REQUEST FOR INFORMATION

Similar documents
REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

Statement of Work. Falcon Stadium Locker Room Audio-Visual & Telecommunications Package. 3 May 2018

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

RFIs AND RESPONSES; ANSWERS ARE IN RED.

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019

Wiring. Requirements

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

LYNX ULTRA Series Hubs and Baluns

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

A Collaborative Future in HiVol to Sell and Install

City of Winter Springs, FL

SAK Information Technology Department. Invitation to Bid For the Implementation Of IP-CCTV

Identification - electrical services

Compact Module. Category 6 FTP Cabling System

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2-output DALI controller

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System

TOMLINSON GROUP NEW CORPORATE OFFICES, OTTAWA -REQUEST FOR PROPOSAL

Digamber Telecom.

Facilities Management Design and Construction Services

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

1.0 GENERAL. 1.2 SUMMARY.1 Section Includes:

Wall Plate HDMI over CAT5 Extender with Power Over Cable 1080p 165ft (50m)

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Exhibitor & Sponsor Service Kit

ADDENDUM NO. 1 CITY OF FREDERICK

The MTS FiON Network. for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations

Electrical Services. The MCCA offers a variety of electrical services through our experienced in-house team of electricians.

Request for Proposal (RFP)

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

USER GUIDE. AXIS T8640 Ethernet Over Coax Adaptor PoE+ ENGLISH

Home Network Sciences. designer s guide

Mfgr. Berk Tek ea , Berk Tek ea , Berk Tek ea. Berk Tek ea ,350.

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

General 64E4 Cultural Center is a flexible black box theater that holds 72 people including cast and crew

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING COAX CABLE U-WRC-C

CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc

INSTALLATION INSTRUCTIONS WIRED REMOTE CONTROL USING TWISTED PAIR AND COAX CABLE U-WRC-U-x

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront

APPENDIX A Verify All Part Numbers (Partial List of Approved Products)

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

WebMD-Medscape Video Program-Madrid-3/11-3/12

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID DOCUMENT: RFP #G PE Building Audio Visual System San Jose City College

1.1 Introduction Getting Connected Guide - Wireless Setting up a Wireless Network Getting Connected Guide - Wired...

Information Technology Services DESIGN AND INSTALLATION STANDARDS

Addendum #2 for: "Bid # 2 EESD ERATE C2" USAC/E-RATE 470 #

Monday, January 7, 2019

Summary Timeline Selection of bids The mission of PWPL

William Woods Director of Sales, Event Technologies 151 West Adams Chicago, IL

Target Interface / Construction Compliance Inspection Checklist

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

Facility Rentals at the Royal Alberta Museum

Television Production Information

DA E: Series of Narrowband or Wideband Distribution Amplifiers

Installation Agreement

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

Your #1 Choice for CCTV and Audio-Video Connectivity Solutions. Broadcast Solutions.

Follow The Leader In Shielded Technology

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION TELECOMMUNICATIONS SYSTEM INFRASTRUCTURE

A. The requirements of Section govern the work specified in this section.

How To: Replace the stock Antenna with a CB Antenna A CFans Members Mod Project by coyote

ENTRY FORM. DVASE 2016 Excellence in Structural Engineering Awards Program

PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT)

SECTION 7 -- CROSS-CONNECT SYSTEMS

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

Camera Control Unit 55D-BS VOLUME OPEN CABLE MIC OFF GND 2W CAMERA CABLE TALLY. Camera Adapter 55D-CA 9.39" 7.40" 5.2"

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

Available For Long-Term Lease, Rent or Sale April Palace Production Center Facilities Overview

What you need to know to plan a successful meeting, conference, or tradeshow at Boise Centre. EVENT GUIDE

Technical Specifications

Digital Signage in Healthcare

Series 60 Online Data Sheet

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008

Quickreference: Cat.6 / Class E shielded. Horizontal floor cabling subsystem with shielded twisted pair technology

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

Multi-Channel Passive Transceiver Hubs Installation Sheet

STRUCTURED CABLE SYSTEM (SCS)

LCS 2 RJ 45 Cat. 6A HD panels and units

CAT6Plus System. Brand-Rex Limited

E3/DS3 Fibre Extender

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

FAMC CREATIVE COMMUNITY

DA MHz Series of Narrowband or Wideband Distribution Amplifiers

USER MANUAL. TR W Audio Transformer. TR-94 2x200W Audio Transformer MODELS: P/N: Rev 1

Quickreference: Cat.6 / Class E unshielded. Horizontal floor cabling subsystem with unshielded twisted pair technology

VGA Video Extender over CAT5

DA : Series of Narrowband or Wideband Distribution Amplifiers

Portable Outlet Boxes

Questions and Answers to the Call for Tender

Transcription:

PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 56.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville, MD 20855 301-670-1635-phone 301-670-9643-fax Requested Date: Requested Contractor: Generated By: Response Due By: Response Received: 09/07/2017 Shelby Mechanical, Inc. Kenneth Romano 09/12/2017 09/12/2017 The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: LV telecom questions from meeting Reference: Information Requested: 1. Tony Wu ask us if we were to install Cat6 cable for WIFI on each quest floor. - We have no detail on drawings. please advise 2. We were just told in meeting that Dual system need to be in place on 5th floor - Are we installing 2nd 2-post rack in room? 3. We were told in install New Cat6 on existing racks until they get New System in place. is that true? NOTE if that is the case Change Order will be needed 4. Are the TV systems going to use Cat6 cable to TV's on 12th & 11th floors? (Existing Coax cable was removed). NOTE: If not RG-6 Cable will need to be re-installed for TV's. Change Order will be needed to re-install RG-6 cables on 12th & 11th floors 5. New TV location, Will the RJ-45 Cat6 outlet be installed in wall/ 6. Are we using all White faceplate? White RJ-45 Cat6 outlets at each communications location / TV's? Response Requested By: Response: 1. No additional cabling required for WiFi. Access points will be housed within guest rooms. 2. Yes, install 2nd 2-post rack in room, as per RFP requirement. 3. No, you are to terminate new cabling into the new rack in the IDF. Upon 100% completion of project, the legacy systems/rack will be removed from the space. 4. LV drawing set called out that all COAX cabling was to remain due to phased approach to room renovations and hotel systems rollout. We will need that COAX replaced in those rooms.

5. The TV Cat6 location in each room should be coordinated with EC location/height of power for TV. 6. For the guestrooms, cover plates and receptacles for devices that occur on guestroom walls w/ PT- 01 wall finish, should be black. All other guestroom cover plates and receptacles should be white. For the public space, Lobby Level device cover plates and receptacles should all be black. Event Level device cover plates and receptacles should all be grey. LL2 device cover plates and receptacles should all be white. Request CCs: Response CCs:

PROJECT: 1845 - Renaissance Hotel Renovations RFI NUMBER: 56.0 JONATHAN NEHMER & ASSOC ATTN: Lauren Maccherone Dacey 7361 Calhoun Place Suite 310 Rockville, MD 20855 301-670-1635-phone 301-670-9643-fax Requested Date: Requested Contractor: Generated By: Response Due By: Response Received: 09/07/2017 Shelby Mechanical, Inc. Kenneth Romano 09/12/2017 The required but unavailable information is resulting in a delay in fabrication of material or prosecution of the work in the field. Once the information is received we will advise you as to the impact to the schedule and cost Subject: LV telecom questions from meeting Reference: Information Requested: 1. Tony Wu ask us if we were to install Cat6 cable for WIFI on each quest floor. - We have no detail on drawings. please advise 2. We were just told in meeting that Dual system need to be in place on 5th floor - Are we installing 2nd 2-post rack in room? 3. We were told in install New Cat6 on existing racks until they get New System in place. is that true? NOTE if that is the case Change Order will be needed 4. Are the TV systems going to use Cat6 cable to TV's on 12th & 11th floors? (Existing Coax cable was removed). NOTE: If not RG-6 Cable will need to be re-installed for TV's. Change Order will be needed to re-install RG-6 cables on 12th & 11th floors 5. New TV location, Will the RJ-45 Cat6 outlet be installed in wall/ 6. Are we using all White faceplate? White RJ-45 Cat6 outlets at each communications location / TV's? Response Requested By: Response: Request CCs: 6. Per HVS: For the guestrooms, cover plates and receptacles for devices that occur on guestroom walls w/ PT-01 wall finish, should be black. All other guestroom cover plates and receptacles should be white. For the public space, Lobby Level device cover plates and receptacles should all be black. Event Level device cover plates and receptacles should all be grey. LL2 device cover plates and receptacles should all be white. Refer to attached LV consultant responses.

RESPONSE PROJECT: Renaissance Philadelphia RFI #: 56 ATTN: Lauren Maccherone DATE: 09/07/2017 Request: 1. Tony Wu asked us if we were to install Cat6 cable for WiFi on each guest floor We have no detail on drawings. Please advise. 2. We were just told in meeting that dual systems need to be in place on 5th floor are we installing 2nd 2 post rack in room? 3. We were told to install New Cat6 on existing rack until they get New System in place. Is that true? NOTE: if that is the case, Change Order will be needed. 4. Are the TV systems going to use Cat6 cable to TV s on the 12th and 11th floors? (Existing Coax cable was removed). NOTE: If not RG 6 cable will need to be re installed for TV s. Change order will be needed to re install RG 6 cables on 12th and 11th floors. 5. New TV location, Will the RJ 45 outlet be installed in wall? 6. Are we using all white faceplates? White RJ 45 Cat6 outlets at each communications location/tv? Response: 1. No additional cabling required for WiFi. Access points will be housed within guest rooms.

2. Yes, install 2nd 2 post rack in room, as per RFP requirement. 3. No, you are to terminate new cabling into the new rack in the IDF. Upon 100% completion of project, the legacy systems/rack will be removed from the space. 4. LV drawing set called out that all COAX cabling was to remain due to phased approach to room renovations and hotel systems rollout. We will need that COAX replaced in those rooms. 5. The TV Cat6 location in each room should be coordinated with EC location/height of power for TV. 6. This is a decision we defer to the interior designer to make.

Response CCs:

Electrical Boilermaking Heavy Rigging Piping Plumbing/HVAC Storage Facility WBE Corporation Fabrication Code Welding Project: To: Ref: Renaissance Hotel Ken Romano GT Telecom Questions RFI#: From: Date: 8 Sean Timmons / Jerry Vitale (GT Telecom) 9/6/2017 Request: 1. Tony from (Maintenance) ask us if we were to install Cat6 Cable for WIFI on each quest floor. We have no detail on drawing. Please advise 2. We were just told in meeting that Dual system need to be in place on 5th floor. Are we installing 2nd 2 post rack in room? 3. We were told to install NEW Cat6 on existing racks until they get NEW System in place. Is that true? Note: if that the case Change Order will be needed 4. Are the TV Systems going to use Cat6 cable for TV s on 12th & 11th floors? (Existing Coax cable was removed). Note: If not, RG 6 Cable will need to be re installed for TV s. Change order will be needed to re install RG 6 cables on 12th 11 Floors 5. New TV Location, Will the RJ 45 Cat6 outlet be installed in wall? 6. Are we using all White Faceplate? White RJ 45 Cat6 outlets at each communications location / TV S? Signed By: Sean Timmons Response: Signed By: Date: Should you have any questions, please do not hesitate to contact our office. Sean Timmons Electrical Divsion Manager