UNDER MILK WOOD - FULL Tek Specs - (updated 19/01/17)

Similar documents
PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

TECHNICAL SPECIFICATIONS: STICKS STONES BROKEN BONES Company: Bunk Puppets, contact :Jeff Achtem,

[technical list] updated 27/09/2017. Groupe Emile Dubois My Ladies Rock Creation September Playing time : 1h15 without intermission

Rider for Pigeon Party! USA Tour 2009/10

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

Technical Rider Attached is a technical Rider covering schedule, technical and practical requirements, and contacts. Changes may occur.

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

Technical Rider received by: Signed: Date: Name: Position: Venue:

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

Rider for Pigeon Party! USA Tour 2009/10

Borderline. Company Wang Ramirez TECHNICAL RIDER

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

CENTRE FOR PERFORMING ARTS

Figurines by Lola Maury - touring technical rider

Technical Rider. Update: may 6th 2008

JANE RUTTER AUSTRALIA S FIRST LADY OF THE FLUTE

Technical Specification Pavilion Dance

N AI-NI C HEN & T HE A HN T RIO

Technical Pack. Attenborough Arts Centre

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

SIMON & GARFUNKEL THROUGH THE YEARS TECHNICAL INFORMATION PACK

New Theatre Royal Lincoln Technical Information

Technical Pack. Embrace Arts at the RA Centre

TECHNICAL REQUIREMENTS

Enormous Room Technical Rider & General Lighting Plan

Live From Nashville TECHNICAL RIDER

TCHAIKOVSKY DISCOVERS AMERICA SCHEDULE A: TECHNICAL REQUIREMENTS

Not Fade Away. The Ultimate Buddy Holly Experience. TECHNICAL RIDER Video Projection is Recommended

Presents. Dare To Sea

"The Road Is Just A Surface" by Anja Garbarek and Jo Strømgren Kompani Technical Requirements

CHELSEA THEATRE. Technical Specifications

Rider Part1: Technical Requirements, A Cappella Show

Timber! Technical Rider

james whiteside lighting design

Barney Simon Theatre Technical Specifications

The Mannie Manim Technical Specifications

Paradiso (ch. Václav Kuneš) (30min) Technical requirements / List of light equipment Focus sheet on demand - (standard focusing)

Year 12 Drama and Theatre Studies: Course Overview

The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

PSYCHIC SALLY PRODUCTION RIDER & FOH REQUESTS (UPDATED 2016)

Matt Dann Cultural Centre

The Tower Theatre Contact - Peter Heselden Theatre Manager Tel

SHIVER. Technical rider update : 10th feb Premiere at Theater l Arsenic in Lausanne/Suisse the 4th of february 2014

DEREHAM MEMORIAL HALL

Technical Rider. Ryan McFarling Illusionist. General Stage Requirements

Phil L. Thomas Performing Arts Center Shiprock, New Mexico

TOURING INFORMATION AND TECHNICAL REQUIREMENTS THE ADVENTURES OF ALVIN SPUTNIK: DEEP SEA EXPLORER BY TIM WATTS

Technical Rider. GöteborgsOperans Danskompani. Tour to xxx. Alaska. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

Technical Rider "THEATRE" by SUPERAMAS

ISLAND HALL TECHNICAL INFORMATION

JERWOOD VANBRUGH THEATRE

TECH SHEET AND INFORMATION (Updated )

ROSE THEATRE BASEMENT

Pleasance London Main House Visiting Company Information Pack May 2017

HUECO / Technical Rider

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

Technical Guidance for Schools, Music, Theatre & Dance Academies

Dr JOHN GALLAGHER CONCERT CHAMBER

TOURING RIDER Where Magic & Motion Meet!

Everyness. Wang Ramirez Company TECHNICAL RIDER

Main House Technical Specification

TECHNICAL SPECIFICATIONS

THEATRE INFORMATION PACK

CONTACTS Jani Lauzon Managing Artistic Director

SHUT DOWN FILM INSTALLATION TECHNICAL SPECIFICATION

MOZART S MAGNIFICENT VOYAGE SCHEDULE A: TECHNICAL REQUIREMENTS

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

Technical Specification

JAMIE ADKINS. Circus INgognitus. Technical Rider Version: January, 2014

TECHNICAL RIDER FOR THEATER (rev. 1/2/18)

Technical Production Rider degeneration For venues in mainland Europe

L Orchestre d hommes-orchestres (lodho) (Performs Tom Waits)

Tabarnak Technical Rider

Borderline. Company Wang Ramirez TECHNICAL RIDER

FASO DANCE COMPANY KALAKUTA REPUBLIK

Uprising & The Art of Not Looking Back

TECHNICAL SHEET Show: Machine de Cirque

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

Source 4 Junior Zoom Profile 575W 14 part of universal rig

Where performance matters

TECHNICAL RIDER March 30th 2015

RHAPSODY & RHYTHM Technical Rider

Theatre Technical Specifications

THEATRE ROYAL MARGATE Technical Specification January 2016

The willing suspension of disbelief.

Please note we do have some regular volunteer technicians but there is no full time technical manager.

THEATRE ROYAL MARGATE Technical Specification April 2018

University of Pittsburgh at Bradford Blaisdell Hall/Pitt-Bradford Arts

HAMLET S BIG ADVENTURE TECHNICAL RIDER

Technical Production Rider

HALFWAY TO DAWN TOUR

Technical requirements & conditions for hirers

GERSHWIN S MAGIC KEY SCHEDULE A: TECHNICAL REQUIREMENTS

Technical Production Rider

TECHNICAL RIDER African Roads, American Streets

TECHNICAL / HOSPITALITY RIDER

Technical Specification

TECHNICAL SPECIFICATIONS (as at 29 April 2011)

Hopgood Theatre NOARLUNGA CENTRE

Standard (with END ON seating) 8.75m Wide x 7.3m Deep (to US black) Open Floor (seating retracted) 8.75m Wide x 13m Deep (to US black)

Transcription:

Theatre Tours International incorporating guy masterson productions tel/fax: +44 7979 757490 (guy masterson) e mail: guy@theatretoursinternational.com UNDER MILK WOOD - FULL Tek Specs - (updated 19/01/17) Please note: UNLESS ARRANGED OTHERWISE - this production requires in-house technicians for fit-up and running of show. If Sound and Lights cannot be operated from same place, two technicians will be required. RUNNING TIME: 110 Minutes (55 mins per half + interval if required State A: 2m wide pool from above front (approx. 35 0 from vertical) Profile - soft focused Specials: 4 x Profiles with shutters (separate channels) playing area Wooden Chair 12' from front of playing area A 2m soft focus Crucifix projected on backcloth floor to grid gobo D2 Door 2 D1 Door 1 gobo or shutters all specials hard focus D crucifix gobo projects onto blacks or back wall State B: Middle State: Open white lit from front, sides, top & back (up the back wall/curtain is fine) States E, F1 & F2: (separate channels) 3 fresnel footlights with barn doors set directly on stage floor on their brackets (clamps removed) or birdies B chair F1 F2 E State C: General Cover: Bright Open white from front, sides, top and back C Special notes: From experience, it is best to set the A spot first which should be focused to encompass a 2m tall man standing on a chair (about 35 0 from vertical - Usually just upstage of the proscenium). Lighting should be hung and focused IN ADVANCE. Fine focusing can be completed upon arrival of artiste and will take approx. 90 minutes. Gobos (A & B) supplied for Crucifix & D (NB: No holders) Programming will consist of 10 states A, B, C, D, E, F1, F2, Doors 1 & 2 & Crucifix and combinations of these in 79 cues. All timings will be pre-programmed where possible. Cues are available as required prerecorded in isf & esf files. We will overwrite cues from subs. Running the show involves following the script with explicitly numbered and LX and SFX cues. Script provided on day. Rehearsal time with technician 1 hour. If show is to be run with mic effects, 2 operators will be required. Sound effects are pre-mixed on apple laptop. (mini-jack to desk input lead needed) GOOD STEREO equipment & desk are required. The show also benefits from VOCAL ECHO EFFECTS. Please advise if you have a LAPEL MIC and EFFECTS UNIT available. The Set consists of a wooden chair. (Venue to supply if Guy Masterson is travelling by ticeted transport. (see web image) Clean black tabs and backdrop. If the stage is very scuffed, please repaint or lay dance floor. The B state should light an area to within 1m of the edge of the playing space so as to create a pool of light - (it is OK to spill onto backcloth). The general cover is self-explanatory. The Crucifix (gobo) should be projected floor to grid onto the backcloth. (If the proscenium prevents this, a wide angle profile spot with gobo holder will work from stage level.) Door D1 and Door D2 require profile spots with shutters. State D can be created with shutters or a gobo. Guy Masterson will require a clean dressing room with ironing & tea making facilities. Sandwiches, bottled water and TWO bananas would be appreciated for 5pm. Please ensure the shower (if available) is clean and a fresh towel and liquid soap are available. NB: LIGHTING SHOULD BE PREPARED IN ADVANCE - max programming/rehearsal time should be 3 hours Any queries please contact Guy Masterson directly on the above numbers.

LIGHTING PROGRAMMING SHEET FOR UNDER MILK WOOD - revised 16/06/16 All states should be programmed at full 100% unless otherwise indicated as a percentage @ 65%) When states are added/mixed with other states, these are indicated by a + sign (ie State A @50% + State D1 + Crucifix) State B is alstate B is always on as part of State C Crossfade times are marked in seconds Cue # A B C D E F1 F2 D1 D2 Crucifix B/O HL Wait Follow Hang Cue # Subs Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Delay Subs 1 5 @ 50% + 5 @ 50% 1 2 15 @ 50% 44 W 74 29 2 2.1 15 34 W 34 19 2.1 3 12 @ 50% 25 13 3 4 180 4 5 3 5 6 3 6 7 3 7 8 0 8 8.1 0 8.1 8.2 0 LINK TO 8.1 8.2 9 0 + 0 + 9 10 0 10 11 4 11 12 3 12 13 0 13 14 3 14 15 3 15 16 3 16 17 2 17 18 2 + 2 + 18 19 3 19 20 3 @ 60% 20 21 0 1.5 1.5 21 21a EFFECT 1: F1 & F2 chase in 0.1 sec increments between 80%-100% 2 @ 75%+ 2 @ 75%+ 80 78 21a 21b 2 3 1 21b 22 7 + 7 @ 30% + 22 23 40% + 4 @ 30% + 4 + 4 + 23 24 5 + 5 @ 30% + 24 25 180 25 26 10 26 27 3 27 28 4 28 29 3 29 30 3 @ 50% + 3 + 30 31 3 31 32 180 32 33 3 @ 50% + 3 + 33 34 3 34 34.a INTERVAL BLACKOUT 0 7 7 34.a 34.b 5 @ 50% + INTERVAL UP 5 + 34.b 1 of 2

Cue # A B C D E F1 F2 D1 D2 Crucifix B/O HL Wait Follow Cue # Subs Sub 1 Sub 2 Sub 3 Sub 4 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Delay Subs 34.c INTERVAL OUT 8 17 9 34.c 34.d 0 ACT 2 START 34.d 35 20 @ 50% 35 36 0 36 37 15 37 38 0 38 39 3 @ 50% 39 40 3 40 41 3 @ 50% + 3 + 41 42 3 42 43 3 @ 50% 43 44 3 44 45 90 45 46 3 @ 50% + 3 + 46 47 4 47 48 3 @ 50% + 3 + 48 49 4 49 50 10 50 51 0 51 52 5 52 53 2 53 54 3 @ 65% 54 55 3 55 56 0 56 57 2 57 58 25 58 59 3 59 60 4 @ 65% + 4 + 4 + 60 61 3 + 3 + 61 62 4 62 63 120 + 120 @ 40% 63 64 40% + 40% + 4 + 4 + 64 65 40% + 40% + 65 66 40% + 40% + 3 + 66 67 7 67 68 4 68 69 4 + 4 + 69 70 3 70 71 3 71 72 0 14 W 14 14 72 72.1 15/20 @ 50% 51 W 51 37 72.1 73 10 15 15 5 73 74 4 74 75 3 4 4 1 75 76 4 76 77 5 @ 50% + 5 75 2 of 2

Theatre Tours International incorporating guy masterson productions tel/fax: +44 7979 757490 (guy masterson) e mail: guy@theatretoursinternational.com UNDER MILK WOOD SEMI-SKIMMED - Tek Specs - (updated 17/01/17) Please note: UNLESS ARRANGED OTHERWISE - this production requires in-house technicians for fit-up and running of show. If Sound and Lights cannot be operated from same place, two technicians will be required. RUNNING TIME: 65 Minutes State A: 2m wide pool from above front (approx. 35 0 from vertical) profile - soft focused Specials: 3 x Profiles with shutters (separate channels) playing area Wooden Chair 12' from front of playing area A 2m soft focus Crucifix projected on backcloth floor to grid gobo D2 Door 2 D1 Door 1 all specials hard focus crucifix gobo projects onto blacks or back wall State B: Middle State: Open white lit from front, sides, top & back (up the back wall/curtain is fine) States E, F1 & F2: (separate channels) 3 fresnel footlights with barn doors set directly on stage floor on their brackets (clamps removed) or birdies B chair F1 F2 E State C: General Cover: Bright Open white from front, sides, top and back C Special notes: From experience, it is best to set the A spot first which should be focused to encompass a 2m tall man standing on a chair (about 35 0 from vertical - Usually just upstage of the proscenium). Lighting should be hung and focused IN ADVANCE. Fine focusing can be completed upon arrival of artiste and will take approx. 90 minutes. Gobos (A & B) supplied for Crucifix & D (NB: No holders) Programming will consist of 9 states A, B, C, D1, D2, E, F1, F2 & Crucifix and combinations of these in 50 cues. All timings will be pre-programmed where possible. Cues are available as required prerecorded in isf & esf files. We will overwrite cues from subs. Running the show involves following the script with explicitly numbered and LX and SFX cues. Script provided on day. Rehearsal time with technician 1 hour. If show is to be run with mic effects, 2 operators will be required. Sound effects are pre-mixed on apple laptop. (mini-jack to desk input lead needed) GOOD STEREO equipment & desk are required. The show also benefits from VOCAL ECHO EFFECTS. Please advise if you have a LAPEL MIC and EFFECTS UNIT available. The Set consists of a wooden chair. (Venue to supply if Guy Masterson is travelling by ticeted transport. (see web image) Clean black tabs and backdrop. If the stage is very scuffed, please repaint or lay dance floor. The B state should light an area to within 1m of the edge of the playing space so as to create a pool of light - (it is OK to spill onto backcloth). The general cover is self-explanatory. The Crucifix (gobo) should be projected floor to grid onto the backcloth. (If the proscenium prevents this, a wide angle profile spot with gobo holder will work from stage level.) Doors D1 and D2 require profile spots with shutters. Guy Masterson travels alone will require a clean dressing room with ironing & tea making facilities. Sandwiches, bottled water and TWO bananas would be appreciated for 5pm. Please ensure the shower (if available) is clean and a fresh towel and liquid soap are available. NB: LIGHTING SHOULD BE PREPARED IN ADVANCE - max programming/rehearsal time should be 3 hours Any queries please contact Guy Masterson directly on the above numbers.

LIGHTING PROGRAMMING SHEET FOR UNDER MILK WOOD SEMI-SKIMMED - (revised 16/06/16) All states should be programmed at full 100% unless otherwise indicated as a percentage @ 65%) When states are added/mixed with other states, these are indicated by a + sign (ie State A @50% + State D1 + Crucifix) State B is alstate B is always on as part of State C Crossfade times are marked in seconds Cue # A B C E F1 F2 D1 D2 Crucifix B/O HL Wait Follow Hang Cue # Subs Sub 1 Sub 2 Sub 3 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Delay Subs 1 5 @ 50% + 5 @ 50% 1 2 15 @ 50% 44 W 74 29 2 2.1 15 34 W 34 19 2.1 3 12 @ 50% 25 13 3 4 180 4 5 3 5 6 3 6 7 3 7 8 0 8 8.1 0 8.1 8.2 0 LINK TO 8.1 8.2 9 0 + 0 + 9 10 0 10 11 4 11 13 0 13 15 3 15 17 2 17 18 2 + 2 + 18 19 3 19 20 3 @ 60% 20 21 0 1.5 1.5 21 21a EFFECT 1: F1 & F2 chase in 0.1 sec increments between 80 2 @ 75%+ 2 @ 75%+ 80 78 21a 21b 2 3 1 21b 22 7 + 7 @ 30% + 22 23 40% + 4 @ 30% + 4 + 4 + 23 24 5 + 5 @ 30% + 24 25 180 25 26 10 26 27 3 27 28 4 28 29 3 29 30 3 @ 50% + 3 + 30 31 3 31 32 180 32 1 of 2

Cue # A B C E F1 F2 D1 D2 Crucifix B/O HL Wait Follow Hang Cue # Subs Sub 1 Sub 2 Sub 3 Sub 5 Sub 6 Sub 7 Sub 8 Sub 9 Sub 10 Delay Subs 35 20 @ 50% 35 36 0 36 39 3 @ 50% 39 40 3 40 45 90 45 50 10 50 51 0 51 54 3 @ 65% 54 57 2 57 58 25 58 59 3 59 63 120 + 120 @ 40% 63 64 40% + 40% + 4 + 4 + 64 71 3 71 72 0 14 W 14 14 72 72.1 15/20 @ 50% 51 W 51 37 72.1 73 10 15 15 5 73 74 4 74 75 3 4 4 1 75 76 4 76 77 5 @ 50% + 5 + 75 2 of 2