OPERATIONAL EXPERIENCE AT J-PARC

Similar documents
COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

PRESENT STATUS OF J-PARC

The PEFP 20-MeV Proton Linear Accelerator

DELIVERY RECORD. Location: Ibaraki, Japan

PEP II Design Outline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Beam instrumentation at the 1-MW proton J-PARC RCS

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC)

TOWARDS THE COMMISSIONING OF J-PARC

The Elettra Storage Ring and Top-Up Operation

Linac 4 Instrumentation K.Hanke CERN

Progress of Beam Instrumentation in J-PARC Linac

The Construction Status of CSNS Linac

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Proton Engineering Frontier Project

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

EPJ Web of Conferences 95,

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

Upgrading LHC Luminosity

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

Beam Loss Detection for MPS at FRIB

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

30 GHz Power Production / Beam Line

LHC Beam Instrumentation Further Discussion

Operational Status of PF-Ring and PF-AR after the Earthquake

New Filling Pattern for SLS-FEMTO

4.4 Injector Linear Accelerator

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

III. Proton-therapytherapy. Rome SB - 3/5 1

Present Status and Future Upgrade of KEKB Injector Linac

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

Commissioning of the CNGS Extraction in SPS LSS4

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Design Studies For The LCLS 120 Hz RF Gun Injector

Status of SOLARIS Arkadiusz Kisiel

THE OPERATION EXPERIENCE AT KOMAC*

Advanced Photon Source - Upgrades and Improvements

Development of an Abort Gap Monitor for High-Energy Proton Rings *

SPEAR 3: Operations Update and Impact of Top-Off Injection

Top-Up Experience at SPEAR3

CONSTRUCTION AND COMMISSIONING OF BEPCII

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

KEKB Accelerator Physics Report

Status of Elettra, top-up and other upgrades

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

PEP II STATUS AND PLANS *

Digital BPMs and Orbit Feedback Systems

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

THE ANTIPROTON DECELERATOR (AD)

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

CLIC Feasibility Demonstration at CTF3

Detailed Design Report

Status of RF Power and Acceleration of the MAX IV - LINAC

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

1. General principles for injection of beam into the LHC

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Tolerances on Magnetic Misalignments in SESAME Storage Ring

Linac3 experience for LHC ion runs

PEP II Status and Plans

Development of high power gyrotron and EC technologies for ITER

RF considerations for SwissFEL

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

beam dump from P2 losses this morning

P. Emma, et al. LCLS Operations Lectures

Studies on an S-band bunching system with hybrid buncher

arxiv: v1 [physics.acc-ph] 9 Aug 2016

UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE

Challenges in Accelerator Beam Instrumentation

Requirements for the Beam Abort Magnet and Dump

Screen investigations for low energetic electron beams at PITZ

Summary of the 1 st Beam Line Review Meeting Injector ( )

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

North Damping Ring RF

A Facility for Accelerator Physics and Test Beam Experiments

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Status and Plans for PEP-II

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

PEP-I1 RF Feedback System Simulation

Transcription:

OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki, 35-8 Japan Abstract The J-PARC is a multi-purpose proton accelerator facility aiming at MW-class output beam power, which consists of a -MeV linac, a 3-GeV rapid cycling synchrotron (RCS), a 5-GeV main ring synchrotron (MR) and several experimental facilities (a materials and life science experimental facility; MLF, a hadron experimental hall; HD, and a neutrino beam line to Kamioka; NU). The beam commissioning of the J-PARC began in November 6, and then the linac and RCS started a user operation for the MLF in December 8. The current output beam power to the MLF is 2 kw. In this paper, the recent progress and operational experience in the course of our beam power rampup scenario such as beam loss control, machine activation and beam availability, especially obtained in the MLF user operation by the linac and RCS will be presented. INTRODUCTION The J-PARC is a multi-purpose proton accelerator facility aiming at MW-class output beam power. As shown in Fig., the J-PARC accelerator complex [] comprises a -MeV linac, a 3-GeV rapid cycling synchrotron (RCS), a 5-GeV main ring synchrotron (MR) and several experimental facilities (a materials and life science experimental facility; MLF, a hadron experimental hall; HD, and a neutrino beam line to Kamioka; NU). Figure : Bird s eye view of the J-PARC. The linac consists of a H ion source, a radiofrequency quadrupole (RFQ), a drift tube linac (DTL) and hotchi.hideaki@jaea.go.jp a separated-type drift tube linac (SDTL). The output energy is 8 MeV and the peak current is 3 ma at present. At full capability in the current configuration, the linac will produce 36 kw output at 8 MeV with 3 ma peak,.5 ms long and 56% chopper beam-on duty factor at 25 Hz repetition, which corresponds to kw output at the RCS extraction energy (3 GeV). The upgrade of the front-end system to get 5 ma peak current as well as the installation of an annular coupled structure linac (ACS) for the energy recovery to MeV, which are essential to achieve our final goal of MW output at the RCS, are scheduled for summer maintenance periods in 22 and 23. The linac beam is delivered to the RCS injection point, where it is multi-turn charge-exchange injected with a carbon stripper foil. The RCS accelerates the injected beam up to 3 GeV with 25 Hz repetition. The current injection energy is 8 MeV, for which the RCS will first aim at 3 kw output, and then drive for MW output after upgrading the linac. The 3-GeV beam from the RCS is mainly transported to the MLF to produce pulsed spallation neutrons and muons. A part of the RCS beam (typically 4 pulses every 3.64 s) is transported to the MR. The MR still accelerates the injected beam to 3 GeV, delivering it to the HD by a slow extraction and to the NU by a fast extraction. The output energy at the MR will be upgraded to 5 GeV in the second phase of the J-PARC project. The beam commissioning of the J-PARC began in November 6 and it has well proceeded as planned from the linac to the downstream facilities [2][3]. The linac and RCS started a user operation for the MLF with 4 kw output beam power in December 8. Via a series of underlying beam studies with such a low intensity beam, the output beam power from the RCS to the MLF was increased to 2 kw in November 9. Since then, our effort has been focused on a parameter tuning for higher-intensity beams ( 3 kw) including a beam painting injection scheme in the RCS. In this paper, the recent progress and operational experience in the course of our beam power ramp-up scenario such as beam loss control, machine activation and beam availability, especially obtained in the MLF user operation by the linac and RCS will be presented (the status of the MR beam operation is presented in [4] in details). CURRENT STATUS OF THE LINAC Fig. 2 shows a typical residual radiation level in the linac, where the top value is a residual radiation level for 4 kw operation measured 6-hour after the beam shutdown, while 276 Commissioning, Operations and Performance

Figure 2: Residual radiation level (μsv/h) in the linac, where the top value is a residual radiation level for 4 kw operation measured 6-hour after the beam shutdown, while the bottom value is for 2 kw operation measured 5-hour after the beam shutdown. In these values, the red one is for the measurement on the surface of the vacuum chamber, while the blue one is at a distance of 3 cm. maintenance period (July-September 2). In the next run cycle (October 2), we are going to measure this particle loss under the improved vacuum condition. Another issue was a considerable machine activation at the first bend of the first arc section detected after 4 kw operation, which mainly came from H + component accelerated to around the design energy generated by gas stripping in the low energy beam transport line (LEBT) between the ion source and RFQ. For this issue, we tried to remove H+ component at the medium energy beam transport line (MEBT) between the RFQ and DTL [7]. As shown in Fig. 3, we separated H + and H with steering and bending magnets, and removed H + component with a scraper originally used for chopping. As shown in Fig. 4, the beam loss was reduced to negligible level in this way. Now we use this scheme for routine operation, and the corresponding residual radiation level is significantly reduced to 3 μsv/h on the surface for the current 2 kw routine operation. the bottom value is for 2 kw operation measured 5-hour after the beam shutdown. In these values, the red one is for the measurement on the surface of the vacuum chamber, while the blue one is at a distance of 3 cm. After startup of a high duty operation for MLF users, we found several significant machine activations [5]. Figure 3: Schematic view of the MEBT. Figure 5: Residual radiation level (μsv/h) in the RCS measured 5-hour after the beam shutdown of 2 kw operation, where the red one is for the measurement on the vacuum chamber surface, while the blue one is at a distance of 3 cm. CURRENT STATUS OF THE RCS Figure 4: Beam loss monitor signal located near the first bend. The first one is a residual radiation widely distributed over the future ACS section. One of the possible causes of this particle loss is H or H+ component generated by gas stripping [6]. For this concern, we will add some vacuum pumps in the SDTL and future ACS section in this summer Commissioning, Operations and Performance Fig. 5 shows a typical residual radiation level in the RCS detected 5-hour after the beam shutdown of 2 kw operation. The intensity loss at the RCS for the current 2 kw operation is now % level. Most of the beam losses are well localized on the ring collimator, and the residual radiation level in the collimator area is still kept at less than μsv/h at a distance of 3 cm. But small part of them makes some machine activations as unlocalized beam loss [5]. The first one is a machine activation detected downstream of the charge-exchange foil in the injection section, where the highest residual radiation level is 2 msv/h on the chamber surface. In the RCS, multi-turn chargeexchange injection with a carbon foil is adopted. In this way the beam hits the foil many times during injection period. Fig. 6 shows beam loss monitor signals measured at the two highly activated points (a) and (b) in Fig. 5 as a 277

BLM signal at (a) 8 2.5 5 2.5 5 7.5 2.5 5 7.5 2 22.5 25 7.5 2.5 5 7.5 2 22.5 25 BLM signal at (b) 35 3 25 5 5 Number of foil hits Figure 6: Beam loss monitor signals located at (a) and (b) in Fig 5 as a function of the average number of the foil hits during injection period. function of the average number of the foil hits during injection period. In this measurement, the number of the foil hits was adjusted by combination of the foil position and the transverse painting. As shown in the figure, the detected beam loss monitor signals are proportional to the number of the foil hits, which indicate that the high residual radiations come from a large angle event from foil scattering. The number of the foil hits in the current 2 kw routine operation is 8.8. The current foil with mm (horizontal) 4 mm (vertical) dimension, which was prepared for the day of the beam commissioning, is too large compared with the actual size of the injection beam (6 mm 6 mm). In order to reduce the foil hitting probability, we will install a new foil with a smaller size in vertical ( mm 5 mm) matched to the injection beam size in this summer maintenance period. If using such a small foil, the number of the foil hits can be reduced to 4.7, and the corresponding residual radiations should be half of the current level. Another one is a machine activation at the arc section with dispersion maximum (6 m). This particle loss takes place at the middle of the acceleration process and is very sensitive for the tune variation during acceleration process and the longitudinal beam profile. Such a feature implies that the beam loss comes from the chromatic tune spread. Now in the RCS the chromatic correction is performed at injection with DC power supplies. Therefore the chromaticity gradually recovers as accelerated. For this concern, we plan to introduce AC power supplies for chromatic correction sextupoles in this summer maintenance period. Another possible cause of this particle loss is a leakage from a distorted rf bucket due to the beam loading effect. In the next run cycle (October 2), we will try to minimize this particle loss by optimizing the chromatic correction and the tune variation during the acceleration process 278 Figure 7: Beam fault statistics for the MLF user operation in the last five run cycles. Figure 8: Beam availability for the MLF user operation in the last five run cycles. and by introducing the beam loading compensation. BEAM FAULT STATISTICS Fig. 7-(a) and (b) shows beam fault statistics for the MLF user operation in the last five run cycles. The significant portion of the downtime related to the linac was from a fault of the RFQ and SDTL. The typical beam resuming time for the RFQ fault was minute for automatic rf recovery case and minutes for operator assisted recovery case. The failure rate of the automatic recovery, which mainly came from a severe discharge, was 2% in these cycles. The increase of the downtime related to the SDTL in the latest run cycle was from a discharge trouble of the coaxial feeder line. The downtime due to this incident reached to 7 hours. While this is a rare event, now we are monitoring temperatures at the feeder lines to get a sign. On the other hand, the downtime related to the RCS was mainly from a fault of the extraction kickers. In the RCS, eight sets of kicker magnets are installed and each magnet is operated by a power supply with two thyratrons. Since the thyratron is a gaseous discharge switching device, it often caused misfire or self-breakdown. As shown in Fig. 7-(b), the fault rate of the kickers is now significantly reduced by optimizing the reservoir voltage of thyratrons. The total scheduled MLF user time in this period was Commissioning, Operations and Performance

Table : Experimental conditions, where I peak /L macro /Chop show peak current/macro-pulse length/chopper beam-on duty factor of the injection beam, N bunch /N part are bunch number/particles per pulse, ɛ tp is the transverse painting emittance, and V 2nd /Δφ/Δp/p show amplitude of second harmonic rf voltage (ratio to the fundamental one)/phase sweep of second harmonic rf voltage relative to the fundamental one/momentum offset applied in the longitudinal painting. Data ID I peak L macro Chop N bunch N part Intensity ɛ tp V 2nd Δφ Δp/p (ma) (ms) (%) (kw) (π mm mrad) (%) (deg) (%) () 5. 56 2 5. 2 6 - - - - (2) 5.2 56 2. 3 2 - - - - (3) 5.3 56 2.5 3 8 - - - - (4) 5.4 56 2 2. 3 24 - - - - (5) 5.5 56 2 2.5 3 3 - - - - (6) 5.5 56 2 2.5 3 3 - - - (7) 5.5 56 2 2.5 3 3 8 8 - (8) 5.5 56 2 2.5 3 3 8 8. (9) 5.5 56 2 2.5 3 3 8 8.2 696 hours, for which the beam availability defined as the beam-on time for MLF users/scheduled beam time promised to users was 92% (Fig. 8). BEAM STUDY FOR FURTHER RAMPING UP THE OUTPUT BEAM POWER In December 9, we began on a parameter tuning for higher intensity beams ( 3 kw) including a beam painting injection scheme at the RCS. The permissible range of intensity loss for 3 kw output operation with 8 MeV injection energy, which is determined by the current collimator capability of 4 kw, is 22% at the injection energy. On the other hand, the allowable intensity loss for MW output operation with MeV injection energy is 3% if assuming the same collimator limit at the injection energy. The above two operations give an equivalent space-charge detuning at each injection energy. Therefore, achieving 3 kw output with less than 3% intensity loss for 8 MeV injection energy is the first matter toward realizing MW output with MeV injection energy. Fig. 9 shows beam survival rates in the RCS measured with a DC current transformer (DCCT) for different intensities and painting parameters () (9) listed in Table. The intensity losses observed for () (5) with no painting were.5 7% depending on the beam intensity only appearing around the injection energy. For a 3 kwequivalent intensity beam causing 7% intensity loss, we performed the painting injection aiming at the beam loss reduction. As for the transverse painting [8], π mm mrad correlated painting was performed by sweeping the closed orbit in the horizontal plane and the injection orbit in the vertical plane. On the other hand, the longitudinal painting [9] was performed by the momentum-offset injection scheme (.2%) superposing a second harmonic rf voltage with an amplitude of 8% of the fundamental one. The phase sweep of the second harmonic rf voltage relative to the fundamental one ( 8 to degrees) was also employed so that the shape of the rf bucket was dynamically changed during the injection process. As shown in Survival rate Survival rate.98.96.94.92.9.88.86.98.96.94.92.9.88.86 () (4) (5) 5 5 2.98.96.94.92.9.88.86 (9) (6) 5 5 2 2 3 4 5 6 7 8 9 Data ID Figure 9: Beam survival rates measured with DCCT for different intensities and painting parameters listed in Table, where the blue dotted curves and blue circles are the results from the corresponding space-charge simulations. The quoted errors in the lower figure are pulse-by-pulse deviations in rms. (6) and (9) of Fig. 9, the intensity loss was improved to 5% by the transverse painting, and finally minimized to % level by adding the longitudinal painting. In the figure, the blue dotted curves and blue circles are the results from the corresponding space-charge simulations including the following lattice imperfections; (A) scattering on the charge-exchange foil, (B) static leakage fields from the extraction beam line, (C) field and alignment errors, (D) edge focus of the injection-orbit bump magnets, and (E) multipole field components for all the ring magnets, where (B) (E) are based on measurements. The calculated ones almost well reproduced the measured intensity losses for different intensities and painting parameters. Fig. shows incoherent tune spreads for the cases of (5) and (9) calculated at the end of the injection period. The current painting mitigates the space-charge detuning from.6 to.4. In order to understand the mechanism of the beam loss reduction by the current painting, we checked a time dependence of the beam moments obtained Commissioning, Operations and Performance 279

ν y 7 6.9 6.8 6.7 6.6 6.5 6.4 6.3 6.2 6. 6 6 6. 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 7 ν x Figure : Incoherent tune shifts at the end of the injection, where the green one is calculated for (5) and the pink one is for (9). x -4 x -4.4 <x 2.4 > <xy>.2.2 x -4.5.6.7.8.9 x.5-6.6.7.8.9.4 <y 2 >.2.5 <x 3 > x.5-6.6.7.8.9 x.5-6.6.7.8.9.5 <x 2 y> x.5-6.6.7.8.9 x -7.5.6.7.8.9.5 <xy 2 >.5 <y 3 >.4 <x 4 >.2 x -7.5.6.7.8.9 x -7.5.6.7.8.9.4 <x 3 y>.4 <x 2 y 2 >.2.2 x -7.5.6.7.8.9 x -7.5.6.7.8.9.4 <xy 3 >.2.5.6.7.8.9.4.2 <y 4 >.5.6.7.8.9 Tune Figure : FFT spectra of the 2nd, 3rd and 4th-order coherent oscillations, where the green ones are calculated for (5), and the pink ones are for (9). from the simulated transverse particle distributions. The influence of the resonance to the particle motion is reflected in the coherent oscillation of the corresponding beam moment; if the beam is captured in a resonance, the tune of the corresponding beam moment gets to integer. Fig. shows FFT spectra of the 2nd, 3rd, and 4th-order coherent oscillations calculated for (5) and (9). While the spectra for <x 2 >, <y 2 >, <x 3 >, <x 4 >, <x 2 y 2 > and <y 4 > have a significant peak at integer, they are significantly mitigated by the current painting. This analysis could say that the beam loss observed with no painting is mainly from the particles which satisfy the parametric resonance conditions at ν x,y =6, where various systematic resonances including high order can be excited. Fig. 2 shows normalized 99.9% emittances for (5) and (9) calculated with a systematic combination of the lattice imperfections (A) (E). In this calculation, the ring collimator aperture was not set to see the emittance growth in more detail. As shown in the figure, the emittance growth at the early stage of acceleration is significantly reduced by the painting. In introducing (π mm mrad) 5 (5) - Horizontal 5 (5) - Vertical 3 3 5 5 2 5 5 2 (9) - Horizontal (9) - Vertical 5 3 5 3 5 5 2 5 5 2 Figure 2: Normalized 99.9% emittances for (5) and (9) calculated with a systematic combination of the lattice imperfections; the light blue ones with all (A) (E), the pink ones with (B) (E), the blue ones with (C) (E), the green ones with (D) (E) and the red ones with only (E). The dotted black curves correspond to the ring collimator aperture of 324π mm mrad. the painting, the events surpassing the collimator aperture is mainly from the emittance dilution caused by foil scattering. This means that the intensity loss for 3 kw beam is almost minimized by the painting injection. SUMMARY The linac and RCS started a user operation for the MLF in December 8. The current output beam power to the MLF is 2 kw. Since December 9, intensive studies for further ramping up the output beam power have been carried out, in which we successfully demonstrated a 3 kw output operation with a low intensity loss of % at the RCS by optimizing the painting injection. In this summer maintenance period, we have some measures for further beam loss reduction; vacuum improvement in the SDTL and future ACS section in the linac, and installation of AC power supplies for chromatic correction sextupoles and a small charge-exchange foil in the RCS. After completing such hardware improvements, we plan to increase the output beam power to 6 kw in December 2, kw in January 2 and then 3 kw with carefully monitoring the trend of the machine activation. REFERENCES [] JAERI-Tech 3-44 and KEK Report 2-3. [2] M. Ikegami, Proc. of LINAC8, MO2 (8). [3] H. Hotchi et al., Phys. Rev. ST Accel. Beams 2, 442 (9). [4] T. Koseki, in these proceedings (MOIB2). [5] K. Yamamoto, in these proceedings (TU2C6). [6] A. Miura et al., Proc. of LINAC, TUP75 (2). [7] H. Sako and M. Ikegami, Proc. of 9 Annual Meeting of Particle Accelerator Society of Japan, p.27 (9). [8] P.K. Saha et al., Phys. Rev. ST Accel. Beams 2, 443 (9). [9] F. Tamura et al., Phys. Rev. ST Accel. Beams 2, 4 (9). 28 Commissioning, Operations and Performance