Facilities Management Design and Construction Services

Similar documents
RFIs AND RESPONSES; ANSWERS ARE IN RED.

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID DOCUMENT: RFP #G PE Building Audio Visual System San Jose City College

University Center AV Integration Construction Documents February 8, 2012

Purchasing Department Finance Group INVITATION TO BID

Purchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)

Furnish & Install Video Surveillance System for Lot B. Exhibits

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

City of Winter Springs, FL

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

Ellis Hall Active Learning Classrooms Project

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Summary Timeline Selection of bids The mission of PWPL

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

2. Are there any outside connectivity requirements? No, we will not have a need to allow outside devices to connect

Request for Proposal # District-Wide Wireless Projector Project. Addendum #1 June 4, 2018

ISS Small Lecture Theatre Specification 2017

SECTION INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

Montclair, NJ ADDENDUM NO. 1 Issue Date: August 11, Request for Proposal # 981 Finley Hall Audio Visual Systems

IFB # ADDENDUM #1 & ACKNOWLEDGMENT

REQUEST FOR PROPOSAL

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

Monday, January 7, 2019

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

Questions & Responses Regarding RFP #3070 Audio Video System for Stewart Auditorium

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Off-center of room to match side screen. Location

EXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Approx. 2,000 BTU each. Off-center of room to match side screen.

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

Request for Proposal For BoCC Technology Refresh Project. BoCC Technology Refresh Project

Conference Center Guidelines. Wake Forest Biotech Place

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

UTM DESIGN CRITERIA FOR CLASSROOMS (Part 2) Classroom Technology / Audio Visual Design Specifications Guide Version 1.0

ADDENDUM NO. 1 CITY OF FREDERICK

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP

RFP No R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS. ADDENDUM NO. 2 April 21, 2016

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

POST DATE: 01/22/19. BID 1407: Projectors and Equipment for Robertson County Schools. Sealed bids must be received by: 02/04/19 at 1:00 PM

Request for Proposal Classroom Multimedia Presentation System, Intercom, Public Address System New Washington County High School Facility

AV for Education. Instructional AV Technology Solutions from Atlona

SAN ANTONIO WATER SYSTEM CENTRAL WATER INTEGRATION PIPELINE TERMINUS TREATMENT FACILITY SAWS Job No SAWS Solicitation No.

Department of Corrections Facilities Bureau Security Equipment Solicitation #TO8133

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

Training and Conference Room Audio Enhancement RFP 2019 Q&A

Munsang College. Tender No. : SSB-WQ-1617-IR-002 PROJECTION AND PUBLIC ADDRESS SYSTEMS IN THE ADMINISTRATION CENTRE. Details : As attached including

Salient Systems June, N Mopac Expy, Bldg 3, Ste 700 Austin, Texas FAX

Frankfurt MX700 with 90 Display

KENYA ELECTRICITY GENERATING COMPANY PLC. KGN-HYD

BUSD Ramona Middle School Gymnasium Project AV Project

Questions and Answers to the Call for Tender

Salient Systems July, N. MoPac Expy. Building 3, Suite 700 Austin, TX FAX

1. Can companies based outside of the United States respond to this RFP?

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

Request for Proposal Questions and Responses. Request for Proposal: Software Based CMED Radio Console and Associated Equipment

REQUEST FOR QUOTATION

Request for Proposals Fiber Optic Network Backbone Upgrades

Request for Proposals PIO. Installation of Broadcast System for Community Services Building (CSB) 104

Furnish and Deliver New Light Emitting Diode (LED) Fluorescent Light Tubes

INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

Invitation to Bid SCOREBOARD - WHH

Brown University New September 26, 2012 Facilities Design & Construction Standards SECTION CLASSROOM AUDIO/VISUAL GUIDELINES

HDM-4X2. Installation Manual. HDMI Matrix Switcher. HLE-1 RX HDMI Extender with HDBaseT-Lite. HDMI Out. IR In. Receiver.

1995 Metric CSJ SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008

STRUCTURED CABLE SYSTEM (SCS)

Request for Technology Fee Funds A separate request should be made for each initiative.

UCCS AUDIO VISUAL SYSTEMS GENERAL STANDARDS & GUIDELINES

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment

REQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM

SEAMLESS SOUND & VISION CUTTING EDGE AV FOR THE PEOPLE BEHIND THE CLOUD

TOMLINSON GROUP NEW CORPORATE OFFICES, OTTAWA -REQUEST FOR PROPOSAL

Maintenance and upgrade of a BARCO video wall installed in the Crisis Room of the ECML

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

Centre Stage and City Room at Surrey City Hall Venue Information

UNM IT/Telecommunications Guide Specification Labeling 11/07/

NC. T H E SEX UP, I.

BANK OF INDIA KOLKATA ZONE ESTATE & SERVICES DEPARTMENT

Audio (providing, fixing complete including all accessories)

COUNTY OF ROCKLAND Department of General Services Purchasing Division

FACT SHEET: MAIN STAGE

SECTION FIBER OPTIC STATION CABLES

AUDIO/VIDEO PRESENTATION SYSTEMS

REVISED EXHIBIT B. CNMCC Westside Campus WSI Building Classroom Scope of Work Outline

Information Technology Services DESIGN AND INSTALLATION STANDARDS

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

Introduction and Opening Remarks. 1. Discuss the County s Current System

Room Recommendations for the Cisco TelePresence System 3210

-Technical Specifications-

Event Rental Package

PLANNING AN EVENT WITH CTS

Transcription:

Facilities Management Design and Construction Services ADDENDUM NO. 1 April 4,, 2019 REQUEST FOR PROPOSALS AUDIO/VISUAL SYSTEMS Indefinite Delivery Indefinite Quantity (IDIQ) UNIVERSITY OF ARKANSAS, FAYETTEVILLE The following supplement is hereby made to the project referenced above: SECTION 00200 INSTRUCTIONS FOR BIDDERS: Page 5 Item 11: Replace the first sentence of Item 11 with the following: Unless dictated by other specific project contract documents which may take precedence, all new equipment shall have a parts and labor warranty for a minimum period ending three (3) years from start-up and acceptance by the University. SECTION 00400 CONTRACT INFORMATION: Page 16 Item 11.A. WARRANTY: Replace Item 11.A with the following: Unless dictated by other contract documents, all new equipment shall have a parts and labor warranty for a minimum period ending three (3) years from start-up and acceptance by the University. A106 Facilities Management Fayetteville, AR 72701 479-575-6192 fama.uark.edu The University of Arkansas is an equal opportunity/affirmative action institution.

FOR INFORMATION ONLY: PRE-PROPOSAL PROPOSAL CONFERENCE MINUTES A non-mandatory pre-proposal conference was conducted on March 28, 2019. The meeting minutes are attached for information purposes only. The attached minutes do not change or imply changes to the Request for Proposals. All comments and questions during the conference were taken under advisement by the Owner. All original provisions of the RFP will remain in effect unless specific changes are incorporated by addendum. This addendum consists of two (2) pages of written documentation plus attachments. The addendum also includes a separate download for the Excel Pricing spreadsheet referenced in the RFP. Except as modified by this addendum, the original proposal documents shall remain in effect. This addendum must be acknowledged in the space provided on the Proposal Form. Kristen Knight Construction Coordinator University of Arkansas Fayetteville, Arkansas Attachments: Pre-Proposal RFI s and Responses Pre-Proposal Meeting Minutes Pre-Proposal Sign-In Sheet Page 2 of 2

Corporate Headquarters 1 Allied Dr., Bldg. 2, Ste. 2600 Little Rock, Arkansas 72202 501.666.6776 www.bernhardtme.com Fayetteville Branch Office 2039 Green Acres Road Fayetteville, Arkansas 72703 479.521.8634 Response to RFP RFI s Date: April 4, 2019 Project: University of Arkansas A/V IDIQ RFP Project # 04-18-0080 Ref: A/V IDIQ RFP RFI Response s Submitted By: Various RFP Proposers The following RFI questions were submitted for the University of Arkansas AV IDIQ RFP. Responses have been provided for each of the questions that were submitted prior to the question deadline of April 2, 2019. Comments 1. Page 30, H., 1. Specifies a JBL Professional CSA180Z or approved equal. This model can output 80W only. The detail listed in (a.) states 40W/80W/120W power output. Please advise if the (a.) spec "40W" and "120W" is to be excluded? Specification is for Standard of Quality. Provide JBL CSA Series 40/80/120 watts amplifiers, or approved equal, as required. 2. What is the rack type for the Uninstalled Component Cost Worksheet (Appendix 9): Floor standing, in-cabinet, wall mount? 14 Unit Rack with Locking Rear Access Panel. 3. In room type I1/N1 Standard Classroom: will the 14u rack be mounted into the podium? If not what type is needed? Refer to Technical Specifications Page 27 Item 1.03.B.1.f. The Control System must be rack mounted at the Instructors Station or where available in the Media Room in Large Auditoriums. 4. In room type I2/N2 Meeting Room: will the 14u rack be stand alone furniture? If not what type is needed? Refer to Technical Specifications Page 27 Item 1.03.B.1.f. The Control System must be rack mounted at the Instructors Station or where available in the Media Room in Large Auditoriums.

5. In room type I3/N3 100+ Seat Auditorium: Will the 14u rack be located in the room or an adjacent room? Refer to Technical Specifications Page 27 Item 1.03.B.1.f. The Control System must be rack mounted at the Instructors Station or where available in the Media Room in Large Auditoriums. 6. In room type I4/N4 300+ Seat Auditorium: Will the 14u rack be located in the room or an adjacent room? Refer to Technical Specifications Page 27 Item 1.03.B.1.f. The Control System must be rack mounted at the Instructors Station or where available in the Media Room in Large Auditoriums. 7. Page 31, L., 3. and 4. list two pieces of individual hardware. Appendix 9 Summary of Uninstalled Component Costs by Type lists one line for Electric system and 1 for networking equipment. Should an additional line be added for each or should the price of the items be combined on the single line with both models listed in the appropriate column? Additional information will be added to the Furnishings and Equipment line items on the Proposal Spreadsheet. 8. Listed in Section 00600 - TECHNICAL SPECIFICATIONS, 1.03 EQUIPMENT SPECIFICATIONS AND SYSTEM, B. Multifunction A/V Control System, 1. General Functions, e. Available communications and control platforms must include Ethernet, Cresnet, USB, RS232 IR/Serial Digital Media/HDBT and HDMI. Question: This is a request to remove Cresnet as a "must include communication" as this is a proprietary Crestron device to Crestron device communication that is not available in any other control system hardware capable of the same functions and meeting the same quality standards. The remaining protocols listed Ethernet, USB, RS232 IR/Serial Digital Media/HDBT and HDMI are well recognized and supported industry standards. The communications and control platforms listed are all acceptable. Cresnet is not to be intended as the only communication platform that is allowed, but it is one of the allowable communication platforms to be used on campus. Page 2

9. In reference to the Bosch motion sensor: Sec 00600-Technical Specifications 1.03 Equipment Specifications and System D. Motion Sensor: Standard of quality is represented by Bosch DS937 or approved equal. 1. Must interface with A/V control system to power system off when no motion is detected for a period of time 2. Must provide 360 degree motion detection of at least 25 feet. Is this a standard component in each of the rooms? If so, should it not be included on the spreadsheets for proposal as a line item? If we are to include it in the Additional Equipment for Complete System Recommended by Vendor please make that clear. Bosch Motion Senor Line Item will be added to the Proposal Spreadsheet. 10. Warranty Please Clarify the following statements: WARRANTY 00400 CONTRACT INFORMATION 11 Warranty (page 16) A. Unless dictated by other contract documents, all new equipment shall have a parts and labor warranty for a minimum period ending two (2) years from start-up and acceptance by the University. 00600 TECHNICAL SPECIFICATIONS PART 3 - EXECUTION Warranty A. A/V Contractor shall indicate on the Proposal Form in the designated location the duration of the proposed warranty. The minimum warranty period acceptable to the University is three years from start-up and acceptance by the University. The minimum Warranty period acceptable to the University is to be three (3) years. 11. There are specs given for both Document Camera and Digital Camera System, but the Cost Proposal Worksheet contains the Digital Camera System under the heading Document Camera Should there be a separate line item for the Digital Camera System, based on the specs I. U5. Document Camera 1. Document Camera: Standard of quality is represented by Lumens PC193 Document Camera or approved equal J. Digital Camera System: Standard of quality is represented by Vaddio ZoomShot 20 QUSB System or approved equal A separate line item for each camera will be added to the Proposal Spreadsheet. Page 3

12. Should these be included on Spreadsheet? If not, where so we account for them? L. U7. Furnishings and other equipment 1. Teaching table a. Electric height adjustable table b. Table top dimensions 30 x 60 2. Equipment Rack a. 14 rack unit dimensions b. Locking rear access panel 3. Electric system a. 1 rack unit 8 port power conditioner b. 1 450V, 1 Rack unit UPS power back up 4. Networking equipment a. 5 port, gigabit Ethernet switch for connecting to University Network b. 8 port, gigabit Ethernet switch with Power over Ethernet for interconnecting audio/visual devices Additional information will be added to the Furnishings and Equipment line items on the Proposal Spreadsheet. 13. Is there any information available regarding quantities needed per room type, specifically in regards to speakers? Refer to RFP Document Section 00500 Proposal Form page 22, Item 1 (Second Paragraph). Vendor shall provide conceptual/preliminary design drawings of recommended solutions for each room. Drawings of floor plans of the sample room types are included in this document. 14. At this point, we are to bid to spec requested for the projection screens, versus the recommended sizes based on maximum recommended viewing distance? Yes, bid the specifications requested for the projection screens. 15. For the 4-room type pricing exercise and considering the 80-watts @ 70V amplifier capability, what is the quantity of loudspeakers, JBL Control 16C/T, to be included for each room type? Refer to RFP Document Section 00500 Proposal Form page 22, Item 1 (Second Paragraph). Vendor shall provide conceptual/preliminary design drawings of recommended solutions for each room. Drawings of floor plans of the sample room types are included in this document. 16. When will the Appendix 9 Proposal Cost Worksheet be available in an Excel format to complete and include with our proposal? Will be included with Addendum #1. Page 4

17. What is the Tax Rate to be used for calculation of proposal pricing? 9.75% 18. What digital media type is required for submission of the electronic copies of the complete proposal? USB Thumb drive. 19. Is the 6" ceiling plate needed with the suspended ceiling projector mount and plenum equipment box? Yes. 20. What is the ceiling height of the different spaces? Assume the following ceiling heights for the following room types: Type N1 Classroom: 10-0 Type N2 Meeting Room: 9-0 Type N3 Auditorium (100+ Seats): 20-0 at front of Auditorium; 8-0 at rear of Auditorium Type N4 Auditorium (300+ Seats): 30-0 at front of Auditorium; 8-0 at rear of Auditorium 21. The amplifiers spec'd do not have enough power for what they are requesting. They are asking for speakers to be tapped at 30w but at 8 speakers the amps they have spec d are not near enough. Provide JBL CSA Series 40/80/120 watts amplifiers, or approved equal, quantity as required for calculated power output in each area. 22. The Sennheiser EW 112 G3 CC-A Microphones spec d have been discontinued. Is there an alternate to replace these? Provide the Sennheiser EW 112 G3 CC-A as specified, the Sennheiser recommended replacement, or an approved equivalent product. 23. Please define the expected warranty of the system. We are comparing two sections of the document between page 7 section 23, and page 39, item 3.07. Page 7 refers to a minimum 2 year warranty on parts and labor. Page 39 refers to The minimum warranty period acceptable to the University is three years from start-up. The minimum Warranty period acceptable to the University is to be three (3) years. Page 5

24. Is a scaling receiver required in conjunction with the Crestron DMPS3-4K-150C, or is the desired connectivity at the projector HDBaseT? The desired connection at the projector is HDBaseT. 25. Is there a preferred projector mounting system? Refer to 00600 Technical Specifications, 1.03, F.3: Provide and install projectors as required by the specification and in strict accordance with the manufacturer s mounting instructions. 26. On page 35, Section 2.02 Item F; is this statement for cinder block construction only or is it required for all facilities that may have an accessible drywall construction? The specification requirement applies at all locations. 27. Per page 32, Section 1.04, Item E; Is the dedicated full time technician provided an office at the university? Is it a requirement for the dedicated full time technician to be on-site at the University 8 hours per day? The specification requires a qualified technician to respond to the site within 2 hours. 28. What are the payment terms of the University from the date of billing receipt? Payment terms are NET 30 days. END OF RFP RFI RESPONSE s Page 6

Corporate Headquarters 1 Allied Dr., Bldg. 2, Ste. 2600 Little Rock, Arkansas 72202 501.666.6776 www.bernhardtme.com Fayetteville Branch Office 2039 Green Acres Road Fayetteville, Arkansas 72703 479.521.8634 Meeting Notes Date: March 28, 2019 Participants: Refer to attached Sign-In Sheet Project: University of Arkansas Audio / Visual Systems IDIQ RFP Project # 04-18-0080 Ref: Pre-Proposal Conference Submitted By: Grant Logan Bernhard TME A pre-proposal conference was held on Thursday, March 28 th, 2019 for the University of Arkansas Audio / Visual IDIQ Request for Proposals. This was a non-mandatory conference to allow interested proposers to the RFP ask questions about the proposal. The following items were discussed: 1. Is this the first year of this contract for this service? a. No, this contract is required to be renewed every 7 years at a maximum. 2. How many projects of each room type are executed on an annual basis as part of this contract? a. According to University staff in the meeting, the approximate numbers of rooms are likely 20 small classrooms, and 10 auditoriums annually. Ideally they would like to get to having a 5-year refresh cycle for A/V equipment in their classrooms, which would amount to approximately 40 classrooms, and 10 auditoriums per year. It should be noted that the 5-year refresh cycle is a goal, but is not being implemented at this time. b. The University has provided the following annual amount spent on this contract on purchases directly from the University to the current AV IDIQ vendor. It should be noted that these amounts do not include the amount of equipment purchased and installed through a General Contractor as part of a capital project on campus. i. 2013: $ 522,382.50 ii. 2014: $ 1,510,393.61 iii. 2015: $ 1,106,592.62 iv. 2016: $ 934,154.61 v. 2017: $ 1,611,693.00 vi. 2018: $ 931,730.00 vii. 2019: $ 592,517.00 3. Can all University departments access this IDIQ contract, or is it just limited to classrooms? a. Yes, Academics, Athletics, Housing, etc. can all access the IDIQ services, but are not bound to use the IDIQ contract in all cases. 4. Does the University track implementation of the rooms? a. Looking to implement Fusion, but currently no. Rooms are heavily utilized from 7:30 am 10:00 pm.

5. What is the overall intended functionality of the rooms? An example was given regarding the utilization of the document camera with a microphone. a. The document camera does have a microphone, but it is not often utilized. It is sometimes used as a makeshift camera / microphone for skype type of applications. 6. Are equivalent products allowed to be submitted as part of this proposal? a. Submissions to the RFP shall meet the requirements of the RFP. Substitutions for less expensive alternative products that do not meet the functionality requirements of the equipment as described in the RFP will not be considered. 7. How is the maintenance aspect of the contract carried out? a. University IT would make the service calls to the AV vendor, and University Facilities would handle the payment terms of the service call. 8. Is there anything that the University would like to change about the IDIQ process? a. Not really. The University wants to have a good partner for A/V services. The University is looking in general for a self-sufficient firm that can execute the projects well. b. Support is important to the University, and does require a quick response to service calls for classroom issues. End of Notes Page 2