AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Similar documents
5 Project Costs and Schedule

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Status of CTF3. G.Geschonke CERN, AB

RF considerations for SwissFEL

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

P. Emma, et al. LCLS Operations Lectures

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

LLRF at SSRF. Yubin Zhao

Upgrade of CEBAF to 12 GeV

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

A new Interlock Design for the TESLA RF System

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

Digital BPMs and Orbit Feedback Systems

CBETA Quarterly Report 7

STATUS OF THE SwissFEL C-BAND LINAC

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

Design Studies For The LCLS 120 Hz RF Gun Injector

RF Upgrades & Experience At JLab. Rick Nelson

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

The FAIR plinac RF Systems

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Upgrading LHC Luminosity

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

PEP-II Disassembly Technical Systems

Status of Elettra, top-up and other upgrades

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Availability and Reliability Issues for the ILC

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

CLIC Feasibility Demonstration at CTF3

Experimental environment with optical lasers in 2020

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

ANKA RF System - Upgrade Strategies

CLEX (CLIC Experimental Area)

Summary of the 1 st Beam Line Review Meeting Injector ( )

Linac3 experience for LHC ion runs

Status of the X-ray FEL control system at SPring-8

Photo cathode RF gun -

Modulator Overview System Design vs. Tunnel Topologies. Snowmass Workshop August 16, 2005 Ray Larsen for the SLAC ILC Group

Advanced Photon Source - Upgrades and Improvements

Summary of recent photocathode studies

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Empirical Model For ESS Klystron Cathode Voltage

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

LCLS Injector Technical Review

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

Status of RF Power and Acceleration of the MAX IV - LINAC

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

Full IEFC workshop Feb.

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

SPEAR 3: Operations Update and Impact of Top-Off Injection

Status of SOLARIS Arkadiusz Kisiel

Beam Losses During LCLS Injector Phase-1 1 Operation

KARA and FLUTE RF Overview/status

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

The PEFP 20-MeV Proton Linear Accelerator

650MHz/800kW Klystron Development at IHEP

STATUS OF THE EUROPEAN XFEL

Instrument Status Review. GSC Meeting October 2009

SLS RF operation report 2003

Undulator Protection for FLASH and for the European XFEL

Detailed Design Report

INFN School on Electron Accelerators. RF Power Sources and Distribution

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

3M High-Speed Solutions

Present Status and Future Upgrade of KEKB Injector Linac

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

The Elettra Storage Ring and Top-Up Operation

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

Report on the LCLS Injector Technical Review

Current status of XFEL/SPring-8 project and SCSS test accelerator

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Linac 4 Instrumentation K.Hanke CERN

MOST. Getting the. BMW Assist. Climate. Settings

Klystron Lifetime Management System

Bunch-by-bunch feedback and LLRF at ELSA

Implementation of Paramount 3013 in Implanter Tools

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

INFN Milano LASA News on Cathode Development

Transcription:

AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team

Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics Magnets & Power Supplies Radiation Safety Time Schedule 16-Jul-13 B. Grigoryan for AREAL TAC-2013 2

Machine Layout 16-Jul-13 B. Grigoryan for AREAL TAC-2013 3

Building & Infrastructure All construction works are finished Thermal stabilization & ventilation system is finished Water, power, networking, communication is ready General mounting works in laboratories are finished Minor mounting work for machine sub-systems Marks and signs placement Furnishing the laboratories Expecting to finish all before August 15, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 4

Laser System 18:45 09:00 25 C 24.5 C 24 C Room and infrastructure is ready Optical table is mounted and pre-aligned Optics and optical mechanics is ready Preliminary optical path assembled, ready for measurements Some remaining accessories to buy Set-up and acceptance check upon laser arrival Final set-up and ready for operation Expecting to finish all before September 10, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 5

RF System Infrastructure, cabling, power, etc. are ready RF System equipment is complete and mounted in place LLRF, MO, pre-amplifiers, klystron and other components are tested Modulators are ready Final assembly at operating locations is finished Waiting for RF pre-amplifier to be repaired Minor work on digitizing analog interlocks Final test of entire system Full power RF with LLRF and high power conditioning Expecting to finish all before August 22, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 6

Vacuum System 100 % of machine components for vacuum system are procured 98% of components are tested for HV Dipole Vacuum chamber is ready Assembly of components in tunnel is started Gun cathode backplane pump out system is in progress Gun mirror holder fabrication and test for vacuum in progress Final assembly of entire linac Expectingto finish all before August 15, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 7

Cooling System Klystron cooling system is ready and functioning Design of other components cooling is finished Required components for other systems procured Improvement on klystron cooling system for better reproducibility of temperature. Assembly of gun cooling, Assembly of solenoid magnet cooling Test and final assembly of entire system Expecting to finish all before September 20, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 8

Control System Vacuum standalone control is ready Control system global architecture is ready Machine component device I/O list is ready Diagnostic system local control Timing system Global interlock system and personnel safety Implementation of local systems to global control Expecting to finish all before September 30, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 9

Beam Diagnostics Nominal setup of diagnostics for Phase 1 is ready Diagnostics components ready Vacuum components for diagnostics ready 95% of required equipment is procured Vacuum test of components is done Assembly of components in progress Electronics for diagnostic devices in progress Procurement of remaining items in progress Control system for diagnostics in progress Final assembly of machine Expecting to finish all before September 25, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 10

Magnets & Power Supplies Solenoid and Dipole magnets are ready Power supplies ordered for fabrication Magnetic measurement bench ready Power supply fabrication in progress Expecting magnetic measurements for all magnets Corrector magnets and power supplies design in progress Final assembly on machine Expecting to finish all before September 10, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 11

Radiation Safety Calculations of radiation level for both operation modes arefinished Radiation Safety equipment is procured Personnel safety concept is ready Tunnel, laser room, RF room radiation safety is provided Personnel safety interlock system integration in global control system in progress Mounting and assembly of safety equipment in progress Final assembly and test of radiation safety alarms and interlocks Expecting to finish all before September 20, 2013 16-Jul-13 B. Grigoryan for AREAL TAC-2013 12

Time Schedule August, 2013 September, 2013 October, 2013 November, 2013 Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics Magnets & Power Supplies Radiation Safety Commissioning 16-Jul-13 B. Grigoryan for AREAL TAC-2013 13

Summary More than 95% of machine components are at CANDLE Assembly of systems in parallel with alignment work is started Most of the tests (Vacuum, RF, MO, etc.) are finished All the general components procurement is finished Many thanks to all members and friends of AREAL!!! A bit more work to do to complete ( kick ) the goal Remaining items are expected to arrive before August Assembly and test of arriving equipment has to be done. Finishing all the minor works and be ready for commissioning 16-Jul-13 B. Grigoryan for AREAL TAC-2013 14