UPDATE ON THE 2 GHZ BAS RELOCATION PROJECT

Similar documents
Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF

Before the Federal Communications Commission Washington, D.C

Response to the "Consultation on Repurposing the 600 MHz Band" Canada Gazette, Part I SLPB December, Submitted By: Ontario Limited

Canada Gazette, Part I, December 18, 2014, Notice No. SLPB Consultation on Repurposing the 600 MHz Band Eastlink s reply comments

FCC Releases Proposals for Broadcast Spectrum Incentive Auctions

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C COMMENTS OF GRAY TELEVISION, INC.

Telephone Facsimile

Before the Federal Communications Commission Washington, D.C

800 MHz Transition Administrator, LLC

Start Recording on Site

Digital Television Transition in US

July 3, 2012 * * * * * * * * * * * * * * TABLE OF CONTENTS * * * * * * * * * * * * * *

Statement of the National Association of Broadcasters

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

TV Translator Relocation Grant Program

Consultation on Repurposing the 600 MHz Band. Notice No. SLPB Published in the Canada Gazette, Part 1 Dated January 3, 2015

Notice Pursuant to Section 32H of the Telecommunications Ordinance (Chapter 106)

Objectives and Methodology for the Over-the-air Television Transition

Reply Comments from the Canadian Association of Broadcasters

C-Band Alliance ITIF Forum On Mid-Band Spectrum. Preston Padden - EVP, Advocacy & Government Relations, C-Band Alliance November 13, 2018

Accessible Emergency Information (TV Crawls)

Telephone Facsimile

Before the Federal Communications Commission Washington, D.C

The long term future of UHF spectrum

Present & Future Opportunities for WISPs to Obtain Access to Additional Spectrum

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C ) ) ) ) ) ) ) ) ) ) REPLY COMMENTS OF CTIA THE WIRELESS ASSOCIATION

Start of DTV Transition 600 MHz repacking

CRS Report for Congress Received through the CRS Web

1.2 The NAB is the leading representative of South Africa s broadcasting industry representing:

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) REPLY COMMENTS OF PCIA THE WIRELESS INFRASTRUCTURE ASSOCIATION

Before the Federal Communications Commission Washington, D.C

Before the Federal Communications Commission Washington, D.C COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS

Before the. FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Planning for TV Spectrum Repacking and the Transition to ATSC 3.0

ARNOLD PORTER LLP FCC RELEASES FINAL DTV TRANSITION RULES CLIENT ADVISORY JANUARY 2008 SUMMARY OF DECISION 1

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

800 MHz Band Reconfiguration

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) REPLY COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS

BEFORE THE FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

PMSE DTT spectrum sharing. Darko Ratkaj European Broadcasting Union

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) OPPOSITION OF PUBLIC KNOWLEDGE PETITION FOR RECONSIDERATION OF

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) )

21 December Mr. Michael Helm Director General Telecommunications Policy Branch Industry Canada 300 Slater Street Ottawa, Ontario, K1A 0C8

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) ) ) ) ) )

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Evolution of Spectrum Valuation for Mobile Services In Other Countries

Before the Federal Communications Commission Washington, D.C COMMENTS OF THE NATIONAL ASSOCIATION OF BROADCASTERS

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum

BY ELECTRONIC FILING. March 25, 2009

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

TV Spectrum Update National Translator Association Annual Meeting May 2013

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

April 7, Via Electronic Filing

Before the FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, D.C REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

Comments of Shaw Communications Inc. Consultation on Repurposing the 600 MHz Band

Before the Federal Communications Commission Washington, D.C

Ensure Changes to the Communications Act Protect Broadcast Viewers

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

1 COPYRIGHT 2012 ALCATEL-LUCENT. ALL RIGHTS RESERVED.

March 2, 2018 Via

116 Albert Street, Suite 811 Phone: K1P 5G3 Fax: Web site:

800 MHz Band Reconfiguration

March 10, Re: Notice of Ex parte presentation in MB Docket No.07-57

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Report touts benefits of CMA-sized spectrum licenses ahead of 600 MHz auction

Reply Comments of The Association for Maximum Service Television, Inc. and The National Association of Broadcasters

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) ) ) ) ) )

Telesat's Canadian Satellite Capacity and Services Plan for the 17 GHz BSS Orbital Resources at lll.l WLandll3 WL.

Licensing & Regulation #379

STAATSKOERANT, 17 FEBRUARIE 2012 No GOVERNMENT NOTICE DEPARTMENT OF COMMUNICATIONS ELECTRONIC COMMUNICATIONS ACT, 2005 (ACT NO.

Digital Switchover Management of Transition Coverage Issues Statement

NATIONAL ASSOCIATION OF BROADCASTERS SUBMISSION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON SCIENCE AND TECHNOLOGY ON THE ASTRONOMY GEOGRAPHIC

Figure 1: U.S. Spectrum Configuration

Industry view on C-band related WRC-15 agenda items (i.e. AI 1.1 and 9.1-5) ATU/ITU Radiocommunications Forum (24 April, 2015 Niamey Niger)

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) REPLY COMMENTS OF THE WMTS COALITION

January 11, Re: Notice of Ex parte presentation in MB Docket No.07-57

Broadcasting Decision CRTC

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) ) INITIAL COMMENTS OF THE WMTS COALITION

700 MHz clearance programme timescale review. Review of progress, risks and readiness

August 7, Legal Memorandum

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

COMMUNICATIONS OUTLOOK 1999

Introduction of digital TV in Bosnia and Herzegovina - Support for Public Broadcasting System

Hearing on Crafting a Successful Incentive Auction: Stakeholders Perspectives. United States Senate Committee on Commerce, Science, and Transportation

GET YOUR FREQ ON. A Seminar on Navigating the Wireless Spectrum Upheaval


Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )

Re: Canada Gazette Notice SMBR , ; Allotment Plan for Digital Radio Broadcasting (DRB), Issue 2.

Mr. Robert A. Morin Secretary General Canadian Radio-television and Telecommunications Commission Ottawa, Ontario K1A 0N2. Dear Mr.

Interim use of 600 MHz for DTT

Canada Gazette - Industry Canada Notice SMBR : DTV (Digital Television) Transition Allotment Plan

DETERMINATION PUBLIC CONSULTATION ON A PROPOSAL FOR ASSIGNMENT OF SPECTRUM IN THE 700 MHZ BAND (MARCH 2013)

Code of Practice on Changes to Existing Transmission and Reception Arrangements

NOTICE 682 OF 2014 PROMOTION OF DIVERSITY AND COMPETITION ON DIGITAL TERRESTRIAL TELEVISION REGULATIONS

Boulder Thinking About The Incentive Auction

Before the Federal Communications Commission Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Transcription:

UPDATE ON THE 2 GHZ BAS RELOCATION PROJECT March 30, 2009 On February 12, 2009, Sprint Nextel, the Association for Maximum Service Television, NAB, and the Society of Broadcast Engineers (referred to as the Joint Parties) filed with the FCC a Supplemental Joint Request to waive until February 7, 2010 the deadline by which Sprint Nextel must complete the relocation of the Broadcast Auxiliary Service (BAS) licensees in the 1990-2025 MHz band. The request cites numerous circumstances beyond Sprint Nextel s and broadcasters control, which will prevent completion of the BAS transition by the current deadline. The BAS relocation project started in 2005, when Sprint Nextel committed to the relocation of BAS incumbents in the 1990-2025 MHz band, with planned completion in 2007. The FCC subsequently granted the parties a waiver to provide additional time to complete the project, extending the relocation deadline to March 5, 2009 and holding in abeyance an original waiver request, which asked that the relocation deadline be extended to February 7, 2010. The purpose of the relocation is to free up 35 MHz of spectrum, previously assigned for BAS, now allocated to the 2 GHz Mobile-Satellite Service (MSS), of which a portion (5 MHz) was assigned to Nextel Communications for cell phone services. This is being achieved by shrinking the existing seven 17 MHz BAS channels to become 12 MHz channels, and moving the channels to new frequency assignments. This is a two-stage process for each DMA, as shown in the following chart. Edited extracts from the Supplemental Joint Request follow, with graphics taken from a subsequent ex parte communication submitted on February 26.

Introduction and Summary In a March 2008 order, the Commission granted a waiver request filed by Sprint Nextel, MSTV, NAB, and SBE to provide additional time to complete the transition of BAS licensees to the new 2 GHz band plan. The Commission found that numerous complexities beyond the control of Sprint Nextel and BAS licensees prevented completion of the BAS relocation within the Commission s original timeframe. The Commission extended the deadline until March 5, 2009 and expressly held open the option of extending this waiver upon further consideration. The Commission also held in abeyance the Joint Parties waiver request for additional time beyond March 5, 2008 to complete the BAS transition. By this filing, the Joint Parties respectfully renew their original request to extend the BAS relocation completion date to February 7, 2010. Since 2005, Sprint Nextel has funded an increase of at least 1,000 American workers across manufacturers, integrator vendors, and service providers. These engineers, technicians, tower climbers, machinists, welders, metal workers, laborers and others have made great progress in clearing the 1990-2025 MHz band of incumbent BAS operations. To date, more than one-third of BAS licensees have completed the transition. The transitioned licensees span 76 television markets that cover approximately 104 million Americans. More than 99 percent of all eligible BAS licensees have signed frequency relocation agreements (FRAs) that specify the equipment, labor, terms and conditions necessary for their transition to the new band plan. And even in those markets yet to be transitioned, hundreds of licensees have already installed replacement BAS equipment or are actively working with vendors and manufacturers to complete the equipment ordering and installation process. In short, BAS relocation is well on the road to completion. In their original, September 2007 waiver request, the Joint Parties requested that the Commission extend the BAS completion date to February 7, 2010. In December 2007, the Joint Parties supplemented their waiver request after conferring with numerous parties, including Mobile Satellite Service (MSS) licensees, who will occupy more than half of the cleared spectrum and wanted the Joint Parties to reprioritize previously scheduled market transitions. In their supplemental filing, the Joint Parties proposed streamlining measures, faster transitions in specified markets to accommodate the MSS licensees testing and service requirements, and a tentative schedule that potentially could accelerate the BAS transition by up to five months. The Joint Parties emphasized the tentative nature of the accelerated schedule due to the inherent complexities of BAS relocation and the fluid nature of a relocation process that depends on the cooperation of scores of different suppliers, integrators, contractors, programmers, installers, and consultants. Since the Extension Order, Sprint Nextel and the broadcast community have used their best efforts to meet the accelerated schedule. These efforts have made the transition more efficient in a number of respects and fully met MSS market-access demands; nonetheless, the BAS transition remains a complex undertaking with new challenges and obstacles seeming to arise at every turn. For example, Congress s recent extension of the digital television (DTV) transition deadline will affect the BAS relocation process due to interdependencies between the two transitions. Thus, despite the good faith efforts of Sprint Nextel and the vast majority of broadcasters, it is now clear that completing the BAS transition will require until February 2010 as described in the Joint Parties original waiver request. Work to Complete the BAS Transition The Joint Request goes on to document the substantial progress made in compiling inventories, obtaining quote packages for virtually all eligible BAS incumbents, and executing frequency relocation agreements for 99% of eligible BAS licensees. It also states that nearly all licensees have submitted purchase orders for their BAS replacement equipment, and more than 70% of equipment has been delivered to licensees. At this time, 46% of licenses have installed their equipment and 36% of primary BAS operators have completed the transition. The Request confirms that the new BAS equipment and band plan meets broadcaster newsgathering needs and that markets can be transitioned without materially disrupting BAS operations. It also states that the success to date could not have been achieved without the good faith efforts and commitment of the nation s broadcasters and explains the efforts that are underway to complete the transition by the date requested, noting that Sprint Nextel has a powerful incentive to complete the BAS relocation as soon as possible. The chart and maps below showing this 2 GHz transition process and progress from 2007 to 2009 were included in the ex parte filing.

Relocation Challenges The Joint Request provides an analysis of the many challenges that Sprint Nextel and the broadcaster community continue to face in the BAS transition, including those listed below. Complexity of BAS Transition Delays Caused by Weather and Other Emergencies Market-Prioritization Demands of MSS Licensees Avoiding Material Disruptions to Broadcaster Operations Delay in TV Transition Competing Priorities for Vendors Bankruptcy Filings: - Pappas Telecasting thirteen BAS systems - Tribune Company nineteen BAS systems - Young Broadcasting thirteen BAS systems Tower Climbing Hazards State Contracting Requirements Helicopter Constraints Aviation Disasters and Capacity Limitations Competing Priorities for Vendors Capacity Limitations Helicopter Constraints

State Contracting Requirements Live News Coverage Must be Protected The request stresses that the Joint Parties believe that it is extremely important that BAS operations remain free from interference until the transition is complete. It states that, Broadcast television serves as an important source of news for local communities and the entire country. As both Congress and the Commission have recognized, the provision of local news and emergency information is a cornerstone of communications policy in the United States. This goal will be undermined if the key element in the provision of local news, i.e., live reporting using electronic newsgathering, is subject to interference. Accordingly, combined with the Joint Parties commitment to work with MSS interests in satisfying their independent obligation to relocate BAS, the Joint Parties request that the Commission take such actions as are necessary to prevent interference to both ENG and fixed operations on BAS frequencies until this transition is complete. Status On February 27, 2009, the FCC waived the relocation deadline for a period of 45 days, until April 19, 2009, in order to provide the Commission with time to consider the issues raised by the Supplemental Request. On March 9, opposition to the Request was filed by ICO Satellite Services, one of the MSS licensees, with further comments from Terrestar, the other licensee. Reply comments from the Joint Parties were filed on March 19, rebutting the objections to the extension. The matter currently rests with the Commission. Click here for the full text of the Supplemental Joint Request Concerning the BAS Relocation. Further information on the 2 GHz relocation project is at: www.2ghzrelocation.com.