IEEE P802.3av Interim Meeting Minutes Atlanta, GA, November 2007 Recorded by Robert Lingle, Jr. and Ken Maricondo

Similar documents
IEEE P802.3av GEPON Task Force. Meeting Summary and Action Items

Meeting Minutes Group: IEEE P802.3ca 100G-EPON Task Force

Meeting Minutes Group: IEEE P802.3ca 100G-EPON Task Force

P802.3av interim, Shanghai, PRC

Meeting Minutes Group: IEEE P802.3ca 100G-EPON Task Force

10G EPON 1G EPON Coexistence

The introduction of a new FTTH Standard in Japan

10G Broadcast: Review and Motion

C-band Wavelength Plan for 10G EPON Downstream

Low-Power Solution for 10GE-PON

REPORT/GATE FORMAT. Ed Boyd, Xingtera Supporters: Duane Remein, Huawei

IEEE 802.3ca Channel Bonding And Skew Remediation

Approved Minutes IEEE P802.3AP - Backplane Ethernet January 24 26, 2005 Vancouver, BC

Data Rate to Line Rate Conversion. Glen Kramer (Broadcom Ltd)

IEEE 1904 ANWG Opening Report

Reducing input dynamic range of SOA-preamplifier for 100G-EPON upstream

PIN-PD based ONU for 10GE-PON (3)

100G CWDM Link Model for DM DFB Lasers. John Petrilla: Avago Technologies May 2013

INTERNATIONAL TELECOMMUNICATION UNION

Proposed NG-EPON wavelength planning decision flow. Ed Harstead, member Fixed Networks Division CTO, Alcatel-Lucent January 2014

100GBASE-SR4 Extinction Ratio Requirement. John Petrilla: Avago Technologies September 2013

SMF Ad Hoc report. Pete Anslow, Ciena, SMF Ad Hoc Chair. IEEE P802.3bm, Geneva, September 2012

100G SR4 Link Model Update & TDP. John Petrilla: Avago Technologies January 2013

IEEE P802.3bj Task Force interim meeting convened at 8:39 am, Tuesday, November 13, 2012, by John D Ambrosia, IEEE P802.3bj Chair.

Unapproved Minutes IEEE P802.3AP - Backplane Ethernet November 16-18, 2004 San Antonio, Tx

50 Gb/s per lane MMF objectives. IEEE 50G & NGOATH Study Group January 2016, Atlanta, GA Jonathan King, Finisar

100G MMF 20m & 100m Link Model Comparison. John Petrilla: Avago Technologies March 2013

Cost Effective High Split Ratios for EPON. Hal Roberts, Mike Rude, Jeff Solum July, 2001

40/100 GbE PCS/PMA Testing

Development of optical transmission module for access networks

40G SWDM4 MSA Technical Specifications Optical Specifications

An Approach To 25GbE SMF 10km Specification IEEE Plenary (Macau) Kohichi Tamura

100GBASE-FR2, -LR2 Baseline Proposal

Simula'on Study on 100G EPON Wavelength Plan A. Eugene (Yuxin) Dai Cox Communica'ons IEEE 802.3ca 100G EPON TF November, 2016 San Antonio, Texas, USA

64G Fibre Channel strawman update. 6 th Dec 2016, rv1 Jonathan King, Finisar

Systematic Tx Eye Mask Definition. John Petrilla, Avago Technologies March 2009

802.3bj FEC Overview and Status IEEE P802.3bm

100G PSM4 & RS(528, 514, 7, 10) FEC. John Petrilla: Avago Technologies September 2012

40GBASE-ER4 optical budget

Comparison of options for 40 Gb/s PMD for 10 km duplex SMF and recommendations

Minutes of the Baseband IR PHY Ad-Hoc Group

SOA / PIN based OLT receiver update. David Piehler, Ruomei Mu 17 July 2007

40G SWDM4 MSA Technical Specifications Optical Specifications

Meeting Notes Sept 23, 2012 IEEE Industry Connections HSE Consensus Ad Hoc

ITU-T. G Amendment 2 (03/2006) Gigabit-capable Passive Optical Networks (G-PON): Transmission convergence layer specification Amendment 2

Accredited Standards Committee C63

Implementation of Modified FEC Codec and High-Speed Synchronizer in 10G-EPON

Hands-On Real Time HD and 3D IPTV Encoding and Distribution over RF and Optical Fiber

Update on FEC Proposal for 10GbE Backplane Ethernet. Andrey Belegolovy Andrey Ovchinnikov Ilango. Ganga Fulvio Spagna Luke Chang

Baseline Proposal for 200 Gb/s Ethernet 40 km SMF 200GBASE-ER4 in 802.3cn

10GBASE-LRM Interoperability & Technical Feasibility Report

Toward Convergence of FEC Interleaving Schemes for 400GE

Experimental results of SOA pre-amplification for 25G-EPON IEEE P802.3ca Task Force Meeting, March 2017 Vancouver BC, Canada

200GBASE-DR4: A Baseline Proposal for the 200G 500m Objective. Brian Welch (Luxtera)

1/12/98: To close debate and consideration of start-up protocols and move on. M Dineen, S Gladstone: Y-16, N-8, A-0 FAIL (Technical, requires 75%)

An Effort to Create Multi-vender Environment for 100 Mb/s P2P optical Ethernet Access in Japan

EEE ALERT signal for 100GBASE-KP4

PAM8 Baseline Proposal

Recommended Changes to Optical PMD Proposal

Baseline proposal update

Issues for fair comparison of PAM4 and DMT

Error performance objective for 400GbE

Component BW requirement of 56Gbaud Modulations for 400GbE 2 & 10km PMD

Optical transmission feasibility for 400GbE extended reach PMD. Yoshiaki Sone NTT IEEE802.3 Industry Connections NG-ECDC Ad hoc, Whistler, May 2016

Clause 74 FEC and MLD Interactions. Magesh Valliappan Broadcom Mark Gustlin - Cisco

Further information on PAM4 error performance and power budget considerations

H5000 Outdoor Mini Virtual HUB

IEEE P802.3cd Ad Hoc meeting October 26, 2016

100G-FR and 100G-LR Technical Specifications

Analysis on Feasibility to Support a 40km Objective in 50/200/400GbE. Xinyuan Wang, Yu Xu Huawei Technologies

MIGRATION TO FULL DIGITAL CHANNEL LOADING ON A CABLE SYSTEM. Marc Ryba Motorola Broadband Communications Sector

The receiver section uses an integrated InGaAs detector preamplifier (IDP) mounted in an optical header and a limiting postamplifier

Backplane NRZ FEC Baseline Proposal

10G/1G E-PON ONU SFP+ Bidi Optical Transceiver (20km) P3157-8D20-RSP

IEEE P802.3bs D Gb/s & 400 Gb/s Ethernet Initial Working Group ballot comments

o-microgigacn Data Sheet Revision Channel Optical Transceiver Module Part Number: Module: FPD-010R008-0E Patch Cord: FOC-CC****

OLP-87/87P. SmartClass Fiber PON Power Meter and Microscope

EPON ONU Triplexer Transceiver

IEEE Broadband Wireless Access Working Group < On Concatenation of Block Turbo Codes for OFDMA

Headend Optics Platform (CH3000)

Part Number Transmitter Output Power Receiver Sensitivity Reach Temp DDM RoHS. Logic Symbol Name/Description Note 1 - GND Module Ground 1

8 Ports. 16 Ports. ED5219LGT Series. CATV Single Channel EDFA 1310nm Forward Optical Transmitter

500 m SMF Objective Baseline Proposal

50 Gb/s per lane MMF baseline proposals. P802.3cd, Whistler, BC 21 st May 2016 Jonathan King, Finisar Jonathan Ingham, FIT

GPON ONU Triplexer Transceiver

IEEE P802.3ae 10 Gigabit Ethernet Minutes Task Force Plenary Meeting Nov 13 th 15 th, 2001 Austin, TX.

IEEE P802.3bs D Gb/s & 400 Gb/s Ethernet 2nd Working Group recirculation ballot comments

Detailed. EEE in 100G. Healey, Velu Pillai, Matt Brown, Wael Diab. IEEE P802.3bj March, 2012

40GBd QSFP+ SR4 Transceiver

The ad hoc stayed and worked on this spec

10G E-PON ONU PR-30 Transceiver (20km)

400G-FR4 Technical Specification

EMPOWERFIBER 10Gbps 2km SFP+ Optical Transceiver EPP C

Innovations in PON Cost Reduction

Cisco 10GBASE Dense Wavelength-Division Multiplexing XFP Modules

Technical Feasibility of Single Wavelength 400GbE 2km &10km application

Extension of OFDMA Physical layer mode to support 256 & 1024 point QAM constellations for high capacity back-haul applications

Cisco 10GBASE Dense Wavelength-Division Multiplexing SFP+ Modules

3GPP2 Access Network Interfaces TSG (TSG-A) #17 Draft Meeting minutes

100G QSFP28 SR4 Transceiver

Transcription:

IEEE P802.3av Interim Meeting Minutes Atlanta, GA, 13-15 November 2007 Recorded by Robert Lingle, Jr. and Ken Maricondo Tuesday, 13 November 2007 Meeting commences at 09:00 (Glen Kramer, Chair). Presentation by Chair: Agenda and General Information (3av_0711_agenda.pdf) - Group introductions (List of participants is available at the end of the Minutes.) - Robert Lingle, Jr. volunteered as recording secretary for Tuesday only. - Chair reviewed policies and procedures, emphasizing responsibility to declare affiliation; sheet for recording affiliation was circulated at 9:14AM - Patent policy was reviewed at 9:15AM (http://standards.ieee.org/board/pat/patslideset.ppt); call for patents at 9:17AM yielded no responses. - Chair covers Private Directory on Task Force Reflector (09:11) Private Directory 802.3av password ***** (removed from the Minutes) - Timeline was reviewed at 09:25. - Discussion on approving minutes of the Seoul meeting at 9:30 Motion #1 [Procedural, required 50%] Approve minutes of September 2007 meeting as recorded in 3av_0709_minutes_unapproved.pdf and post them on the TF website as 3av_0709_minutes_approved.pdf Moved: Ken Maricondo Seconded: Duane Remein Approved by voice vote without opposition. - Schedule for meeting was reviewed at 09:32. Motion #2 (09:39) [Procedural, required 50%] Approve agenda for November 2007 meeting as presented in 3av_0711_agenda.pdf Moved: Bidyut Parruck Seconded: Marek Hajduczenia Approved by voice vote without opposition. - Chair reviews future IEEE 802.3 plenary and interim meetings - Chair reviewed that IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 1

ITU-T SG-15 considers organizing a joint ITU-T SG15/FSN/IEEE 802.3av workshop on broadband optical access network issues - ITU-T headquarters in Geneva, Switzerland - June 19-20, 2008 - Room capacity: 100 people How many will participate? 23 Total in the room: 48 What topics would group like to cover? - FASN operator deployment plans, timelines, services, technologies - Inter-relationship between IEEE and ITU-T PON standards - Future wavelength allocation - IEEE current status review; FSAN current status review - 10GEPON technical details, solution overview Books of attendance were brought at 09:43. Presentation: Channel Link Model (v2.1) Ad Hoc Activity Report - Presented by Marek Hajduczenia at 09:51 (3av_0711_hajduczenia_1.pdf) - Demonstration was given Break at 10:05AM Resume at 10:35AM Presentation: 10G EPON Power Budget - Presented by Frank Effenberger at 10:37AM (3av_0711_effenberger_1.pdf) - Summarized results from decisions made in Seoul and discussed extensively on the reflector after Seoul meeting. - Questions and discussion. During questions, Frank clarified that system margin should be captured by using worst-case, EOL parameters when evaluating the parameters in the tables. Motion #3 (10:05) [Technical, required 75%] Adopt the power budgets defined on pages 3-5 of 3av_0711_effenberger_1.pdf as the baseline for PR10, PR20, and PR30 PMDs. Moved: Frank Effenberger Seconded: Marek Hajduczenia Yes: _42 No: _0 Abstain: _5 Motion Passes Total in Room: 47 IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 2

Presentation: 10G EPON Downstream 1590nm is the right choice - Presented by Frank Effenberger at 11:07AM (3av_0711_effenberger_2.pdf) - Gave reasons for choosing 1590nm as the choice for PR10 and PR20. - Questions and discussion revolved around clarifying possible Raman interactions between analog video and 1590nm wavelength, origin of the benefits of having 1590nm and 1577nm bands contiguous, and whether one could allow 1550nm as an optional and additional wavelength over and above 1590nm. Presentation: C-band Wavelength Plan for 10G EPON Downstream - Presented by Dongsoo Lee at 11:39AM (3av_0711_lee_1.pdf) - Gave reasons for choosing 1555nm as the choice for PR20 and 1577nm as the choice for PR10 (to match PR30). - Questions and discussion revolved around the number of PMDs required to support the proposals, and the future of RF video overlay. Adjourn for lunch 12:06PM Meeting is called to order at 13:30. Marek Hajduczenia took over as recording secretary at 1:32PM Presentation: Wavelength plan for PR-20 - Presented by Bin Young Yoon at 11:33AM (3av_0711_yoon_1.pdf) - PR20 power budget system proposal, motivation and overview of the pros and cons of the current wavelength allocation schemes for PR20 systems. Technical parameters for PR20 systems operation were discussed (power consumption, power penalties etc.) Robert Lingle, Jr. took over the minutes at 13.40PM Straw Poll #1 [standard rules] by Frank Effenberger Define the OLT transmit wavelength range for PR10 and PR20 PMDs to be: 1580 to 1600nm: 29 1545nm to 1565nm: 3 Something else: 1 No opinion: 9 Number in the room: 47 IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 3

Motion #4 (2:05) [Technical, required 75%] Define the OLT transmit wavelength range for PR10 and PR20 PMDs to be 1580nm to 1600nm. Moved: Frank Effenberger Seconded: Marek Hajduczenia Yes: _31 No: _3 Abstain: _10 Motion Passes Total in Room: 47 Straw Poll #2 [standard rules] by Bidyut Parruck I would like to change PR30 downstream wavelength to the range 1580 to 1600nm Yes: 5 No: 30 No opinion: 9 Total count in the room: 45 Presentation: Pseudo-Random Test Pattern Mode - Presented by Jeff Mandin at 2:20PM (3av_0711_mandin_1.pdf) - Discussion issues with the use of the PSC pseudo-random test pattern defined in 10GBASE-R considering the presence of FEC in 10G EPON. - Extensive discussion about what are the functions of the test patterns, how they are used in practice, whether FEC decoder itself can be used to report performance, how these test patterns would be used with burst-mode receivers. Presentation: Square Wave and PRBS31 Test Modes - Presented by Jeff Mandin at 2:20PM (3av_0711_mandin_2.pdf) - Discussion issues with the use of the PSC square wave test pattern defined in 10GBASE-R considering the presence of FEC in 10G EPON. Straw Poll #3 [standard rules] by Jeff Mandin 10G EPON should include support for square-wave test mode and optional support for PRBS31 test mode. Yes: 16 No: 0 More study needed: 17 No opinion: 5 Break at 3:08 for 30 minutes Reconvene at 3:38 IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 4

Straw Poll #4 [standard rules] by Jeff Mandin 1) 10G EPON should support mandatory or optional pseudo-random test pattern mode with: a) FEC parity blocks included in the test pattern b) 10GEPON burst preamble/delimiter at the start of the upstream test pattern 8 2) 10G EPON should support pseudo-random test patter mode as in 10GBASE-R and implement special sync state machines 0 3) More study needed 30 4) 10G EPON should not support pseudo-random test mode 0 4. No opinion 6 Presentation: Timing Consideration for 10GEPON Burst Receiver - Presented by Haim Ben-Amram at 3:55PM (3av_0711_benamram_2.pdf) - Discussion issues with the use of the PSC square wave test pattern defined in 10GBASE-R considering the presence of FEC in 10G EPON. - Extensive discussion followed on multiple topics from Haim s presentation. Presentation: Power Budget Class (PBC) and PMD naming - Presented by Marek Hajduczenia at 4:37PM (3av_0711_hajduczenia_2.pdf) - Discussed issues surrounding naming PMDs for D1.0 Motion #5 5:20 PM [Technical, required 75%] 802.3av Task Force approves the 10G EPON Power Budget Class (PBC) naming nomenclature as presented in 3av_0711_hajduczenia_3.pdf, slides 2 and 3 (symmetric and asymmetric data links, respectively). Moved: Marek Hajduczenia Seconded: Ken Maricondo Yes: _38 No: _0 Abstain: _4 Motion Passes Motion #6 5:23 PM [Technical, required 75%] 802.3av Task Force approves the 10G EPON Physical Medium Dependent (PMD) naming nomenclature as presented in 3av_0711_hajduczenia_3.pdf, slides 4. Moved: Marek Hajduczenia Seconded: Ken Maricondo Yes: _40 No: _0 Abstain: _1 Motion Passes IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 5

Chair led group in a discussion of Wednesday s agenda beginning at 5:26PM based on following outline (including amendments during discussion). 1. Remaining PMD parameters a. Burst mode timing study (Ton, Toff) (Ken-ichi Suzuki) b. Burst mode timing study (AGC, CDR) (Haim Ben-Amram) c. Transmitter spectral limits (Frank Effenberger) d. Define value for TDP (Hamano-san) 2. Jitter Budget Reference Model (Vijay Pathak) 3. Coexistence clause/annex (discussion on Wed) a. Model description b. Layer diagram c. Dual-rate burst-mode receiver 4. FEC method (discussion on Wed) a. FEC algorithm selection b. FEC framing details (SH, SOD) (Frank Effenberger) 5. 10G PCS changes for burst-mode operation a. BER monitoring b. Link fault signaling c. Synchronization 6. PMD Testing (Jeff Mandin) 7. PY30 Upstream power budget (Marek Hajduczenia) 8. Definitions of optical and electrical subassemblies (Ken Maricondo) Recessed for the day by Chair at 5:48PM ================================================== Wednesday, 14 November 2007 Meeting commences at 09:00AM (Glen Kramer, Chair). Ken Maricondo took over as recording secretary at 09:00AM Announcements: - Future meeting venue http://ieee802.facetoface-events.com/sessions/46/survey.php - How many people are interested in the HSSG and what areas of specialty track? 6 people interested in the fiber track. - Draft 1.0 being creating and posted and will be reviewed on Thursday. - Reminder to sign-in in the attendance list - Review liaison letter - Approved link model V2.1 posted for review IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 6

Presentation by Chair: Agenda and General Information (3av_0711_agenda.pdf) - Timeline was reviewed at 09:10AM. - Burst mode timing study (AGC, CDR) (Haim Ben-Amram) to be presented in January meeting. - Definitions of optical and electrical subassemblies (Ken Maricondo) out of scope and removed from day s presentation. Duane Remein taken over as chair 09:15AM Presentation: Consideration and proposal of laser on/off time for 10G EPON. - Presented by Ken-ichi Suzuki at 9:20PM (3av_0711_suzuki_1.pdf) - Propose definitions of T on and T off times be adjustable verse remaining 512ns. - MPCP and OAM Query options discussed along with pro and cons. Straw Poll #5 [standard rules] by Ken-Ichi Suzuki I support adjustable (ONU-specific) Laser ON and Laser OFF times for only 10G PON. - Yes: 33 - No: 0 - No opinion: 4_ Total count in the room: 42 Straw Poll #6 [standard rules] by Ken-ichi Suzuki Adjustable (ONU-specific) Laser ON and Laser OFF times should use: a) Modify REGISTER _REQ and REGISTER messages: 28_ b) OAM messages: 0 c) No opinion: 9 Total count in the room: 42 Glen Kramer took over as chair 9:45AM Presentation: Transmitter spectral limits - Presented by Frank Effenberger at 9:45AM (802.3-2005_section4.pdf) - Single mode lasers will not have to have their spectral width defined - Only quote optical path penalties Presentation: How and When TDP should be determined for 10GEPON?? - Presented by Hamano-san at 10:03AM (3av_0711_hamano_1.pdf) - Current values of 802.3ae 3.0dB verse the proposed value of 1.5dB - No Hi-power DML production results - Action item: Hamano-san and Jessica Jiang will study the TDP implications to the 10GEPON for the January meeting - Decision on TDP before July - General open discussion on topic The attendance books had entered the room at 10:15AM IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 7

Break at 10:35AM Resume at 11.05AM Presentation: 10GEPON Reference Model: 96.96.ps challenge - Presented by Vijay Pathak at 11:05AM (3av_0711_pathak_1.pdf) - Total jitter budget less then 97ps total for the system - Review of the IEEE Jitter definitions - 4 jitter test points identified - Action item: Vijay Pathak to propose values at the January meeting Intended interruption of 10GEPON Reference Model 96.96.ps challenge for Bob Grow discussion on liaison letter response by the task force and 802.3 WG. 11:20AM Presentation resumed by Vijay Pathak at 11:25AM Straw Poll #7 [standard rules] by Vijay Pathak Specify optical and electrical domain jitter budgets for PR and PBX in a format similar to IEEE802.3ah table 60-10 and 60-11: - Yes: 36 - No: 0 - No opinion: 2_ Chair proposed to move coexistence clause/annex discussion to end of day. No objections from the group. Presentation: FEC Codes - Presented by Fumio Daido at 11:35AM (3av_0707_daido_1.pdf are shown again) - Comparison of FEC codes - Codes other than RS Code: BCH code and Concatenated Code - Performance and implementation complexity of RS(255, 223) is compared with RS(255, 239) - RS(255, 223) is proposed to be the best by presenter. Straw Poll #8 [standard rules] by Bidyut Parruck I prefer the following FEC algorithm: (Vote for only one) - RS(255, 239): 7 - RS(255, 223): _20 - BCH(1944, 1690): 2 - Something else: 0 - No opinion: 6 Number in Room: 41 IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 8

Motion #7 12:33 PM [Technical, required 75%] Accept RS(255, 223) as the baseline proposal for the FEC algorithm. Moved: Fumin Daido Seconded: Bidyut Parruck - Yes: 22 - No: 3 - Abstain: 12 Total in Room: 39 Motion Passes Adjourn for lunch 12:35PM. Meeting is called to order at 02:00PM. Presentation: A better sync header pattern for the FEC Parity Blocks Presented by Frank Effenberger at 02:00PM (3av_0711_effenberger_3.pdf) - FEC frame structure using the RS(255, 223) - Proposed Sync header pattern Motion #8 02:13 PM [Technical, required 75%] For 10G EPON, accept as baseline proposal for the sync header pattern for the FEC parity block to be {00, 11, 11, 00}. Moved: Frank Effenberger Seconded: Bidyut Parruck Motion withdrawn by mover. Straw Poll #9 [standard rules] by Frank Effenberger Which sync header pattern for the FEC parity blocks do you like? (Vote for only one) - {00, 11, 11, 00}: 8 - {00, 11, 00, 11}: 5 - Any balanced pattern proposed of 00 and 11 sync headers: 9 - No opinion: 15 Action item: Frank Effenberger will present state machine that uses these patterns at the January meeting. Break at 2:35PM Resume at 3.00PM Motion #9 03:07 PM [Technical, required 75%] by Marek Hajduczenia 802.3av Task Force adopts the channel link model (formulas not Particular values) including in 3av_0711_linkmodel_v2_1.xls. Moved: Marek Hajduczenia Seconded: Duane Remein Head count: 38 (technical >= 75%) IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 9

Motions passed by voice vote without opposition. Presentation by Chair: Draft review D1.0 (3av_c91_d1_0_markup.pdf) - Proposed 15 minutes allotted for review for the document. Issue brought up by Jeff Mandin that some text in the draft has not been approved and therefore should be deleted before approving the draft. - Proposed plan is not to vote on the draft editors will remove old (carry-over) text tonight and vote planed for tomorrow. - Jeff Mandin posed question on what is an editorial changes verse technical changes. - Group agreed that editorial changes are not a reason to stop the approval process. - Kenneth Maricondo expressed concerns that voting on a document that has not been completely reviewed. Chair explained the reason why the need for the approval of the daft need to occur today, so that a review of draft comment process could take place tomorrow. - Discussion on forcing the review process. Chair polled room by a show of hands to find out who has reviewed the draft with mixed results. - Duane Remein walked through draft clause 92 and made editorial changes while group review draft on presentation screen. Editorial comments made to the draft while reviewed. - Changes to the Clause 92 o 92.1.1.3 line rate value additions o 92.4 alignment function in the upstream not the downstream - Chair - Things that have not been reviewed or voted cannot be in the draft and must be removed. Draft does not need to be complete at this point in the process. - Editors notes are not binding - Chair - if text is not clear, it can be changed (does not violate procedure) - Marek Hajduczenia walked through draft clauses 91 and 64 and made editorial changes while group review draft on presentation screen. - Changes to Clause 91 o Changes to values in table 91-2 - Changes made to Clause 64 - Editors will post the revised draft online tonight and group was advised to review the draft for tomorrow s motion to vote. Motion #10 05:4PM [Technical, required 75%] by Ken-Ichi Suzuki Accept as a baseline proposal for MPCP handshake-based adjustable Laser On and Laser Off times for 10G EPON using modified REGISTER_REQ and REGISTER messages shown in pages 6 and 7 of 3av_0711_suzuki_1.pdf. Moved: Ken-ichi Suzuki Seconded: Bidyut Parruck Yes: 33_ No: 0_ Abstain: 3 Number in room: 37 Motions passed IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 10

Presentation: PRX30-U3 Upstream power budget - Presented by Marek Hajduczenia at 5:51PM (3av_0711_hajduczenia_4.pdf) - Explanation of changes to spreadsheet - Group advised to review power budgets - Action item: Marek Hajduczenia will post the spreadsheet on the website for download and will present changes at the January meeting. Chair asked Jeff Mandin if the following topics could be put off until next meeting. 10G PCS changes for burst-mode operation - BER monitoring (Jeff Mandin will present in January) - Link fault signaling (Jeff Mandin will present in January) Jeff Mandin agreed to postpone presentation. Presentation: Clause 64 and Coexistence Annex - Presented by Jeff Mandin at 5:56PM (3av_0711_mandin_3.pdf) - Background reviewed - Option 1: 10 G EPON MAC functionality is a superset of the 1G EPON MAC - Option 2: 10G MAC functionality coexists with 1G MAC - General discussion on topic - Action item: Marek Hajduczenia will do drawings in PowerPoint. Coexistence clause/annex moved to January. Marek, Jeff, and Glen - will review suggest examples of FSM complications when 10G and 1G are combined. o Model description o Layer diagram o Dual-rate burst-mode receive Chair proposed meeting start time for Thursday at 8:30AM. No objections from the task force. Recessed for the day 6:21PM ================================================== Thursday, 15 November 2007 Meeting commences at 08:30AM (Glen Kramer, Chair). Announcements: - Future meeting venue survey to be conducted before break. - Chair asked if anyone was unable to access draft. No such reports received from the group. IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 11

Motion #11 08:35AM [Technical, required 75%] Adopt draft 1.0 of clauses 64, 91, and 92 as presented in 3av_c64_d1_0.pdf, 3av_c91_d1_0.pdf, and 3av_c92_d1_0.pdf. Moved: Marek Hajduczenia Seconded: Kenneth Maricondo Yes: 32_ No: 0 Abstain: 0 Head count: 33 Motion Passes Presentation by Chair: Agenda and General Information (3av_0711_agenda.pdf) - Timeline was reviewed at 08:40AM. Motion #12 08:40AM [Procedural, required 50%] Adopt P802.3av project timeline as presented in 3av_0711_agenda.pdf. Moved: Duane Remein Seconded: Kenneth Maricondo Yes: 29 No: 0 Abstain: 4 Head count: 34 Motion passes. Straw Poll #10 [standard rules] by Chair I will attend 802.av meeting in Portland, Oregon, on January 22-24, 2008. Yes: 26 No: 3 Overview of submitting comments for the draft - Eric Lynskey demonstrated web tools (comment submission tool) - General comment submission procedure - Duane Remein and David Law demonstrated the database input submission (access) and comment resolution process Comment Resolution on Comments Submitted to Date - Proposed responses are generated by editors and posted in 3av_0711_responses_proposed.pdf - Resolution on 5 technical comments, all proposed responses accepted after discussions and comments - Resolution on 1 editorial comments, all proposed responses accepted after discussions and comments - Report generated and posted in 3av_0711_responses_accepted.pdf Break at 10:35AM IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 12

Resume at 11.05AM Presentation by Chair: Timeline for January meeting - Timeline for submissions January meeting was reviewed at 11:05AM. - Final day for comments submission to editors is December 17, 2007 - December 20, 2007 all comments without proposed responses are published. - January 7, 2008 - comments with proposed responses published on website for review - January 22-24, 2007 comment resolution during January Interim meeting Presentation by Chair: On topics what will be presented at 802.3 closing plenary. (3av_0711_closing.pdf) - Baseline proposals - Objectives of the group : o Power Budget Classes o PMDs o Project timeline - Review of the action items - Approved Link Model v2.1 - Approved Draft 1.0 - Approved timeline Chair asked if anyone has any new business to be brought forward. Motion #13 11:35AM Move to adjourn. Moved: Marek Hajduczenia Seconded: Jeff Mandin Motion passes by voice vote without opposition. Taskforce meeting adjourned by Chair at 11:35AM ================================================ List of Attendees Name Beaudoin, Denis Ben Amram, Haim Carroll, Martin Chang, Frank Chow, Jacky Cook, Charles Daido, Fumio Effenberger, Frank Affiliation Texas Instruments PMC Sierra Verizon Vitesse Marvell Qwest Sumitomo Electric Huawei IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 13

Farmer, Jim Wave7 Optics Feng, Dongning Huawei Hajduczenia, Marek Nokia Siemens Hamano, Hiroshi Fujitsu Labs Hirano, Kengo NEC Ikeda, Hiroki Hitachi Jiang, Jessica Salira Kimura, Mitsunobu Hitachi Communications Tech. Kozaki, Seiji Mitsubishi Electric Kramer, Glen Teknovus Kusano, Toshihiko PMC Sierra Lamb, Lowell Teknovus lapak, Jeff UNH-IOL Lee, Dongsoo ETRI Leung, Raymond Huawei Lin, Rujian Shanghai Luster Teraband Photonics Lingle, Jr., Robert OFS Lynskey, Eric Teknovus Mandin, Jeff PMC Sierra Maricondo, Ken independent Nagahori, Takeshi NEC Nomura, Takumi NEC Communication Systems Otaka, Akihiro NTT Parruck, Bidyut Cortina Systems Pathak, Vijay Kawasaki Microelectronics Remein, Duane Alcatel-Lucent Saeki, Naoto NEC Corporation Sanchez, Oliver Oplink/OCP Smith, Joe Alcatel-Lucent Suzuki, Ken-Ichi NTT Suzuki, Naoki Mitsubishi Electric Tajima, Akio NEC Takizawa, Motoyuki Fujitsu Access Tanaka, Keiji KDDI R&D Labs Tsuji, Shinji Sumitomo Electric Uematsu, Kiyoshi OKI Electric Umnov, Alexander Fujitsu Yamashita, Hajime NEC Access Yokomoto, Tetsuya Fujitsu Access Yoon, Bin Yeong ETRI IEEE P802.3av Task Force Interim Meeting, Atlanta, GA, November 13-15, 2007 Page 14