) Joint body CSJ CSJ CPEEPL 4. Slip the tubular ground copper braid on the cable outer sheat. Slip the heat shrink tube on the cable outer sheat. Slip the CSJ cold shrink joint body on the cable outer sheat.! Protect the tubes from dirt. C 1 3 4 2 MV connector 1 3 4 2 1 2 4 3 5. Check measurement C before installing the connector. Install a suitable connector following the manufacturer s instructions. Remove any sharp edges with the help of a file or a hammer. Clean the cable insulation with a cleaning tissue. Go towards the semiconductive layer and finally clean the semiconductive layer without touching the insulation, thus no semiconductive particles are deposited on the insulation. At last clean the connector.

6/10 CJH11.42 PEM1368ENG 2015-01 D Grey sealing mastic Grey sealing mastic 6. Fill the srew holes, and if a compression connector is used also other surfaces on the connector that are hole like, with grey sealing mastic. Apply one layer of semiconductive tape (SSETA46) with 50 % overlap on the connector and 5 mm on the insulation on both sides of the connector. The compression connector should be covered with semiconductive tape to even out any sharp edges! Cable connector min. diameter: CJH11.4202=20 mm, CJH11.4203=26 mm and CJH11.4204=26 mm.(dim.d)! Do not use PVC tape to increase the diameter of the connector. Semiconductive layer Silicon grease C 10 25 Pull and turn COUNTERCLOKWISE = = 7. Spread a thin layer of silicon grease evenly over the insulation, semiconductive layer and at last over the connector. Position the CSJ joint body according to the dimensions in the picture and start pulling the spriral so that the joint body shrinks down 1-2 cm from the end. Adjust the joint body so that edge of the tube is 10 mm from the outer sheat cut. Holding the joint body, pull out the spiral gently and at the same time turning it counterclockwise.! If necessary, at this stage, minor repositioning of the body is still possible.

PEM1368ENG 2015-01 CJH11.42 7/10 Grey sealing mastic 8. Fill the space between outher sheat of the cable and the joint body with some mastic on both sides of the joint, as shown in the picture.! Make sure the mastic is applied firmly and evenly. Ground copper braid (tubular) 9. Position the ground copper braid over the joint so that it overlaps the shield wires. 20 Constant force spring Reference line Constant force spring 10. Position the first constant force spring 20 mm from the outer sheat cut. Fold back, over the fixed constant force spring, the shield wires and the tubular ground copper braid. Fix the second constant force spring close to the first one (as shown in the picture) and fold the shield wires and the tubular ground copper braid in the opposite direction of the previous fold. Remove the exceeding wires and braid.

8/10 CJH11.42 PEM1368ENG 2015-01 Reference line 80 Self amalgamating tape SSATA10 11. Apply the self amalgamating tape (SSATA10) for a distance of 80 mm starting from the reference line and moving towards the joint.! Self amalgamating tape should be applied tightly and by stretching it to half of its original width.! Use 1/2 roll on each side of the joint. 60 Roughen Self amalgamating tape SSATA10 PCV tape PCV tape 100 12. Use PVC tape to fasten the ground copper braid on the joint. Leave 60 mm of self amalgamating tape free of PVC tape. Roughen 100 mm of the cable outer sheat with grinding paper on both sides of the joint. Treat the roughened parts gently with flame. Heat shrink tube (CPEEL/CPEEPL) CPEEPL Shrinking sequence 13. Centre the heat shrink tube on the joint. Start shrinking the tube from the middle and move towards the ends.! The tube is properly shrunk when the adhesive starts to come out from the ends. 14. The joint is finished and ready to use, but let it cool down before loading it mechanically.

PEM1368ENG 2015-01 NOTES 9/10

PEM1368ENG / Issue 2015-01-12 ENSTO FINLAND OY ENSIO MIETTISEN KATU 2, P.O.BOX 77 06101 PORVOO, FINLAND TEL. +358 204 76 21 FAX +358 204 762 770 UTILITY.NETWORKS@ENSTO.COM WWW.ENSTO.COM