Equipment Installation, Planning, Layout, organisation and updates

Similar documents
PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

Full IEFC workshop Feb.

EPJ Web of Conferences 95,

Linac 4 Instrumentation K.Hanke CERN

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

1. General principles for injection of beam into the LHC

Upgrading LHC Luminosity

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

RF upgrade program in LHC injectors and LHC machine

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Top-Up Experience at SPEAR3

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.

SPS BPM system renovation. Roadmap & Milestones

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

PEP II Design Outline

The Elettra Storage Ring and Top-Up Operation

The 2011 LHC Run - Lessons in Beam Diagnostics

LHC Beam Instrumentation Further Discussion

5 Project Costs and Schedule

Linac3 experience for LHC ion runs

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

ANKA RF System - Upgrade Strategies

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2

Assembly of the HIE-ISOLDE accelerator cavities in a clean room.

A Facility for Accelerator Physics and Test Beam Experiments

TRANSVERSE DAMPING AND FAST INSTABILITIES

SPEAR 3: Operations Update and Impact of Top-Off Injection

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

What can be learned from HERA Experience for ILC Availability

beam dump from P2 losses this morning

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

Status of CTF3. G.Geschonke CERN, AB

Bunch-by-bunch feedback and LLRF at ELSA

LLRF at SSRF. Yubin Zhao

Digital BPMs and Orbit Feedback Systems

LHC Nominal injection sequence

LHC COMMISSIONING PLANS

Availability and Reliability Issues for the ILC

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam instrumentation at the 1-MW proton J-PARC RCS

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Present Status and Future Upgrade of KEKB Injector Linac

THE ANTIPROTON DECELERATOR (AD)

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

30 GHz Power Production / Beam Line

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Commissioning of the CNGS Extraction in SPS LSS4

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Beam Loss Detection for MPS at FRIB

PEP II STATUS AND PLANS *

LHC Machine check out

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

PEP-II Disassembly Technical Systems

Advanced Photon Source - Upgrades and Improvements

DELIVERY RECORD. Location: Ibaraki, Japan

Status of Elettra, top-up and other upgrades

CBETA Quarterly Report 7

OPERATIONAL EXPERIENCE AT J-PARC

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Status of SOLARIS Arkadiusz Kisiel

P. Emma, et al. LCLS Operations Lectures

CLIC Feasibility Demonstration at CTF3

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Summary of the 1 st Beam Line Review Meeting Injector ( )

4.4 Injector Linear Accelerator

Accelerator Controls Part2: CERN central timing system

REVIEW OF LHC OPERATION

Fast Orbit Feedback at the SLS. Outline

Beam systems without failures what can be done?

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

Radiation Safety System for Stanford Synchrotron Radiation Laboratory*

CLEX (CLIC Experimental Area)

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

LCLS Injector Technical Review

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC)

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

BE Department Annual Report 2013

PEP II Status and Plans

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

CONSTRUCTION AND COMMISSIONING OF BEPCII

BEAM DIAGNOSTICS IN THE CNAO INJECTION LINES COMMISSIONING

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Challenges in Accelerator Beam Instrumentation

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

Proton Engineering Frontier Project

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold

North Damping Ring RF

Transcription:

Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the LIU Planning, Layout and Installation activities Space Reservation Requests, Engineering Change Requests, layout database, layout drawings and integration studies Work planning for (Extended)Year End Technical Stops and Long Shutdown 2 Summary and outlook 2

LIU-IONS activities (Linac3 and LEIR) EYETS 2016-2017 SEM grids ETL: new electronics to measure injected and extracted beam properly Upgrade of LEIR ring orbit system 2 new BPMs ITE 3

LIU-IONS activities (Linac3 and LEIR) YETS 2017-2018 SEM grids ITL-ITM: request for new wire layout ITF Faraday Cup LEIR Dump 7 new BPMs ETL and EI 4

LIU-PSB activities EYETS 2016-2017 Renovate electronics for 4 BR.BCTDC (section 9) 4 New monitors BR.TMD (8L1) New ring Trajectory Measurement System (PSB-TMS) New BLMs (FIC detectors) New prototype wire Scanner BWS (4L1) New Tune pick-up BPM (3L1) Exchange Septum SMH (15L1) New kicker KSW (16L1) Replace kicker KSW (16L4) Move kicker KSW (from 16L4 to 2L1) Relocate Monitor BTV (BT.BTV30) Enlargement of the shaft New wideband electrostatic pick-up BPM (BTP.BPMW15) Vers PS 5

LIU-PSB activities YETS 2017-2018 New SEMGrid (4L1 ring 3) Vers PS 6

LIU-PSB activities New Absorber/Scraper New Wire Scanner x4 (11L1) Under studies: - Change of the beam stoppers - New vacuum window before the PSB Dump New finemet cavities BR2&4.C02 7L1 BRr.C04 13L1 BR.C16.5L1 New RF bypasses Laminated side plate on bending (BHZ MAIN) Parallel shunt resistors on quadrupoles (QDE, QFO) and bending (BHZ MAIN) magnets Transverse Feedback New interlock system PSB extraction to PS New Wire Scanner x3 (4L1) New extraction kicker (BEr.KFA14L1) PSB Injection Systems: New Injection bending (BHZ INJ) New Distributor (BI.DIS10) New Septa (BI.SMV10) Relocate beam instrumentation (BI.BTV30) Change of the magnets New PSB Injection Region Remove the current sector (1L1) New H- charge exchange injection systems PSB Extraction and Transfer: New BHZ EXT New septum (BT.SMV10 and BT.SMV20) Relocate beam instrumentation (BT.BTV10) New kicker (BT.KFA10) Change the magnets Vers PS 7

LIU-PS activities EYETS 2016-2017 New vacuum chambers (MU41, MU42) Relocation skew quadrupole (MU42 MU52) Upgrade injection kicker generator Installation of short-circuit (KF45) New horizontal ionization profile monitor BGI and magnets (SS82) New BLMs (Diamond & Ionization) (Diamond detectors in SS14, 15, 17, 18, 40, 41, 42, 43, 44, 45, 46, 49, 71, 75, 79, 83 and 100 ionization chambers in each section) New prototype fast tuner 80MHz (SS08) New Wideband Electrostatic pick-up (SS90) Repair and development of longitudinal damper (SS02) 8

LIU-PS activities YETS 2017-2018 New prototype beam wire scanners BWS (SS54) New vertical ionization profile monitor BGI and magnets (SS84) 9

LIU-PS activities Replace injection (spare) kicker KFA45 New injection septum + bumper SMH42 (SS42): New BTV (MU41) New SEMGrid (MU42) New bumper (SS42) New bumpers (40, 41, 43, 44) New beam dumps (SS75) New insertion quadrupoles (SS33, SS49) New beam wire scanners BWS (SS64, SS65, SS68, SS85) Replace skew quadrupoles (03,07,19,23,29,33,37,41,43,47,53,57,69,73,79,83,87,91,93,97) Replace vertical correctors (02,04,08,12,20,22,24,30,34,38,44,54,64,70,76,80,88,94,98) Replace 2 magnets in extraction line to SPS (TT2) Upgrade of the 10 MHz feedback amplifiers Modification of the 10 MHz water cooling circuit (SS36, SS46, SS51, SS56, SS66, SS76, SS81, SS86, SS91, SS96) Longitudinal beam control 1-turn delay feedbacks 20/40/80 MHz New feedback amplifier for the 40/80 MHz Upgrade of the cooling plant Modify the copper secondary cooling circuit New internal beam dumps (SS47 or SS48) Remove dump in SS12 and SS47 or 48 New 80 MHz fast tuner (SS88 or 89) 10

LIU-SPS activities EYETS 2016-2017 New Vacuum sectorization Optical fibres for the orbit systems 2 New fast BLMs (Diamond) New Fast BCT (LSS5) Renovation of the over head crane (ECX5) Civil engineering for new beam dump ac coating (9 QFs, 2 cells MBB,10% drifts) and impedance reduction 11

LIU-SPS activities YETS 2017-2018 New RF power feeder line New 1 GHz slotline kicker Installation kicker platform Installation of kicker transmission lines Dump platform reinforcement ac coating (8 QFs, 1 cell MBB, drifts) and impedance reduction 12

LIU-SPS activities ZS improvement (LSS2) Reconfiguration of LSS1 (LSS1, BA1) 200 MHz RF power upgrade (LSS3, BA3, BAF3) LLRF (new FC electronics) New Fast BCT (LSS3) Extraction protection devices: Replacement of TPSC4 (LSS4) Replacement of TPSG6 (LSS6) ac coating (QF, drifts) and Impedance reduction New collimators TCDI (TI2, TI8) Replacement MOPOS electronics (Sextants 1,2,3,4,5,6) New Beam Dump Reconfiguration of LSS5 New BGI (LSS5) New Wire Scanners (LSS4, LSS5) 13

Organisation of the LIU Planning, Layout and Installation activities The Planning, Layout and Installation (LIU-PLI) working group ensures dispatching of all information and efficient work progress. LIU Planning and Installation www.cern.ch/liupli Indico 5706 Integration www.cern.ch/project-integration-accelerateurs Indico 579563 Configuration www.cern.ch/cfg Layout www.cern.ch/layout Organization and Scheduling www.cern.ch/ls1tols2 Planning and coordination meeting Joint Linac2&3,PSB, PS indico 7157 SPS indico 3213 Planning www.cern.ch/pacs/projects.aspx Safety Coordination Configuration Management Layout Database Facility Coordination Integration Studies 14

Layout drawings and integration studies The integration office is working on 2 versions of 3D models (current situation and post- situation) and provides differential layout drawings of the beam line when engineering changes take place. The layout drawings are controlled, approved and stored in the CERN Drawings Directory (CDD). Current Future The validation of the integration studies is part of the approval process of the Engineering Change Requests. Integration studies are also done for the facility surface buildings. 15

Space Reservation Requests, Engineering Change Requests: Documentation status Space Reservation Request (SRR) A Space Reservation Request is sent for approval and released at least 1 year in advance in order to reserve the space and inform the different stakeholders. Engineering Change Request (ECR) A Engineering Change Request is sent for approval and released before the installation in order to get the agreement of all the stakeholders and to perform the work in due time. Status of the LIU Project : 37% October 2016 16

Work planning (EYETS 2016-2017) The master schedule has been more precisely defined, especially the estimation of the hardware commissioning tests and the beam recommissioning of the accelerators chain. The EYETS will allow us to: Anticipate upgrade activities Carry out the de-cabling campaigns Machines Opening of the machine (weeks) not including the xmas break of 2 weeks PSB 11.5 PS 13.5 SPS 12.5 (BA1,BA2) 13.5 LHC 15 17

Work planning (YETS 2017-2018) The master schedule has be estimated and shall be reviewed next year and will take into account physics and operation needs. The YETS will allow us to: Anticipate any minor upgrade activities Carry out the de-cabling campaigns Machines Opening of the machine (weeks) not including the xmas break of 2 weeks PSB 7.5 PS 7.5 SPS 7 (BA1, BA2) 7.5 LHC 9 18

Work planning () General Master Schedule 19

Stop Protons Version 1.0 Work planning () Linac4 connection Beam to Linac4 transfer line Beam to Beam Linac4 to Linac4 transfer line Beam to PSB 1.5 months radiation protection cool-down 6 months shutdown time available (not including the 2 weeks of closure) 2.5 months Linac4 and transfer line beam tests 6 months shutdown 1.5 months Linac4 beam commissioning 3.5 months Linac4 and transfer line beam commissioning A detailed schedule has been presented at the Linac4 connection readiness review in August 2016. The integration studies is completed. ECRs covering the work needed for the full connection have been circulated for first verifications. Sequence of beam tests during has been defined. The shutdown duration is not critical for the Linac4 to the PSB connection activities during. The resource needs are being identified by the committee (PLAN tool) and resource levelling still needs to be done through all of the facilities. 20

Stop Protons Version 1.0 Work planning () PS Booster upgrade Beam to PSB LHCPROBE Beam to PS 1.5 months radiation protection cool-down 14.5 months shutdown time available (not including the 2x2weeks of closure) 5 months Hardware tests Cold check-out 2.5 months LHCPROBE beam commissioning Anticipated works before ( reduced the workload) Identified, labelled and disconnected all of the obsolete cables to be removed Shall carry out the removal of the obsolete cables during the EYETS 2016-2017 The shutdown duration is no more critical for the upgrade of the PSB during. The resource needs are being identified by the committee (PLAN tool) and resource levelling still needs to be done through all of the facilities. It is important to respect the shutdown duration of the PSB. 21

Stop Protons Version 1.0 Work planning () PS and TT2 upgrade LHCPROBE LHCPROBE Beam Beam to SPS to PS 1.5 months radiation protection cool-down 18 months shutdown time available (not including the 2x2weeks of closure) 4 months Hardware tests Cold check-out 1.5 months LHCPROBE beam commissioning Anticipated works before ( reduced the workload) Shall identify, label and disconnect all of the obsolete cables which are to be removed during the EYETS 2016-2017 Shall start the removal of the obsolete cables during the YETS 2017-2018 The shutdown duration is not critical for the upgrade of the PS and TT2 during. The resource needs are being identified by the committee (PLAN tool) and resource levelling still needs to be done through all the facilities. It is important to respect the shutdown duration of the PS and TT2. 22

Stop Protons Version 1.0 Work planning () SPS upgrade LHCPROBE Beam to LHC LHCPROBE Beam to SPS 1.5 months radiation protection cool-down 19.5 months shutdown time available (not including the 2x2weeks of closure) Anticipated works before ( reduced the workload, i.e. ac coating, impedance reduction, civil engineering for the new beam dump) Identified, labelled and disconnected all of the obsolete cables to be removed during the LS1 and the YETS 2015-2016 Shall start the removal of the obsolete cables during the EYETS 2016-2017 3.5 months Hardware tests Cold check-out 1.5 months LHCPROBE beam commissioning The shutdown duration is not critical for the upgrade of the SPS during but the logistics for transport will be challenging. The resource needs are being identified by the committee (PLAN tool) and resource levelling still needs to be done through all the facilities. It is important to respect the shutdown duration of the SPS. 23

Outlook The LHC injectors upgrade fits in the long shutdown 2 master schedule but it is important to note that the hardware tests and beam commissioning are planned in a critical path Possible impacts on the master schedule: The resource allocation (manpower and material) between the facilities The additional work (consolidation and maintenance) The consolidation requests shall be approved by the planning and installation team The groups shall continue informing the planning and installation team of any maintenance or additional work to be carried out during The logistic and safety constraints between the facilities The identification of co-activities and safety aspects in a facility which could adversely affect other facilities is under study 24