NSLS2 Diagnostic System Commissioning and Measurements

Similar documents
SPEAR 3: Operations Update and Impact of Top-Off Injection

Status of SOLARIS Arkadiusz Kisiel

The Elettra Storage Ring and Top-Up Operation

PEP II Design Outline

Accelerator Systems of the TPS

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Digital BPMs and Orbit Feedback Systems

Status of Elettra, top-up and other upgrades

New Filling Pattern for SLS-FEMTO

NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE

Top-Up Experience at SPEAR3

LHC Beam Instrumentation Further Discussion

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Summary of the 1 st Beam Line Review Meeting Injector ( )

North Damping Ring RF

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

SSRF Beam Diagnostics Commissioning. LENG Yongbin on behalf of SSRF BI group

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

4.4 Injector Linear Accelerator

Bunch-by-bunch feedback and LLRF at ELSA

Photoinjector Laser Operation and Cathode Performance

P. Emma, et al. LCLS Operations Lectures

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

PEP II STATUS AND PLANS *

Current status of XFEL/SPring-8 project and SCSS test accelerator

Precision measurements of beam current, position and phase for an e+e- linear collider

Beam Instrumentation for X-ray FELs

Linac 4 Instrumentation K.Hanke CERN

CONSTRUCTION AND COMMISSIONING OF BEPCII

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Future Performance of the LCLS

OPERATIONAL EXPERIENCE AT J-PARC

PEP-II STATUS REPORT *

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

30 GHz Power Production / Beam Line

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

Status of RF Power and Acceleration of the MAX IV - LINAC

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Present Status and Future Upgrade of KEKB Injector Linac

Requirements for the Beam Abort Magnet and Dump

The Construction Status of CSNS Linac

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Hall-B Beamline Commissioning Plan for CLAS12

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

Proton Engineering Frontier Project

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

The FLASH objective: SASE between 60 and 13 nm

Operational Status of PF-Ring and PF-AR after the Earthquake

Photo cathode RF gun -

Upgrading LHC Luminosity

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Detailed Design Report

ALBA. Libera Workshop 16 A. Olmos

CLIC Feasibility Demonstration at CTF3

LCLS Injector Technical Review

Beam Loss Detection for MPS at FRIB

Introduction to Synchrotron Radiation and Storage Ring Light Sources.

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

beam dump from P2 losses this morning

Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

A Facility for Accelerator Physics and Test Beam Experiments

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

TECHNIQUES FOR OBSERVING BEAM DYNAMICAL EFFECTS CAUSED BY THE PRESENCE OF ELECTRON CLOUDS*

BUNCH BY BUNCH FEEDBACK SYSTEMS FOR SUPERKEKB RINGS

Fast Orbit Feedback at the SLS. Outline

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Jae-Young Choi On behalf of PLS-II Linac team

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Sérgio Rodrigo Marques

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

LHC Nominal injection sequence

The PEFP 20-MeV Proton Linear Accelerator

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *

TRANSVERSE DAMPING AND FAST INSTABILITIES

RF considerations for SwissFEL

Periodic Seasonal Variation of Magnets Level of the STB ring

KARA and FLUTE RF Overview/status

PEP II Status and Plans

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Beam Instrumentation for CTF3 and CLIC

1 Digital BPM Systems for Hadron Accelerators

G0 Laser Status Parity Controls Injector Diagnostics

CLIC Feasibility Demonstration at CTF3

Screen investigations for low energetic electron beams at PITZ

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

ANKA RF System - Upgrade Strategies

LLRF at SSRF. Yubin Zhao

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

LIGHT PROTON THERAPY PROJECT

PRESENT STATUS OF J-PARC

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Activities on FEL Development and Application at Kyoto University

Transcription:

NSLS2 Diagnostic System Commissioning and Measurements Weixing Cheng, on behalf of NSLS2 diagnostic group and commissioning team 3 rd International Beam Instrumentation Conference Monterey, California, USA, Sep. 14-18, 2014 RHIC NSLS NSLS2

Outline NSLS2 introduction and commissioning overview Diagnostic systems commissioning with beam Button BPMs Current monitors (FC, WCM, FCT, ICT, DCCT, FPM) Profile monitors (Screen, SLM) Other diagnostics (Tune, BxB feedback, LCM, etc.) Machine measurements Summary 2

NSLS2 Injector BtS SR Injection straight Booster 200-MeV linac 15 nc max, up to 300 ns multibunch train; single bunch mode available, 0.5% energy spread, 50 µm rad 3-GeV booster C=158m, Frf = 499.68MHz, h = 264 20 ma max. current, 1 Hz ramping, 40 nm rad Equipment Racks Injector service area Klystron Gallery LtB Linac Tunnel LINAC 3

NSLS2 storage ring main parameters Energy 3.0 GeV Circumference 792 m Number of Periods 30 DBA Length Long Straights 6.6 & 9.3m Emittance (h,v) <1nm, 0.008nm Momentum Compaction 0.00037 Dipole Bend Radius 25m Energy Loss per Turn <2MeV Energy Spread 0.094% RF Frequency 499.68 MHz Harmonic Number 1320 RF Bucket Height >2.5% RMS Bunch Length 15ps-30ps Average Current 500mA Current per Bunch 0.5mA Charge per Bunch 1.3nC Touschek Lifetime >3hrs Top-Off Injection 1/min 4

Injector commissioning timeline Mar 26 May 29 2012, LINAC commissioning. Mis-steering event happened. Nov 27 Dec 6 2013, LINAC re-start Dec-6-2013, Start of booster commissioning Dec-7-2013, Beam through injection septum Dec-10-2013, First turn in the Booster Dec-17-2013, Circulating beam Dec-19-2013, Multibunch mode, better signals, 100 msec circulating beam Dec-20-2013, RF Capture- synchrotron sidebands observed Dec-28-2013, Complete injection fault studies, authorization to accelerate Dec-31-2013, 3 GeV achieved Jan-19-2014, Start Fault studies with circulating beam Jan-28-2014, Completed Fault studies with circulating beam Jan-29-2014, Authorization to extract to the dump Feb-1-2014, Fault studies in the BtS transport line Feb-19-2014, Booster commissioning complete successfully 5

SR Commissioning timeline Phase 1, Mar 26 May 12, PETRA 7-Cell cavity, DWs installed but not used Mar-26-2014, authorized to start storage ring commissioning. Mar-31-2014, first turns in the ring (2-3 turns) Apr-02-2014, discovered injection pulse kickers had wrong polarity which made injection difficult. Apr-03-2014, after fixing IS kickers, beam goes around for multi-turns (~10 turns). Observed partial beam lost at C10 BPM4. Apr-04-2014, beam circulating for ~ 100 turns Apr-05-2014, stored beam with injection DC bump. Sextupole ON, RF ON Apr-12-2014, accumulate beam w/o DC bump. Low capture efficiency Apr-16-2014, scanned dynamic aperture using IS kickers: ~ 4mm, 0.3mrad Apr-18-2014, achieved 5mA for short period of time Apr-23-2014, decided to inspect magnets and vacuum aperture near C10 Girder 4, after struggling with beam accumulation. Apr-24-2014, fixed leakage current issue for all dipoles. Found RF spring hanging in C10, in between first dipole chamber and flange absorber Apr-25-2014, re-start after fixing the C10 vacuum and dipole leakage current, beam accumulation to 1.5mA then to 5mA (limitation for fault study). Observed longitudinal/vertical beam instability. Apr-29-2014, 25mA beam stored in multi-trains May-14-2014, after the phase-i commissioning, found another RF spring in C08 Phase 2, Jun 30 Jul 14, SC cavity, C03, C05 IVUs installed with gap fully open, DWs fully open Jun-26-2014, tunnel closed, SR cavity conditioning Jul-02-2014, 25mA with SC RF Jul-11-2014, 50mA stored beam achieve with SC RF 6

50mA stored beam, Jul-11-2014, SC RF cavity, 1200kV 7

RF spring surprises C10 BPM4 First hint of partial beam loss found on Apr-03-2014, using BPM SUM signal. Beam was circulating for ~10 turns for the first time. Struggled to get accumulated beam. Other evidences shown obstacle in the vacuum near C10. Local bump sweep saw limited aperture; elevated radiation near the area when beam lost; vacuum activities etc. Decided to open the vacuum on Apr-24 and we found the hanging spring at after first dipole in the cell. 8

May-14-2014, after phase-i commissioning. C08 RF Spring, after the first dipole chamber. Flange absorber right upstream of the bellow. The spring was hanging at top-outer corner. It s melted probably due to dipole radiation. y x 9

NSLS-II Diagnostics Systems Other Profile Current Position LINAC FE LINAC Booster LTB BTS SR Button BPM 1 4 37 6 8 180 ID Button BPM 2 or 3 per ID Photon BPM 1 or 2 per BL Faraday Cup 1 2 1 WCM 1 4 FCT/FPM 1 2 2 1 ICT 2 2 DCCT 1 1 Fluorescent / OTR Screen 2 4 6 9 9 1 X-Ray Diagnostics beamline 1+1 VSLM Diagnostics beamline 2 1 Energy Slit 1 1 Tune Monitor 1 1 BxB Feedback (H & V) 1+1 Beam Loss Controls - Scrapers 3 H +2 V Beam Loss Monitors (Cerenkov BLMs and Neutron detectors) 5 CBLM 2 NBLM 10

1. Position monitors (button BPM) 11

BPM timing adjustment, LINAC and LtB BPMs, beam to LtB dump2 LINAC P1 LINAC P2 LINAC P3 LINAC P4 LINAC P5 LtB P1 LtB P2 Dec-05-2013 Multibunch mode, LtB ICT reading 4.563 nc Beam delivered to LtB dump2 All BPMs set to 0 db RF attenuation BPMs were triggered on the global soft event, so that all BPMs get the same pulse data. LtB P1 is close to saturate, larger button and smaller capacitance Big loss from LtB P1 to P2. Note P2 has power splitter in the signal path. Beam position at P2 is off a lot. 12

BPM - Booster first turns Dec-14-2013, ISVF1 lifted, 2 nd turn signal observed on ISPKU2 and other 3-4 BPMs after injection straight. Turn #2 Dec-17-2013, ~23:00 multi-turns in booster 13

BPM - Booster stored beam, 200MeV, Dec-22-2013 fs fx fy Turn 1:1024 NFFT = 1024 Fsam = Frev df = 1.85 khz 19.41kHz => fs 681kHz => fx 724.6 khz => fy 14

Booster BPMs - Timing adjustment Booster injection at sample #4 Extraction on sample #3966, only first 18 BPMs see the beam signal on that turn. DDR offset 719236 turns (380ms) ADC raw data, 62 ADC samples per turn ADC band-pass filtered data. Align the first turn beam signal in ADC sample range 62-124. 15

Booster BPM applications - Tune Spectrum 1-ν y 1-ν x IS Kic #1 Kicker delay from 10:5:400 ms Kicker amp from 1:0.1:4.9 kv At each delay point, record the BPM TbT data. Fractional tune is above 0.5 16

SR BPM first turn ~ 1 turn beam 180 SR BPMs data triggered at: 04/02/2014,08:39:16 Struggling to get beam for multi-turns. Use the measured first turn beam trajectory and fit with machine lattice. Beam at the IS K4 exiting has 21mm horizontal offset, which is far from designed value. Discovered that K3, K4 were kicking the beam in opposite direction. Note: First BPM data (C30 BPM1) is not trustable since beam is too far away from center (~20mm), BPM is in very non-linear range. Y. Li 17

SR BPM multi turns Apr-03-2014, after fixing injection kicker polarities Beam lost partially near C10 BPM4 at every turn around. This is the location where loose RF spring was found later. C10 BPM4 x/y position nonlinearity corrected using 5 th order polynomial Button SUM signal corrected with button geometry, cable attenuations, and beam positions. 18

19 J. Mead, WEPD27 SR BPM electronics resolution and timing BPM electronics resolution, C28 SBPM1 combiner/splitter Single bunch May-01-2014 One turn beam Single bunch in bucket #0 No leakage to nearby turns for target bucket #0 - #1000 38 turns TbT averaged => FA data, resolution ~ 1/sqrt(38)

SR BPMs TbT beam spectrum Beam was kicked by injection kicker(s) and/or vertical pinger. Record BPM TbT data at different single bunch current. NFFT = 4096, Hanning window Interpolated to get precise tunes v x ~ 0.2755, don t change much at different current v y ~ 0.205, decreasing at higher current v s ~ 0.007, Vrf = 1.9 MV Noise ~ 0.13-0.008/mA (-3.07kHz/mA) v y v x Q T I 0 b β E is the beam energy We get k IbT0 = β k 4πE / e total total IbT0 = 4πE / e is the ring revolution period is the single bunch current = 14.8kV / pc / m j β k β is average beta - function, ~ 7.7m for NSLS2 vertical plane j j 20

SR BPMs beam spectrum BPM TbT data from 2015-Jul-11, 17:44:21, 23mA store beam, BxB feedback OFF NFFT = 8192 Average PSD for 180 BPMs Xrms ~ 3.6um w/o betatron motion ~ 26 um include betatron motion Yrms ~ 2.1um w/o betatron motion ~ 9.8um include betatron motion 10kHz FA data characterize the lower frequency ( < khz) beam motions 21

BPM FA data recorded at 20:43:43, Jul-11-2014 ~ 44mA stored beam NFFT = 8192, PSD spectrum averaged for three blocks of FFT ~ 1.8 um RMS motion ( < 1kHz) in both x/y 22

44mA 1040 bunches, FA data spectrum from all BPMs [0, 5kHz] PSD integration Xrms 6um contribution from energy jitter and dispersion, at BPM3. Assume 0.4m dispersion at BPM3, the energy jitter ~ 1.5e-5 This is corresponding to ~ 2.2 deg phase jitter of 1.2MV Vrf. 2.2deg@500MHz <=> 12 ps, this looks huge and should be visible on streak cameras dual sweep, will check. Xrms, Yrms integrated from psd in the range of [10,1000]Hz Compare with model beam sizes Average of 180 BPMs data we get: mean(xrms) = 1.7um mean(yrms) = 1.77 um

2. Current monitors (Faraday cup, WCM, FCT, ICT, DCCT, FPM) 24

Current monitors - Faraday cup, FCT Dec-05-2013, 300ns long pulse train, 15nC Dec-17-2013, ~ 23:10 Booster FCT saw multi turns beam Dec-21-2013, ~ 02:46 Booster FCT, many turns beam with RF 20-bunches 25

Turn #1 Turn #50 Turn #100 Turn #150 26

Current monitors DCCT, ICT SR DCCT noise - SR DCCT noise was 40uA noises, hard to fit a good lifetime - Suppressed to 3uA resolution by adding LPF and decreasing digitizer sampling rate - Further improvement possible to < 1uA Mar-27-2014, BtS ICT sees the beam signal and kicker noise, at BCM signal view. Beam signal Kick induced noises 27

SR Filling pattern monitor high sampling rate scope Apr-03-2014, after IS kicker polarity correction ~ 8 turns in SR 28

Apr-04-2014 Beam survives > 150 us 29

Three shots 1/3 Hz injection 30

Trev = 2.64us 31

Trf = 2ns 20 bunches gun pulse width 40ns 32

Apr-05-2014 Stored beam RF ON, Sext ON On-axis injection 33

Apr-13-2014 Stored beam, poor accumulation Off-axis injection 34

Captured on Apr-11, after Booster energy and SR RF phase adjusted, didn't see the dip on BPM raw button SUM signal. The reason we saw dip is because: longitudinal large oscillation filament => effective bunch length increase => SUM signal decrease. After radiation damping, bunch length decrease => SUM signal recovered. 35

Apr-25-2014, after fixing RF spring in C10 Off-axis injection 36

37

Apr-25-2014 Three shots 1/3Hz injection 38

18 bunches Stored beam ~1.58mA. 18 bunches with e-gun pulse width set to 35ns 39

Camshaft filling pattern There was 0.6mA in the single bunch and 13.1mA in 1000 bunches. Reflection signal from single bunch 40

4-bunch train, 80% fill, Itotal = 22mA 41

~ 47mA, one bunch train, 80% fill 42

FPM to measure synchronous phase 2014-Jul-13 data, use FPM to measure synchronous phase at various Vrf, keep the current same and filling pattern. I = 2.1mA, 20- bunches in one bunch train. 43

φ s = 0 + φ - measured phase m φ - constant due todelays 0 φ - synchronous phase s φ φ m ev sinφ = U = U + U rf s At low current, neglect parasitic energy loss sr pm ev rf x = ev rf y = ev sinφ cosφ + ev rf m y cosφ + xsinφ = U 0 cosφ sinφ m m 0 0 rf s cosφ sinφ = U m 0 sr Measured energy loss per turn was 274.74 kv 287 kv from ideal lattice, w/o DW. Within 5% difference 44

3. Profile monitors (Flags, visible SLM, x-ray diagnostics) 45

Profile monitor injector flags Mar-27-2014, ~21:40 injection beam passing through pulse septum on IS flag - 10 x 10 mm square visible - Circle should be vacuum window - Beam image and some reflections BtS BDVF2, OTR Energy jitter and energy spread measurement, using LtB VF2. 46

Profile monitors - Booster SLM #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 10 burst images acquired on the same booster ramp cycle, separate by 40ms 47

Profile monitors Visible SLM TUPF21 First turn image Apr-02-2014 First several turns profile captured using gated camera after injection kicker ~ 1.5mA stored beam 48

0.22mA Streak camera measurements Profile at Vrf = 1200kV Height scaled to bunch current Alpha = 3.6270e-04 % momentum compaction factor SigE = 5.1390e-04 % relative energy spread α σ E fromσ t =, we know 2πf E σ f t s s α σ E = = 2.97e -8 2π E 49

4. Other diagnostics (TMS, BxB feedback, FFT spectrum etc.) 50

Beam spectrum and tune Fx = 87.5kHz, vx = 0.231 Fy = 70.3kHz, vy = 0.186 Fs = 2.7kHz, vs = 0.0071 Vrf = 1.89 MV Methods to measure tunes - FFT spectrum with pulse kicker - BPM TbT Fourier spectrum with pulse kicker - TMS network analyzer with sweeping excitation - BxB feedback spectrum or transfer function - Others (phase advance, LOCO etc) 51

TMS sweeping tune measurement TMS measures betatron tune with 1e-4 resolution Worked fine at very low current, 0.1mA in multi-bunches NA sweep time 1-2 seconds 15cm stripline kicker, 75W broadband amplifiers 1 st order chromaticy X/Y = 2.2252; 2.6925 ξξ = Δνν ΔE = αα cc EE Δνν Δff ff 52

BxB feedback commissioning WEPD27 30 cm plate Ceramic Single bunch, I_b = 4.5mA Y plane growth-damp measurement, feedback OFF for 3ms and recaptures I = 44mA, stored beam, C30 BPM1 FB OFF FB ON 53

Single bunch transfer function measurement - 2.92 khz/ma or - 0.0077/mA Vertical plane tune spectrum at different single bunch current looks like TMCI Horizontal plane peak position doesn t move much. - 2.92kHz/mA (0.0077/mA) slope, agrees with other method results. 3dB bandwidth increasing as the single bunch current increased. 54

Unstable modes analysis, 1024 turns data of 1320 buckets m=-3 m=-9 55

Compare BPM TbT spectrum with BxB ON/OFF Data at around 2014Jul11_2040, I ~44mA Red Feedback OFF Blue Feedback ON > 30 db suppression of betatron motions sideband 56

Summary 50mA stored beam achieved in NSLS2 storage ring, with SC RF cavity ID commissioning, higher current high stability beam will continue in coming months Most of NSLS2 diagnostics have been commissioned with beam. Machine characterized and optimized using these powerful tools. These diagnostics will play important roles for further understanding and development of the machine. Some highlights include: Beam motion measured to be ~ 2um RMS (< khz) Reliable current and lifetime measurement First synchrotron light on the NSLS2 experiment floor (visible light) Single bunch and coupled bunch instabilities suppression NSLS2 contributions at the conference: MOPF03 NSLSII Photon Beam Position Monitor Testing MOPF07 Construction and Operational Performance of a Horizontally Adjustable Beam Profile Monitor at NSLS-II MOPF20 Diagnosing NSLS-II -- the World's Most Advanced Synchrotron Light Source TUPF01 NSLS-II RF Beam Position Monitor- System Test and Integration TUPF21 NSLS2 Visible Synchrotron Light Monitor Diagnostic Beamline Commissioning WECYB2 NSLS-II RF Beam Position Monitor Commissioning Update WEPD27 Commissioning of Bunch-by-Bunch Feedback System for NSLS2 Storage Ring Thanks for those who design, build, test and commissioned the machine. Thanks for outside experts for various reviews, discussion, collaboration and helps. 57