FY Transportation Improvement Program Funding Summary: Federal Highway Funds

Similar documents
FY Transportation Improvement Program Funding Summary: State Match for Federal Funds

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA, AND MESILLA

City of Charlottesville Bicycle and Pedestrian Master Plan Update

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

Preliminary Transportation Recommendations for. Presentation to Sector Plan Work Group/WRAC October 5, 2009

>> By Jason R. Kack, LS

Brief History of the MUTCD

Yorkdale Station Easier Access Project Public Open House

Appendix 6 St. Bernard Basin

Attendees: First Name Last Name Company Attended. Marguerite Carnell Archaeological and Historical Services, Inc.

I-85 Collapse, Atlanta, Georgia

Kane County Transportation Planning Area Study. Existing Transportation Conditions and Forecasts of Future Travel Demand

TRANSPORTATION COMMITTEE

BUNKER THEATRE VISUAL GUIDE. THE BUNKER THEATRE Access Pack

October 13, Absentee voting by machine begins next Wednesday, October 18 th.

Brief History of the MUTCD

Back to the MUTCD Future

The MUTCD: Where It s. Gene Hawkins

Lesson 79: Land Transport (20-25 minutes)

WILSHIRE PREMIER RETAIL SPACE AVAILABLE ALONG THE WILSHIRE CORRIDOR IN THE HEART OF FAIRFAX/ MIRACLE MILE DISTRICT

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45

BUNKER THEATRE VISUAL GUIDE. THE BUNKER THEATRE Access Pack

The National Traffic Signal Report Card: Highlights

Roadway/Structure Widening Project MP A30.30 to MP A Lansdale Montgomery County, PA NOISE ANALYSIS REPORT FINAL. August 2006.

BUNKER THEATRE VISUAL GUIDE. KILLYMUCK Access Pack

MESILLA VALLEY METROPOLITAN PLANNING ORGANIZATION TECHNICAL ADVISORY COMMITTEE The following are minutes for the meeting of the

Major department stores anchoring Hillsdale Shopping Center are Macy s and Nordstrom.

Attachment 7: 5/9/13 Neighborhood Meeting Summary

Hollywood Bowl Union Station Shuttle

The MUTCD: Its History and Future

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

Metrotown Station and Exchange Upgrades

BICYCLE ADVISORY COMMITTEE

D R A F T DENVER STRATEGIC TRANSPORTATION PLAN TRANSPORTATION MODEL DEVELOPMENT TECHNICAL REPORT. Prepared for: City and County of Denver

PURPOSE: The purpose of this document is to describe the electronic file storage and naming conventions for documentation and reports

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Houston METRO Rail Expansion Program

TRAFFIC SIGNAL DESIGN GUIDELINES

REGIONAL ROAD IMPACT FEE (RRIF) DEVELOPER CREDITS for THE TRUCKEE MEADOWS AREA OF NORTHERN NEVADA

Evaluation of Construction Zone Pavement Marking Materials

Taubman Centers, Inc. Beverly Center Los Angeles, Calif. March 7, 2016

TEO Work Zone Safety Committee Meeting January 25, 2006 Minutes

LEASE OR SALE SAN FRANCISCO CA 94109

LEE COUNTY BOARD OF COUNTY COMMISSIONERS

INTERIM ADVICE NOTE 109/08. Advice Regarding the Motorway Signal Mark 4 (MS4)

Finding Aid for the Charles K. Adams Santa Fe Railroad Collection, No online items

COE Group plc. Contents

Welcome SIGN CODE UPDATE

BUNKER THEATRE VISUAL GUIDE. FUNERAL FLOWERS Access Pack

SEC ANALOG SPECTRUM RECOVERY: FIRM DEADLINE.

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

BUNKER THEATRE VISUAL GUIDE. SLEEPING BEAUTY Access Pack

Los Angeles Smart Traveler Information Kiosks: A Preliminary Report

Processes for the Intersection

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

Train times. northernrailway.co.uk. Manchester to. Hadfield. and Glossop. 15 May 2 October Manchester Piccadilly. Guide Bridge.

Train times. Manchester to Hadfield and Glossop. 11 December May northernrailway.co.uk. Manchester Piccadilly.

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004

TABLE OF CONTENTS. Facility Description. Ticketing and Box Office. Seating & Configuration. Rules and Regulations

The Ferry Building Waterfront

CALDECOTT FOURTH BORE

RIDERSHIP SURVEY 2016 Conducted for the San Francisco Municipal Transportation Agency

Join us for our. A Campaign to Evolve, Elevate, and Inspire

COUNCIL ACTION FORM. The following streets will be within the closed area, but are not part of the race route:

Contact Us Opening Hours Admission

Sample: A small part of a lot or sublot which represents the whole. A sample may be made up of one or more increments or test portions.

400 TRAFFIC SIGNALS Traffic Engineering Manual

A30 Chiverton to Carland Cross

December 9, week I meet the Transportation Department.

York to Preston. 29 January 25 March 2018 PRESTON TO BLACKPOOL UPGRADE. York Ulleskelf Church Fenton. Micklefield East Garforth. Garforth.

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

TOWN OF FAYAL 4375 SHADY LANE, EVELETH, MN 55734

Warwick Gates w Leamington w University of Wa

Globe Exhibition &Tour. Useful information. for your Group s visit

Train times. Manchester to Hadfield and Glossop. 21 May 1 October northernrailway.co.uk. Manchester Piccadilly. Guide Bridge.

Clayton State University Police Department

SUPPORTING AND PROMOTING FOLK MUSIC, DANCE & STORYTELLING IN THE FOX VALLEY SINCE 1975

Darbo-Worthington-Starkweather Neighborhood Plan Community Meal and Open House 6:30pm 8:30pm on Nov 10, 2016 Salvation Army

FOR LEASE BUILD TO SUIT OFFICE 189 HOWARD LAS CRUCES, NM PROPERTY DETAILS ROADRUNNER & CAMINO COYOTE TENDER CARE HOME HEALTH CLOSE PROXIMITY TO :

EVALUATION OF DATA COLLECTION TECHNIQUES & METHODS FOR ROADSIDE STATION ORIGIN-DESTINATION STUDIES

APA Review Library Information Sciences End of Program Exam. Susan Whitmer Reference Specialist University of North Texas Libraries September 2013

Wabash Bridge Competition. Bridge Engineering. Todd Wilson, B.S., E.I.T. Traffic Engineer - DMJM Harris

Wireless Box Permit Block:3783 Lot: 009 Zip: 94103

City Council Report 915 I Street, 1 st Floor

GUIDE TO ONSITE MARKETING AT KENTUCKY STATE FAIR BOARD FACILITIES

DIGGERS HOTLINE. Midwest Fiber Networks, LLC. CALL : (414) OR TOLL FREE (800) MIDWESTFIBERNETWORKS

Acoustical design of Shenzhen Concert Hall, Shenzhen China

46 SHATTUCK SQUARE, BERKELEY

BRAND GUIDELINES. DavidMason.com or CHICAGO SAINT LOUIS CENTER CITY NORRISTOWN

MicroPAVER TECHNOLOGY THAT WORKS FOR YOU

City of Palm Coast Capital Projects Timeline - 2nd Quarter CAPITAL PROJECTS FUND

WiFi. Warwick Gates Leamington. University. of Warwick U17. Sydenham Leamington University of Warwick U2 U12 U17. to & from.

CROCODILE AUSTRIA VIDEOSYSTEM

Greater Minneapolis External Origin-Destination Survey Draft Report Metropolitan Council Cambridge Systematics, Inc.

one bloor firstgulf.com FIRST GULF CONTACT: Jonathan Weinberg Vice President, Retail T:

03/08/10 Bonner County Dispatch :51 Daily Activity Log, with Law Narrative Page: 1

Office of Traffic Operations Signal Design Reference Packet

DOWNTOWN STREET CONSTRUCTION

Transcription:

CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $150,000 $150,000 AMPA Wide Bicycle Facil. Prog. & Activities AMPA Wide Joint TDM-Travel Demand Management AMPA Wide Joint TDM-Travel Demand Management ITS Incident Management & Signal Oper. Enhancements AMPA Wide Joint TDM-Travel Demand AMPA Wide Joint TDM-Travel Demand AMPA Wide Bicycle Facil. Prog. & Activities AMPA Wide Bicycle Facil. Prog. & Activities - Coors Corridor Park & Ride Central Ave BRT - Phase IB 100.6 A300706 City of $150,000 $150,000 123.8 A300748 City of Transit $1,082,021 $1,082,021 123.9 A300749 City of Transit $710,000 $710,000 50 A300971 MRCOG ITS $889,993 $889,993 Subcomm 202 A301820 Rio Metro $1,090,000 $1,090,000 Transit Dist 202.1 A301821 Rio Metro $1,123,000 $1,123,000 Transit Dist 141 A302030 City of $175,000 $175,000 141.1 A302031 City of $175,000 $175,000 120.4 TA00085 City of Transit $601,207 $601,207 345.4 TA00351 City of $3,125,894 $3,194,107 $3,643,326 $3,610,326 $13,573,653 (11 CMAQ-Flex Projects) $4,984,122 $4,969,100 $4,883,326 $4,883,326 $19,719,874 Page 1 of 13

NHPP I-40 Louisianna Westbound Ramps 197.1 A300079 NMDOT D-3 $3,455,629 $3,455,629 I-25 Rio Bravo Interchange Reconstruction I-25 S-Curve Pavement Preservation 448.6 A300280 NMDOT CRDC Central $14,834,993 $14,834,993 651.6 A300376 NMDOT D-3 $3,844,800 $3,844,800 I-25 NB Widening 448.7 A300377 NMDOT D-3 $2,563,200 $2,563,200 NM 528 Rio Rancho Blvd (Upper Section) NM 6 Bridge Replacement ( Rio Grande Bridge #7453) ITS - District 3 Deployment of ITS ITS - District 3 Deployment of ITS AMPA Wide Motorist Assistance Courtesy Patrols 493.4 A300381 NMDOT CRDC Central $13,437,276 $13,437,276 6.8 A300423 NMDOT D-3 District 3 $15,939,281 $15,939,281 104.8 A300768 NMDOT D-3 District 3 $854,400 $854,400 104.9 A300769 NMDOT D-3 District 3 $640,800 $854,400 $854,400 $2,349,600 568.9 A300799 NMDOT D-3 District 3 $1,708,800 $336,833 $213,600 $2,259,233 I-25 Widening PHASE II 485 A301011 NMDOT D-3 District 3 $9,080,884 $9,080,884 Southern Blvd Reconstruction Phase I US 550 Reconstruction & Widening US 550 Construction & Widening Phase 1 US 550 Construction & Widening Phase 2 District 3 Bridge Repairs - Mateo Overpass Bridge Replacement 9.1 A301041 City of Rio DPW $1,794,240 $1,794,240 Rancho 386.3 A301232 NMDOT CRDC Central $38,799 $38,799 386.4 A301233 NMDOT CRDC $2,136,001 $2,136,001 386.5 A301234 NMDOT CRDC $602,001 $602,001 114 A301343 NMDOT D-3 $2,563,200 $2,563,200 Page 2 of 13

District 3 Bridge Replacement- FR 4058 116 A301345 NMDOT D-3 $4,870,080 $4,870,080 District 3 Bridge Replacement- Algadones I-25 / Montgomery Blvd. Interchange Reconstruction District 3 Pavement Preservation - I-40 West of Coors District 3 Pavement Preservation: I-25 SB Lanes District 3 Pavement Preservation - I-40 and I-25 (Big I) District 3 Pavement Preservation - I-25 North of Algodones Bridge I-40 Canyon Pavement Rehabilitation AMPA Wide Corridor Study Interstate and other NHS routes 75.8 A301801 NMDOT D-3 $1,708,800 $1,708,800 250.3 A301900 NMDOT CRDC $22,518,161 $22,518,161 260 A302100 NMDOT D-3 $2,957,329 $2,957,329 651.4 A302101 NMDOT D-3 $2,563,200 $2,563,200 651.5 A302102 NMDOT D-3 $9,365,329 $9,365,329 651.7 A302103 NMDOT D-3 $2,686,433 $2,686,433 359.2 A302120 NMDOT D-3 $12,816,000 $12,816,000 160.1 A302141 NMDOT D-3 $854,400 $854,400 I-25 FDR Phase 2 265.1 A302161 NMDOT D-3 $854,400 $854,400 I-25 FDR Phase 3 265.2 A302162 NMDOT D-3 $854,400 $854,400 AMPA Wide Motorist Assistance Courtesy Patrols (FFY 2019) 214 A302200 NMDOT D-3 $213,600 $213,600 (27 NHPP Projects) $26,279,263 $21,663,761 $22,518,160 $22,518,161 $22,518,162 $22,518,162 $138,015,669 Page 3 of 13

NHPP (Non-Chargeable) District 3 Bridge Deck Overlays 115 A301344 NMDOT D-3 $1,062,575 $1,062,575 District 3 Bridge Preservation 117 A301346 NMDOT D-3 District 3 $1,173,629 $1,173,629 District 3 Bridge Preservation (Bridge Deck Overlays) 117.1 A301347 NMDOT D-3 $1,528,725 $1,528,725 (3 NHPP (Non-Chargeable) Projects) $1,062,575 $1,173,629 $1,528,725 $3,764,929 STL-E Sunport Blvd Extension 437 A300160 County of PWD $582,734 $582,734 $1,165,468 Sunport Blvd-Interchange Alameda DrainTrail Phase 2 437.3 A300162 County of $191,097 $191,097 24.2 A301031 County of Parks & $73,671 $106,188 $106,188 $286,047 Rec. (3 STL-E Projects) $264,768 $688,922 $688,922 $1,642,612 STP-Bridge Off Sys NM 6/BNSF Railroad Bridge Preservation 138.5 A301555 NMDOT D-3 District 3 $1,384,000 $1,384,000 (1 STP-Bridge Off Sys Project) $1,384,000 $1,384,000 Page 4 of 13

STP-Flex I-40 Embudo Channel 615.7 A300257 NMDOT D-3 District 3 $106,800 $106,800 $213,600 I-25 Rio Bravo Interchange Reconstruction NM 528 Rio Rancho Blvd (Upper Section) NM 6 Pavement Preservation in Los Lunas NM 6 Pavement Preservation West of I-25 448.6 A300280 NMDOT CRDC Central $59,303 $59,303 493.4 A300381 NMDOT CRDC Central $3,543,923 $3,543,923 260.1 A300424 NMDOT D-3 $1,070,572 $1,070,572 260.2 A300425 NMDOT D-3 $854,400 $854,400 Orthophotography 3.4 A300604 NMDOT D-3 District 3 $42,720 $42,720 Orthophotography 3.5 A300605 NMDOT D-3 District 3 $42,720 $42,720 Orthophotography 3.6 A300606 NMDOT D-3 $42,720 $42,720 ITS - District 3 Deployment of ITS AMPA Wide Motorist Assistance Courtesy Patrols District 3 On-Call Planning & Design Support District 3 On-Call Planning & Design Support NM 556 (Tramway Blvd) @ Montgomery Signal Upgrade NM 500 (Rio Bravo) and 98th Street Signal Upgrade Paseo del Norte PCCP Intersection Reconstruction District 3 Bridge Replacements-NM 165 104.9 A300769 NMDOT D-3 District 3 $854,400 $854,400 568.9 A300799 NMDOT D-3 District 3 $170,880 $170,880 650.8 A300808 NMDOT D-3 District 3 $427,200 $427,200 650.9 A300809 NMDOT D-3 District 3 $427,200 $256,320 $683,520 41.1 A300922 NMDOT D-3 $256,320 $256,320 42.2 A300944 NMDOT D-3 $256,320 $256,320 28.1 A301021 NMDOT D-3 District 3 $700,212 $700,212 165.1 A301161 NMDOT D-3 $1,708,800 $1,708,800 Page 5 of 13

US 550 Construction & Widening Phase 1 386.4 A301233 NMDOT CRDC $8,544 $8,544 NM 14 Slope Erosion Mitigation NM14/NM 536/Frost Rd intersection NM 14 Roadway Preservation & Rehab Phase 1 NM 14 Roadway Preservation & Rehab Phase 2 NM 14 Roadway Preservation & Rehab Phase 3 NM 6/BNSF Railroad Bridge Preservation NM 337 Bridge Replacement in Chilili 99.1 A301441 NMDOT D-3 $486,100 $486,100 99.2 A301442 NMDOT D-3 District 3 $141,768 $141,768 99.3 A301443 NMDOT D-3 $640,800 $640,800 99.4 A301444 NMDOT D-3 $537,896 $537,896 99.5 A301445 NMDOT D-3 $3,647,058 $3,647,058 138.5 A301555 NMDOT D-3 District 3 $900,785 $900,785 671 A301620 NMDOT CRDC Central $271,033 $271,033 NM337 Bridge Replacement 671.1 A301621 NMDOT D-3 District 3 $2,990,400 $2,990,400 I-25 / Montgomery Blvd. Interchange Reconstruction District 3 Pavement Preservation - I-40 West of Coors AMPA Wide Access Management and Corridor Study Non-Interstate Routes ITS-District 3 Deployment of ITS (FFY 2020) 250.3 A301900 NMDOT CRDC $2,978,519 $2,978,519 260 A302100 NMDOT D-3 $836,383 $836,383 160 A302140 NMDOT D-3 $342,625 $342,625 217 A302190 NMDOT D-3 District 3 $854,400 $854,400 (29 STP-Flex Projects) $1,631,888 $4,975,043 $4,868,243 $4,975,044 $4,975,043 $4,138,660 $25,563,921 Page 6 of 13

STP-Flex (Non-Chargeable) NM 528 Rio Rancho Blvd (Upper Section) 493.4 A300381 NMDOT CRDC Central $106,800 $106,800 NM 6 Bridge Replacement ( Rio Grande Bridge #7453) 6.8 A300423 NMDOT D-3 District 3 $606,624 $606,624 I-25 Widening PHASE II 485 A301011 NMDOT D-3 District 3 $606,624 $606,624 US 550 Reconstruction & Widening NM 14 Slope Erosion Mitigation I-25 / Montgomery Blvd. Interchange Reconstruction NMDOT CRDC On-Call Planning & Design Support 386.3 A301232 NMDOT CRDC Central $256,320 $256,320 99.1 A301441 NMDOT D-3 $213,600 $213,600 250.3 A301900 NMDOT CRDC $2,170,641 $2,170,641 270 A302170 NMDOT CRDC $427,200 $427,200 (7 STP-Flex (Non-Chargeable) Projects) $3,640,209 $747,600 $4,387,809 Page 7 of 13

STP-Rural I-25 & NM 6 Interchange Beautification Enhancements Phase III 6.9 A301122 Village of Los $35,440 $645,072 $680,512 Lunas NM 14 Slope Erosion Mitigation NM14/NM 536/Frost Rd intersection NM 14 Roadway Preservation & Rehab Phase 1 NM 14 Roadway Preservation & Rehab Phase 2 NM 14 Roadway Preservation & Rehab Phase 3 NM 337 Bridge Replacement in Chilili 99.1 A301441 NMDOT D-3 $1,677,258 $1,677,258 99.2 A301442 NMDOT D-3 District 3 $1,677,258 $1,677,258 99.3 A301443 NMDOT D-3 $192,993 $192,993 99.4 A301444 NMDOT D-3 $1,865,102 $1,338,806 $3,203,908 99.5 A301445 NMDOT D-3 $338,452 $338,452 671 A301620 NMDOT CRDC Central $1,641,818 $1,032,186 $2,674,004 (7 STP-Rural Projects) $2,058,095 $1,677,258 $1,677,258 $1,677,258 $1,677,258 $1,677,258 $10,444,385 Page 8 of 13

STP-Sm Urb NM 6 Bridge Replacement ( Rio Grande Bridge #7453) 6.8 A300423 NMDOT D-3 District 3 $175,399 $175,399 NM 6 Pavement Preservation in Los Lunas NM 6 Pavement Preservation West of I-25 NM 314 Bike & Pedestrian -Northside of Village Los Lunas Corridor River Crossing ROW Acquisition I-25 & NM 6 Interchange Enhancements Phase II I-25 & NM 6 Interchange Beautification Enhancements Phase III Southeast Los Lentes Road Carson Dr-Aspen Dr-NMRX Station Rd Bike & Pedestrian Improv. Molina Road - Roadway and Pedestrian NM 263 & El Cerro Mission Blvd Intersection Meadowlake Road Camelot Blvd Extension West Aragon Rd. 260.1 A300424 NMDOT D-3 $3,816,850 $3,816,850 260.2 A300425 NMDOT D-3 $3,816,850 $3,816,850 825.2 A300891 Village of Los Village $226,995 $1,286,305 $1,513,300 Lunas Govt 537.3 A300961 Village of Los Village $1,187,492 $251,946 $1,156,715 $153,901 $2,750,054 Lunas Govt 6.6 A301121 Village of Los Village $623,360 $623,360 Lunas Govt 6.9 A301122 Village of Los $35,440 $645,072 $680,512 Lunas 935 A301350 Village of Los Village $85,440 $406,968 $492,408 Lunas Govt 936 A301360 Village of Los Village $855,136 $855,136 Lunas Govt 937 A301370 Town of Peralta Town Govt $212,160 $212,160 939 A301380 County of County $85,440 $85,440 Valencia Govt 941 A301400 County of County $2,361,092 $949,708 $3,310,800 Valencia Govt 932 A301480 Village of Los Village $151,816 $1,248,064 $1,399,880 Lunas Govt 212 A301880 City of Belen $444,288 $1,573,805 $2,018,093 (14 STP-Sm Urb Projects) $2,931,551 $3,816,850 $3,638,687 $3,729,454 $3,816,850 $3,816,850 $21,750,242 Page 9 of 13

STP-U University Blvd Multimodal Phase II 854.1 A300111 City of Dept. $2,000,000 $2,000,000 Munic. Devel GAP Closure for On-Street Bicycle Facilities North Diversion Channel Undercrossing Sunport Blvd Extension Woodward Road Project Sunport Blvd-Interchange CMP Transportation Assessment Program CMP Transportation Assessment Program Northern Blvd Expansion Phase B Bridge Blvd and Tower Rd Reconstruction Phase 2 ITS-Albuquerque Traffic Management System Albuquerque Complete Streets: West Albquerque Complete Streets: East 802.1 A300142 City of $975,000 $975,000 870.1 A300143 City of Dept. $1,000,000 $595,646 $1,595,646 Munic. Devel 437 A300160 County of PWD $2,136,000 $1,163,175 $3,874,290 $784,306 $1,708,800 $9,666,571 865.1 A300161 County of $2,531,577 $1,554,712 $4,086,289 437.3 A300162 County of $1,304,103 $1,304,103 107.8 A300188 MRMPO Mid-Reg. $30,917 $30,917 Metro Plan. Org. 107.9 A300189 MRMPO Mid-Reg. $310,843 $310,843 Metro Plan. Org. 347.1 A300431 City of Rio $2,255,616 $2,255,616 Rancho 872.4 A300504 County of $2,531,577 $1,857,096 $2,031,327 $6,420,000 103 A300750 City of Dept. $1,000,000 $1,000,000 $2,000,000 Munic. Devel 587.4 A300842 City of $2,000,000 $2,000,000 587.5 A300844 City of Dept. $1,000,000 $1,000,000 Munic. Devel Page 10 of 13

Albuquerque Complete Streets: East (Operational ) 682 A300846 City of $1,000,000 $1,000,000 Albuquerque Complete Streets: East (Intersection ) Albquerque Complete Streets: West Albuquerque Complete Streets: West NM 500 Rio Bravo Blvd & 2nd St Intersection NM 500 Rio Bravo Adaptive Signal Control Technology Project ITS Regional Transportation Management Center (TMC) ITS Incident Management & Signal Oper. Enhancements Alameda Drain/2nd Street Bike/Ped Trail Ph 3 Southern Blvd Reconstruction Phase I Westside Blvd Widening Lincoln Ave Construction (Interim 2 Lane) Main St Streetscape Phase III Unser Blvd Widening (Phase 2B) 682.1 A300847 City of $1,000,000 $1,000,000 587.9 A300848 City of $2,000,000 $2,000,000 683 A300849 City of $1,000,000 $1,000,000 42.1 A300942 County of PWD $2,000,000 $2,000,000 209 A300943 County of $1,025,280 $1,025,280 49.1 A300970 City of Operations/ $93,300 $93,300 ITS 50 A300971 MRCOG ITS $267,255 $267,255 Subcomm 24.3 A301032 City of Parks & $379,354 $379,354 Rec. P&R 9.1 A301041 City of Rio DPW $7,722,706 $7,722,706 Rancho 508.1 A301050 City of Dept. $1,885,204 $4,757,627 $3,000,000 $9,642,831 Munic. Devel 376 A301141 City of Rio DPW $3,888,423 $3,888,423 Rancho 382.2 A301312 Town of Town Govt $1,108,309 $1,108,309 380.3 A301321 City of Rio $300,000 $300,000 Rancho Page 11 of 13

Alameda Blvd Operational 920.1 A301471 City of Dept. $820,000 $820,000 Munic. Devel 2nd St SW (Valle de Oro) Trail Phase 2 Concrete Replacement:Downtown Transit Routes CMP Transportation Analysis Program CMP Transportation Analysis Program CMP Transportation Analysis Program CMP Transportation Analysis Program Unser Blvd Dam & Realignment - Coors Corridor Park & Ride Coors Corridor Park & Ride Phase 2 Central Ave BRT - Phase IB Commuter Rail: Railroad Sidings - Alameda Siding 96.3 A301522 County of $325,854 $325,854 204 A301830 City of $1,200,000 $1,000,000 $2,200,000 201 A301840 MRMPO $192,198 $192,198 201.1 A301841 MRMPO $192,240 $192,240 201.2 A301842 MRMPO Mid-Reg. $149,520 $149,520 Metro Plan. Org. 201.3 A301843 MRMPO Mid-Reg. $170,880 $170,880 Metro Plan. Org. 211 A301850 SSCAFCA $1,087,720 $1,087,720 120.4 TA00085 City of Transit $2,148,793 $2,148,793 120.5 TA00086 City of $500,000 $500,000 345.4 TA00351 City of $3,000,000 $378,656 $3,378,656 645.2 TA00370 Rio Metro $258,731 $258,731 NMRRX (39 STP-U Projects) $17,146,725 $17,263,261 $17,263,261 $17,263,261 $7,389,647 $170,880 $76,497,035 Page 12 of 13

STP-U (Non-Chargeable) West Meadowlark Lane 938 A301460 Village of Village $273,408 $273,408 Corrales Govt (1 STP-U (Non-Chargeable) Project) $273,408 $273,408 TAP-Lg Urb North Diversion Channel Undercrossing 870.1 A300143 City of Dept. $379,354 $379,354 Munic. Devel AMPA wide Bike/Ped Safety Education Program Alameda DrainTrail Phase 2 Alameda Drain/2nd Street Bike/Ped Trail Ph 3 AMPA Wide Bike Share Program Nicklaus Dr Pedestrian 101.7 A300717 City of $110,000 $110,000 $110,000 $110,000 $440,000 P&R 24.2 A301031 County of Parks & $256,320 $366,004 $366,612 $929,812 $1,918,748 Rec. 24.3 A301032 City of Parks & $94,838 $94,838 Rec. P&R 190.1 A301861 Rio Metro $511,067 $563,200 $1,074,267 Transit Dist 242 A302130 City of Rio $111,289 $184,454 $295,743 Rancho (6 TAP-Lg Urb Projects) $1,083,514 $1,039,812 $1,039,812 $1,039,812 $4,202,950 Grand Total of All Federal Highway Funds $61,091,350 $57,801,453 $57,751,298 $58,303,963 $40,376,960 $32,321,810 $307,646,834 Page 13 of 13