SNS Target Imaging and Related Developments

Similar documents
Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Linac 4 Instrumentation K.Hanke CERN

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

The Spallation Neutron Source Project Geneva December 8, 2006

The Construction Status of CSNS Linac

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

Proton Engineering Frontier Project

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

Beam Loss Detection for MPS at FRIB

Activities on FEL Development and Application at Kyoto University

Screen investigations for low energetic electron beams at PITZ

The Beam Test Facility at the SNS

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

SPEAR 3: Operations Update and Impact of Top-Off Injection

LHC Beam Instrumentation Further Discussion

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Progress of Beam Instrumentation in J-PARC Linac

PRESENT STATUS OF J-PARC

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Beam instrumentation at the 1-MW proton J-PARC RCS

Photoinjector Laser Operation and Cathode Performance

Upgrading LHC Luminosity

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

OPERATIONAL EXPERIENCE AT J-PARC

Status of SOLARIS Arkadiusz Kisiel

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

P. Emma, et al. LCLS Operations Lectures

G0 Laser Status Parity Controls Injector Diagnostics

The PEFP 20-MeV Proton Linear Accelerator

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

CLIC Feasibility Demonstration at CTF3

LIGHT PROTON THERAPY PROJECT

DELIVERY RECORD. Location: Ibaraki, Japan

ESS Linac WP8 Radio Frequency Systems and Test Facilities

INSTALLATION STATUS OF THE ELECTRON BEAM PROFILER FOR THE FERMILAB MAIN INJECTOR*

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Design Studies For The LCLS 120 Hz RF Gun Injector

The Elettra Storage Ring and Top-Up Operation

4.4 Injector Linear Accelerator

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

New Filling Pattern for SLS-FEMTO

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

New Results on the Electron Cloud at the Los Alamos PSR

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Status of the X-ray FEL control system at SPring-8

Status and Plans for PEP-II

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Digital BPMs and Orbit Feedback Systems

COMMISSIONING AND FIRST RESULTS OF THE ELECTRON BEAM PROFILER IN THE MAIN INJECTOR AT FERMILAB*

Low-Energy Electron Linacs and Their Applications in Cargo Inspection

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

Detailed Design Report

Summary of the 1 st Beam Line Review Meeting Injector ( )

PEP II Design Outline

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

Connection for filtered air

THE OPERATION EXPERIENCE AT KOMAC*

ESS Linac WP8 Radio Frequency Systems and Test Facilities

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

The FLASH objective: SASE between 60 and 13 nm

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

arxiv: v1 [physics.ins-det] 1 Nov 2015

The European Spallation Source

DAQ Systems in Hall A

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

Status of RF Power and Acceleration of the MAX IV - LINAC

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

High Rep Rate Guns: FZD Superconducting RF Photogun

STATUS AND COMMISSIONING RESULTS OF THE R&D ERL AT BNL*

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

Beam Losses During LCLS Injector Phase-1 1 Operation

LENS Operating Experience

Cathode Studies at FLASH: CW and Pulsed QE measurements

Current status of XFEL/SPring-8 project and SCSS test accelerator

Compact, e-beam based mm-and THzwave light sources

Undulator Protection for FLASH and for the European XFEL

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

TESLA FEL-Report

Report on the LCLS Injector Technical Review

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Future Performance of the LCLS

Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers

The 2011 LHC Run - Lessons in Beam Diagnostics

Neutron Irradiation Tests of an S-LINK-over-G-link System

Requirements for the Beam Abort Magnet and Dump

Drive Laser Operations

Operation of CEBAF photoguns at average beam current > 1 ma

Transcription:

SNS Target Imaging and Related Developments Tom Shea (ORNL) ESS Seminar Lund, Sweden January 28, 2011 T. J. Shea, T. McManamy, G. Bancke, W. Blokland, A. Brunson, M. Dayton, R. Fiorito, K. C. Goetz, J. Janney, M. Lance, C. Maxey, F. Montgomery, P. Rosenblad, S. Sampath, M. Simpson, T. Ally, Garcia, K. Hasse, Mitchell Multiple ORNL divisions, Stony Brook University, University of Maryland

Outline Brief history: SNS diagnostics deployment and commissioning Development of Target Imaging System (TIS) Imaging system performance with beam Related developments Summary 2 Managed by UT-Battelle

SNS Accelerator Complex Front-End: Produce a 1-msec long, chopped, H- beam 1 GeV LINAC Accumulator Ring: Compress 1 msec long pulse to 700 nsec Injection Collimator s RF Accumulator Ring Extraction 2.5 MeV 1000 MeV RTBT HEBT Front-End LINAC Liquid Hg Target Current! 945 ns Chopper system makes gaps mini-pulse Current! 1 ms macropulse 1ms 3 Managed by UT-Battelle

SNS Design Parameters Kinetic Energy 1.0 GeV Beam Power 1.4 MW Linac Beam Duty Factor 6% Modulator/RF Duty Factor Spec. 8% Peak Linac Current 38 ma Average Linac Current 1.6 ma Linac pulse length 1.0 msec Repetition Rate 60 Hz SRF Cavities 81 Ring Accumulation Turns 1060 Peak Ring Current 25 A Ring Bunch Intensity 1.5x10 14 4 Managed by UT-Battelle

The SNS Partnership During Construction Partner lab obligation completed: LBNL: Sept 2002* LANL: Sept 2004 JLAB: April 2005 BNL: April 2005 Beam Diagnostics partnership: LBNL, LANL, BNL, ORNL 5 Managed by UT-Battelle

Organization communication performance is correlated with technical performance* head 1 2 3 4 *Allen, Goldhar, Baker, 1964 and on 6 Managed by UT-Battelle

Probability of Communication vs. distance 7 Managed by UT-Battelle T. Allen, Sloan WP 165-97, MIT, 1997

Commissioning ran in parallel with installation 1 2 3 4 5 6 7 8 9 2002 2003 2004 2005 2006 At LBNL Run #1: - RFQ (2.5 MeV), Jan 25th through Feb 2002 Run #2: - Front End (2.5 MeV), Apr 4 to May 31, 2002 At ORNL Run #3: - Front End again (2.5 MeV), Nov 5, 2002 to Jan 31, 2003 Run #4: - Front End, DTL tank 1, D-Plate (7.5 MeV), Aug 26 to Nov 17, 2003 Run #5: - Front End & DTL tank 1,2,3 (39 MeV) Spring 2004 Run #6 : - Front End, DTL, CCL modules 1,2,3 (158 MeV) Fall 2004 Run #7 : - Front End, DTL, CCL, SCL (1 GeV), Aug 2005 Run #8 : - Front End, DTL, CCL, SCL, Ring (1 GeV), Feb 2006 Run #9 : - Front End, DTL, CCL, SCL, Ring, Target (1 GeV), April 28, 2006 8 Managed by UT-Battelle

The Final Commissioning Run: Beam to Target 602 Diagnostic Devices 9 2002 2003 2004 2005 2006 MEBT 6 Position 2 Current 5 Wires 2 Thermal Neutron 1 Emittance Horizontal 1 Emittance Vertical 1 Fast Faraday Cup 1 Mode-locked Laser 1 Faraday/Beam Stop D-box video D-box emittance D-box beam stop D-box aperture Differential BCM DTL 10 Position 5 Wire 12 Loss 5 Faraday Cup 6 Current 6 Thermal and 12 PMT Neutron Differential BCM 9 Managed by UT-Battelle CCL/SCL Transition 2 Position 1 Wire 1 Loss 1 Current IDump 1 Position 1 Wire 1 Current 6 BLM CCL 10 Position 9 Wire 8 Neutron, 3 BSM, 2 Thermal 28 Loss 3 Bunch 1 Faraday Cup 1 Current 1 Dump SCL 32 Position 86 Loss 8 Laser Wire 7 PMT Neutron RING 44 Position 2 Ionization Profile 70 Loss 1 Current 5 Electron Det. 12 FBLM 2 Wire 1 Beam in Gap 2 Video 1 Tune HEBT 29 Position 11 Wire 46 BLM, 3 FBLM 4 Current EDump 1 Current 4 Loss 1 Wire RTBT 17 Position 36 Loss 4 Current 5 Wire 1 Harp 3 FBLM LDump 6 Loss 6 Position 1 Wire,1 BCM

Integrated Diagnostics for Beam on Target Prove We Met Project Execution Plan Criteria: 10^13 protons per pulse on target 5*10^-3 neutrons/proton*steradian from moderator Beam Current Monitor RTBT tunnel Layout of CD-4 Observation System Proton beam Target Target building Blokland Beam Current RTBT service building BCM interface Local log Mezzanine Target Viewscreen Neutron Time-of-flight* Moderator neutron detector Moderated neutrons Target Viewscreen* PC FO dist. Riedel PC FO dist FO dist. Neutron elec Iverson Local log Camera interface PC Shea Local log SM fiber - DeVan PC FO dist. MM fiber - Riedel Private UDP - Riedel ICS network - Williams EL/RTDL - Thompson Control room display - Purcell 10 Managed by UT-Battelle ` remote log *temporary

Temporary Target Viewscreen Uncooled Chromium- doped alumina viewscreen Redundant optical fiber bundles and cameras in service bay Removed before power exceeded 20 kw Viewcreen on target nose Camera system on target cart 11 Managed by UT-Battelle

12 Managed by UT-Battelle

Permanent Target Imaging System (TIS) Rad hard, 11 meter fiber optic cable turning mirror and focusing elements 25 mm ID viewport luminescent coating beam Parabolic mirror 2.2 meters Target 13 Managed by UT-Battelle

Candidate Photon Sources Source Screen* (Cr:Al2O3) 2*10 +2 Coating (Cr:Al2O3) 2*10 +1 Optical Transition Radiation 3*10-4 Helium scintillation (10 mm) 3*10-3 Thermal Incandescence Photon yield (photons/ proton/steradian) (nonlinear) * Ruby screen used during low power commissioning 14 Managed by UT-Battelle Fiorito et al, UMD

Luminescent Coating Development 800 MeV beam test at LANL Structure of powder before spraying Electron backscatter image of coating 1 GeV test at SNS linac: 0.25 mm coating produced 1/17 intensity of 1 mm Ruby plate 15 Managed by UT-Battelle Kenik, Sampath, Blokland T

Luminescence intensity increases with the amount of alpha alumina (corundum) intensity 16 Managed by UT-Battelle F. Montgomery

Automated Target Coating Stony Brook University 17 Managed by UT-Battelle

Coating Pattern Target 2 Pre-reacted Ruby Targets 3 and 4!"#$%&'()'!"#$"%&!'#!"#$%&'*)'$"%&!'# ()*+,+-.#/"*#0,/-#"/# 1%*'-1#!"#$%&'+)',!#(-*+,$-#!"2#3#("#/%*#("#'"".# Alumina Alumina/Chromia blend Find target center to +/-1mm 18 Managed by UT-Battelle

Component Layout from RTBT BCM 19 Managed by UT-Battelle

Optics: Some Design Challenges Only a small (<1 dia) viewing tube is possible: low light collection For a 1.5 MW year window life, the dose in Si at 1 m above beam (window location and transition to fiber) is about 1x10 8 rad An optical element must also be located at the in He near the hottest point 20 Managed by UT-Battelle Dose calculations: Ferguson, et. al.

Optics on Proton Beam Window Turning mirror, lens, beginning of fiber bundle Shielding Window 1: no optics Window 2: optics survived for life of window Window 3: improved optics installed and ready for beam in Feb 2011 25 mm view tube convex mirror 21 Managed by UT-Battelle proton beam flight tube View of mock target nose as seen from flight tube

Improved Optics Window 2 3 fused silica refractive elements Wide field of view Image onto bundle of 10,000 fibers 700 nm center, 80 nm FWHM Window 3 2 fused silica refractive and 1 fused silica diffractive element Tighter field of view Image onto bundle of 20,000 fibers 22 Managed by UT-Battelle

Predicting Beam-on-Target Parameters with RTBT Wizard application halo thermocouples BPMs Harp, BPM 4 wire scanner emittance station M. Plum, S. Cousineau 23 Managed by UT-Battelle

First Beam Images 24 Managed by UT-Battelle

Beam Study of 5 Extreme Cases (3/22/10) 1 2 Size, peak densities and center locations compared between Wizard predictions and TIS measurements Super-Gaussian fits cross-checked with 3 codes: generally agree well with each other 5 3 We believe beam can be centered on target geometric center to a few mm 25 Managed by UT-Battelle 4 Trends all agree well, but TIS generally shows a lower peak density and larger beam size than Wizard (by up to 40%!)

Uniformity: scan with small beam spot 26 Managed by UT-Battelle

Uniformity Early in target life Later in target life Horizontal 0.070 0.065 0.060 0.055 0.050 0.045-100 -50 50 100 0.070 Vertical 0.065 0.060 0.055 0.050 0.045 27 Managed by UT-Battelle -20-10 10 20

Calculated Radiation Damage to Coating >85% due to neutrons DPA in the alumina spray (dpa/sns yr/mw) X (cm) 3 2 1 0-1 -2-3 -10-7.5-5 -2.5 0 2.5 5 7.5 10 28 Managed by UT-Battelle 3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 5.75 Y (cm)

Target 2 coating lasted full life of target Efficiency Plot- Sep 09 Jun 2010 Target 3 is similar Increase due to gas impurities from seal leak Shutter delay to eliminate gas flash with gas scintillation 90% intensity drop after 100 MW-hours (~0.1 dpa, point at which suspected neutron-induced F-center production saturates); then slow intensity reduction to 3200 MW-hours 29 Managed by UT-Battelle kw-hrs shutter delayed to gate out light from Helium

Emission Spectrum vs. Integrated Beam Power 1562 MWHr 808 MWHr 196 MWHr 125 MWHr 68 MWHr 16 MWHr 6 MWHr

Identify Emission Lines 4-5#:==9@!;#,-./)'01+23' B5#7779>!;# 4-5#7?<9<!;# 4-5#<<79=!;# 4-5#6789:!;# 4-5#>?89<!;# 4-5#6@A9A!;# 4-5#<><9?!;# 4-5#7A=98!;# 4-5#>=79<!;# B5#=669<!;#

Line intensity vs. MW-hours R-line Intensity vs. MW Hours on Target Suspected Oxygen Line Intensities vs. MW Hours on Target 32 Managed by UT-Battelle

Expect Emissions from F-centers Where are they? 2+ 2+ F 2 : 466nm F 2 : 550nm PL spectra of a sapphire crystal before and after neutron irradiation: î! 10^ 19cm 2 = (1) 0, (2) 0.0005 (3) 0.005 (4) 0.01 (5) 0.05 (6) 0.1 (7) 0.5 (8) 1 (9) 5 Abdukadyrova, 2007 F+ 2 : 380nm F+ 2 : 756nm F: 420nm F + : 504 and 517nm

Images vs. Wavelength

Luminescence Lifetime at 560 nm Filter centered at 560 nm" Typical image, 200 ns shutter 1000 100 10 Photon yield vs. time Vertical log scale 1 0.1 1 microsecond 804 35 Managed by UT-Battelle 805 806 807 808

Luminescence Lifetime at 692 nm Filter centered at 692 nm (at R-lines) " typical images, 800 ns shutter, at beam arrival time (left), and 6 microseconds later (right) 2000 1000 500 200 100 50 20 Photon yield vs. time Vertical log scale 4566'-2%786"92%:)' C*"%.D%!.#,;%',!'#(E"2(# 0,/-&;-(#1E%1#.-F-!.#"!#D-%;# *-F-&&"!#*%1-# 10 1 millisecond 1000 1500 2000 2500 3000 36 Managed by UT-Battelle

Reflections, Focus Issues Vertical slices of pencil beam 37 Managed by UT-Battelle

Effect of Beam Position on Neutron Production pencil beam 38 Managed by UT-Battelle Iverson

Audio from full Beam Pulse at 1 Hz Audio File 39 Managed by UT-Battelle

Amplitude of Audio Signal vs. Vertical Beam Position Channel A Channel C 5 mm Channels A and C are from upper moderator. Channel B is from lower moderator. Channel B 40 Managed by UT-Battelle

Upgrades, Applications, Related R&D Planned 41 Managed by UT-Battelle Improvements already deployed for February re-start Accelerator physics studies to further assess TIS accuracy Proposal for injection dump imaging system Development of neutron imaging devices Deferred due to budget constraints: Low noise camera and 60 Hz acquisition Instrumenting of Window 4 with multiple optical paths Alternate luminescent coatings Irradiation testing of coating samples Beam tests at SNS, LANL and/or other facility Optical modeling and bench measurements Online measurement of core vessel emission spectrum Development of proton beam window imaging concept Audio integration

Summary SNS partnership achieved successful commissioning runs and now, successful operations Target imaging system successfully deployed, but absolute density measurements need work Plenty of interesting science and additional applications to pursue 42 Managed by UT-Battelle