TECHNICAL SPECIFICATIONS (as at 29 April 2011)

Similar documents
The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

TECHNICAL SPECIFICATIONS: STICKS STONES BROKEN BONES Company: Bunk Puppets, contact :Jeff Achtem,

PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

ETC Congo Desk 1024 channels in two universes ( Universe 1 House dimming, Universe 2 Toured dimming) Digital light processor dimmers

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

SR Wing space = 2m SL Wing space = 1.1m There is an upstage cross over with pass doors onto stage USR & USL.

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

TOURING INFORMATION AND TECHNICAL REQUIREMENTS THE ADVENTURES OF ALVIN SPUTNIK: DEEP SEA EXPLORER BY TIM WATTS

TECHNICAL SPECIFICATIONS

Technical Specification

JANE RUTTER AUSTRALIA S FIRST LADY OF THE FLUTE

DEREHAM MEMORIAL HALL

Dr JOHN GALLAGHER CONCERT CHAMBER

HALFWAY TO DAWN TOUR

THE STREET THEATRE. Technical Specifications

FASO DANCE COMPANY KALAKUTA REPUBLIK

Matt Dann Cultural Centre

Enormous Room Technical Rider & General Lighting Plan

Stage point load limit: Stage point load of 700kg. Stage dimensions Non-proscenium stage. Setting line 200mm upstage from the fire curtain.

Theatre Technical Specifications

O Donoghue Centre for Drama, Theatre and Performance National University of Ireland Galway

Technical Specifications Updated 01/10/2017. Stage

Technical specifications Main theatre. Sound. Console: Soundcraft Si Performer 3

JERWOOD VANBRUGH THEATRE

2017 TECHNICAL SPECIFICATIONS

The Tower Theatre Contact - Peter Heselden Theatre Manager Tel

John Leslie Theatre. Technical Specifications. Updated July 2018

Main House Technical Specification

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

Technical Specification Pavilion Dance

Standard (with END ON seating) 8.75m Wide x 7.3m Deep (to US black) Open Floor (seating retracted) 8.75m Wide x 13m Deep (to US black)

Technical Specification

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

Esso BHP Billiton Wellington Entertainment Centre

HIRE AND TECHNICAL INFORMATION

TECHNICAL REQUIREMENTS

New Theatre Royal Lincoln Technical Information

DOMINO THEATRE INC. THEATRE TECHNICAL SPECIFICATIONS AND INFORMATION

Latrobe Performing Arts Centre

VENUE TECHNICAL REQUIREMENTS

ROSE THEATRE MAIN THEATRE

Auditorium Seating VISY THEATRE TECHNICAL SPECIFICATIONS

Presents. Dare To Sea

TECH SHEET AND INFORMATION (Updated )

Stage point load limit: Stage point load of 700kg. Stage dimensions Non-proscenium stage. Access door to stage from scene dock - 2.9m by 2.9m.

CENTRE FOR PERFORMING ARTS

BANYULE THEATRE TECHNICAL INFORMATION. 10 Buckingham Drive Heidelberg VIC Page 0 of 10

MONASH University Academy of Performing Arts

Arlington Arts Tech Spec 2018

CONTACTS Jani Lauzon Managing Artistic Director

TECHNICAL REQUIREMENT FORM

HUECO / Technical Rider

Technical Rider Attached is a technical Rider covering schedule, technical and practical requirements, and contacts. Changes may occur.

Sandusky State Theatre Technical Specifications

Stage Right wing = 3m 10cm Depth X 6m 40cm Width. Stage to underside of fly galleries from flat floor = 7m

TECHNICAL RIDER GENERAL INFORMATION

"The Road Is Just A Surface" by Anja Garbarek and Jo Strømgren Kompani Technical Requirements

Technical Pack. Attenborough Arts Centre

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

Technical Specifications

Downtown Arts Center Tech Packet. General Information

Technical Information

Everyness. Wang Ramirez Company TECHNICAL RIDER

THE ROUNDHOUSE THEATRE

Technical Rider. Update: may 6th 2008

BURDEKIN THEATRE BURDEKIN THEATRE. Technical Specifications. Updated 08/02/2008

Stage. Get In & Parking

Dubbo Regional Theatre & Convention Centre Theatre Technical Specifications

Technical Specification for the Alley Theatre, Strabane

The Haymarket Basingstoke Technical Specifications

Technical Rider. GöteborgsOperans Danskompani. Tour to xxx. Alaska. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

* All public events require the presence of Centerville High School Security. Contact Theatre Manager for details.

Tech specs: Main Auditorium. Dimensions. Prompt Corner. Stage Floor. Dressing Rooms (Under stage)

Shouson Theatre Venue Specifications (updated Jan 2017)

ROSE THEATRE BASEMENT

Equipment Inventory. Seating. Stage. Dressing Rooms. Loading Bay

TOURING RIDER Where Magic & Motion Meet!

Summary. Access and Parking

The set is very simple. It consists of one small box, a small stool, and a small ping- pong table.

Hopgood Theatre NOARLUNGA CENTRE

Visy Theatre technical information and general specifications 2019

Technical Specifications

20 hemp bars, set at random intervals (SWL=150lbs) Fixed position situated Stage Right. Operated stage level, SL (counterweighted)

SIMON & GARFUNKEL THROUGH THE YEARS TECHNICAL INFORMATION PACK

Technical Specifications

Monash Academy of Performing Arts

Uprising & The Art of Not Looking Back

TECHNICAL SPECIFICATIONS RIVERSIDE THEATRE

Barney Simon Theatre Technical Specifications

Cornerstone Technical Specifications 2018 / V1

1/16 Virginia Tech/Blacksburg, VA/Haymarket Theatre

Hard Rock Cafe Times Square Sound System Advance Sheet

Pleasance London Main House Visiting Company Information Pack May 2017

RPAC REDLANDS PERFORMING ARTS CENTRE

University of Pittsburgh at Bradford Blaisdell Hall/Pitt-Bradford Arts

JAMIE ADKINS. Circus INgognitus. Technical Rider Version: January, 2014

BECKETT THEATRE TECHNICAL INFORMATION & GENERAL SPECIFICATIONS 2014 PLEASE DIRECT ALL ENQUIRIES TO THE OPERATIONS MANAGER:

Monash University Academy of Performing Arts

Transcription:

www.brinkproductions.com BRINK PRODUCTIONS Skip Miller s Hit Songs By Sean Riley TECHNICAL SPECIFICATIONS (as at 29 April 2011) Brink Productions Limited GPO Box 1269, Adelaide SA 5001 Tel : + 61 8 8211 6565 Fax : + 61 8 8211 6513

GENERAL REQUIREMENTS runs for 1hr 25mins with no interval. It takes place in various locations, including an art gallery and a beach shack in Australia, and an African refugee camp. Venue requirements Venue type First presented in end-on configuration with raked seating. (See attached plan). Can be adapted to Proscenium Arch Theatre. Stage area Stage Floor Height stage floor to grid / Standard flown trim height 16m wide x 11m deep (incl. Exposed wing space and cast cross-over behind wall) Flat, not raked. We must be able to fix into the stage floor with screws French braces for the US wall. 6m - 7m is the tolerance for effects and projection to work Flies (to be confirmed) Counterweight fly system required Minimum drift 15m We use 3 counterweighted fly lines for set and min 3 up to 5 Lx bars Special Flown Elements Moving in and out below the Lx Bar / Grid trim height are 3 suspended lines of mini Electro Magnets, single sheets of A3 paper hang from the Magnets. Masking No onstage legs required. Possible use of panorama masking if the actual stage is larger than required. Other requirements Supply of water to stage via hose is essential to keep the sand dampened post-show Theatre access Load-in & Load-out Adjustable loading bay ramp. Forklift or pallet jack for pallets. (level loading path required as elements may weight up to 500kg )

Show Length Number of shows Touring company Full season To Opening Night, and for Bump-out To Opening Night only 1 hour 25 mins No interval 8mins latecomers lock-out Max 2 shows per day, 8 shows per week (Except in bump in week) Min 1 day off per week. 9 x Performers 6 actors, 3 musicians 1 x Stage Manager 1 x ASM 1 x Production Manager Producer 1x Director 1x Lighting Designer 1 x Technical Manager (Sound and AV) Dressing Room / Laundry Requirements Dressing rooms Wardrobe maintenance Laundry facilities Dry cleaning Dressing room facilities for 9 performers with benches or dressing tables, chairs, mirrors (table and full-length), showers and toilets, good lighting for make-up. Minimum 2 dressing rooms (7 Men, 2 Women) 1 x Production Office for Stage/Tour Manager and Production Manager, with access to phone and email/internet. Wardrobe maintenance call required after each performance (3 hrs), including between shows on matinee days. 1 x Washing machine 1 x Tumble dryer 1 x Drying cupboard Hand washing facilities Ironing facilities Steamer 1 x Jacket weekly negotiable

Stage Management Stage Manager desk: Backstage Cue lights Bottled spring water Kitchen SM desk with view of stage Video monitor of full stage Infrared camera monitor Stage sound monitor Cast call to Dressing Rooms Cue lights x 2 (OP and PS) Shout mic Comm to LX / SX 2 x medium-sized props tables USPS USOP 1 x 11 litre bottle per day or access to filtered water (not sparkling water) 1 x water well located backstage Tea/coffee making facilities Washing up facilities Communications / Monitors Communications Stage Sound Monitor Stage Video Monitors Production Desk Stage Manager desk x1 Lighting Operator x1 Sound/AV Operator x1 Wireless: ASM x1; Mx x1 If no wireless available: 2 DSOP and DSPS wings Production desk x3 (see below) SM Desk x1 Live video feed of full stage required to: - SM desk x1 Live infrared video feed of full stage to: SM desk x1 Required in auditorium for Lighting and Sound plots and Technical Rehearsal Comms x 3 (SM, SD, LX) Dimmable desk lights x2

Local crew bump-in Local show crew Local crew bump-out Freight Risk Assessment General show notes Refer schedule 1 x Mechanist 1 x Lighting Board operator 1 x Sound/AV operator 1 x Wardrobe maintenance (not required for show call) Refer schedule Touring by Road - 50 m 3 pantech Sea Freight 40 foot container Risk Assessment documentation for original production in Odeon Theatre, Norwood, South Australia available for reference. Show Mech to wear long-sleeved back shirt and long pants. SET (See attached Floor Plan) Overview: The main elements of the set are as follows: - Upstage walls pine frames with MDF skin painted and textured - Stage floor (10m x 9m) lined in builders plastic and covered with approx 60mm thickness of brickies sand - 1 x electronic drop mechanism, operated by the mechanist offstage PS Electro Magnetic controlled paper drop simple on/off switch control. - Musicians area on OP of stage - Stage furniture comprising a trestle table and various crates Brink Productions to provide: - All set elements (except sand) - Hose and water wand for sand - Upstage cross-over carpet Presenter to provide: - Stage masking, as necessary for specific venues. - Pallet jack to load and unload wall flats and sand containers - Cement roller - Sand 6 tonnes (bag example) - Water to stage is essential

SHOW SET PHOTO #1 Photo: Chris Herzfeld SHOW SET PHOTO #2 Musicians - OP Photo: Chris Herzfeld

LIGHTING Overview: The lighting plan will be specifically adapted to each venue. Lighting plan to be delivered one month prior to bump in. Lighting requirements (generic) Lighting control board Lighting console requires minimum 1 universe The original show plot is in PC Stage Format. Positions Lanterns Dimmers Details to be advised as per venue requirements. 14 x 650w Zoom Profiles 16 to 30ish degree (could be 1Ks) 21 x 1000w Zoom Profiles 16 to 30ish degree 49 x 1000w Fresnels 4 x ILED RGBAW LED Cyc Wash units or similar - must have Amber & White 3 x Varilite VL1000TS (must be TS) 2 x Water ripple FX 76 x 2.4K dmx dimmers Brink Productions to provide: - Show Plot disc in compatible format - Venue Specific Lighting Plan Presenter to provide: - All lighting fixtures, accessories & gels - Lighting control board see note above - All dimmers and cabling - Appropriate levels of blue light backstage

SOUND Overview: The show audio consists of; live music from 3 onstage musicians and of playback from QLAB. Sound Requirements Desk Sources 1x 24-channel Analogue / Digital console. Must have individual stereo outputs, 8 separate groups with individual outputs, and minimum 6 pre/post switchable auxiliaries. Playback for the show is provided by a Macintosh laptop with external soundcard running Qlab (provided by Brink). Appropriate cabling from the soundcard (TRS jacks - line level signal) to the console. 2 x Mics positioned around the performance area. 4 x Mics positioned around the musicians. Mics 4 x High Quality Condensor (AKG 451 / similar ) 2 x Shotgun Condensors ( ME 66 / similar ) on Round base Table Stand with T bar mic clip assembley 1x Shout Mike Stage Manager 4 x 20m mic cables ( plain black ) Speakers/amplifiers A minimum three-way house system and amplifiers capable of producing a clean, undistorted sound pressure level of 105dB ( A-weighted) at any point in the venue. System crossovers, equalization, and/or processors must be located at FOH mix position, and be accessible to the FOH engineer. Two two-way active upstage rear fills, each with appropriate amplification, running two separate mixes, with each rear fill containing one twelveinch speaker, and a two-inch compression driver/horn arrangement (or the equivalent ). Each rear fill should have a minimum of one thousand watt handling capacity. Two active or passive small (hot spot) style foldback wedges/speakers.

FOH processing Two one-third octave graphic equalizers for equalization of the entire system All delay speakers, and/or any speakers running on a console matrix, must have a dedicated one-third octave graphic equalizer. All foldback sends must have a dedicated onethird octave graphic equalizer. Brink Productions to provide: - Macintosh laptop with external soundcard running Qlab (provided by Brink). - All instruments for musicians Presenter to provide: - Complete sound system as specified above. - All mics & pickups

VIDEO Overview: The video projection is required to cover the set wall, and all the A3 sheets of paper rigged on the paper drop lines flown in during the show. The projection angles needed are very specific. Final positioning of the projector will need to be determined and agreed with Brink dependent on venue.. Video Requirements Projector Projector position(s) 1 x Sanyo PDG DHT 8000L (or equivalent 1920 x 1080) 1 x Lens to cover projection range (specifications dependent on venue) 1 x Shutter, DMX controlled. From bio box window centre ( or rear centre of the auditorium - dependent on venue ) Mac Laptop Running Qlab outputting DVI. 2 way - DVI split Signal source Vision Processing Monitors 1 x HD LCD Monitor 1920 x 1080. Brink Productions to provide: - Data Projector with appropriate lens and shutter(s) - All necessary fling hardware for projector(s) - All necessary cabling - Q-Lab software and appropriate computer. Presenter to provide: Possible TBA - (specifications dependent on venue)

CREW SCHEDULE (as at March 2011) PRE-RIG Rig stage Lx 4 Lx x 8 hrs DAY ONE Morning Unload truck 4 Mx x 4 hrs Install wall Rig Floor LX 4 Lx x 4 hrs Install AV line-up during lunch break 2 Snd x 4 hrs Afternoon Lay Floor plastic and sand 4 Mx x 3 hrs (8/4/2011) Install floor LX (once Floor in) 4 Lx x 4 hrs Patch Install Sound 2 Snd x 5 hrs Tune system during dinner break Evening Focus LX 3 Lx, 1 Mx x 4 hrs DAY TWO Morning Finish set 1 Mx x 4 hrs Complete LX Focus 4 Lx x 2 hrs Set sound levels Check lighting/av cues 2 Lx, 1 Snd x 2 hrs Set up costumes 1 Wdrbe x 3 hrs Afternoon Dry tech / Check lighting/av states Show crew + 1 Lx x 4 hrs Evening Tech/Dress rehearsal Show crew + 1 Lx x 4 hrs Scenic Call TBC 1 Scenic painter DAY THREE Morning Tech hold Show crew + 1 Lx x 4 hrs Wardrobe maintenance 1 Wdrbe x 4 hrs Afternoon Dress Rehearsal Show crew x 4 hrs Wardrobe maintenance 1 Wdrbe x 3 hrs Evening Performance (Preview) Show crew x 4 hrs DAY FOUR Morning Tech hold Show crew + 1 Lx x 4 hrs Wardrobe maintenance 1 Wdrbe x 4 hrs Afternoon Work on stage (no costumes) Show crew x 4 hrs Evening Performance (Opening) Show crew x 4 hrs SEASON T 1.5 hrs Venue open for Stage Management 1 Mx x 4 hrs T 1 hr Crew call 1 Lx, 1 Snd T Performance x 3 hrs T+ 1hr 30mins Performance ends T+ 1hr 45mins Crew finish Wardrobe maintenance 1 Wdrbe x 3 hrs BUMP-OUT 5 hours Note: Time specified is to bump-out the show only, including truck pack. Time required to restore theatre should be added by local presenter as necessary. 6 Mx x 5 hrs 2 Lx x 2 hrs 1 Snd/AV x 2 hrs 1 Wdrbe x 3 hrs

Skip Miller s Hit Songs Odeon Theatre 2011 (not to scale)